Reference list Advant Energy Management Systems IT Industrial for Power Management Systems

Page 1 2012

Below the reference list of Energy / Power Management Systems is shown. MasterView (MV) / Advant Station (AS) and MasterPiece (MP) / Advant Controller (AC400) are the names of the previous products for respectively IT the Human Machine Interface (HMI) now called Operate and for the Process Control Computer, now called Advant Controller (AC800M). The reference list is focussed on Energy / Power Management applications. ABB has several thousands of references for Substation Control / Automation Systems. No: COUNTRY: Customer: Project: 1. GREECE HAR Athens Refinery 2. 3. NETHERLANDS PGEM NETHERLANDS Shell Pernis Primary Equipment: 6x 150 kV 30x 6 kV 3x GEN Power Management Functions: Hardware: Year of delivery: 1986

150 kV 10x 66kV 48x 25kV 10kV 6kV 3kV 6x GEN 150 kV 50 kV 10 kV 150 kV

Monitoring and Control, Power Control, Volatge Regulation, Event Recording, Alarm Handling and Recording reports, Load Shedding (60 priorities, 1200 loads), Power Sharing. Peak Shaving, Event Recording, Alarm Handling and Recording, reports. Control, Monitoring, Power Factor Control, Voltage Control, tie-line Control, Event Recording, Alarm Handling, reports, protection, transient Recording & evaluation, SPA-bus Communication Peak Shaving by means of Voltage and boiler (132MW) Control, Event Recording, Alarm Handling and Recording, reports. Peak Shaving, Event Recording, Alarm Handling and Recording, reports. Monitoring and Control, Power Control, Power factor Control, transformer Control, Generator Control, metering, Event Recording, Alarm Handling and Recording, reports, Power Sharing, Fast and Back-up Load Shedding. Control, Monitoring, interlocking, Timetagged-Events, Alarming, SPA-bus Communication to Control and protection relays, reports Extension of Sriracha refinery for the CCR-2 process.

7x MP 240 15x MP 100 1x MV 850 1x MV 310 3000 I/O 1x MP 240 350 I/O 1x MP240/1 6x MP 40 MicroSCADA SPACOM units

1986 1987 (upgrade 1995)

4.

NETHERLANDS REMU Province Utrecht NETHERLANDS Hoogovens Ijmuiden THAILAND Thai Oil Sriracha refinery

3x MP 260 20x MP 100 1x MV 850 1x MP 240 300 I/O 8x MP 240/1 4x AS 520-OS 1x AS 515-ES 1x AS 515-IMS > 10.000 I/O

1987

5.

1988

6.

7.

BRUNEI Shell BLNG

115 kV 33 kV 11 kV 3.3 kV 0.4 kV 15x GEN 10kV 6kV 3kV 33 kV 11 kV 3.3 kV 0.4 kV

1990 (upgrade MMI 1995)

8.

THAILAND Thai Oil CCR-2

MicroSCADA 1992 8x SRIO 1000M 220xSPAC 310C 20x SPAD 330C 2x MP 240/1 1992 1x MV 830/1 1200 I/O 1x MP 240/1 1x AC450 2x MV 830/1 1200 I/O MP 240/1 MV 850/1 1993

9.

ARUBA WEB

Monitoring and Control, Event and Alarm Handling and Recording, reports, Synchrocheck. 3x GEN Monitoring and Control, Power Control, Power factor Control, Voltage Regulation, Generator Control, metering, Event Recording, Alarm Handling and Recording, reports, Power Sharing, Load Shedding, peak shaving. Extension of Sriracha refinery for 2 new substations for PEA connection.

10.

ENGLAND La Roche CHP

1994

11.

