Sie sind auf Seite 1von 312

OIL & GAS DEVELOPMENT COMPANY LTD.

TENDER ENQUIRY NO. PROC-FD/CB/PROJ(NASHPA)-732/2012

TENDER DOCUMENTS FOR ACQUIRING THE SERVICES OF EPCC CONTRACTOR FOR GAS PROCESSING, LPG RECOVERY PLANT & ALLIED FACILITIES AT NASHPA OIL FIELD ( VOLUME I )

Submitted by:

Zishan Engineers (Pvt.) Ltd.


An ISO 9001-2008 certified company
47/F, Block 6, PECHS, Karachi-Pakistan. Tel: (92-21) 34393045-48, & 34310151-54 Fax: (92-21) 34533430 & 34310156 E-mail: contact@zishanengineers.com Web site: www.zishanengineers.com

DECEMBER - 2012
Web site: www.zishanengineers.com

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

TABLE OF CONTENTS
VOLUME I SECTION I: 1.0 165-3-SPG-024 Project Background & Introduction

SECTION II: 2.0 165-3-SPG-025 Invitation to Bid

SECTION III: 3.0 165-3-SPG-026


Annexure I Annexure II Annexure III Annexure IV Annexure V Annexure VI-A Annexure VI-B Annexure VII
Attachment-1

Instruction to Bidders
Format of Responsibility Matrix Bid Bond Contractors Profile Details of Similar Gas Processing, LPG Recovery Plant & Allied Facilities Supplied, Constructed & Commissioned CVs of Nominated Commissioning Personnel Integrity and Ethics Undertaking Integrity and Ethics Undertaking Technical Details for Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities Composition of Commissioning Team and Details of Task Assigned & Responsibilities Bidding Form Format Fixed Lump Sum Price Summary Price Breakdown for NASHPA Gas Processing & LPG Recovery Plant System Costs Price Details for Surveys & Soil Investigation Price Details for Design Engineering Price Details for Works (Construction, Installation / Erection Etc.) Price Details for Start-Up & Commissioning
SHEET 1 OF 18

Annexure VIII Annexure IX

Attachment-1

Attachment-2 Attachment-3 Attachment-4

FILE: Table of Contents

Attachment-5

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Annexure X Annexure XI Annexure - XII Annexure - XIII - A Annexure - XIII - B Annexure - XIV Annexure - XV Annexure - XVI Annexure-XVII Annexure - XVIII

Data Summary Sheet Deviation Form Addresses of Third Party Inspection Agencies Terms & Conditions of L/C for Supply Terms and Conditions of the L/C for Services Mobilization Advance Payment Bank Guarantee Format Performance Guarantee Requirements Format of Performance Bond Schedule Rates for Additional Equipment and Material Items Copy of SRO 678(1)/2007

SECTION IV: 4.0 165-3-SPG-027


Annexure - A

Form & Conditions of Contract

Fixed Lump Sum Price Summary Price Breakdown for NASHPA Gas Processing & LPG Recovery Plant System Costs Price Details for Surveys & Soil Investigation Price Details for Design Engineering Price Details for Works (Construction, Installation / Erection Etc.) Price Details for Start-Up & Commissioning Terms & Conditions of L/C for Supply Terms & Conditions of L/C for Services Bank Guarantee for Advance Payment Format Performance Guarantee Requirements

Attachment-1

Attachment-2 Attachment-3 Attachment-4

Attachment-5

Annexure B 1 Annexure B 2 Annexure C Annexure - D

FILE: Table of Contents

SHEET 2 OF 18

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Attachment I Attachment II Attachment III Attachment IV Attachment V Attachment - VI

Mechanical Acceptance Certificate Provisional Acceptance Certificate Final Acceptance Certificate Certificate of Completion Certificate of Compliance Undertaking

VOLUME II SECTION V: 5.0 165-3-SPG-028 Annexure I Annexure II Annexure III Annexure IV Annexure V Annexure VI OVERALL SCOPE OF WORK AND SERVICES Design Basis Document General Specification for Plant Layout & Spacing Specification for Site Environmental Conditions Preferred Vendor List Document Check List General Plot Plan

VOLUME III 5.1 Supplementary Technical Documents Mechanical Specifications: 1. 2. 3. 4. 5. 165-2-3-SPM-011 165-2-3-SPM-020 165-2-3-SPM-023 165-2-3-SPM-026 165-2-3-SPM-028 Specification for Shell and Tube Heat Exchangers Specification for Internals for Pressure Vessels Piping Specification Specification for Air Cooled Heat Exchangers Specification for Export Packing and Crating
SHEET 3 OF 18

FILE: Table of Contents

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23.

165-2-3-SPM-031 165-2-3-SPM-033 165-2-3-SPM-035 165-2-3-SPM-038 165-2-3-SPM-039 165-2-3-SPM-040 165-2-3-SPM-041 165-2-3-SPM-044 165-3-SPM-009 165-3-SPM-010 165-3-SPM-027 165-3-SPM-029 165-3-SPM-032 165-3-SPM-045 165-3-SPM-046 165-3-SPM-047 165-3-SPM-048 165-3-SPM-049

Specification for Insulation Specification for Skid Mounted Packages Specification for Painting & Surface Preparation Specification for Production Welding Specification for Fabrication / Installation of Equipment & Piping Specification for Equipment With Low Temperature Service and Their Materials of Construction Specification for Unfired Pressure Vessels Specification for Steel, Gate, Plug, Ball and Check Valves Specification for Turbo Expander Recompressor Specification for Brazed Aluminium Heat Exchangers Specification for Centrifugal Pumps Specification for Gaskets Specification for Stud Bolts and Nuts Specification for Carbon and Stainless Steel Pipes Specification for Carbon and Stainless Steel Fittings Specification for Steel Flanges Specification for Fired Heater Specification for Gas Engine Driven Reciprocating Compressor

Civil Specifications: 1. 2. 3. 4. 5. 6. 7. 165-3-SPTS-001 165-3-SPG-005 165-3-SPC-001 165-3-SPC-002 165-3-SPC-003 165-3-SPC-004 165-3-SPC-005 Specification for Topographic Survey Works Specification for Geotechnical Investigation Specification for Dewatering Earth Work and Excavation /

Specification for Plain and Reinforced Concrete Works Specification for Stone Soiling Specification for Damp Proof Course Specification for Cement Plaster
SHEET 4 OF 18

FILE: Table of Contents

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19.

165-3-SPC-006 165-3-SPC-007 165-3-SPC-008 165-3-SPC-009 165-3-SPC-010 165-3-SPC-011 165-3-SPC-012 165-3-SPC-013 165-3-SPC-014 165-3-SPC-015 165-3-SPC-016 165-3-SPC-017

Specification for Floor and Wall Finishes Specification for Carpentry & Joinery, Steel Doors, Windows & Ventilators Specification for Aluminum Doors and Windows and UPVC Windows Specification for Painting for Building Works Specification for Plumbing Works Specification for Grouting Specification for Brick Works Specification for Road and Paving Works Specification for Drainage Specification for Fencing Specification for Structural Steel Works Specification for Block Masonry

HVAC Specifications: 1. 2. 3. 4. 5. 6. 7. 8. 9. 165-3-SPHV-001 165-3-SPHV-002 165-3-SPHV-003 165-3-SPHV-004 165-3-SPHV-005 165-3-SPHV-006 165-3-SPHV-007 165-3-SPHV-008 165-3-SPHV-009 Specification for HVAC Equipments Specification for Duct Thermal and Sound Insulation Specification for Piping and Pipe Insulation Specification for Electric Motors and Starters Specification for Instruments and System Automatic Controls Specification for Water Treatment Specification for Installation & Painting Specification for Charts and Tags Specification for Cleaning, Testing, Adjusting, Test Runs, Special Tools and Instruments for Maintenance

Electrical Specifications: 10. 11. 12. 13. 165-3-SPE-002 165-3-SPE-003 165-3-SPE-006 165-3-SPE-007 Specification for Gas Engine Generator Specification for Diesel Engine Generator Specifications For LV Switchgear / MCC Specifications for UPS
SHEET 5 OF 18

FILE: Table of Contents

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

14. 15. 16.

165-3-SPE-009 165-3-SPE-011 165-3-SPG-015

Specifications for Motors Specifications for Cathodic Protection System Electrical Load List

Instrumentation Specifications: 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 165-3-SPI-002 165-3-SPI-004 165-3-SPI-005 165-3-SPI-006 165-3-SPI-007 165-3-SPI-009 165-3-SPI-012 165-3-SPI-013 165-3-SPI-015 165-3-SPI-016 Specification for DCS Specification for Wellhead Control Panel (WHCP) Specifications for General Instrumentation Specification for Instrument Cabling Specification for ESD/F&G System Specification for Tank Gauging System Specification for Gas Chromatograph Specification for Instrument Installation & Workmanship Specification for SCADA/ Telemetry System General Specifications for Instrumentation for Packaged Equipment

Datasheets: Datasheets for Close Drain 1. 2. 165-3-DSM-047 165-3-DSM-050 Data Sheet for Slop Pumps Data Sheet for Slop Vessel

Datasheets for Condensate Loading 3. 4. 165-3-DSM-039 165-3-DSM-041 Data Sheet for Condensate Loading Arms Data Sheet for Condensate Loading Pumps

Datasheets for Condensate Stabilization 5. 6. 7. 165-3-DSM-053 165-3-DSM-054 165-3-DSM-055 Data Sheet for Condensate Stabilizer Reboiler Data Sheet for Condensate Stabilizer Column Data Sheet for Condensate Heat Exchanger
SHEET 6 OF 18

FILE: Table of Contents

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18.

165-3-DSM-056 165-3-DSM-057 165-3-DSM-058 165-3-DSM-059 165-3-DSM-060 165-3-DSM-061 165-3-DSM-062 165-3-DSM-063 165-3-DSM-064 165-3-DSM-065 165-3-DSM-066

Data Sheet for Condensate Rundown Air Cooler Data Sheet for Second Stage Compressor Air Cooler Data Sheet for First Stage Compressor Air Cooler Datasheet for Condensate Filters Datasheet for Condensate Filter Coalescer Datasheet for Two Stage Compressor Datasheet for Stabilizer MPA Pumps Datasheet for Flash Separator Datasheet for Stabilizer Reflux Drum Datasheet for Compressor Suction Drum Package Data Sheet for Condensate Stabilization Unit

Datasheets for Dehydration (Mol. Sieve) Unit 19. 165-3-DSM-008 Datasheet for Molecular Sieve Dehydration Unit

Datasheets for Diesel Storage System 20. 21. 22. 165-3-DSM-083 165-3-DSM-084 165-3-DSM-085 Datasheet for Diesel Oil Filters Datasheet for Diesel Transfer Pumps Data Sheet for Diesel Storage Tank

Datasheets for Fire Water System 23. 24. 25. 26. 165-3-DSM-044 165-3-DSM-067 165-3-DSM-068 165-3-DSM-097 Data Sheet for Jockey Pumps Data Sheet for Main Fire Water Pump (Motor Driven) Data Sheet for Main Fire Water Pump & Diesel Engine Driver Data Sheet for Fire Water Storage Tank

Datasheets for Fuel Gas System 27. 165-3-DSM-069 Data Sheet for Fuel Gas Vessel

Datasheets for Hot Oil System 28. 29. 30. 31. 165-3-DSM-070 165-3-DSM-071 165-3-DSM-072 165-3-DSM-073 Data Sheet for Hot Oil Side Stream Filter Data Sheet for Hot Oil Fired Heaters Data Sheet for Hot Oil Circulation Pumps Data Sheet for Hot Oil Storage Tank
SHEET 7 OF 18

FILE: Table of Contents

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

32. 33. 34.

165-3-DSM-074 165-3-DSM-075 165-3-DSM-076

Data Sheet for Hot Oil Expansion Vessel Data Sheet for Hot Oil Drain Vessel Data Sheet for Hot Oil Package

Datasheets for Instrument Air System 35. 165-3-DSM-077 Data Sheet for Instrument Air Skid

Datasheets for LPG Extraction Unit 36. 37. 38. 39. 40. 41. 42. 43. 44. 45. 46. 47. 48. 49. 50. 51. 52. 53. 54. 55. 56. 57. 58. 165-3-DSM-010 165-3-DSM-011 165-3-DSM-012 165-3-DSM-013 165-3-DSM-014 165-3-DSM-015 165-3-DSM-016 165-3-DSM-017 165-3-DSM-018 165-3-DSM-019 165-3-DSM-020 165-3-DSM-021 165-3-DSM-022 165-3-DSM-023 165-3-DSM-024 165-3-DSM-025 165-3-DSM-026 165-3-DSM-027 165-3-DSM-028 165-3-DSM-029 165-3-DSM-030 165-3-DSM-031 165-3-DSM-032 Data Sheet for Absorber Column Data Sheet for De-Propanizer Column Data Sheet for Low Temperature Separator Data Sheet for De-Ethanizer Column Data Sheet for De-Butanizer Column Data Sheet for De-Ethanizer Reflux Drum Data Sheet for De-Butanizer Reflux Drum Data Sheet for De-Propanizer Reflux Drum Data Sheet for Deethanizer Reflux Pumps Data Sheet for Debutanizer Reflux Pumps Data Sheet for De-Propanizer Reflux Pumps Data Sheet for Absorber Bottom Pumps Data Sheet for Package Data Sheet for LPG Recovery Unit Data Sheet for Turbo Expander And Recompressor Data Sheet for Inlet Gas Multi Pass Heat Exchanger Data Sheet for De-Ethanizer Reboiler Data Sheet for De-Ethanizer Overhead Exchanger Data Sheet for De-Butanizer Reboiler Data Sheet for De-Propanizer Reboiler Data Sheet for De-Butanizer Overhead Condenser Data Sheet for Condensate Cooler Data Sheet for De-Propanizer Overhead Condenser Data Sheet for LPG Cooler

FILE: Table of Contents

SHEET 8 OF 18

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Datasheets for LPG Storage and Filling System 59. 60. 61. 62. 165-3-DSM-038 165-3-DSM-040 165-3-DSM-078 165-3-DSM-079 Data Sheet for LPG Loading Arms Data Sheet for LPG Loading Pumps Data Sheet for LPG Inlet Storage Cooler Data Sheet for LPG Storage Bullet

Datasheets for Produced Water Treatment System 63. 64. 65. 66. 67. 68. 69. 70. 165-3-DSM-086 165-3-DSM-087 165-3-DSM-088 165-3-DSM-089 165-3-DSM-090 165-3-DSM-091 165-3-DSM-092 165-3-DSM-093 Data Sheet for Produced Water Treatment Package Data Sheet for Oily Water Pumps Data Sheet for Produced Water Transfer Pumps Data Sheet for Recovered Oil Pumps Data Sheet for Produced Water Disposal Pumps Data Sheet for Oily Water Basin Datasheet for Produced Water Storage Tank Data Sheet for Produced Water Degasser

Datasheets for Propane Storage & Loading System 71. 72. 73. 165-3-DSM-080 165-3-DSM-081 165-3-DSM-082 Data Sheet for Propane Inlet Storage Cooler Data Sheet for Propane Loading Pumps Data Sheet for Propane Storage Bullet

