COLLEGE OF ARCHITECTURE
PROFESSIONAL PRACTICE 4
PROJECT: STUDIO TYPE CONDOMINIUM UNIT
SUBMITTED BY:
SUBMITTED TO:
ARCH: RODELLO DEL ROSARIO
SUBMITTED ON:
MARCH 5 2014
PROJECT
LOCATION
SUBJECT
DATE
DESCRIPTION
ITEM NO.
DESCRIPTION
QUANTITY
UNIT
UNIT COST
MATERIAL
TOTAL
COST
AMOUNT
PICTURE
(MATERIALS)
LABOR
(30%)
I.EARTHWORKS
n/a
n/a
n/a
I.EARTHWORKS
n/a
n/a
n/a
n/a
N/A
n/a
n/a
n/a
n/a
n/a
II. REINFORCEMENT
n/a
n/a
n/a
N/A
n/a
588.00
2,400.00
588.00
2,400.00
1207.50
1207.50
1032.00
1032.00
135.00
135.00
5,362.50
5,400.00
5,400.00
120.00
120.00
18.75
4,000.00
120.00
120.00
18.75
4,000.00
II.REINFORCEMENT
III.MASONRY/
CONCRETE WORKS
Cement
Sand
3
6
Bags
m
105
Pcs
196.00
400.00
Tiles
11.50
1610.00
43
Pcs
24.00
Tile Grout
3
bags
45.00
III.MASONRY/CONCRETE WORKS SUB-TOTAL
IV.CARPENTRY
7 x 1220 x 2440mm
Wood Laminates
pcs
600.00
2
2
0.5
2
Kg
Kg
Kg
pcs
60.00
60.00
37.50
2,000.00
2900.00
IV.CARPENTRY SUB-TOTAL
9,658.75
V. PLUMBING /
SANITARY WORKS
SEWER AND VENT
SYSTEMS
n/a
n/a
n/a
14,800.00
n/a
n/a
WATER DISTRIBUTION
SYSTEM
75mm x 10ft
50mm x 10ft
75mm x 50mm Wye
75mm x 50mm Tee
FIXTURES AND MISC.
MATERIALS
HCG 720 x 440 x 730
CS4384 Water Closet
2
2
6
4
Pcs
Pcs
Pcs
Pcs
320.00
270.00
75.00
75.00
640.00
540.00
450.00
300.00
640.00
540.00
450.00
300.00
unit
11,350.00
11,350.0
0
11,350.00
Unit
4,420.00
4,420.00
4,420.00
Everglades LF8722PX
Lavatory Faucet
Pc
5,530.00
5,530.00
5,530.00
3,800.00
4
2
Pcs
Pcs
138.00
93.17
552.00
186.34
552.00
186.34
0.732
Sqm
10,000.00
7,320.00
7,320.00
1
1
1
Pc
Pc
Slab
500.00
250.00
7,500.00
500.00
250.00
7,500.00
500.00
250.00
7,500.00
70.00
5,000.00
2,600.00
250.00
70.00
5,000.00
2,600.00
250.00
49,328.34
4.0) Granite
Kitchen Sink
Kitchen Sink Faucet
Wood Counter w/
Granite Top
Floor Drain
Tub
Shower Head
Faucet
2
Pcs
35.00
1
Pc
5,000.00
1
Pc
2,600.00
1
Pc
250.00
V. PLUMBING / SANITARY WORKS SUB-TOTAL
VI.ELECTRICAL
WORKS (Excluding
Lighting Fixtures)
CU S24KKQ 2 1hp ACU
Unit
25,000.00
9440.00
25,000.0
0
2,000.00
25,000.00
2,000.00
31,454.00
6,000.00
1,870.00
1,300.00
500.00
350.00
104.00
150.00
180.00
VII.STEEL WORKS
24
Sqm
250.00
1800.00
6,000.00
6,000.00
VIII.PAINTING
WORKS
Wallpaper
Healthy Home SemiGloss Latex (off-white)
3
3
Rolls
Gals
615.00
730.40
Flat Latex
Tins
1,350.00
2240.00
1,845.00
2,191.20
1,845.00
2,191.20
2,700.00
2,700.00
Gals
730.40
730.40
ITEM NO.