THAILAND Thai Oil SS100/200

115 kV 11 kV

2x MP 240/1 600 I/O

1994

Reference list Advant Energy Management Systems IT Industrial for Power Management Systems

Page 2 2012

No: COUNTRY: Customer: Project: 12. THAILAND RRC Rayong Refinery THAILAND Thai Oil HCU-2 14. BRAZIL Petrobras REPAR Refinery

Primary Equipment: 20x 33 kV 5x GEN 33 kV 11 kV 3.3 kV 0.4 kV

Power Management Functions:

Hardware:

Year of delivery: 1995

Monitoring and Control, Active and Reactive 1x MP 260/1 Power Control, Active- and Reactive Power 1x AS 515-OS Sharing, Volatge Control. 600 I/O Extension of Sriracha for the Hydro Cracker 2x AC 450 Unit 2 process. 1000 I/O

13.

1995

15.

THAILAND Thai Oil CO-GEN

2x

16.

THAILAND Thai Lube Base Lube Base Oil

1x

33 kV 11 kV 0.4 kV GEN 33 kV 11 kV 0.4 kV GEN

Monitoring and Control, Active and Reactive Power Control, Generator/transformer Control, Power Sharing, Fast Load Shedding, re-acceleration, Event & Alarm Handling, G2 expert system for operator guidance. Extension of Sriracha for the Co-Generation process including two gasturbines with Communication to MARK-V Controllers. Monitoring and Control, Power Control, Power factor Control, transformer Control, Generator Control, metering, Event Recording, Alarm Handling and Recording, reports, Power Sharing, Fast and Back-up Load Shedding. Monitoring and Control, Fast Load Shedding, Power demand Control, Event & Alarm Handling. Monitoring and Control, Active and Reactive Power Control, Generator/transformer Control, Power Sharing, Fast Load Shedding, thermal Load Shedding, reacceleration, Event & Alarm Handling. Monitoring and Control, Active- and Reactive-Power Control, Generator/transformer Control, Power Sharing, Fast Load Shedding, thermal Load Shedding, re-acceleration, Event & Alarm Handling. Monitoring, Active-Power Control, frequency Control, Generator Control, Power Sharing, spinning reserve evaluation, Fast Load Shedding, Event & Alarm Handling Extension of Sriracha for Small Power Plant and Hydro De Sulphurization process including two gasturbines with Communication to MARK-V Controllers. Load Management System including Fastand Back-up Load Shedding.

12x MP 240/1 2x AS 520-OS 1x AS 515-IMS

1995

2x AC 450 1000 I/O

1996

3x MP 240/1 1x AS 520-OS 2000 I/O

1996

17.

INDIA Reliance Hazira Refinery BRAZIL Petrobras RLAM Refinery

2x AS 515-OS 20x MP 200/1 4x AC 450 11x AC 410 2x AS 520-OS

1996

18.

1996

19.

BRAZIL Petrobras REDUC Refinery

24x AC 400 2x AS 520-OS

1997

20.

SYRIA AFPC OMAR Refinery

21.

THAILAND Thai Oil SPP, HDS

2x

33 kV 11 kV 0.4 kV GEN

7x AC 450 2x AS 520 3x AS 515 4500 I/O 4x AC 450 1600 I/O

1997

1997

22.

OMAN Shell LNG

1x AC 410 1x AS 520-OS 500 I/O

1998

Reference list Advant Energy Management Systems IT Industrial for Power Management Systems

Page 3 2012

No: COUNTRY: Customer: Project: 23. INDIA Reliance Jamnagar Refinery

Primary Equipment: 220 kV 33 kV 6.6 kV 0.4 kV 12x GEN

Power Management Functions:

Hardware:

Year of delivery: 1998

24.

INDIA Larsen & Toubro CPP AT HPL Haldia Refinery 5x

132 kV 33 kV 6.6 kV 0.4 kV GEN

25.

EGYPT

26.

27.

10x 220 kV 48x 33 kV ANSDK 52x 6.6 kV Steel factory 3x GEN NORWAY 36 kV 13.8 kV Statoil Gullfaks A and C 6 kV 7 x GEN NORWAY BP Amoco Valhall Water Injection MALAYSIA

Monitoring and Control, Fast & Back-up Load Shedding, restoration, Active- & Reactive Power Control, Generator/transformer Control, Power Sharing, auto-Synchronisation, IEC 870-5103 Communication & SPABUS with protection relays, MODBUS Communication with intelligent meters, DCS & 415 V PCC, Event & Alarm Handling, Time Synchronisation. Monitoring and Control, Active- & Reactive Power Control, Generator/Transformer Control, Power Sharing, autoSynchronisation, IEC 870-5-103 Communication & SPABUS with protection relays, MODBUS Communication with intelligent meters, DCS & 415 V PCC, Event & Alarm Handling. Monitoring and Control, interlocking, Event & Alarm Handling.