Datasheets for Sales Gas Compressor 74. 165-3-DSM-045 Data Sheet for Sales Gas Compressor Package

Datasheets for Sales Gas Metering Skid 75. 165-3-DSM-049 Data Sheet for Sales Gas Metering Package

Datasheets for Test Separator 76. 165-3-DSM-051 Data Sheet for Test Separator

Datasheets for Water Treatment System 77. 78. 79. 165-3-DSM-094 165-3-DSM-095 165-3-DSM-096 Data Sheet for Raw Water Pumps Data Sheet for Treated Water Pumps Data Sheet for Treated Water Storage Tanks
SHEET 9 OF 18

FILE: Table of Contents

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Datasheets for Wellhead Facilities 80. 81. 82. 83. 165-3-DSM-004 165-3-DSM-003 165-3-DSM-009 165-3-DSM-102 Data Sheet for Corrosion Inhibitor Injection Skid Data Sheet for Portable Methanol Injection Skid Data Sheet for Instrument Gas Scrubber Data Sheet for NASHPA Mobile Wellhead Test Separator

Datasheets for Off-Spec Condensate Pump 84. 165-3-DSM-098 Data Sheet for Off-Spec Condensate Pump

Datasheets for Crude Oil / Condensate Tanks 85. 165-3-DSM-099 Crude Oil / Condensate Tanks

Datasheets for Nitrogen Generation System 86. 165-3-DSM-100 Data Sheet for Nitrogen Generation System

Datasheets for Evaporative Air Cooler 87. 165-3-DSM-101 Data Sheet for Evaporative Air Cooler

Drawings: Plot Plan 1. 165-3-GPP-001 General Plot Plan

Process Flow Diagrams: 2. 3. 4. 5. 6. 7. 8. 165-3-PFD-001 165-3-PFD-002 165-3-PFD-003 165-3-PFD-004 165-3-PFD-005 165-3-PFD-006 165-3-PFD-007 Typical Wellhead Facilities Process Flow Diagram for NASHPA 1, 2, 3 & 4 Flow Lines Gathering System and Slug Catcher Process Flow Diagram Inlet Separation System Process Flow Diagram Condensate Stabilizer Unit Process Flow Diagram Molecular Sieve Unit Process Flow Diagram LPG Recovery Unit Process Flow Diagram Hot Oil System Process Flow Diagram

FILE: Table of Contents

SHEET 10 OF 18

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Piping & Instrumentation Diagrams (P&IDs): Legends 9. 10. 165-3-PID-001 (Sheet 1 of 2) 165-3-PID-001 (Sheet 2 of 2) Proposed P&ID Legends and Symbols Proposed P&ID Legends and Symbols

P&ID for Wellhead Facilities 11. 12. 13. 14. 165-3-PID-002 (Sheet 1 of 2) 165-3-PID-002 (Sheet 2 of 2 ) 165-3-PID-003 (Sheet 1 of 2 ) 165-3-PID-003 (Sheet 2 of 2) 165-3-PID-004 (Sheet 1 of 2) 165-3-PID-004 (Sheet 2 of 2) 165-3-PID-005 (Sheet 1 of 2) 165-3-PID-005 (Sheet 2 of 2) 165-3-PID-051 Piping & Instrument Diagram For NASHPA-01 Well Piping & Instrument Diagram for Instrument Gas Scrubber, Corrosion Inhibitor & Methanol Inj. Skids Piping & Instrument Diagram NASHPA-02 Well Piping & Instrument Diagram For Instrument Gas Scrubber, Corrosion Inhibitor & Methanol Inj. Skids NASHPA-02 Well Piping & Instrument Diagram NASHPA-03 Well Piping & Instrument Diagram for Instrument Gas Scrubber, Corrosion Inhibitor & Methanol Inj. Skids NASHPA-03 Well Piping & Instrument Diagram NASHPA-04 Well Piping & Instrument Diagram for Instrument Gas Scrubber, Corrosion Inhibitor & Methanol Inj. Skids NASHPA-04 Well P&ID for NASHPA Mobile Wellhead Test Separator

15. 16.

17. 18.

19.

P&IDs for Slug Catcher & Gathering Manifolds 20. 21. 165-3-PID-006 (Sheet 1 of 2) 165-3-PID-006 (Sheet 2 of 2) Piping & Instrument Diagram Flow Lines Gathering System Piping & Instrument Diagram Slug Catcher

P&IDs for Separation System 22. 23. 165-3-PID-007 (Sheet 1 of 3) 165-3-PID-007 (Sheet 2 of 3) Piping & Instrument Diagram NASHPA H.P Production Separator Piping & Instrument Diagram NASHPA M.P Production Separator
SHEET 11 OF 18

FILE: Table of Contents

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

24.

165-3-PID-007 (Sheet 3 of 3)

Piping & Instrument Diagram NASHPA L.P Production Separator

P&IDs for Condensate Stabilization unit & Off Gas Compressor unit 25. 26. 27. 28. 29. 165-3-PID-008 (Sheet 1 of 5) 165-3-PID-008 (Sheet 2 of 5) 165-3-PID-008 (Sheet 3 of 5) 165-3-PID-008 (Sheet 4 of 5) 165-3-PID-008 (Sheet 5 of 5) Piping & Instrument Diagram Condensate Stabilization Flash Separator Piping & Instrument Diagram Condensate Stabilization Filters Piping & Instrument Diagram Stabilizer Column & Reboiler Piping & Exchanger Instrument Diagram Condensate Heat

Piping & Instrument Diagram Condensate Stabilization Over Head Compressor

P&IDs for Gas Dehydration (Molecular sieve unit) 30. 31. 32. 165-3-PID-009 (Sheet 1 of 3) 165-3-PID-009 (Sheet 2 of 3) 165-3-PID-009 (Sheet 3 of 3) Piping & Instrument Diagram Gas Dehydration (Mol. Sieve) Unit Piping & Instrument Diagram Gas Dehydration (Mol. Sieve) Unit Piping & Instrument Diagram Regeneration Gas Heating & Cooling System

P&IDs for LPG Extraction 33. 34. 35. 36. 37. 38. 39. 40. 165-3-PID-010 165-3-PID-011 165-3-PID-012 165-3-PID-013 165-3-PID-014 165-3-PID-015 165-3-PID-016 165-3-PID-017 Piping & Instrument Diagram Multi Pass Heat Exchanger Piping & Instrument Diagram Low Temperature Separator And Absorber Column Piping & Instrument Diagram Sales Gas Turbo Expander & Recompressor Piping & Instrument Diagram De-Ethanizer Column Piping & Instrument Diagram De-Ethanizer Overhead Condenser Piping & Instrument Diagram De-Butanizer Column Piping & Instrument Diagram De-Propanizer Column Piping & Instrument Diagram Mechanical Refrigeration

FILE: Table of Contents

SHEET 12 OF 18

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

P&ID for Sales Gas Compression 41. 165-3-PID-018 Piping & Instrument Diagram Sales Gas Compressor

P&ID for Sales Gas Metering 42. 165-3-PID-019 Piping & Instrument Diagram Sales Gas Metering

P&IDs for Condensate Storage System 43. 44. 165-3-PID-020 (Sheet 1 of 2 ) 165-3-PID-020 (Sheet 2 of 2 ) Piping & Instrument Diagram Condensate Storage Tanks Piping & Instrument Diagram Condensate Storage Tanks

P&IDs for Condensate Loading System 45. 46. 165-3-PID-021 (Sheet 1 of 2 ) 165-3-PID-021 (Sheet 2 of 2 ) Piping & Instrument Diagram Condensate Loading System Piping & Instrument Diagram Condensate Loading System

P&ID for Test Separator 47. 165-3-PID-022 Piping & Instrument Diagram Test Separator

P&IDs for LPG Storage System / Filling System 48. 49. 50. 51. 52. 53. 54. 165-3-PID-023 165-3-PID-024 165-3-PID-025 165-3-PID-026 165-3-PID-027 165-3-PID-028 165-3-PID-029 Piping & Instrument Diagram LPG Storage Piping Header Piping & Instrument Diagram LPG Storage Bullet (Typical) Piping & Instrument Diagram LPG Loading Pump Suction Header Piping & Instrument Diagram LPG Loading Pumps Piping & Instrument Diagram LPG Loading Arm Piping & Instrument Diagram Vapor Return Line Network Piping & Instrument Diagram Minimum Flow Network

P&ID for Fuel Gas System 55. 165-3-PID-030 Piping & Instrument Diagram Fuel Gas System

FILE: Table of Contents

SHEET 13 OF 18

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

P&IDs for Hot Oil System 56. 57. 58. 165-3-PID-031 165-3-PID-032 (Sheet 1 of 2 ) 165-3-PID-032 (Sheet 2 OF 2 ) 165-3-PID-033 (Sheet 1 of 2 ) 165-3-PID-033 (Sheet 2 of 2 ) 165-3-PID-034 P&ID for Flare System 62. 165-3-PID-035 Piping & Instrument Diagram Flare System Piping & Instrument Diagram Hot Oil Expansion Vessel And Circulation Pumps Piping & Instrument Diagram Hot Oil Heater-A Piping & Instrument Diagram Hot Oil Heater-B

59. 60. 61.

Piping & Instrument Diagram Hot Oil Distribution Piping & Instrument Diagram Hot Oil Distribution Piping & Instrument Diagram Hot Oil Storage

P&ID for Power Generation System 63. 165-3-PID-036 Piping & Instrument Diagram Closed Drain System

P&IDs for Instrument & Utility Air System 64. 65. 66. 165-3-PID-037 165-3-PID-038 165-3-PID-039 Piping & Instrument Diagram Instrument & Utility Air System Piping & Instrument Diagram Instrument Air Distribution System Piping & Instrument Diagram Utility Air Distribution System

P&ID for Fire Water System 67. 165-3-PID-040 Piping & Instrument Diagram Fire Water System

P&IDs for Water Treatment System 68. 69. 165-3-PID-041 165-3-PID-042 Piping & Instrument Diagram Water Treatment System Piping & Instrument Diagram Water Treatment System

P&ID for Diesel Fuel System 70. 165-3-PID-043 Piping & Instrument Diagram Diesel Fuel System

P&ID for Produced Water System 71. 72. 165-3-PID-044 165-3-PID-045 Piping & Instrument Diagram Produced Water Degasser Piping & Instrument Diagram Oily Water Basin
SHEET 14 OF 18

FILE: Table of Contents

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

73. 74.

165-3-PID-046

Piping & Instrument Diagram Produced Water Treatment Package 165-3-PID-047 Piping & Instrument Diagram Produced Water Storage Tank P&ID for Nitrogen Generation System 165-3-PID-048 Piping & Instrument Diagram Inert Gas System

75.

P&ID for Off Spec. Condensate Storage System 76. 165-3-PID-049 Piping & Instrument Diagram Off-Spec Condensate Storage Tanks

P&IDs for Propane Storage System 77. 78. 165-3-PID-050 (Sheet 1 of 2) 165-3-PID-050 (Sheet 2 of 2) Piping & Instrument Diagram Propane Storage Bullet Piping & Instrument Diagram Propane Loading System

Civil Drawings Civil Standard Drawings 79. 80. 81. 82. 83. 84. 85. 86. 87. 88. 89. 90. 91. 165-3-CSTD-001 165-3-CSTD-002 165-3-CSTD-003 165-3-CSTD-004 165-3-CSTD-005 165-3-CSTD-006 165-3-CSTD-007 165-3-CSTD-008 165-3-CSTD-009 165-3-CSTD-010 165-3-CSTD-011 165-3-CSTD-012 165-3-CSTD-013 Standard Drawing of Legend and Abbreviation Standard Drawing for General Notes for Civil Works and Bar Arrangement Standard Drawing for General Notes for Civil Works and Bar Arrangement Standard Drawing for R.C.C. Works Standard Drawing for Chemical Coating Standard Drawing for Pedestal Anchor Bolts Standard Drawing for Pedestal Anchor Bolts Standard Drawing of Anchor Bolts for Equipment Standard Drawing for Doors & Glazing Detail Standard Drawing for Windows/Ventilator Glazing Detail Standard Drawing for Watch Tower Standard Drawing for Concrete Pipe Marker With Plate Standard Drawing of Typical Road Cross Section
SHEET 15 OF 18

FILE: Table of Contents

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

92. 93. 94. 95. 96. 97. 98. 99. 100. 101. 102. 103. 104. 105. 106. 107. 108. 109. 110. 111. 112. 113. 114. 115. 116. 117.

165-3-CSTD-014 165-3-CSTD-015 165-3-CSTD-016 165-3-CSTD-017 165-3-CSTD-018 165-3-CSTD-019 165-3-CSTD-020 165-3-CSTD-021 165-3-CSTD-022 165-3-CSTD-023 165-3-CSTD-024 165-3-CSTD-025 165-3-CSTD-026 165-3-CSTD-027 165-3-CSTD-028 165-3-CSTD-029 165-3-CSTD-030 165-3-CSTD-031 165-3-CSTD-032 165-3-CSTD-033 165-3-CSTD-034 165-3-CSTD-035 165-3-CSTD-036 165-3-CSTD-037 165-3-CSTD-038 165-3-CSTD-039

Standard Tank Foundation Details (Crushed Stone Ring Wall) Standard Drawing of Paving Detail Standard Details for Paving Pedestal Standard Details for Paving Pedestal Standard Details for Embedded Plate for Paving Pedestal Standard Drawing of Thrust Blocks Standard Drawing for Pipe Connection Standard Drawing of Sanitary Sewer Standard Drawing Foundation for Stair and Ladders Standard Drawing for Soak Pit & Septic Tank Standard Drawing for Pipe Sizing for Sewer Lines Standard Drawing for Oily Water System Sewer Lines Standard Detail of Valve Pit Standard Drawing for Storm Water Standard Drawing for Clean Out Standard Drawing for Miscellaneous Underground Piping Details Standard Drawing for Vent Pipe, Firefighting Equipment and Misc. Step Standard Drawing Foundation for Skid Mounted Equipment

Standard Drawing of Cable Trench Standard Drawing for Tank Foundation (R.C.C. Ring Wall) Standard Drawing for Dyke Wall Standard Drawing Secondary Containment Bund Wall Detail Standard Drawing of Pipe Sleeper Standard Drawing for Pump Foundation Standard Drawing Foundation for Column / Vessel/ Tower

Standard Drawing for Horizontal Vessel / Heat Exchanger Foundation


SHEET 16 OF 18

FILE: Table of Contents

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Steel Structure Standard Drawings 118. 119. 120. 121. 122. 123. 124. 125. 126. 127. 128. 129. 130. 131. 132. 133. 134. 135. 136. 137. 138. 139. 140. 141. 142. 143. 144. 145. 146. 147. 165-3-SSTD-001 165-3-SSTD-002 165-3-SSTD-003 165-3-SSTD-004 165-3-SSTD-005 165-3-SSTD-006 165-3-SSTD-007 165-3-SSTD-008 165-3-SSTD-009 165-3-SSTD-010 165-3-SSTD-011 165-3-SSTD-012 165-3-SSTD-013 165-3-SSTD-014 165-3-SSTD-015 165-3-SSTD-016 165-3-SSTD-017 165-3-SSTD-018 165-3-SSTD-019 165-3-SSTD-020 165-3-SSTD-021 165-3-SSTD-022 165-3-SSTD-023 165-3-SSTD-024 165-3-SSTD-025 165-3-SSTD-026 165-3-SSTD-027 165-3-SSTD-028 165-3-SSTD-029 165-3-SSTD-030 Standard Drawing of General Notes of Structural Steel. Standard Drawing of Member List (AISC Members) Standard Drawing of Member List (Universal Member) Standard Drawing of End Plate Moment Connection Standard Drawing of End Plate Moment Connection Standard Drawing of End Plate Moment Connection Standard Drawing of End Plate Moment Connection Standard Drawing of Single Shear Connection Standard Drawing of Single Shear Connection Standard Drawing of Single Shear Connection Standard Drawing of Double Shear Connection Standard Drawing of Double Shear Connection Standard Drawing of Angle Cleats Connection Standard Drawing of Angle Cleats Connection Standard Drawing of Base Plate Connection Standard Drawing of H-Bracing and K-Bracing Standard Drawing of V-Bracing Standard Drawing of Embedded Plate Standard Drawing of Fireproofing Standard Drawing of Fireproofing Standard Drawing of Grating Floor Standard Drawing of Ladder Standard Drawing of Ladder Standard Drawing of Ladder Standard Drawing of Handrail Standard Drawing of Handrail Standard Drawing of Handrail Standard Drawing of Typical Gate and Fence Standard Drawing of Typical Gate and Fence Standard Drawing of Base Plate Connection
SHEET 17 OF 18

FILE: Table of Contents

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

148. 149.