DESCRIPTION
QUANTITY
UNIT
22.52 SQM
7,466.60
UNIT COST
MATERIAL
730.40
TOTAL
COST
AMOUNT
LABOR
IX. CIVIL/
ARCHITECTURAL
WORKS
BASEBOARD - Supply and
installation of wood
baseboard 1 x 4 and
cornice x 2 complete
with necessary
accessories and
consumables.
Length
Baseboard
a. 1 x 4 x 12 tanguile
wood 5pcs
b. Misc
210.00
20
Bdft
120.0
120.00
2,400.00
15
lm
20.0
20.00
299.70
2
699.70
FLOORING WORKS
HOMOGENOUS TILES
(TOILET) Supply and
installation of 300mm x
300mm homogenous
tiles, as per approved
sample, complete with
all the necessary
accessories and
consumables. Offer: Euro
tiles/Kris Series (white)
Floor area
Concrete topping
Cement
Sand
Floor tiles
300x300
homogenous tiles
Techno stone /
Glow Series
Adhesive
Grout
HOMOGENOUS TILES
9855.00
3.68
Sq.m.
709.78
2.39
7.36
Bags
Sacks
196.00
40.00
468.44
294.40
468.44
294.40
41
Pcs
24.19
991.79
991.79
1.23
0.74
Bags
kgs
470.00
45.00
705.00
33.13
705.00
33.13
(BEDROOM) Supply
and installation of
600mm x 600mm
homogenous tiles, as per
approved sample,
complete with all
necessary accessories
and consumables.
Floor area
Concrete topping
Cement
Sand
Floor tiles
600x600
homogenous tiles
Techno stone /
Glow Series
Adhesive
19.38
Sq.m.
1,423.48
12.59
38.75
Bags
Sacks
230.00
40.00
2,895.70
1,550.00
2,895.70
1,550.00
54
Pcs
428.40
23,133.6
0
23,133.60
6.46
Bags
428.40
2, 767.46
2, 767.46
32, 839.52
9.80
sqm
9.80
6.00
Lm
m2
981.18
2.08
pcs
300.00
624.00
624.00
4.00
pcs
159.00
636.00
636.00
9.00
pcs
165.00
1,485.00
1,485.00
36.00
3.27
24.50
104.17
12.00
pcs
pcs
pcs
pcs
pcs
6.72
88.00
15.00
0.50
69.44
241.92
287.76
367.50
52.09
833.28
241.92
287.76
367.50
52.09
833.28
12.00
12.00
12.00
pcs
pcs
Pair
24.64
12.32
3.36
295.68
147.84
40.32
295.68
147.84
40.32
0.10
1.20
1.00
6.00
6.00
Roll
Bag
Lm
m2
m2
200.00
550.00
75.00
20.00
20.00
660.00
75.00
120.00
20.00
660.00
75.00
120.00
CEILING WORKS
GYPSUM BOARD (ALL
CLOSED ROOMS)
Supply and installation of
1/2 thick Gypsum Board
Brand including metal
furring, painted finish,
complete with
accessories and
consumables. Note: As
per approved design.
Cove ceiling type at
Lobby Area.
Perimeter
Consider Area (2.40m
x 2.40m)
12mm thk gypsum
board
Carrying channel,
ga#20, 1mm
Metal furring,
ga#24, 0.6mm
w-clip
Wall angle
Hilti nails
Screw
Threaded hanger
rod
j-clip
Steel angle
Hex nuts and
washer
Gypsum tape
Ub 888
Sand paper
Misc
labor
1770.00
5886.39
PAINTING WORKS
14,860.00
32.57
Sq.m.
730.00
23,776.1
0
23,776.10
Painting of walls
(fresh air)
8.20
Sq.m.
730.00
5,986.00
5,986.00
Painting of ceiling
(Gypsum Board)
24.00
Sq.m.