4x AS 520-OS 1x AS520-IMS 29x AC 450 5x AC410 5000 I/O

2x AS 520-OS 2x AC 450 5000 I/O

1999

1x AS 520-OS 1x AC 450 1750 I/O 4x AS520-OS 2x AC450 7x AC410 1x AS520-OS 1x AC450

1999

Load Shedding, Power Control, Generator Control, Circuitbreaker Control.

2001

Load Shedding, Power Control, Generator Control, Circuitbreaker Control.

2002

28.

Substations: MLNG-Satu, Dua 3x 33 kV 2x 11 kV & Tiga 20x 6 kV LNG Complex 15x GEN

Monitoring and Control, Fast Load Shedding, Active- & Reactive Power Control, Generator/transformer Control, Power Sharing, auto & manualSynchronisation, Event & Alarm Handling, Time Synchronisation.

29.

30.

Substations: Qatar Petroleum 3.3 kV 4x GTGs 2 Offshore Oil 50hz platforms comprising MALAYSIA Substations: Asean Bintulu 2x 33 kV Fertilizer 2x STGs 50hz

QATAR

Monitoring and Control, Fast Load Shedding, Active- & Reactive Power Control, Generator, Power Sharing, Event & Alarm Handling, Time Synchronisation, Monitoring and Control, Fast Load Shedding, Active- & Reactive Power Control, Generator, Power Sharing, Event & Alarm Handling, Time Synchronisation, auto and manual Synchronisation.

3x AS 520-OS 2003 1x AS 520-IMS 11x AC 450 30x S800 I/O SPABUS to: - 300 REF 542+ MODBUS to: - MARK-V - Diesel Gen. - INSUM II MCCs, - Siemens 60 Hz 8000 I/O 2x HMI 2004 5x AC800M Red

2x HMI 2004 1x AC800M Red MODBUS to: - DCS - 25x REF542+ - INSUM II MCCs 400 I/O

Reference list Advant Energy Management Systems IT Industrial for Power Management Systems

Page 4 2012

No: COUNTRY: Primary Customer: Equipment: Project: 31. NORWAY Conocco Philips Ekofisk Oil & Gas Field 32. NORWAY Statoil Hammersfest LNG Complex 132 kV GIS 11 kV 6.6 kV 690 V 440 V 5x GTG 50 MW, 15kV, 50 Hz.

Power Management Functions:

Hardware:

Year of delivery: 2004

33.

RUSSIA Shell Sakhalin II LNG Complex

Substations: 1x 33 kV 8x 6.6 kV 5x GTG

Monitoring, Active and Reactive Power Control with grid and island operation, frequency Control, Generator Control, transformer Control, Power Sharing, spinning reserve evaluation, heavy consumers, Fast Load Shedding, Event & Alarm Handling, Communication red MODBUS with protection relays REF542+, MODBUS Communication with turbine Generator packages Monitoring and Control, Fast Load Shedding, Active- & Reactive Power Control, Generator, Power Sharing, Event & Alarm Handling, Time Synchronisation, Communication with: protection relays, MARK-V, INSUM II MCCs, Siemens 60 Hz systems. Monitoring and Control, Fast Load Shedding, Active- & Reactive Power Control, Generator, Power Sharing, Event & Alarm Handling, Time Synchronisation.

12x HMI Clients 2005 25x AC800M Red 15x AC800M Sing Communication: Hammersfe LNG.pdf - Profibus DP - MODBUS - LON OPC

2x HMI 2005 10x AC800M Red MODBUS to: - REF542+ Sakhalin.p - MARK-V - INSUM II MCCs 3000 I/O 2x HMI 2006 4x AC800M Red. LONBUS to: - 400x REF542+ MODBUS to: - DCS - MARK-VI - INSUM II MCCs 2006

34.