165-3-SSTD-031 165-3-SSTD-032

Standard Drawing of Stairway Standard Drawing of Stairway

Building Architectural Drawings 150. 151. 152. 153. 154. 155. 165-3-AR-004 165-3-AR-006 165-3-AR-008 165-3-AR-010 165-3-AR-012 Details Architectural Drawing (Maintenance Workshop) Details Architectural Drawing (Admin Building) Details Architectural Drawing (Laboratory) Details Architectural Drawing (Shipping Office I/C Weigh Bridge) Details Architectural Drawing (M.P.E & I Workshop)

165-3-AR-014 Details Architectural Drawing (Ware House) Civil Conceptual Drawings 165-3-C-001 165-3-C-002 Conceptual Layout & Section Details for LPG Bullet Foundation Conceptual Racking Plan and Details (Warehouse)

156. 157.

HVAC Drawings 165-3-HVACSTD Standard Drawing Misc. Details For HVAC

Electrical Drawing 158. 165-3-ELS-001 Key Single Line Diagram

Instrumentation Drawing 159. 165-3-SCI-001 Control System Schematic Drawing

FILE: Table of Contents

SHEET 18 OF 18

Zishan Engineers (Pvt.) Ltd.


An ISO 9001-2008 certified company,
47/F, Block 6, PECHS, Karachi-Pakistan Tel: (92-21) 34393045-48 & 34310151-54 Fax: (92-21) 34533430 & 34310156 E-mail : contact@zishanengineers.com, Web : www.zishanengineers.com

Document No. Revision Date Total Pages (inc front cover)

165-3-SPG-024 0 24-12-2012
4

OIL & GAS DEVELOPMENT COMPANY LTD.

TENDER ENQUIRY NO: PROC-FD/CB/PROJ (NASHPA)-732/2012

(SECTION I) PROJECT BACKGROUND & INTRODUCTION FOR GAS PROCESSING, LPG RECOVERY PLANT AND ALLIED FACILITIES AT NASHPA OIL FIELD

24-12-2012

Issued for Tender

SP

SFA

MRF

Rev.

Date

Description

Prepared By

Checked By

Approved By

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

TABLE OF CONTENTS

S. NO.

DESCRIPTION

PAGE NO.

1.0

PROJECT BACKGROUND & INTRODUCTION

03

FILE: 165-3-SPG-024, Rev.0

SHEET 2 OF 4

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

1.0

PROJECT BACKGROUND AND INTRODUCTION Oil and Gas Development Company Limited (OGDCL) intends to undertake Installation of LPG Recovery Plant, Compressors and Allied Facilities at Nashpa Field (the PROJECT). NASHPA and MELA gas fields are located in KPK Province of Islamic Republic of Pakistan. The objective of the PROJECT is to construct a gas processing facility at NASHPA to process raw gas of NASHPA and separator gas from MELA Field. MP separator and stabilizer gas at MELA will be compressed through existing Off-gas compressor, and this gas will be combined with existing HP MELA separator gas for transportation from MELA through a trunk line to NASHPA. The MELA and NASHPA combined gas is the feed for Mol sieve and LPG plant. The NASHPA plant will produce LPG, Sales Gas and Stabilized Condensate. The PROJECT covers Wellhead facilities, Gas Gathering System and Gas Processing Plant (including LPG Recovery Plant). The gas processing plant is intended to normally process 98 MMSCFD with a design margin of 10 %. The anticipated production capacity of the facility is as under: i) ii) iii) iv) v) 90 16800* 1120 373 1 MMSCFD (sales gas & fuel gas) Barrel/day of Condensate Barrel/day of NGL Tonne/day of LPG Tonne/day of Propane

*From NASHPA wells oil production will be 16800 Barrel/day (production forecast provided by OGDCL) whereas 150 Barrel/day will be added from MELA trunk line in winter operation. For engineering, procurement, construction and commissioning of the above mentioned facilities. OGDCL intends to engage a Contractor to execute and commission the project on complete responsibility basis. This document has been prepared as per Public Procurement Regularity Authority (PPRA) requirements and provides the basis for engineering, procurement, construction and commissioning of NASHPA Gas Processing, LPG Recovery Plant & Allied Facilities. The tender document comprises of following: Volume-I Background & Introduction (Section-I) Invitation to Bid (Section-II) Instruction to Bidders (Section-III) Forms & Conditions of Contract (Section-IV)
SHEET 3 OF 4

FILE: 165-3-SPG-024, Rev.0

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Volume-II Scope of Work and Services for Design, Manufacturing, Supply, Installation, Construction & Commissioning of Gas Processing, LPG Recovery Plant & Allied Facilities.

Volume-III Supplementary Technical Documents (Drawings, Specifications Datasheet)

The bidders will prepare and submit their bids, as per instructions given in the ITB (Section-III of Volume-I) and Scope of Supply/Work and Services given in Volume-II and Specifications and technical drawings given in Volume-III of this tender document. The Form and Conditions of the Contract are given in Section-IV of Volume-I. OGDCL has engaged M/s. Zishan Engineers (Pvt.) Limited (ZEL) as Consultant for providing design engineering and project management services (including procurement assistance and supervision of EPCC Contractor activities) for execution of NASHPA Gas Processing, LPG Recovery Plant and Allied Facilities Project.

FILE: 165-3-SPG-024, Rev.0

SHEET 4 OF 4

Zishan Engineers (Pvt.) Ltd.


An ISO 9001-2008 certified company,
47/F, Block 6, PECHS, Karachi-Pakistan Tel: (92-21) 34393045-48 & 34310151-54 Fax: (92-21) 34533430 & 34310156 E-mail : contact@zishanengineers.com, Web : www.zishanengineers.com

Document No. Revision Date Total Pages (inc front cover)

165-3-SPG-025 0 24-12-2012
9

OIL & GAS DEVELOPMENT COMPANY LTD.

TENDER ENQUIRY NO: PROC-FD/CB/PROJ(NASHPA)-732/2012

(SECTION II) INVITATION TO BID FOR GAS PROCESSING, LPG RECOVERY PLANT AND ALLIED FACILITIES AT NASHPA OIL FIELD

24-12-2012

Issued for Tender

SP

SFA

MRF

Rev.

Date

Description

Prepared By

Checked By

Approved By

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

TABLE OF CONTENTS

S. NO.

DESCRIPTION

PAGE NO.

1.0

INVITATION TO BID

03

FILE: 165-3-SPG-025, Rev.0

SHEET 2 OF 9

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

1.0

INVITATION TO BID Oil & Gas Development Company Limited (OGDCL) Islamabad is operating NASHPA Oil Field located in Kohat District of Khyber PakhtoonKhuwa Province of Islamic Republic of Pakistan. The facilities to be installed at NASHPA Field include Well Head system, Gas Treatment, LPG Recovery Plant, Compressors and Allied Facilities (including LPG/Condensate Storage & handling etc.). For engineering, procurement, construction and commissioning of these facilities, OGDCL intends to engage a Contractor to execute and commission the project on complete responsibility basis. This document has been prepared as per Public Procurement Regularity Authority (PPRA) requirements and provides the basis for the engineering, procurement, construction and commissioning of Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities. The prospective bidders are required to carefully review this document and within two (02) weeks of downloading the tender document from OGDCL website and send the enclosed letters of Intention to Bid or Declining the Bid and Secrecy Declaration. The Bids are invited on two stage-two envelope bidding procedure. Under this procedure the bid to be submitted shall comprise of a single package containing two separate envelopes. Each envelope shall contain separately the technical (proposal) bid and financial (proposal) bid. The details of the procedure are given in Clause 7.0 of ITB (Section-III) of Volume-I. The bids are required to be submitted at OGDCLs Office on or before 12th March, 2013 at 14:30 HRS (PST). The bids shall be valid for 120 days from the bid submission date and should be accompanied with a Bid Bond (Bank Guarantee) of an amount of US $ 2,000,000/- (US$ Two Million Only) or equivalent Pakistani Rupees or in the currency of the Bid. The award will be made in favor of lowest evaluated responsive bidder at the sole discretion of OGDCL. OGDCL reserves the right to accept or reject any bid or part of a bid and or to annul the bidding process and reject all bids at any time prior to award of contract, without thereby incurring any liability to the affected bidder or bidders or any obligation to inform the affected bidder or bidders of the grounds for OGDCLs action.

FILE: 165-3-SPG-025, Rev.0

SHEET 3 OF 9

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

(On Bidders Letter Head)

LETTER OF INTENTION TO BID

General Manager SCM Oil & Gas Development Company Limited 1st Floor, OGDCL House, Blue Area, Islamabad.

SUBJECT:

TENDER ENQUIRY (NO: PROC-FD/CB/PROJ (NASHPA)-732/2012) FOR ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING OF NASHPA GAS PROCESSING, LPG RECOVERY PLANT & ALLIED FACILITIES

Dear Sir, We have obtained the subject tender document and hereby confirm that we shall be submitting our bid on or before the deadline of bid submission as per OGDCLs requirement.

Yours Truly,

Signature:

Name:

Designation:

FILE: 165-3-SPG-025, Rev.0

SHEET 4 OF 9

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

(On Bidders Letter Head)

LETTER OF DECLINING TO BID

General Manager SCM Oil & Gas Development Company Limited 1st Floor, OGDCL House, Blue Area, Islamabad.

SUBJECT:

TENDER ENQUIRY (NO: PROC-FD/CB/PROJ (NASHPA)-732/2012) FOR ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING OF NASHPA GAS PROCESSING, LPG RECOVERY PLANT & ALLIED FACILITIES

Dear Sir,

We have obtained the subject tender document and regret that at this instance we shall not be submitting the bid. We are hereby returning the complete tender document together with secrecy declaration for OGDCLs record.

Yours Truly,

Signature:

Name:

Designation:

FILE: 165-3-SPG-025, Rev.0

SHEET 5 OF 9

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

SECRECY DECLARATION

Oil & Gas Development Company Limited OGDCL House, Jinnah Avenue Islamabad (Pakistan)

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING OF NASHPA GAS PROCESSING, LPG RECOVERY PLANT & ALLIED FACILITIES Tender Enquiry No: PROC-FD/CB/PROJ (NASHPA)-732/2012

We the undersigned _________________________________ having our principal office at ________________________ (hereinafter referred to as the Bidder) hereby declare to Oil & Gas Development Company Limited, Islamabad Pakistan (hereinafter referred to as OGDCL) to accept the following terms and conditions on which OGDCL is prepared to communicate to the Bidder certain Confidential Information as hereinafter defined: 1.0 DEFINITIONS 1.1 The Project shall mean Installation of LPG Recovery Plant, Compressors & Allied Facilities at NASHPA FIELD. Confidential Information shall mean any knowledge and information in connection with the Project at any time disclosed to the Bidder by or on behalf of the OGDCL in writing, in drawing or in any other form or acquired by the Bidder from the OGDCL, as well as all data derived from such knowledge and information at the time of such disclosure or acquisition is not: 1.3 In the free and lawful possession of the Bidder or Part of public knowledge or literature

1.2

Confidential Report shall mean all manuals, specifications, drawings, letters, faxes, emails and any other material containing Confidential Information. For the purpose of Clauses 2 and 5 Confidential Information shall include Confidential Record. The confidential record shall be such information as may be given by OGDCL.

1.4

FILE: 165-3-SPG-025, Rev.0

SHEET 6 OF 9

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

2.0

CONFIDENTIALITY 2.1 The Bidder Shall preserve and cause its employees to preserve the secrecy of all Confidential Information. Shall not use or disclose the confidential information except with the prior written consent of OGDCL and subject to the conditions contained in Clause 5, for any purpose other than the performance of the contract for the Project or the preparation and submission of a Bid for the Project. iDisclose to any third party or enable any third party to note that fact that the Bidder has been invited to submit a bid for the Project and / or, if applicable, the fact that the Project has been entrusted to the Bidder. Reproduce, copy or use, or disclose to, place at the disposal of or use on behalf of any third party or enable any third party to peruse, copy or use, any Confidential Information

ii-

2.2

The undertakings under 2.1 above shall continue in so far as the Confidential Information in question has not: Become a part of public knowledge or literature, or Been disclosed to the Bidder by a third party (other than one disclosing on behalf of OGDCL) whose possession of such information is lawful and who is under no secrecy obligation with respect to the same.

3.0

COPYRIGHT The copyright of the Confidential Record shall, in the absence of any express provision to the contrary be vested in OGDCL.

4.0

RETURN OF CONFIDENTIAL RECORD Upon completion of the Project, or if it is decided that the Project will not be entrusted to the Bidder, upon notification to the Bidder of such decision, the Bidder shall return to OGDCL all Confidential Record.

FILE: 165-3-SPG-025, Rev.0

SHEET 7 OF 9

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

5.0

THIRD PARTY The Bidder shall ensure that under the terms of this Secrecy Declaration any of the Confidential Information comes to the knowledge and/or in the possession of any third party, the Bidder shall require from such third party that it shall abide by stipulations equivalent to those contained in this Secrecy Declaration.

