ANNEX PHOTOS OF DAMAGED TRACTION TRANSFORMER TTR-41

Schematic top view of TTR-41 & photo index of photos A, B, C, D, E, F & G shown below & in the following pages.

Photo A: TTR-41 primary phase 1U HV winding showing one side of the damage. This side of the HV coil has ruptured, cracked & burnt as evidenced by the cracks & black smoke. 1 of 7

Photo B: A close-up of the ruptured, cracked & burnt portion of TTR-41 primary phase 1U HV winding.

Photo C.1: Lower part of TTR-41 primary phase 1U HV winding with signs of burning; the black smoke indicate more or less the locations of the HV windings vertical air ducts (hidden).

2 of 7

Photo C.2: Bottom view of TTR-41 primary phase 1V HV winding; note the windings resin which has slowly melted & dripped out of one of the HV windings vertical air ducts.

Photo D: TTR-41 primary phase 1U HV winding showing another side of the damage. Here, the very hot melted resin has found a way out of the cast winding by creating a hole. Upon getting out of the hole & because of the presence of air, the resin has started to burn & flow down at the same time as evidenced by the charring & black smoke.

3 of 7

Photo E: TTR-41 primary phase 1V HV winding (middle winding) showing signs of overheating & bulging. Fiberglass mesh binder is normally hidden inside the resin cast but in this case it has started to appear because of the bulging hot winding.

Photo F: TTR-41 primary phase 1W winding showing tell-tale signs of internal overheating. Note the encircled blackened part which is already bulging & about to rupture.

4 of 7

Photo G: Visible signs on inner side of doors: 1) Short-circuit blast from the ruptured portion of TTR-41 primary phase 1U winding; & 2) Burning of melted resin.

Recent temperature readings of the TSS traction transformers obtained on Dec. 10, 11 & 17, 2013 from the marshalling boxes (Transformer protection relay TR-7570):

Scada ID TTR-41 TTR-42 TTR-51 TTR-52 TTR-61 TTR-62

Location Wadala TSS Mysore TSS Fertilizer TSS

Winding Temperature in deg C RTD 1 RTD 2 RTD 3 56 64 57 60 66 107 56 61 54 53 64 70 59 65 59 57 61 58

Remarks RTD for primary phases 1U, 1V & 1W resp. Replacement; on standby on Dec17 3:50pm. Was in service on Dec 17 3:50pm. Was on standby on Dec 10 10am. Was in service on Dec 10 10am. Was on standby on Dec 11 2pm. Was in service on Dec 11 2pm.

5 of 7

Transformer Protection Relay TR-7570 which is used in monitoring the temperature of each of the Traction Transformers 3 HV windings. The temperature shown in the digital readout is for illustration purpose only.

6 of 7

NAMEPLATE OF THE DAMAGED TRACTION TRANSFORMER TTR-41