QATAR Qatar Petroleum & Exxon Mobil Qatar Gas II LNG Complex

Substations: 1x 66 kV 3x 33 kV 10x 6.6 kV 7x GTG 3x STG

35.

36.

BRAZIL Vittoria FPSO MALYSIA Petronas Melaka Cogeneration

Substations: 1x 132 kV 1x 33 kV 4x 6.6 kV 4x GTG 1x STG

Monitoring and Control, Active- & Reactive Power Control, Generator Control, Power Sharing, Network Synchronisation, Event & Alarm Handling, energy reporting, Time Synchronisation, Communication with: protection relays, MARK-VI, GE MCCs and DCS. Monitoring and Control, Fast Load Shedding, Active- & Reactive Power Control, Generator Control, Power Sharing, Network Synchronisation, Event & Alarm Handling, Time Synchronisation, Communication with: protection relays.

37.

BRUNEI Shell BLNG LNG complex

Substations: 1x 110 kV 1x 33 kV 3x 11 kV 1x GTG 4x STG

1x HMI 2007 1x AC800M Red. OPC to DCS SherlockDist.Rec. MODBUS to: - 35x REF542+ - 4x MARK-VI - GE MCCs 1x HMI 2007 3x AC800M Red. LONBUS to: - 30x REF542+

Reference list Advant Energy Management Systems IT Industrial for Power Management Systems

Page 5 2012

No: COUNTRY: Customer: Project: 38. QATAR Qatar Petroleum & Conoco Philips & Shell Qatar Gas III & IV LNG Complex

Primary Equipment: Substations: 1x 66 kV 3x 33 kV 10x 6.6 kV 8x GTG 3x STG

Power Management Functions:

Hardware:

Year of delivery:

Monitoring and Control, Fast Load Shedding, Active- & Reactive Power Control, Generator, Power Sharing, Event & Alarm Handling, Time Synchronisation.

39.

40.

CHINA China Southern Power Grid Huizhou Power Plant NETHERLANDS Substations: Shell 1x 66 kV Shell Pernis 3x 25 kV 10x 6,6 kV 9x GEN

2x HMI 2007 4x AC800M Red. LONBUS to: 400x REF542+ MODBUS to: - DCS - MARK-VI - INSUM II MCCs 2007

Monitoring and Control, Fast Load Shedding, Active- & Reactive Power Control, Generator Control, Power Sharing, Network Synchronisation, Event & Alarm Handling, Time Synchronisation, Communication with: protection relays. Monitoring and Control, Event & Alarm Handling, Time Synchronisation, Communication with: protection relays, disturbance Recording.

41.

NIGERIA Shell NLNG Bonny Six

Substations: 1x 132 kV 3x 33 kV 8x GTG

42.

43.

44.

UK Montrose Platform QATAR Maersk Oil Block 16 Field Development Proj. (2 offshore platforms (BG & BE) Qatar Petroleum Halul Island

4(5)x GTG

Substations: 1x 11 kV 2x 3 kV 4(5)x GTG

Fast Load Shedding, OverLoad Shedding, Spinning reserve calculation and Event logging PMS Load Sharing and Load Shedding, Synchronisation, Event & Alarm Handling, Time Synchronisation from SCADA, Communication (MODBUS) with SCADA system

4x HMI 4x AC800M Red. 9x Rem. S800I/O LONBUS to: - 55x REF542+ SPABUS to: - 100x SPACOM 1x HMI 4x AC800M Red. MODBUS to: - 1x Brush LONBUS to: - 20x REF542+ 1x HMI 1x AC800M Red. 1x HMI 2x AC800M Red MODBUS to: - 2x SCADA

2008

2008

2008

2009

Substations: 1x 33 kV 1x 22 kV 17x LV 15x RMU 11x GTG

Presently In design stage PMS Generator Control, Load Sharing and Load Shedding. Synchronisation. Event and Alarm Handling Time Synchronisation from PMS

5x 800xA 2009 12x AC800M Red

45.