Agreed and accepted this __________ day of _____________. Signature: ______________________ Name: ______________________

Position: ______________________

FILE: 165-3-SPG-025, Rev.0

SHEET 8 OF 9

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

PROFORMA FOR SITE VISIT & PRE-BID MEETING

Oil & Gas Development Company Limited OGDCL House, Jinnah Avenue Islamabad (Pakistan) Dear Sir(s) ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING OF NASHPA GAS PROCESSING, LPG RECOVERY PLANT & ALLIED FACILITIES Tender Enquiry No: PROC-FD/CB/PROJ(NASHPA)-732/2012 The representative(s) nominated for the Site Visit and Pre-Bid meeting are: I- SITE VISIT FULL NAME 1- _________________________ 2- _________________________ 3- _________________________ II- PRE-BID MEETING FULL NAME 1- _________________________ 2- _________________________ 3- _________________________

NATIONALITY __________________ __________________ __________________

NATIONALITY __________________ __________________ __________________

We accept that the Site Visit & Pre-Bid Meeting will be coordinated by OGDCL but the arrangements and costs for the visit including Travel and Accommodation costs will be to our account. Yours Faithfully Signature: _____________________ Position: _____________________ Enclosures: 1) Copy of valid passport/National Identity Card 2) Three (03) Photographs
FILE: 165-3-SPG-025, Rev.0 SHEET 9 OF 9

Zishan Engineers (Pvt.) Ltd.


An ISO 9001-2008 certified company,
47/F, Block 6, PECHS, Karachi-Pakistan Tel: (92-21) 34393045-48 & 34310151-54 Fax: (92-21) 34533430 & 34310156 E-mail : contact@zishanengineers.com, Web : www.zishanengineers.com

Document No. Revision Date Total Pages (inc front cover)

165-3-SPG-026 0 24-12-2012
175

OIL & GAS DEVELOPMENT COMPANY LTD.

TENDER ENQUIRY NO: PROC-FD/CB/PROJ(NASHPA)-732/2012

(SECTION III) INSTRUCTIONS TO BIDDERS FOR GAS PROCESSING, LPG RECOVERY PLANT AND ALLIED FACILITIES AT NASHPA OIL FIELD

24-12-2012

Issued for Tender

SP

SFA

MRF

Rev.

Date

Description

Prepared By

Checked By

Approved By

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

TABLE OF CONTENTS
S. NO.
1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0 21.0 22.0
ANNEXURES: ANNEXURE I: ANNEXURE II: ANNEXURE III: ANNEXURE IV: FORMAT OF RESPONSIBILITY MATRIX BID BOND CONTRACTORS PROFILE DETAILS OF SIMILAR GAS PROCESSING, LPG RECOVERY PLANT & ALLIED FACILITIES SUPPLIED, CONSTRUCTED & COMMISSIONED
SHEET 2 OF 38

DESCRIPTION
DESCRIPTION OF NASHPA GAS PROCESSING & LPG RECOVERY PLANT

PAGE NO.
4 6 8 8 9 9 9 10 11 11 12 12 12 13 13 15 29 29 30 31 33 37

CONTRACTORS WORK SCOPE & RESPONSIBILITIES: AN OVERVIEW CONSULTANTS ROLE OGDCL RESPONSIBILITIES PROJECT COMPLETION PERIOD SCOPE OF BID & SOURCE OF FUNDS BIDDING PROCESS COST OF BIDDING ELIGIBILITY REQUIREMENTS BIDS OF JOINT VENTURES/CONSORTIUM AGENT / REPRESENTATIVES PREFERRED VENDORS SITE VISIT PRE-BID MEETING TENDER DOCUMENT PREPARATION OF BIDS PERFORMANCE GUARANTEES WARRANTIES FORMAT AND SIGNING OF BID SUBMISSION OF BIDS BID OPENING AND EVALUATION AWARD OF CONTRACT

FILE: 165-3-SPG-026, Rev.0

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE V:

CVs OF NOMINATED COMMISSIONING KEY PERSONNEL

ANNEXURE VI-A: INTEGRITY AND ETHICS UNDERTAKING ANNEXURE VI-B: INTEGRITY AND ETHICS UNDERTAKING ANNEXURE VII: TECHNICAL DETAILS FOR NASHPA GAS PROCESSING, LPG RECOVERY PLANT & ALLIED FACILITIES ATTACHMENT 1: COMPOSITION OF COMMISSIONING TEAM AND DETAILS OF TASK ASSIGNED & RESPONSIBILITIES

ANNEXURE VIII: ANNEXURE IX:

BIDDING FORM FORMAT FIXED LUMP SUM PRICE SUMMARY ATTACHMENT 1: PRICE BREAKDOWN FOR NASHPA GAS PROCESSING & LPG RECOVERY PLANT SYSTEM COSTS PRICE DETAILS FOR SURVEYS & SOIL INVESTIGATION PRICE DETAILS FOR DESIGN ENGINEERING PRICE DETAILS FOR WORKS (CONSTRUCTION, INSTALLATION / ERECTION ETC.) PRICE DETAILS FOR START-UP & COMMISSIONING

ATTACHMENT 2: ATTACHMENT 3: ATTACHMENT 4:

ANNEXURE X: ANNEXURE XI: ANNEXURE XII:

ATTACHMENT 5:

DATA SUMMARY SHEET DEVIATION FORM ADDRESSES OF THIRD PARTY INSPECTION AGENCIES

ANNEXURE XIII-A: TERMS AND CONDITIONS OF THE L/C FOR SUPPLY ANNEXURE XIII-B: TERMS AND CONDITIONS OF THE L/C FOR SERVICES ANNEXURE XIV: ANNEXURE XV: ANNEXURE XVI: MOBILIZATION ADVANCE PAYMENT BANK GUARANTEE PERFORMANCE GUARANTEE REQUIREMENTS FORMAT OF PERFORMANCE BOND

ANNEXURE XVII: SCHEDULE RATES FOR ADDITIONAL EQUIPMENT AND MATERIAL ITEMS ANNEXURE XVIII: COPY OF SRO 678 (1) 2007

FILE: 165-3-SPG-026, Rev.0

SHEET 3 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

1.0

DESCRIPTION OF NASHPA GAS PROCESSING & LPG RECOVERY PLANT 1.1 General Oil and Gas Development Company Limited (OGDCL) intends to undertake Installation of LPG Recovery Plant, Compressors and Allied Facilities at Nashpa Field (the PROJECT). NASHPA and MELA gas fields are located in KPK Province of Islamic Republic of Pakistan. The objective of the PROJECT is to construct a gas processing facility at NASHPA to process raw gas of NASHPA and separator gas from MELA Field. MP separator and stabilizer gas at MELA will be compressed through existing Off-gas compressor, and this gas will be combined with existing HP MELA separator gas for transportation from MELA through a trunk line to NASHPA. The MELA and NASHPA combined gas is the feed for Mol sieve and LPG plant. The NASHPA plant will produce LPG, Sales Gas and Stabilized Condensate. The PROJECT covers Wellhead facilities, Gas Gathering System and Gas Processing Plant (including LPG Recovery Plant). The gas processing plant is intended to normally process 98 MMSCFD with a design margin of 10 %. The anticipated production capacity of the facility is as under: i) ii) iii) iv) v) 90 16800* 1120 373 1 MMSCFD (sales gas & fuel gas) Barrel/day of Condensate Barrel/day of NGL Tonne/day of LPG Tonne/day of Propane

*From NASHPA wells oil production will be 16800 Barrel/day (production forecast provided by OGDCL) whereas 150 Barrel/day will be added from MELA trunk line in winter operation. The major components of the above listed facilities include: Gas Processing Plant Slug Catcher & Gathering System Separation System Dehydration (Mol. Sieve) Unit LPG Recovery Unit (including Mech. Refrigeration) Condensate Stabilization & Off Gas Compression Unit Sales Gas Compressor Package Sales Gas Metering Package DCS, ESD and F&G Systems.

FILE: 165-3-SPG-026, Rev.0

SHEET 4 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Offsites LPG Storage Condensate Storage (Revamping) LPG & Condensate Loading Flare System Wellhead Facilities Scada Telemetry System Buildings

Utilities Power Generation Fuel Gas System Hot Oil System Drains & Slop System Instrument & Utility Air System Nitrogen Generation System Fire Fighting System Raw Water Treatment System Waste Water Treatment and Disposal System.

Interconnections between units / systems and tie-ins. Modifications / Upgradations. Works Civil Mechanical Instrumentation Electrical

For engineering, procurement, construction and commissioning of earlier mentioned facilities. OGDCL intends to engage a Contractor to execute and commission the project on complete responsibility basis. The bidders are to follow the scope of work and services given in Volume-II and specifications, data sheets and technical drawings given in Volume-III of this document. In general, the emphasis is to maximize skid mount and modularize wherever practical in order to reduce construction time. The bidder can provide alternate proposal based on their standard design if it reduces the project completion period.

FILE: 165-3-SPG-026, Rev.0

SHEET 5 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

1.2

Plant Description For description of the proposed facilities at NASHPA Plant, please refer to the following: Doc. No. 165-3-SPP-001 : Doc. No. 165-3-SPE-001: Doc. No. 165-3-SPI-001: Drawing No. 165-3-BFD-001: Design Basis Document Electrical Design Basis Instrumentation & Control Design Basis Block Flow Diagram

The above documents are included in AnnexureI of Scope of Work (Volume-II). 2.0 CONTRACTORS WORK SCOPE & RESPONSIBILITIES: AN OVERVIEW OGDCL intends to have a complete workable, safe and operable Nashpa gas processing and LPG Recovery plant meeting all the performance parameters, guarantees, warranties and other requirements. The Contractor shall be responsible for installing the plant on complete responsibility basis and accordingly carry out all activities necessary to have in place an operational Nashpa gas processing, LPG Recovery plant & Allied Facilities. The Contractor shall review and validate the basic, engineering package given in tender document, carry out detailed engineering, procure required materials, equipment electrical items instrumentation/control and execute works related to construction, installation and commissioning and related project management. The Contractors scope and responsibilities shall include but not limited to the following: Review and validation of Front End Engineering Design (FEED) Document. Perform detailed engineering design of Nashpa Gas Processing and LPG Recovery Plant. Provision of all construction equipment, materials, tools/tackles, consumables, manpower and all other things that are necessary for the construction, testing and commissioning of gas processing and LPG Plant. Arrange all approvals from the local provincial and Federal government authorities/departments, which may be required for performing the works. This also includes supplying of all certificates (as necessary), qualifications, calculations, reports, drawings and documentation required by governmental agencies, Certifying Authorities, inspection institutions, surveyors. Project management and control of the project from award to final acceptance by the Company to ensure proper, sound and timely performance of the work.

FILE: 165-3-SPG-026, Rev.0

SHEET 6 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Construction, installation, fabrication, erection of equipments, electrical, instrument and safety systems of Nashpa Plant. Preparation, fabrication, position, orientation, installation, construction, NDT, inspection, quality control & surface treatment. Dimensional control of each and every stage to complete the plant facilities. Carryout testing, checking, completion of detailed check lists, pre-commissioning, commissioning and start-up, supply of consumables and any incidental matters relating to the satisfactory completion and operation of the complete plant facilities. Tie-in of gas processing facilities and utilities (to be supplied by Contractor) with Companys provided infrastructure and other works. Construction and maintenance of temporary site facilities warehouse & security arrangements. The Contractor shall perform the work with due diligence in a professional manner and in accordance with good industry practice and standards and warrant and guarantee the defect free and on specifications operation of Nashpa Gas Processing Plant. Procurement (Supply) of all equipment/material including preparation and placement of Purchase Orders, expediting, inspection, quality control, shipping, delivery, inland transportation and offloading at port and project site. Project management, planning and control of the whole project from contract award to final acceptance by the OGDCL. Pre-commissioning, commissioning, performance testing and start-up of the new plant and training of staff. QA/QC. Health Safety and Environment (HSE) Arrange delivery of initial fill of consumables, commissioning spares and two (2) years spares. Preparation of all documentation (including as built drawings/documents and operations/maintenance manuals etc.) and their submission to OGDCL in both hard & soft form. The documentation will include softcopies of PFDs, heat & material balance, P&IDs and simulation by HYSIS. Approvals from OGDCL/Consultant for all engineering material, equipment & consumables.

FILE: 165-3-SPG-026, Rev.0

SHEET 7 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Liaison and Coordination with OGDCL/Consultant & relevant local authorities and obtain approvals from the local provincial and federal government authorities/departments which may require for executing the Project. Training of Companys personnel for the operation and maintenance of the overall system and equipment supplied by the Contractor.

The Contractor shall perform the work in an efficient manner with due diligence, high professional standards, and good industrys practices, internationally accepted codes/standards and in accordance with the requirement setout in the Contract Documents. The Contractor shall not be relieved of any of its obligations under the Contract as a result of any inspection, examination, review, instruction, approval, consent or certificate given/issued by OGDCL/Consultant. The Contractor shall comply with all applicable laws including environmental regulations, OGDCLs HSE & Security requirements in the performance of the Contract and shall ensure that the Project is fully compliant with all applicable laws. The responsibilities and scope of Contractor are more specially described in the scope of work and services given in Volume-II. 3.0 CONSULTANTS ROLE OGDCL has appointed M/s. Zishan Engineers (Pvt.) Ltd. (ZEL) as Consultant for providing consultancy services to ensure timely project completion complying with quality specifications and performance requirements. ZEL responsibilities shall include: Process selection & Preparation of Front End Engineering Design (FEED) document. Preparation of tender document for execution of project on EPCC basis and required procurement support & assistance in Contract formulation & negotiations. Review of Contractors design and timely review and approval of all documents. Procedures, prepared by Contractor. Inspection & Testing of main equipment & material items. Supervision during construction, fabrication, installation/erection, commissioning and performance testing of Nashpa plant.

4.0

OGDCL RESPONSIBILITIES OGDCL shall be responsible for providing the Contractor the following: Land for plant and temporary construction (camp).

FILE: 165-3-SPG-026, Rev.0

SHEET 8 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

5.0

Engineering data/documents as stipulated in the Contract Document Issue of letters and documents, to the authorities in Pakistan, which Contractor may require for the execution of the Project Works. Assistance in obtaining custom duty/tax concessions under relevant SRO. Timely review and approvals of documents. Gas production of wells. Access of Contractor to Project site.

PROJECT COMPLETION PERIOD The timely completion of the Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities by the contractor shall be the essence of the Contract, as OGDCL has to meet its obligations for completion of the project and supply of Gas. Accordingly, the Contractor (Successful Bidder) is required to complete the engineering, procurement, construction, installation/erection, pre-commissioning, commissioning & start-up of Nashpa Gas Processing and LPG Recovery Plant within fourteen (14) months from the effective date of the Contract to be executed between OGDCL and the successful Bidder.

6.0

SCOPE OF BID & SOURCE OF FUNDS The bid pertains to engineering, procurement, construction & commissioning of Nashpa Gas Processing and LPG Recovery Plant for NASHPA Field of OGDCL. The cost to be incurred for procurement of Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities will be financed from available internally generated funds.

7.0

BIDDING PROCESS OGDCL is adopting the two stage-two envelope bidding procedure as outlined below: First Stage The bid shall comprise a single package containing two separate envelopes. Each envelope shall contain separately the technical (proposal) bid and financial (proposal) bid. The envelopes shall be marked as TECHNICAL (PROPOSAL) BID and FINANCIAL (PROPOSAL) BID in bold and legible letters to avoid confusion. Initially, only the envelope marked TECHNICAL (PROPOSAL) BID shall be opened. The envelope marked as FINANCIAL (PROPOSAL) BID shall be retained in the custody of OGDCL without being opened.
SHEET 9 OF 38

FILE: 165-3-SPG-026, Rev.0

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

The technical (proposal) bid shall be reviewed by OGDCL/CONSULTANT and communications shall be exchanged or (if required) discussions will be held with the bidders with reference to the OGDCLs technical requirements given in the tender document. Those bidders willing to meet the requirements of OGDCL shall be allowed to revise the relevant part of the technical proposals as a result of exchange of communications and discussions. Bidders not willing to conform their technical (proposal) bid to the revised requirements of OGDCL shall be allowed to withdraw their respective bids without forfeiture of their bid security.

