Sie sind auf Seite 1von 30

Commercial Heat Pump Installation

Commercial Products Training Series

Commercial Heat Pump


Manifold Kit (Optional)

1. Components

Manifold tube

Threaded reducer

Branch Assembly (Gate or Ball Valve Only)

End cap

Commercial Heat Pump


Components

1. Components

Heat pump

Storage tanks

Commercial Heat Pump


Heat pump requires 900mm service clearance at each end.

2. Clearances

Commercial Heat Pump


Mark out position of all pipes on wall. Mark out position of storage tanks on floor.

3. Mark out position of pipes and tanks

Manifold tube Manifold tube

Elbows Copper pipe Manifold tube Manifold tube

Coldwater inlet train


Manifold tube Manifold tube T Piece

Commercial Heat Pump


Solder all joints as required.
End cap

4. Connect pipes

Manifold tubes

Hot Water Supply Out

Secure all pipes to wall with pipe clamps as required.


Copper pipe

End cap

Elbows

Coldwater inlet train

T Piece

End cap

Commercial Heat Pump


Cold water inlet train.

5. Connect cold water inlet train

Pressure Limiting Valve (If Required)

Expansion Control Valve (if required)

Isolation Valve

Copper Inlet Pipe

No Return Valve

Drain line must terminate at least 1 metre away from tank. (AS/NZS 3500.4)

Commercial Heat Pump


Place storage tanks in position.

6. Position storage tanks

Commercial Heat Pump


Connect reducer fittings. Repeat for all inlets/outlets on each storage tank.

7. Connect reducer fittings

Commercial Heat Pump

8. Fit branch assemblies

Check position of tanks inlets/outlets must be parallel to wall. Fit the branch assembly to manifold and storage tank. Solder connections as required.

NB: Gate valve or ball valve ONLY to be used in branches DO NOT install non-return valves or loose jumper valves

Isolation Valve
Compression nut, Flared pipe end or similar

Solder connection here

Commercial Heat Pump


Repeat fitting of branch assemblies to all required inlets/outlets.

8. Fit branch assemblies

Commercial Heat Pump


Connect TPR valves to each tank.

9. Connect TPR valves

Commercial Heat Pump


Fit drain lines to each TPR valve. TPR Valves can drain into a common tundish. Terminate drain lines at least 1 metre away from tanks.

9. Connect TPR valves

Tundish

Drain line must terminate at least 1 metre away from tank. (AS/NZS 3500.4)

Commercial Heat Pump


Position Heat Pump.

10. Position Heat Pump

Note alignment of inlet and outlet pipes

Commercial Heat Pump

11. Connect cold water inlet pipe

Connect primary flow to heat pump. Note: non return valve is not required after primary pump.

Isolation Valve

Primary Pump

Connect to Heat Pump inlet

Commercial Heat Pump


Connect the primary hot water return line.

12. Connect hot water return line

Connect to outlet

Isolation Valve

Commercial Heat Pump


Connect the drain line to the pressure relief valve.

12. Connect hot water return line

Drain line must terminate at least 1 metre away from Heat Pump and Tank(s). (AS/NZS 3500.4)

Commercial Heat Pump


Remove the front cover panel.

13. Connect main power

Commercial Heat Pump


Insert 3 Phase power cable.

13. Connect main power

Conduit Gland

Commercial Heat Pump


Connect the 3 Phase power cable. Secure wires with screws provided in the Terminal Block. Observe correct phase rotation. Tighten firmly.

13. Connect main power

Commercial Heat Pump


Secure the conduit to heat pump using brackets. Tighten screws firmly.

13. Connect main power

Do not obstruct cover panel opening.

Commercial Heat Pump


Connect primary circulation pump wiring to heat pump.

14. Connect wiring to primary pump

Commercial Heat Pump

14. Connect wiring to primary pump

Connect primary pump wiring to heat pump.

Commercial Heat Pump


Secure the conduit to heat pump using brackets or cable ties. Run conduit to primary pump.

14. Connect wiring to primary pump

Run conduit to primary pump

Commercial Heat Pump


Remove pump cover screw.

14. Connect wiring to primary pump

Remove pump cover.

Commercial Heat Pump

14. Connect wiring to primary pump

Connect wiring to primary pump using push-fit connectors on the terminal block.

Push retaining lug down and insert wire

Commercial Heat Pump


Replace pump cover and screw. If outdoors affix a suitable weather cover over the primary pump.

14. Connect wiring to primary pump

Commercial Heat Pump

15. Fit tank sensor

Remove the protective cap from one of the tanks. Remove the threaded plug. Insert the sensor well into the tank and tighten firmly.

Commercial Heat Pump


Replace Heat Pump cover panel.

16. Replace heat pump cover panel

Secure conduit. Do not obstruct control panel opening.

Commercial Heat Pump

17. Commissioning

Refer to instructions for commissioning the unit.