MALAYSIA SHELL Gumusut offshore

Substations: 1x11kV 15x LV 3x GTG

Presently In design stage Control and Monitoring if circuit breakers IEC61850 Interface with MV IEDs Remote parameters setting and disturbance recorders files download. Load Shedding. Event and Alarm Handling Time Synchronisation from PMS

5x 800xA 2009 12x AC800M Red IEC61850 com to - 20x IED

Reference list Advant Energy Management Systems IT Industrial for Power Management Systems

Page 6 2012

No: COUNTRY: Customer: Project: 46. Pluto LNG

Primary Equipment: Substations: 1x 33 kV 8x 6,6 kV 3x MV VSD 3x GTG

Power Management Functions:

Hardware:

Year of delivery:

47.

QATAR Shell Pearl GTL

48.

SPAIN Repsol C10 Cartagena Refinery

49.

NORWAY Peregrino FPSO

50.

NORWAY Bergersen FPSO

51.

THAILAND PTT Map Ta Phut C&S-GSP#3

Substations: 1x 132 kV 4x 33 kV 4x 11 kV 17x 6,6 kV 4x STG 8x GTG Cogen 6x MV VSD Substations: 1x 132 kV 3x 33 kV 10x 11kV 2x STG 2x GTG Cogen Substations: 2x 13.8 kV 2x 4 kV 12x LV 3x STG Substations: 2x 13,8 kV 2x 4 kV 12x LV 3x STG 11 kV 0,4 kV

Presently In design stage PMS Generator Control, Load Sharing and Load Shedding. Synchronisation. Event and Alarm Handling Time Synchronisation from PMS Power Quality Monitoring NOX avoidance PMS Generator Control, Load Sharing and Load Shedding. Synchronisation. Event and Alarm Handling Time Synchronisation from PMS Power Quality Monitoring Complete electrical package

2x 800xA 2009 12x AC800M Red

3x 800xA 2009 25x AC800M Red IEC61850 com to >500x IED

Generator Control, Load Sharing and Load Shedding. Event and Alarm Handling Time Synchronisation

3x 800xA 2009 13x AC800M Red

Part of an integrated DCS + Safety + PMS Systems inc complete electrical package.

5x 800xA 6x AC800M Red

2009

Part of an integrated DCS + Safety + PMS Systems inc complete electrical package.

4x 800xA 6x AC800M Red

2009

Monitoring and Control, Automatic Transfer Switching, Communication with protection devices

1x 800xA 1x AC800M Red

2009

52.

THAILAND 33 kV PTT 11 kV Map Ta Phut 0,4 kV PMS-ESP/GSP#6 THAILAND 33 kV PTT 11 kV Map Ta Phut 0,4 kV C&S-ESP/GSP#6 NORWAY StatoilHydro Gullfaks A & C 36 kV 13,8 kV 6 kV

PMS Generator Control, load Sharing, Load 1x 800xA Shedding, Power restoration, 6x AC800M Red Synchronisation, Event & Alarm Handling

2009

53.

Monitoring and Control, automatic transfer switching, Communication with protection devices. Integrated with PMS project.

8x AC800M Red

2009

54.

Improvement project. Replacement of PC hardware by AC800M

1x AC800M Red

2009

Reference list Advant Energy Management Systems IT Industrial for Power Management Systems

Page 7 2012

No: COUNTRY: Customer: Project: 55. GREECE HELPE ERUP

Primary Equipment: Substations: 2x 20 kV 1x 11 kV 7x 6,6 kV 2 x STG 24x LV MCC's

Power Management Functions:

Hardware:

Year of delivery:

56.

United Arab Emirates GASCO Habshan 5

57.

United Arab Emirates GASCO Ruwais Train 4

58.

Russia ExxonMobil Sakahlin 1 extension

59.

Russia ExxonMobil Arktun Dagi

60.

Argentina ExxonMobil Campana Refinery

61.