Second Stage After agreement between OGDCL and the bidders on the technical requirements, bidders who are willing to conform to the revised technical specifications and whose bids have not already been rejected shall be asked to submit a supplementary financial (proposal) bid, according to the technical requirement as agreed during technical evaluation. The original and supplementary financial (proposals) bids shall be opened at a date, time and venue announced and communicated to the bidders in advance. OGDCL shall evaluate the original and supplementary financial (proposal) bids as per laid down evaluation criteria and the bid found to be the lowest evaluated bid shall be accepted. The award will be made in favor of lowest evaluated responsive bidder at sole discretion of OGDCL. OGDCL reserves the right to increase or decrease the quantities of Nashpa Gas Processing, LPG Recovery Plant and Allied Facilities or give partial order without any change in price or other terms & condition. OGDCL reserves the right to accept or reject any bid or part of a bid and or to annul the bidding process and reject all bids at any time prior to award of contract, without thereby incurring any liability to the affected bidder or bidders or any obligation to inform the affected bidder or bidders of the grounds for OGDCLs action

8.0

COST OF BIDDING The bidder shall bear all costs associated with the preparation and submission of its bid including submission of Bid Bond and OGDCL will in no case be responsible or liable for those costs, regardless of the conduct or outcome of the bidding process

FILE: 165-3-SPG-026, Rev.0

SHEET 10 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

9.0

ELIGIBILITY REQUIREMENTS Bidder must meet the following eligibility requirements: a) The Bidder shall be Oil & Gas industry contractors of Pakistan and of countries with whom Pakistan has bilateral relationship. b) The bids of only those bidders shall be entertained by OGDCL who will submit the letter of intention to bid to OGDCL within two (02) weeks of downloading the tender document from OGDCL website. c) The equipment to be supplied and services to be provided for Nashpa Gas Processing, LPG Recovery Plant and Allied Facilities under this contract shall have origin in the countries having bilateral trade relations with Islamic Republic of Pakistan. For purpose of this Clause, origin means the place where the Goods are mined, grown or produced or from where the ancillary services are supplied. Goods are produced through manufacturing, processing or substantial and major assembling of components, a commercially recognized product results that is substantially different in basic characteristics or in purpose or utility from its components. d) The Bidders shall be experienced (at least five (05) years) possessing required resources and capable to execute the contract on EPCC basis of Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities. The bidders shall furnish as part of the bid documents establishing bidders eligibility to bid and qualifications perform the contract if their bid is accepted by OGDCL. e) The bidder and its engineering staff shall meet all the requirements of Pakistan Engineering Council (PEC) Act 1976, its bye-laws and amendments and provide documents to this effect.

f) The offshore companies registered at places e.g. Virgin Cayman, Nausa jersy and Bohman Islands shall not be eligible nor entertained and bids if submitted shall be rejected. 10.0 BIDS OF JOINT VENTURES/CONSORTIUM The bids submitted by a Joint Venture/Consortium comprising of two or more firms as partners shall comply with the requirements given below: a) The Joint Venture/Consortium shall nominate one of the partner as Partner Incharge and this authorization shall be evidenced by submitting a power of attorney signed by partners themselves or legally their authorized signatories. The power of attorney shall be certified by Notary Public. b) The Partner Incharge shall be authorized to incur liabilities and receive instructions for and on behalf of any and all partners of the joint venture/consortium and the entire execution of the contract (including release of payment) shall be made with the Partner Incharge.
FILE: 165-3-SPG-026, Rev.0 SHEET 11 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

c) All partners of the joint venture/consortium shall be liable jointly and severally for executing and fulfilling the obligations stipulated in the contract document. A relevant statement to this effect shall be incorporated in the authorization mentioned under clause (a) above as well as Form of Bid and the Form and Conditions of Contract in case of successful bid d) The bidder shall submit a copy of Memorandum of Understanding (MOU) entered into by the joint venture/consortium partners giving the relationship and responsibilities of the partners with respect to supply of Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities. (A format of Responsibility Matrix is given as Annexure-I). e) The bid, and in case of a successful bid the form and conditions of contract shall be signed so as to be legally binding on all partners f) The bidder, if successful shall within ten (10) days of receiving the notification of award from OGDCL shall furnish a copy of contract entered into by joint venture/consortium partners. 11.0 AGENT / REPRESENTATIVES The agent / representatives can download the tender document from OGDCL website and submit the bid (including the bid bond) on behalf of their principals. However, they shall be required to submit agency / distributorship / representation letter (On Principals letter head) duly signed and stamped with authorization for the subject tender. 12.0 PREFERRED VENDORS The Bidder shall procure various components of Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities from OGDCLs Preferred Vendors list given in Volume-II of this Tender Document. However, the bidder can propose other reputable equivalent vendors for OGDCLs approval. Bidder shall submit documentary evidence to prove equivalency such as client list, past experience etc. for evaluation by OGDCL / CONSULTANT. 13.0 SITE VISIT The Bidders are required to visit the Site of proposed facilities. During the visit the bidders will examine the site and its surrounding area. The Bidder should verify the information present in the Tender Document assess and obtain on its own responsibility all required information for preparing the bid proposal. OGDCL/Consultant will coordinate the visit and bidders will be informed about the exact date and timing of the visit. The visit will be scheduled to take place within two (02) weeks of tender sale closing date. In order to visit the site of proposed facilities the prospective bidders should send to OGDCL the Proforma for Site Visit & Pre-Bid Meeting enclosed with Invitation to Bid in a timely manner.
FILE: 165-3-SPG-026, Rev.0 SHEET 12 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

The cost to be incurred on the visit shall be on Bidders expense. The Bidder and any of its personnel or Agents/Consultants will be granted permission by OGDCL to enter upon its facilities for the purpose of such visit, but only upon the express condition that the Bidders, its personnel or Agents/Consultants will release and indemnify OGDCL its personnel Agents/Consultants form and against all liability in respect thereof including personal injury (whether fatal or otherwise) and any other loss, damage, costs and expenses. 14.0 PRE-BID MEETING OGDCL will organize a pre-bid meeting, the venue, date, timing of the pre-bid meeting will be notified to all the prospective bidders. The Bidders representatives should attend the meeting to obtain clarifications and any other information required for preparation of the bid. 15.0 TENDER DOCUMENT 15.1 Contents As stated earlier, the tender document comprises of following together with any addenda that may be issued from time to time: Volume-I Project Background & Introduction (Section-I) Invitation to Bid (Section-II) Instruction to Bidders (Section-III) Forms & Conditions of Contract (Section-IV)

Volume-II Scope of Work and Services for Design, Manufacturing, Supply, Installation, Construction & Commissioning of Gas Processing, LPG Recovery Plant & Allied Facilities.

Volume-III Supplementary Datasheets). Technical Documents (Drawings, Specifications and

The prospective bidders shall carefully study and examine all sections of the document and shall comply with the stipulated requirements. Failure to furnish all information required by the tender document or submission of bid not substantially responsive to the tender requirement in every respect will be at Bidders risk and may result in the rejection of the Bid.

FILE: 165-3-SPG-026, Rev.0

SHEET 13 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

15.2

Clarifications A prospective bidder requiring any clarification of the Tender document or requiring any data may notify Consultant in writing by fax or email with C.C. to OGDCL at below given addresses: CONSULTANT Project Manager NASHPA Field Zishan Engineers (Pvt) Limited 47-/F, Block 6, PECHS, Karachi-Pakistan Tel: 92-21-34393045-48 Fax: 92-21-34533430 E-mail: rashid.faruqi@zishanengineers.com furrukh@zishanengineers.com OGDCL Project Manager NASHPA Field Oil & Gas Development Company Limited OGDCL House, Jinnah Avenue, Blue Area, Islamabad Pakistan Tel: 92-51-9209811-8 Email: khalid_qureshi@ogdcl.com Project Coordinator NASHPA Field Oil & Gas Development Company Limited OGDCL House, Jinnah Avenue, Blue Area, Islamabad Pakistan Tel: 92-51-8352956 Email: kausar_ali@ogdcl.com GM Projects Room No.: 202, 2nd Floor Tower B OGDCL House Jinnah Avenue, Blue Area, Islamabad. Tel. No.: 051-9244431, 920023549, 920023550 Fax No.: 051-2623085 E-mail: ajmalkhan@ogdcl.com OGDCL/ Consultant will respond in writing to any request for clarifications of the Tender Document, which it receives not later than one (01) week prior to deadline for the submission of bids prescribed in the Tender Document. Written copies of Consultants response (including an explanation of the query clarification but without identifying the source) will be communicated to all the participating bidders.

FILE: 165-3-SPG-026, Rev.0

SHEET 14 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

15.3

Amendment Any time prior to the deadline for submission of bids, OGDCL for any reason whether at its own initiative or in response to clarification requested by a prospective bidder, may modify the tender document by issuing addenda/amendment. Any addendum/amendment shall form part of the tender document and shall be notified in writing or fax or email to all prospective bidders and will be binding on them. The prospective bidders should acknowledge receipt of any such addenda/amendment in the tender document. In order to allow prospective bidders reasonable time to take the addenda/amendment into account in preparing their bids OGDCL at its discretion may extend the deadline for submission of bids.

16.0

PREPARATION OF BIDS 16.1 Language of Bids The Bids prepared by the Bidder and all correspondence and documents relating to the Bid exchanged between the Bidder and OGDCLs Consultant, shall be written in English language. Any supporting printed literature furnished by the Bidder written in another language should be accompanied by an English translation of its pertinent pages in which case, for purposes of interpretation of the Bid, the English translation shall govern. 16.2 Documents Comprising the Bid The Bid to be submitted by the Bidder shall comprise Technical Bid and Financial Bid:
16.2.1 Technical (Proposal) Bid

The Technical (Proposal) Bid shall consist of the following: I) General a) Original Bid Bond for an amount of US $ 2,000,000/- (US Dollars two million only) or equivalent Pak Rupees as per format given in Annexure-II. b) An un-priced copy of Annexure-IX along with a statement confirming the bid validity period as per tender requirement. c) Documentary evidence established in accordance with Instructions 16.3 that the bidder is eligible to bid and is qualified to perform the Contract.
FILE: 165-3-SPG-026, Rev.0 SHEET 15 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

d) Documentary evidence established in accordance with Instructions 9.0 and 16.4 that the required units/equipment to be supplied, installed, constructed & commissioned by the bidder are eligible material and conform to the Tender Document. e) Details of major components items of Gas Processing & LPG Recovery Plant proposed to be supplied including the following: Sources/Country of origin Name and complete address of manufacturers/packager Profile of manufacturers/packager, their credentials, details of items to be supplied and their capacity.

f) Bidders and its joint venture partners (if any) profile as per details given in Annexure-III. g) Detailed Project Execution Plan covering all components including Design, Procurement (Supply), Installation, Construction & Commissioning of Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities. h) A reference list of plants similar to Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities executed on EPCC basis designed supplied, installed, constructed & commissioned in the country of origin, Pakistan and other countries during last five (05) years as per format given in Annexure-IV. The documentary evidence in the form of Copies of Contracts and performance/Completion Certificates should be provided. Only those Projects whose complete documentary evidence (including performance/ completion certificates) have been submitted will be considered in the evaluation. i) Bidders proposed project organization plan and resources (i.e. physical and human resources) to be deployed. The details of physical resources and curriculum vitae of key personnel are required to be provided as per format given in Annexure-V. The curriculum vitae (CV) shall include the proposed position, qualification, experience and age of the person. The key personnel, if accepted by OGDCL, shall be nominated in the final Contract. j) Proposed master and level-3project schedule with CPM network of project execution covering all components i.e. Design, Supply, Construction, Installation, Construction & Commissioning of Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities. k) List of major construction & related machinery & equipment available with the Bidder and its joint venture partner.

FILE: 165-3-SPG-026, Rev.0

SHEET 16 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

l) List of computer software and hardware available with the Bidder and its joint venture partner. Also specify the software(s) to be used in: Design Engineering Procurement of material/inventory management Construction Project Planning & Control

m) Bidders plan for co-ordination with OGDCL/Engineering Consultant and relevant government agencies and departments. n) Detailed procedure of how physical progress and percent completion will be measured, tracked and reported for each component of the Contract i.e. Design, Supply, Installation, Construction & Commissioning of Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities. o) Detailed description of project management system and Quality Assurance and Quality Control procedures and safety, QA/QC organization which the Bidder intends to adopt/follow for this project (These procedures should be Project specific). p) Health, Safety and Environment (HSE) project specific plan and procedures. The plan and procedures should be inline with OGDCLs HSE policy and procedures. q) Areas of the work proposed to be sub-contracted with names, address, capabilities and other details of Sub-Contractors and their written consent for entering into an agreement with the bidder for the specified work of the Project. r) Memorandum of Understanding (MOU) executed by joint venture partners with respective responsibilities for each package. s) Copies of ISO, API and other certification/accreditations. t) Authority Letter in the name of representative signing the Bid. u) Duly initialed & stamped copy of complete Tender Document including Design Basis, Technical Details & Drawings, Form & Conditions of Contract as well as Integrity and Ethics Undertaking as per format given in Annexure-VI-A & B. v) Statement that the goods are "Brand New

FILE: 165-3-SPG-026, Rev.0

SHEET 17 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

II) Technical Details: a) The technical details of Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities are presented in Annexure-VII. 16.2.2 Financial Bid a) Bidding Form as per Annexure VIII. b) Photocopy of Bid Bond for an amount of US $ 2,000,000/- (US Dollars two million only) or equivalent Pak Rupees. c) Bid Price Schedule as per Annexure IX. d) Item-wise (unit/system-wise) price list of Start-up & Commissioning Spares e) Item-wise (unit/system-wise) price list of spare parts for two (02) years operation f) Expenses of design review, HAZOP Inspection / witness testing by OGDCLs/Consultants Representatives. g) Pre-Shipment Inspection Charges supported by verified quotation of nominated Inspection Agency. h) Statement that the duties taxes levied by the exporting country and Pakistan are included. i) Schedule of Rates for Additional equipment & material items given in Annexure-XVII. j) Schedule of Rates for various types of works i.e. civil, mechanical, electrical & instrumentation. k) Schedule of manday rates of home office and field staff and construction equipment. l) Data Summary Sheet as per format given in Annexure-X. 16.3 Documents Establishing the Bidder's Qualification The Bidder shall furnish, as part of its Bid, documents establishing Bidder's qualifications to perform the Contract covering: a) That, the Bidder offering the Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities under the Contract has been duly authorized by the manufacturer or producer to supply the materials to Pakistan.
FILE: 165-3-SPG-026, Rev.0 SHEET 18 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

b) That, the plant/units offered have been manufactured and supplied in the past and have been successfully in operation for at least three (03) years in similar conditions 16.4 Documents Establishing Eligibility and Conformity to Tender Document of the Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities Proposed to be Supplied The Bidder shall furnish, as part of the Bid, documents establishing the eligibility and conformity to the Tender Document of Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities which the Bidder proposes to supply under the Contract. The documentary evidence of Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities eligibility shall consist of a statement in the Price Schedule on the country of origin of the equipment offered which shall be confirmed by a certificate of origin issued at the time of shipment. The documentary evidence of the equipments conformity to the Tender Document may be in the form of literature, drawings and data and shall furnish a detailed description of the goods and essential technical and performance characteristics. A clause-by-clause commentary on the Technical Specifications demonstrating the Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities substantial responsiveness to those specifications or a statement of deviations and exceptions to the provisions of the Technical Specifications.