730.00
17,520.0
0
17,520.00
Baseboard and
Mouldings, Ducco
Finish
14.99
lm
150.00
2,248.50
2,248.50
49,530.60
WALLPAPER WORKS
DOOR WORKS
2280.00
10.91
m2
10.91
m2
10.91
m2
616.00
6,720.56
10.91
m2
80.00
872.80
6,720.56
872.80
7,593.36
7085.00
1.00
Set
4,000.00
4,000.00
4,000.00
panel by Acts
Woordworks
Wood jamb. From
2 x 6
Stiffener to jamb
Paints to jamb
Paints to door
panel
Hardwares:
Hinges; BB1279
ball bearing hinge
standard weight,
Hager, 4 x 4
US26D
Door closer, LCN
series 1260, Hold
open
Door lock, US
Schlage A53PD x
orbit x 626
Door stopper,
Hager
Hardwares:
Hinges; BB1279
ball bearing hinge
standard weight,
Hager, 4 x 4
US26D
Door closer, LCN
series 1260, Hold
open
Door lock, US
Schlage A53PD x
orbit x 626
Door stopper,
Hager
Miscellaneous
20.00
Bd.ft
120.00
2,400.00
2,400.00
1.00
5.70
4.66
Pc
Lm
2
m
500.00
120.00
250.00
500.00
684.00
1,163.75
500.00
684.00
1,163.75
4.00
Pcs
465.00
1,860.00
1,860.00
1.00
Set
7,600.00
7,600.00
7,600.00
1.00
Set
5,202.00
5,202.00
5,202.00
1.00
set
205.00
205.00
205.00
23,614.75
6470.00
1.00
Set
1,870.00
1,870.00
1,870.00
20.00
Bd.ft
120.00
2,400.00
2,400.00
1.00
5.60
4.17
Pc
Lm
2
m
500.00
120.00
250.00
500.00
672.00
1,041.25
500.00
672.00
1,041.25
4.00
Pcs
465.00
1,860.00
1,860.00
1.00
Set
7,600.00
7,600.00
7,600.00
1.00
Set
5,202.00
5,202.00
5,202.00
1.00
1.00
Set
Set
205.00
200.00
205.00
200.00
205.00
200.00
21,550.25
FABRICATION
WORKS
1.00
Set
1,200.00
360.00
1,200.00
5355.00
21,550.2
5
1,200.00
46,365.00
21,550.25
1.00
3.00
Set
Pcs
8,578.00
2,500.00
8,578.00
7,500.00
8,578.00
7,500.00
14.40
50.00
720.00
720.00
3.00
6.00
Pcs
pcs
250.00
50.00
750.00
300.00
750.00
300.00
17,848.50
2.0) COUNTERTOP
(SYNTHETIC
GRANITE)
Marine plywood
1.20 x 2.40 x
granite
4140.00
2.00
Pc
1,900.00
3,800.00
3,800.00
1.00
Pc
10,000.00
10,000.0
0
10,000.00
4830.00
13,800.00
172,709.76
Pc
250.00
250.00
250.00
1
1.00
Pc
Set
500.00
7,700.00
500.00
7,700.00
500.00
7,700.00
1.00
Set
35.00
1.00
Set
5,000.00
1.00
Set
2,600.00
X. PLUMBING WORKS SUB-TOTAL
35.00
5,000.00
2,600.00
35.00
5,000.00
2,600.00
16,085.00
XI. ELECTRICAL
SYSTEM WORKS
SUPPLY & FIX the
APPROVED materials,
equipment, tools, and
components in
accordance with the
manufacturers and
instructions.
1.0) LIGHTING
FIXTURES, LAMPS
AND
CONSUMABLES
a. Fluorescent
Lighting
Fixture
FUMACO
Brand
1200mm x
210mm x
115mm, OPEN
Type T8 (1 x 36
watts) with
mirror
reflector. T8
bulb with
electronic
ballast,
Tridonic ATCO
Brand, 1-36
watts, 230
volts, 6Hz,
84TLD Type
(DAYLIGHT),
Philips Brand
including
necessary
accessories
and ready to
install. For SPG
approval
before
installation.
b. Pinlight
Fixtures,
recessed
mounted &
inches
diameter,
diamond
design
reflector, E-27
base
4734.00
1.00
set
1,200.00
1,200.00
1,200.00
6.00
set
650.00
3,900.00
3,900.00
3.00
set
182.40
547.20
547.20
1.00
set
132.80
132.80
132.80
15,780.00
2,000.00
1.0) AIRCONDITIO
1.00
set
15,000.00
4500.00
NING UNIT
XIII. MECHANICAL WORKS SUB-TOTAL
15,000.0
0
2,000.00
2,000.00
XIII. MECHANICAL
WORKS
PROJECT COST
LABOR COST
TOTAL (30%)
CONTINGENCY
(10%)
GRAND TOTAL
COST PER SQUARE
METER (24 SQM)
15,000.00
15,000.00
330,844.95
99,839.00
33,085.00
463,767.95
19,323.67