Qatar ExxonMobil & RasGas Barzan Gas Process

Monitoring and Control, Fast Load Shedding, Active- & Reactive Power Control, Generator Control, Power Sharing, Network Synchronisation, reacceleration Event & Alarm Handling, Time Synchronisation, Communication with: protection relays. 13 Substations Monitoring and Control, Fast Load comprising Shedding, Active- & Reactive Power switchboards: Control, Generator Control, Power Sharing, 1x132 kV Network Synchronisation,, Event & Alarm 4x 33 kV Handling, Time Synchronisation, IEC61850 11x 11 kV Communication with: protection relays. 9x 3,3 kV 35x LV MCCs 9 x GEN Substations Monitoring and Control, Event & Alarm comprising Handling, Time Synchronisation, IEC61850 switchboards: Communication with: protection relays. 1x132 kV 1x 33 kV 4x 11kV 6x 3,3kV 25x LV MCC Substations: Monitoring and Control, Fast Load 1x 20 kV Shedding, Active- & Reactive Power 5x 6,6 kV Control, Generator Control, Power Sharing, 2x GEN Network Synchronisation, reacceleration Event & Alarm Handling, Time Synchronisation, Communication with: protection relays. Substations: Monitoring and Control, Fast Load 1x 20 kV Shedding, Active- & Reactive Power 5x 6,6 kV Control, Generator Control, Power Sharing, 2x GEN Network Synchronisation, reacceleration Event & Alarm Handling, Time Synchronisation, Communication with: protection relays. Substations: Monitoring and Control, Fast Load 1x 20 kV Shedding, Active- & Reactive Power 5x 6,6 kV Control, Generator Control, Power Sharing, 2x GEN Network Synchronisation, reacceleration Event & Alarm Handling, Time Synchronisation, Communication with: protection relays. Substations: Monitoring and Control, Reactive Power 1x 132 kV Control, Generator Control, Power Sharing, 15x 6,6 kV Event & Alarm Handling, Time 2x GEN Synchronisation, Communication with ABB Relion & Siemens Siprotec protection relays.

4x HMI 2010 16x AC800M Red IEC61850 com to - 500 IED

14x HMI 2011 15x AC800M Red IEC61850 com to - 1800 IED

9x HMI 2011 13x AC800M Red IEC61850 com to - 300x IED

5x HMI 2011 12x AC800M Red IEC61850 com to - 400x IED

5x HMI 2011 12x AC800M Red IEC61850 com to - 400x IED

5x HMI 2011 12x AC800M Red IEC61850 com to - 400x IED

3x HMI 2012 18x AC800M Red IEC61850 com to - 400x IED

Reference list Advant Energy Management Systems IT Industrial for Power Management Systems

Page 8 2012

No: COUNTRY: Customer: Project: 62. Saudi Arabia SADAF Petrochemical

Primary Equipment: Substations: 1x 230 kV 21x 13,8 kV 3x GEN 9x Capacitor banks Substations: 1x 13,8 kV 1x 4,16 kV 5x 480 V 26x 34.5 kV 4x 4,16 kV

Power Management Functions:

Hardware:

Year of delivery:

Monitoring and Control, Reactive Power Control, Generator Control, Event & Alarm Handling, Time Synchronisation, Communication with ABB Relion & Siemens Siprotec protection relays. Monitoring and Control, Event & Alarm Handling, Time Synchronisation, Communication with legacy protection units, Power Quality & Energy Demand Monitoring. Monitoring and Control, Load Shedding (via GOOSE), Event & Alarm Handling, Time Synchronisation, Reverse Protection blocking (via GOOSE), Communication with protection units

3x HMI 2012 18x AC800M Red IEC61850 com to - 400x IED

63.

USA Dow Corning URS Alabama Plant USA Confidential URS Tennessee

64.

1x HMI 2012 2x AC800M Red MODBUS com to - 135x IED / Power Meters 1x HMI 2012 2x AC800M Red IEC61850 com to - 84x IED / Power Meters

Das könnte Ihnen auch gefallen