16.5

Bid Form and Price Schedule The Bidder shall complete the Bid Form (Annexure-VIII) and Bid Price Schedule (Annexure-IX) furnished in the Tender Document, indicating the Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities to be supplied, a brief description of the Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities their country of origin, quantity and prices.

16.6

Deviation/Exceptions The Bid shall clearly state, in a section explicitly devoted for this purpose, any or all deviation/exceptions to the requirements of these Instructions to Bidders including Conditions of Contract, also list of any departures or deviation from specifications contained in Technical Documents given in Volumes 2 & 3. The Deviation form is given as Annexure-XI.

FILE: 165-3-SPG-026, Rev.0

SHEET 19 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

16.7

Bid Bond
16.7.1 The Bidder shall furnish, as part of its Technical Bid, original Bid Bond

(Annexure-II) for an amount of US $ 2,000,000 (US Dollars two million only) or in equivalent currency of the bid or in equivalent Pak Rupees.
16.7.2 The Bid Bond is required to protect OGDCL against the risk of Bidders'

conduct which would warrant the Bid Bond encashment pursuant to Instructions given in following paragraphs.
16.7.3 The Bid Bond shall be denominated in United States Dollars or equivalent

Pak Rupees and shall be in the following form: A bank guarantee issued by a Scheduled Bank (having long term rating of more than A), registered in Pakistan or any international bank operating in Pakistan acceptable to OGDCL, in the form provided in the Tender Document and valid for 45 days beyond the validity of the Bid.

16.7.4 Any Bid not secured in accordance with Instructions 16.7.1 and 16.7.3

will be rejected by OGDCL as non-responsive.


16.7.5 Unsuccessful Bidders' Bid Bond will be discharged/returned as promptly

as possible but not later than 45 days after the expiry of the period of Bid validity prescribed by OGDCL.
16.7.6 The successful Bidder's Bid Bond will be discharged upon the Bidder's

executing the Contract, and furnishing the Performance Bond.


16.7.7 The Bid Bond shall be encashed:

i) ii)

If a Bidder withdraws its Bid during the period of Bid validity specified by the Bidder on the Bid Form; or In the case of a successful Bidder, if he fails: To furnish Performance Bond in accordance with the Tender Document. To sign the Contract

16.8

Bid Prices & Payment Terms


16.8.1 Bid Prices

The Contract shall be on EPCC basis with fixed lumpsum price. This concept entails that the Contractor shall be fully responsible for complete execution of the Project as defined in the tender document meeting the technical specifications, applicable standards and OGDCLs objectives.

FILE: 165-3-SPG-026, Rev.0

SHEET 20 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

All prices shall be quoted on fixed lumpsum basis as per format given in Annexure-IX of this document. The prices shall be for complete scope of work and the obligations of Design, Engineering, Supply, Construction, Installation, Commissioning, Testing and overall Project management with no exceptions. The quoted process shall be firm and fixed during the Contract performance period and shall not be subject to any escalation on any account. The prices shall be quoted by the Bidder separately in the following currencies: a) For those inputs to the Project which the Bidder expects to supply by importing them from outside Pakistan (referred to as the foreign currency component) shall be in US Dollars or other internationally convertible currency. The prices shall inclusive of taxes (If applicable) of the exporting country. b) For those inputs to the project which the Bidder expects to supply from within Pakistan in Pak Rupees. The price shall be on ex-Project site delivery basis (inclusive of applicable sales tax/levies). However, the Bidder shall provide separately the details of sales tax/levies considered, and shall take into account the provisions of relevant SROs applicable to OGDCL. The custom duties/taxes etc as levied on import of plant and machinery required for construction of Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities which do not form part of the Plant shall be on Contractors account. The pre-shipment inspection charges shall be quoted on all inclusive basis and shall be fixed lump sum duly supported by verified quotation of the third party inspection agency. OGDCL approved third party inspection agencies include SGS, Lloyd, Velosi & Moody International. The complete addresses of OGDCL approved inspection agencies are given in Annexure-XII. The scope of Pre-shipment inspection is given below: Review the complete list of equipment, spare parts, commissioning and start-up spares, systems/ auxiliaries etc. being supplied and compare it with the relevant purchase document. Presence of all items shall be verified. Dimensional Inspection. Review the available inspection and testing reports. Verification of name plate sizing rating model numbers, port numbers, tag numbers.

FILE: 165-3-SPG-026, Rev.0

SHEET 21 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Packing and marking check. Check that all manuals, instructions, guidelines and procedures are included. Verification of number of packing cases and marking against contractual specifications. Checking for appropriate handling during loading. Checking the stowing, fastening and wedging on the means of transport. Compilation & submission of Pre-Shipment inspection report to OGDCL

The bidder shall quote Expenses of Design Review HAZOP Inspection/witness testing by OGDCL/Consultant Representatives on the following basis: Design Review Meetings at Contractors Office

Three (03) Visits; each for a duration of five (05) workings days. Six (06) Engineers each visit.

HAZOP Meetings at Contractors Office (After Finalization of P&IDs)

Six (06) Engineers for a duration of five (05) working days.

Shop Witness Testing for Each System FAT


One (01) visit for a duration of five (05) working days. Three (03) Engineers.

HAZOP Meetings at Contractors Office (Before Commissioning of Plant)

Six (06) Engineers for a duration of five (05) working days.

The Contractor shall provide the following facilities for these visits;

Full Fare economy class Return Air Tickets. Local Transportation. Hotel Room on Single occupancy basis for each person in a four 04 star hotel for duration of stay.

FILE: 165-3-SPG-026, Rev.0

SHEET 22 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Daily Allowance to be paid to the Engineers for the period of stay as detailed above plus two (02) days for travel on the following basis: For Design Review and HAZOP Meetings @US $ 300 per person per day. For performance & shop witness testing @US $ 300 per person per day.

16.8.2 Payment Terms

The payment for the foreign currency component of Bid Price shall be made by OGDCL through irrevocable Letter of Credits (L/C) established through a bank of OGDCLs choice. Letter of Credit (L/C) shall be established in accordance with the requirements of State Bank of Pakistan, customs authorities and other concerned governmental organizations. The terms & conditions of L/C for supply of foreign equipment and material items and foreign component of services (if any) i.e. design engineering, works covering construction, installation & erection are given in Annexure-XIII-A & B. Foreign currency payment can only be made to the foreign beneficiary of the L/C. Payments in local currencies shall be made through account payee cheques issued in favor of the Contractor Payment shall be subject to ten (10%) advance adjustment and 10% retention money and deduction of withholding tax as per relevant laws/regulations/ Payments shall be subject to deduction of withholding tax as per relevant laws/regulations. All payments shall be according to terms of payment, milestones and invoicing procedure, which are described in detail in the Conditions of Contract. Mobilization Advance Payment Ten Percent (10%) of the total Contract Price shall be paid by OGDCL to Contractor as advance separately for foreign currency component through letter of credit (L/C) and local currency component though account payee cheque. The Mobilization Advance shall be paid to the Contractor on submission of Advance Payment Guarantee of equivalent amount issued as per format given in Annexure-XIV and by bank acceptable to OGDCL. No advance shall be paid before the submission of Performance Bond required as per relevant clause of Conditions of Contract. The amount of advance payment shall be deducted proportionately from Contractor each invoice. The payment schedule for various components of the Contract Price is outlined below:

FILE: 165-3-SPG-026, Rev.0

SHEET 23 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Procurement (Supply) of Equipment and Materials Foreign Currency Payments The payment of foreign currency component of the contract price shall be made under the L/C on the following milestones: Ten percent (10%) on the placement of order of major equipment & material items on submission of un-priced copy of purchase order and suppliers acceptance along with Contractors invoice duly verified by OGDCL. Ten percent (10%) of the L/C amount shall be paid on satisfactory completion of Shop Witness Testing accompanied by a Certificate of the Contractor to that effect and Contractors invoice duly verified by OGDCL. Forty Five percent (45%) of the L/C amount shall be paid upon shipment of materials and equipment against presentation of below given documents by Contractor; One (01) Original and four (04) manually signed copies of Contractors separate invoices specifying the amount to be paid through the Letter of Credit. One (01) original and four (04) photocopies (attested by the Contractor as true copies) of the certificate(s) of origin for the shipment in question. One (01) original and four (04) photocopies (attested by Contractor as true copies) of the relevant negotiable clean, on-board, shipped bills of lading or of negotiable, clean on-board Combined Transport Bills of Lading (to allow for feeder carriage by truck or rail) or airway bills, where relevant. One (01) original and one (01) photocopy (attested by the Contractor to be a true copy) of the Contractors packing list.

The documents will accompany a certificate of the Contractor stating that the shipment of materials and equipment items in question has passed applicable tests and is strictly in accordance with the requirements and specifications of the Contract.

FILE: 165-3-SPG-026, Rev.0

SHEET 24 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Ten percent (10%) of the L/C amount shall be paid on clearance of equipment and material items from Karachi Port accompanied with relevant documents and duly verified Contractors invoice. Ten percent (10%) of the L/C amount shall be paid upon delivery of materials and equipment items at Project Site against presentation of following documents by the Contractor: One (01) original and four (04) manually signed copies of the Contractors Invoice and OGDCLs certificate that the materials and equipment has been delivered at Project Site and duly inspected by OGDCL.

Five percent (05%) of the L/C amount shall be paid on submission of operating manuals by the Contractor accompanied with a invoice and Certificate of OGDCL receipt. Ten percent (10%) of the L/C amount shall be paid on issuance of Provisional Acceptance Certificate by OGDCL.

The payment shall be made after deducting ten (10) percent amount for adjustment on account of advance till the total amount of advance is recovered and ten (10) percent for retention money. The five percent (5%) of retention money shall be released by OGDCL to the Contractor within thirty (30) days of issuance of Provisional Acceptance Certificate by OGDCL. The remaining five percent (5%) of retention money shall be released within thirty (30) days of submission of Final Payment documents. In order to be entitled to payment for any particular milestone all previous milestones must have been achieved. Local Currency Payments The payment for local supply of equipment & material shall be made by OGDCL to the Contractor as per following schedule: Fifteen percent (15%) shall be paid on placement of equipment & material order(s) by Contractor evidenced by unpriced copy of purchase order duly acknowledged by the Supplier and Contractors invoice duly verified by OGDCL.

FILE: 165-3-SPG-026, Rev.0

SHEET 25 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Forty five percent (45%) shall be paid on satisfactory shop inspection of equipment & material items by OGDCL/ Consultant and submission of Contractor invoice duly verified by OGDCL. Thirty percent (30%) shall be paid on delivery/Inspection of equipment & material at project site duly and submission of Acceptance Certificate by OGDCL and verified Contractors invoice. Ten percent (10%) shall be paid on issuance of Provisional Acceptance Certificate by OGDCL.

The payment shall be made after deducting ten (10) percent amount for adjustment on account of advance till the total amount of advance is recovered and ten (10) percent for retention money. The retention money shall be released by OGDCL to the Contractor within thirty (30) days of issuance of Provisional Acceptance Certificate by OGDCL. The remaining five percent (5%) of retention money shall be released within thirty (30) days of submission of Final Payment documents. The above payments shall be subject to deduction of withholding tax as per relevant laws/regulations. Services The local currency payments shall be made through account payee cheques issued in favor of the Contractor. For the foreign component of Services (if any) an irrevocable L/C shall be established by OGDCL as per requirements of Custom Authorities and other concerned government authorities as per format given in Annexure-XIII-B. Surveys & Soil Investigation Forty percent (40%) shall be paid on submission of preliminary report on completion of field work and Contractors invoice duly verified by OGDCL. Sixty percent (60%) shall be paid on submission of surveys drawings & final soil investigation report and Contractors invoice duly verified by OGDCL.

FILE: 165-3-SPG-026, Rev.0

SHEET 26 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Design Engineering Ninety Percent (90%) design engineering (including inspection) work price shall be paid in accordance with the valuation/completion of engineering work. The valuation shall be done on the basis of the documents received by OGDCL. For this purpose the Contractor within two (2) weeks of the Contract award shall submit a list of major engineering documents. Each document shall be assigned a weightage in proportion of its size and complexity. Documents / Drawings submitted by the Contractor but not yet approved by the Company / Consultant shall be considered 70% complete. Ten percent (10%) of engineering & project management work price shall be paid on Issuance of Provisional Acceptance Certificate The payment shall be made after deducting ten (10%) percent amount for adjustment on account of advance till the total amount of advance is recovered and ten (10) percent of the retention money. The retention money shall be released by OGDCL to the Contractor within thirty (30) days of issuance of Provisional Acceptance Certificate by OGDCL. The remaining five percent (5%) of retention money shall be released within thirty (30) days of submission of Final Payment documents.

Works (Covering Construction, installation & erection) OGDCL shall make progressive payments to Contractor on monthly basis against Contractors invoices giving details of that specific work and its completion status. The payment shall be made considering the Bid Price Schedule and verified percentage completion of work. The measurement/verification mechanism for progressive payments of works shall be mutually agreed between Contractor and Company/Consultant. The progressive payment shall be made after deducting ten (10) percent amount for adjustment on account of advance till the total amount of advance is recovered and ten (10) percent for retention money. The retention money shall be released by OGDCL to the Contractor within thirty (30) days of issuance of Provisional Acceptance Certificate by OGDCL. The remaining five percent (5%) of retention money shall be released within thirty (30) days of submission of final payment documents.

FILE: 165-3-SPG-026, Rev.0

SHEET 27 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Start-up & Commissioning (including performance Testing) The start-up & commissioning charges shall be paid on successful commissioning & performance testing of the Plant by OGDCL and submission of Contractors invoice duly verified by OGDCL. The payment shall be made after deducting ten (10) percent amount for adjustment on account of advance till the total amount of advance is recovered and ten (10) percent for retention money. The retention money shall be released by OGDCL to the Contractor within thirty (30) days of submission of final payment documents.

Invoicing Procedure For progress payment of engineering & project management, and work on a day in each month, to be agreed between the OGDCLs representative and the Contractors representative the Contractor shall in respect of all amount owing to him submit an invoice with relevant supporting documents, in three copies, to the OGDCLs Representative with a Work progress report for OGDCLs approval and signature. OGDCLs Representative shall authorize in writing payment to the Contractor as ascertained in accordance with the above clause. Timing for Payment The Payment of undisputed invoices shall be made in full not later than thirty (30) days after OGDCL has authorized such payment in writing, provided OGDCLs representative has first certified such invoice and Contractor has fulfilled all requirements for the release of payment, OGDCL shall pay the amount due less applicable taxes and any amounts which may be due to OGDCL. Deduction of Withholding Tax All payments made locally shall be subject to deduction of withholding tax as applicable. If the Contractor is entitled for any exemption from the withholding tax or a reduced rate of withholding tax, he shall obtain a certificate from the relevant tax authority in Pakistan and submit it to OGDCL. Disputed Invoices If any invoice or an amount of invoice is disputed, OGDCL shall within ten (10) days of receipt of invoice inform the Contractor the grounds on which payment of the invoice or an amount is disputed. Efforts shall be made by both parties to resolve the dispute within a period of thirty (30) days.

FILE: 165-3-SPG-026, Rev.0

SHEET 28 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

17.0

PERFORMANCE GUARANTEES 17.1 The Contractor shall guarantee satisfactory performance of Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities as defined in the performance guarantee requirements given in Annexure-XV. The Contractor shall also provide and prove during commissioning the performance parameters of all major equipment of the Plant. Prior to Performance Test the Contractor will have to operate the Nashpa Plant for continuous seven (07) days in a steady state. The Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities shall be evaluated over a seventy two (72) continuous Acceptance Test over which the process conditions and products specs shall be required to be met. If the Plant does not achieve satisfactory performance or otherwise adhere to the requirements outlined in the Contract, the Contractor shall promptly analyze the cause of failure. The Contractor shall take all necessary corrective measures in a prompt manner to ensure such that Nashpa Plant gives satisfactory performance. If the Plant still fails to give satisfactory performance or otherwise adhere to the requirements outlined in the Contract in a subsequent Performance Test the date of which will be mutually agreed then Contractor shall determine the cause of this failure and advice changes/modifications or addition. OGDCL/Consultant can also independently determine the cause of such failure. The Contractor shall be liable to bear all expenses of the design, purchase, delivery and installation of such changes, modifications or additions. The liability of such additions, modifications shall be un-limited. If after all such additions/modifications the Nashpa Plant still fail to meet performance in a final test to be demonstrated within three (03) months of the agreement to changes to be made to the Plant, the Contractor shall pay to OGDCL as liquidated damages an amount equal to twenty percent (20%) of the Contract Value.

17.2

17.3

17.4

17.5

18.0

WARRANTIES 18.1 The Contractor shall warrants that the equipment and material supplied under the Contract shall be new, having good title and fit for the use intended, The Contractor further warrants that: a) Equipment & materials supplied against the Contract conforms in all respects with the specifications and requirements contained in contract document. b) Equipment supplied under this Contract shall be of good quality and free from all defects arising from design, materials or workmanship. The Contractor shall also obtain and provide to OGDCL/Consultant original manufacturers warranty of the equipment supplied by it from vendors and manufacturers. The warranties shall be obtained in the name of OGDCL.

FILE: 165-3-SPG-026, Rev.0

SHEET 29 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

The Contractor warrants that the construction/installation, erection and other work shall be of good quality, free from faults or defects and shall perform so as to comply with the specifications contained in the contract documents or with any revisions thereof pursuant to any changes. The Contractor further warrants that all work performed under the Contract shall be in accordance with industrys recognized codes and standards. The foregoing warranties shall remain valid for a period of twelve (12) months from the date of Provisional Acceptance Certificate. If the supplied equipment/materials, construction, installation/erection and related work fail to meet the warranty conditions set. OGDCL shall promptly notify the Contractor in writing about the defects and claims under the warranty. Upon receipt of such notice the Contractor shall within the time specified by OGDCL/Consultant repair/replace the defective equipment, material and or portion of works, with no cost or expense to OGDCL. The repaired or replaced equipment, material or works shall be warranted by Contractor for twelve (12) months from the date of repair(s) or replacement(s). If the Contractor having been notified, fails to remedy the defect(s) within the specified time, OGDCL shall proceed to take remedial actions as may be necessary, at the Contractors risk and cost. All costs thereof shall be charged to the Contractor or recovered from retention money/performance bond. The Contractor shall have no objection to the above and he hereby acknowledges the rights of OGDCL to recover such sums as a debt due to OGDCL from defaulting Contractor. It is understood that in this case the contractor shall not be relieved from the provided warranties and contractual obligations. The Contractor shall also provide warranties of original equipment manufacturers in the name of OGDCL (where applicable). 19.0 FORMAT AND SIGNING OF BID 19.1 The bidder shall prepare three (3) copies of the bid, clearly marking each "Original Bid" and "Copy of Bid" as appropriate. In the event of any discrepancy between them, the original shall govern. The original and all copies of the Bid shall be typed or written in indelible ink. Bids must be properly signed by the Bidder, and shall contain the full name and address of the Bidder. Each page of the Bid and its Annexures must be initialed and stamped by the person or persons signing the Bid. The name of all persons signing the Bid shall be typed or printed below their signatures. Bidders shall be deemed to warrant that the signatories have the necessary delegated authority to sign the Bid and to bind the Bidder. The Bid shall contain no interlineations, erasures or overwriting except as necessary to correct errors made by the Bidder, in which case such corrections shall be initialed by the person or persons signing the Bid.

19.2

19.3

FILE: 165-3-SPG-026, Rev.0

SHEET 30 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

20.0

SUBMISSION OF BIDS 20.1 Sealing and Marking of Bids


20.1.1 As stated earlier, OGDCL is following two stage bidding process.

Accordingly, at stage one (1) the bid to be submitted shall comprise of a single package containing two separate envelopes. Each envelope shall contain separately the technical (proposal) bids and financial (proposal) bids of each package. After completing the evaluation of the technical (proposal) bids OGDCL will allow those bidders willing to meet the technical requirements to submit supplementary financial bids, on the notified date.
20.1.2 At stage one (1) the technical and financial (proposal) bids shall be

submitted in separate envelope. Both the envelopes should then be put in one sealed envelope as described below.
20.1.3 The Original Technical and Financial (Proposal) Bids shall be separately

packed in an inner envelope marked as Technical (Original) or Financial Bid (Original) as the case may be, each inner envelope shall be sealed in an outer envelope, which shall also be marked. Copies of the Technical and Financial (Proposal) Bids shall be sealed and marked in separate inner and outer envelopes. The outer sealed envelope shall be marked and addressed as follows: Manager Foreign Procurement Oil & Gas Development Company Limited (OGDCL) First Floor, OGDCL House, Plot No.3, Jinnah Avenue, Blue Area, Islamabad - Pakistan. Telephone: 92-51-9207461, 920023593 Fax: 92-51-9207530, 9209673 BID FOR ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING OF NASHPA GAS PROCESSING, LPG RECOVERY PLANT & ALLIED FACILITIES TENDER ENQUIRY NO: PROC-FD/CB/PROJ(NASHPA)-732/2012 DO NOT OPEN BEFORE: 12th March, 2013 The sealed envelope shall indicate the name and address of the Bidder to enable the bid to be returned unopened in case it is declared LATE. A similar procedure will be adopted at Stage-II supplementary Financial Bid.

FILE: 165-3-SPG-026, Rev.0

SHEET 31 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

20.1.4 OGDCL shall not be responsible for the premature opening or

misplacement of any Bid not clearly marked and addressed in accordance with Instruction 20.1.3. 20.2 Deadline for Submission of Bids
20.2.1 The Bids must be received by OGDCL at the address specified under

Instruction 20.1.3 not later than 12th March, 2013 at 14:30 Hours local standard time. Bid received later than the specified date and time will not be entertained. OGDCL does not accept any responsibility for Bids detained, delayed or misplaced in transit by mail/courier service or otherwise.
20.2.2 OGDCL may, at its discretion, extend this date for the submission of Bids

by amending the Tender Document in accordance with Instruction 15.3 in which case all rights and obligations of the Owner and Bidders will extend likewise. 20.3 Late Bids Any Bid received by the Owner after the prescribed date and time for submission of Bids, pursuant to Instruction 20.2 shall be rejected and returned unopened to the Bidder. 20.4 Modifications and Withdrawal of Bids
20.4.1 The Bidder may modify or withdraw its Bid after the bid's submission,

provided that written notice of the modification or withdrawal is received by OGDCL prior to deadline prescribed for submission of the Bids.
20.4.2 The Bidder's modifications or withdrawal notice shall be prepared, sealed,

marked and dispatched in accordance with the provisions of Instruction 20.1. A withdrawal notice may also be sent by fax or e-mail but followed by a signed confirmation copy, postmarked not later than the deadline for submission of the Bids.
20.4.3 No Bid may be modified subsequent to the deadline for submission of the

Bids.
20.4.4 No Bid may be withdrawn in the interval between the date for submission

of Bids and the expiry of the period of Bid validity specified by the Bidder on the Bid Form. Withdrawal of a Bid during this interval may result in encashment of Bid Bond under Instruction 16.7.7.

FILE: 165-3-SPG-026, Rev.0

SHEET 32 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

21.0

BID OPENING AND EVALUATION 21.1 Bid Opening

Sealed bids received shall be examined for correct identifying information on the envelope. If the inscription does not clearly shows as per in Instruction given in Section 20.1, the entire bid may be returned unopened. Also bids received after closing date shall be returned un-opened OGDCL will open the Technical Bids, in presence of Bidders representatives who choose to attend, at 15:00 Hrs (PST) on 12th March, 2013 at the following location: Manager Foreign Procurement Oil & Gas Development Company Limited (OGDCL) First Floor, OGDCL House, Plot No.3, Jinnah Avenue, Blue Area, Islamabad - Pakistan. Telephone: 92-51-9207461, 920023593 Fax: 92-51-9207530, 9209673 The Bidders representatives who are present shall sign a register evidencing their attendance.

The envelope marked as Financial (Proposal) Bid shall be retained in the custody of OGDCL without being opened. The Technical (Proposal) Bid shall be reviewed by OGDCL/CONSULTANT and communications shall be exchanged and (if required) discussions will be held with the bidders. The original Financial Bid as well as supplementary Financial Bid of technically responsive bidders will be opened on the above location in presence of Bidders representatives who choose to attend. The date and timings of financial bid will be intimated to relevant Bidders. The Bidders' representatives who are present shall sign a register evidencing their attendance. OGDCL shall prepare minutes of the bid opening. The Bidder names, Bid prices, and such other details as OGDCL, at its discretion, may consider appropriate, will be announced at bid opening.

21.2

Clarification of Bids OGDCL/Consultant may ask bidders individually for clarification of their bid during the process of examination, evaluation and comparison of bids.

FILE: 165-3-SPG-026, Rev.0

SHEET 33 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

21.3

Evaluation & Comparison of Bids The evaluation and comparison of bids will involve: Summary Rejection of Bids Technical Evaluation Financial Evaluation

21.3.1 Criteria for Summary Rejection of Bid

The Bids are not meeting the following mandatory criteria shall be summarily rejected without right of appeal:

Bid must be prepared in English Language Bid must be valid for 120 days from the Date of Bid Opening Bid must be accompanied with a Bid Bond as specified in Clause 16.7 hereof. Bid must reach at the specified OGDCL address before 14:30 hours PST on 12th March, 2012. Bid must not be submitted in form of fax or email. Bid must be on Companys original letter head/pad. Bidding form should be part of the Bid submitted.

21.3.2 Technical Evaluation

The technical bids will be examined and evaluated with the objective of assessing their eligibility, compliance, completeness, conformity to the specifications, guarantee/warranty requirements and responsiveness to the requirements stipulated in the Tender Document. Following factors will be considered for evaluation:
FILE: 165-3-SPG-026, Rev.0

Bid must be prepared as instructed vide clause 17.0 hereof. Bid must be quoted for complete scope of work given in Volume-II of this tender document. Technical qualification, experience and capabilities of the bidder. Process/Technology offered & its commercial proveness (As applicable). Codes & Standards
SHEET 34 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Quality of proposal and compliance with tender requirements. Quality of proposed Project Execution organization and resource plan. ISO, API & other certifications/accreditations. Bidders Profiles and List of Customers/Buyers. Bidders experience (minimum five (05) years), the bidder should have executed on its own two (02) projects on EPCC basis. Pre-Shipment Inspection. Project Completion Period. Warranty/Guarantee. Financial Strength

A bid determined to be substantially non-responsive will be rejected. During evaluation certain clarifications may be sought from the Bidders or discussions may be held with them for the purpose of Bid conditioning/evaluation. The final technical evaluation shall be carried out considering the submitted technical proposal and responses received from the bidder against clarifications/queries. The final technical evaluation shall be based on numerical merit score. A total of 100 points have been allocated to eight (08) areas as detailed below:
S. No. 1 2 3 Areas Experience of Similar Gas Processing and LPG Recovery Plant Compliance to FEED Document i.e. P&IDs, Specifications, Codes/Standards & Datasheet Project Specific Execution Plan (Covering all phases of work), Organogram (including CVs of key personnel) and Resource Deployment plan (human & physical) Adherence to preferred vendors list given in the tender document or its equivalence to be demonstrated by the bidder Detailed Project Schedule Project Specific QA/QC and HSE plan/procedures to be adopted Financial Strength TOTAL Points 20 25 10

4 5 6 7

15 15 5 10 100

The minimum overall qualifying points shall be 70. However, bidder shall have to score minimum 60 % in all the above eight (08) areas.

FILE: 165-3-SPG-026, Rev.0

SHEET 35 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Only those bids which qualify this stage will undergo the financial evaluation.
21.3.3 Financial Evaluation

The financial bids (both original and supplementary) of technically qualified bids will be opened. The evaluation of financial bids will involve: Check and confirm the amount of Bid Bond(s). Conversion to Pak Rupees of foreign currency amount based on interbank currency exchange rate prevailing on the date of financial bid opening. Arithmetic errors in computation and summation shall be checked. The errors shall be corrected in the following manner: a) Where there is a discrepancy between amounts in figures and in words, the amount in words shall govern and b) Where there is a discrepancy between the unit rate and the total amount derived from the multiplication of the unit rate and the quantity, the unit rate as quoted shall govern. Calculation of financial effect of: Completion period beyond the stipulated period of fourteen (14) months. Deviation in payment terms Any other exception/deviation which has financial implications. The Bids whose completion period is beyond the stipulated period given in Section 5.0 of ITB an amount equivalent to four (04) percent of total quoted price shall be added to respective Bidders price for each excess month. The effect of payment terms asked by the Bidder other than those spelled out in ITB, Conditions of Contract shall be calculated @ 1.0 percent per month and shall be added to the respective Bidders price. The effect of any other exception/deviation which has financial implications shall be calculated by OGDCL as considered appropriate. With the addition of above effects to each Bidders total quoted price the evaluated price shall be arrived.

FILE: 165-3-SPG-026, Rev.0

SHEET 36 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

The award will be recommended in favor of bidder whose evaluated price is lowest. 21.4 Contacting OGDCL or CONSULTANT
21.4.1 Subject to Instruction 21.2 and 21.3 no Bidder or his agent shall contact

OGDCL or CONSULTANT on any matter relating to its Bid, from the time of the Bid opening to the time the Contract is awarded.
21.4.2 Any effort by Bidder to influence OGDCL or CONSULTANT in its Bid

evaluation, Bid comparison or Contract award decisions may result in the rejection of the Bidder's Bid.
21.4.3 All correspondence technical/financial shall be made with authorized

representative of Contractor.
21.4.4 All correspondence relating to technical matters before bid submission or

clarifications during OGDCL/Consultant. 22.0 AWARD OF CONTRACT 22.1

evaluation

etc.

will

be

directed

to

OGDCLs Right to Accept any Bid and to Reject any or all Bids OGDCL reserves the right to accept or reject any bid or part of a bid and to annul the bidding process and reject all bids at any time prior to award of Contract, without thereby incurring any liability to the affected bidder or bidders or any obligation to inform the affected bidder or bidders of the grounds for OGDCLs action.

22.2

OGDCLs Right to Vary the Scope of Contract OGDCL reserves the right at the time of award of Contract to make addition and deletions in any component of scope of work or vary the scope of work given in the Tender Document.

22.3

Notification of Intent to Award


22.3.1 Prior to the expiration of the period of bid validity, OGDCL will notify the

successful Bidder in writing by fax or courier service its intent to award the contract. The Contract will be executed subject to satisfactory negotiation of the terms and conditions of the Contract.
22.3.2 Upon the successful bidders furnishing of Performance Bond pursuant to

Instruction 22.5, OGDCL will promptly notify each unsuccessful bidder and will discharge its Bid Bond pursuant to Instruction 16.7.5.

FILE: 165-3-SPG-026, Rev.0

SHEET 37 OF 38

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

22.4

Signing of Contract
22.4.1 At the same time as OGDCL notifies the successful Bidder of its intent to

award the Contract, OGDCL will send the Bidder the Form and Conditions of Contract (Section IV) provided in the Tender Document, incorporating all agreements between the parties.
22.4.2 Within ten (10) days of receipt of the Form and Conditions of Contract the

successful bidder will be required to sign the Contract and return it to OGDCL. 22.5 Performance Bond
22.5.1 Within ten (10) days of the receipt of notification of intent to award the

Contract from OGDCL, the successful Bidder shall furnish a Performance Bond in the Form of Bank Guarantee (Annexure XVI) for an amount of ten percent (10%) of the Contract Price as a guarantee for the due and faithful performance of the Contract. The said Performance Bond shall be valid upto twelve (12) months from the date of the Provisional Acceptance Certificate. The performance Bond shall be issued by a Pakistani Scheduled Bank (having long term credit rating of more than A) or an International Bank operating in Pakistan and acceptable to OGDCL.
22.5.2 Failure of the successful Bidder to comply with the requirements of

Instruction 22.4 or 22.5 shall constitute sufficient grounds for the annulment of the award and forfeiture of the Bid Bond, in which event OGDCL may make the award to the next lowest evaluated Bidder or call for new Bids.

FILE: 165-3-SPG-026, Rev.0

SHEET 38 OF 38

ANNEXURE I
FORMAT OF RESPONSIBILITY MATRIX

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE-I

FORMAT OF RESPONSIBILITY MATRIX


S. No. Name of JV Partner Nature of Involvement & Responsibilities

FILE: ANNEXURE-I

SHEET 1 OF 1

ANNEXURE II
BID BOND

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE II

BID BOND
(To be submitted with Technical Bid) Oil & Gas Development Company Limited OGDCL House, Jinnah Avenue, Blue Area, Islamabad. (Pakistan) Dear Sir, In consideration of M/s.. herein after called THE BIDDERS having submitted the accompanying BID with reference to OGDCL Tender Enquiry No:PROC-FD/CB/PROJ(NASHPA)-732/2012 and in consideration of value received from (the Bidder above), we hereby agree to under take as follows: 1. To make unconditional, immediate and forthwith payment of the sum US $ 2,000,000/(US Dollars two million only) or equivalent of Pak Rupees /= (Pak Rupees Only) upon your FIRST and SIMPLE written demand without further recourse, question, query, deferment, contestation or reference to the bidder, account party or any other person in the event of the withdrawal of the aforesaid bid by the BIDDER before the end of the period specified in the Bid after the opening of the same for the validity thereof or if no such period be specified, within 150 days after the said opening or if the Bidder, having been notified of the acceptance of his bid by the Company during the period of bid validity: a) b) 2. Fails, refuses or delays to execute the Contract in accordance with the instruction to Bidders, or Fails, refuses or delays to furnish Performance Bond in accordance with the instruction to Bidders. Guarantee No.... Date of Issue. Date of Expiry...... Amount.

To accept written demand from you as conclusive, sufficient and final evidence of the existence of a default of non-compliance, breach or default as aforesaid on the part of the BIDDER and to make payment immediately and forthwith upon receipt of your FIRST and SIMPLE written demand. No grant of time or other indulgence to, or composition or arrangement with the BIDDER in respect of the aforesaid Bid with or without notice to us shall affect this Guarantee and our liabilities and commitments hereunder. This is an independent and direct obligations guarantee and shall be binding on us and our successor in interest and shall be irrevocable. The Guarantor Bank warrants and represents that it is fully authorized, empowered and competent to issue this guarantee. Yours faithfully,

3.

4. 5.

( B A N K E RS )
FILE: Annexure-II SHEET 1 OF 1

ANNEXURE III
CONTRACTORS PROFILE

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE III

CONTRACTORS PROFILE
The Contractor and partners/members of joint venture /consortium are required to provide the information/details given in this document separately.

1)

Name of Company (including Fax, Telephone, email, website) complete address of the corporate/Head Office as well as office dealing with sales to Pakistan and adjoining region.

2)

Incorporation status & place of Registration i.e. Corporation Public/Public Limited etc. Please provide a copy of incorporation/Registration document.

3) 4)

Details of companys core business. Financial details of the company (including annual audited balance sheet and profit & loss accounts) of last three (03) years and Bank(s) Credit worthiness certificates.

5) 6)

Litigation Details (if any) with customers during last ten (10) years. Any information including brouchres, references and other documentary evidence of corporate and technical qualification, capability and experience of the Applicant to execute the Project on EPCC basis.

The undersigned on behalf of _______________ hereby declare that the statements made and the information provided official herewith is complete, true and correct in every detail.

Signature

Official Seal of the Company

FILE: Annexure-III

SHEET 1 OF 1

ANNEXURE IV DETAILS OF SIMILAR GAS PROCESSING, LPG RECOVERY PLANT & ALLIED FACILITIES SUPPLIED, CONSTRUCTED & COMMISSIONED

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE-IV DETAILS OF SIMILAR GAS PROCESSING, LPG RECOVERY PLANT & ALLIED FACILITIES SUPPLIED, CONSTRUCTED & COMMISSIONED
Details of Equipment Procured (Including nature/type of equipment, its value* and origin/source) Whether the Name of Sub- Project is on Details of Contractors/ Schedule? If no, Qualification Consultants specify reasons of Man-power and their for delay and Employed Work Scope give expediting plans

Owners Name , Name & Country Sr. Description & Address of & Year No. Capacity of the Client Project

Contract Value
Project Completion Period Foreign Currency Local Currency Total

Detailed Description of Work, Scope & Responsibili ties **

(*) Please indicate name and unit of currencies (**) For example design, engineering, procurement, construction and commissioning. NOTE: Please also provide a list of current Contracts for Engineering, Procurement (Supply), Construction & Commissioning of Gas Processing, LPG Recovery Plant & Allied Facilities on the above pattern.
FILE: Annexure-IV SHEET 1 OF 1

ANNEXURE V
CVs OF NOMINATED COMMISSIONING KEY PERSONNEL

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE V Format of Curriculum Vitae (CV) of Nominated Key Personnel (Including Design, Construction, Commissioning Personnel and Training Experts)
Proposed Position: Name of Firm: Name of Staff: Profession: Date of Birth: Years with Firm: Membership in Professional Societies: Nominated Position & Tasks Assigned: Key Qualifications: [Give an outline of staff members experience and training most pertinent to supply installation & commissioning of Gas Processing, LPG Recovery Plant & Allied Facilities. Also describe degree of responsibility held by staff member.] Education: [Summarize college/university and other specialized education of staff member, giving names of schools, dates attended and degrees obtained. Use up to a quarter page.] Employment Record: [Starting with present position, list in reverse order every employment held. List all positions held by staff member since graduation, giving dates, names of employing organization, title of positions held and location of assignments. For experience in last ten years, also give types of activities performed and client references, where appropriate. Use up to three-quarters of a page.] Nationality:

Languages: [Indicate proficiency in speaking, reading and writing of each language: excellent, good, fair, or poor.] Certification: I, the undersigned, certify that to the best of my knowledge and belief, these bio-data correctly describe myself, my qualifications and my experience.

Date: Signature of Staff Member or authorized official of Contractor Day/Month/Yr

FILE: Annexure-V

SHEET 1 OF 1

ANNEXURE VI-A
INTEGRITY AND ETHICS UNDERTAKING

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE-VI-A (On official letter-head of the bidder) To be signed by the Chief Executive of the bidding company or a representative duly authorized by abroad resolution.

Integrity and Ethics Undertaking


We hereby commit and undertake to observe the following principles during our participation in the tender process and during the contract execution. a) That we will not directly or through any other person or firm, offer promise or give to any of the employees of OGDCL involved in the tender process or execution of the contract any gain, pecuniary benefit or facilitation payment in order to obtain in exchange any advantage of any kind whatsoever during the process or during the execution of contract. b) That we have not and will not enter with other bidders into any undisclosed agreement or understanding either formal or informal to restrict competiveness or to cartelise in the bidding process. c) That we will ensure that the remuneration of agents (if engaged) is appropriate and for legitimate service only. d) That we will not use subcontracts, purchase orders or consulting agreements as means of channeling payments to employees of OGDCL. e) That we will not commit any offence under the Pakistan Panel Code, Prevention of Corruption Act or National Accountability Ordinance to achieve any exchange, gain or benefit during the tender process or the execution of contract. We further understand and acknowledge that any violation or transgression of the above mentioned principles will attract disqualification from the tender process and may also result in permanent exclusion from further contract award processes. We also accept and understand to respect and upload OGDCLs absolute right to resort to and impose such disqualification, debarment or execution. For and on behalf of ____________ Tender No. ____________________

FILE: Annexure- VI-A

SHEET 1 OF 1

ANNEXURE VI-B
INTEGRITY AND ETHICS UNDERTAKING

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE-VI-B (On official letter-head of the bidder) To be signed by the Chief Executive of the bidding company or a representative duly authorized by abroad resolution.

Integrity and Ethics Undertaking


We hereby commit and undertake to observe the following principles during our participation in the contract execution. a) That we will not directly or through any other person or firm, offer promise or give to any of the employees of OGDCL involved in or relevant to the execution of the contract any gain, pecuniary benefit or facilitation payment in order to obtain in exchange any advantage of any kind whatsoever during the execution of contract or at any stage thereafter. b) That we did not enter with any bidder into any undisclosed agreement or understanding either formal or informal to restrict competiveness or to cartelise in the bidding process. c) That we will ensure that the remuneration of agents (if engaged) is appropriate and for legitimate services only. d) That we will not use subcontracts, purchase orders or consulting agreements as means of channeling payments to employees of OGDCL. e) That we will not and have not committed any offence under the Pakistan Panel Code, Prevention of Corruption Act or National Accountability Ordinance to achieve any advantage, gain or benefit during the tender process or the execution of contract. We further understand and acknowledge that any violation or transgression of the above mentioned principles will attract disqualification from doing business with OGDCL and may also result in permanent exclusion from further contract award processes. We also accept and understand to respect and upload OGDCLs absolute right to resort to and impose such disqualification, debarment or execution. For and on behalf of _______________ Tender No. ______________________ Contract No. _____________________

FILE: Annexure- VI-B

SHEET 1 OF 1

ANNEXURE VII
TECHNICAL DETAILS FOR NASHPA GAS PROCESSING, LPG RECOVERY PLANT & ALLIED FACILITIES

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE VII

TECHNICAL DETAILS FOR NASHPA GAS PROCESSING, LPG RECOVERY PLANT & ALLIED FACILITIES
a) Complete description/details of technology and process to be employed for proposed Gas Processing and LPG Recovery Plant its data sheets, technical specifications and technical catalogues as per tender requirement. The background and profile of Licensors (if applicable) of LPG Plant shall also be provided along with data about its commercial proveness. The description & design basis of the Condensate Stabilization Unit shall also be provided. b) Bidders overall conceptualization and description of methodology to be adopted for design supply, construction, installation & commissioning for Gas Processing and LPG Recovery Plant (including details of design resources i.e. human & computer softwares to be deployed/used). c) The technical details of the plants shall include: Process Flow Diagrams (PFDs). Piping and Instrumentation Diagram (P&IDs). Process Description details covering process selection and optimization. Simulation run and Heat and Material Balance. Detailed List showing Scope of Supply and Services. Equipment Layout. Equipment data sheet and performance. Drawings showing main equipment & skids general arrangement and key interface drawings. Review report of basic design document with modifications (if any) and statement of ownership and following: Column details including diameter, materials of construction design/operating pressures and temperatures, number of theoretical and actual trays, tray types, location of feeds/draws and access provisions (if any).

FILE: Annexure-VII

SHEET 1 OF 3

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Plate & Frame exchanger details such as material of construction, performance, duty pressure drop & arrangement of the tube passes. Pumps detail such as materials of construction, flow, suction and discharge pressures, NPSH margin, manufacturer, seal type, motor details and power margin. Design duties and materials of construction and main dimensions for all other equipment forming a part of the package. Total equipment volumes, purge, venting and blow-down/relief requirements. Details of compressor required for stabilizer over head gas such as suction pressure, discharge pressure, manufacturer and power margin. Skid sizes and weights. Details of Instrumentation and Control System offered. List of electrical power users with KW requirements and power factor and other utility consumption. Origin of all the modules/sub-units. All those items for which information requirements are specifically mentioned anywhere in this requisition, data sheets, specifications, etc. to be also included in this list.

d) Commissioning plan with responsibilities of individual team members (As per Attachment-1). e) Details of available after sales technical back-up support services and infrastructure and its location. f) Sample Installation Commissioning operations & maintenance manual of LPG Plant & Condensate Stabilization Unit. g) Item-wise (unit/system wise) list of Start-up and commissioning spares, special tools as well as personal safety equipment and tools for LPG Plant & Condensate Stabilization Unit. h) Item-wise (unit/system wise) list of recommended spares (without price) for two (02) years continuous operation for LPG Plant & Condensate Stabilization Unit. i) Details of operational consumables for one (01) year (If applicable). j) Testing and inspection plan along with confirmation of scope of Pre-shipment Inspection given in Section 16.8.1 of ITB with complete details of the nominated Agency.

FILE: Annexure-VII

SHEET 2 OF 3

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

k) Net and gross shipping weights, overall dimensions and total volume of each shipping unit l) Bid should conform in all respects to the applicable specifications, drawings and instructions forming part of the Tender Document. m) Bidders must state any deviation from equipment and material or other standards specified, separate list of proposed standards shall then be attached to the bid indicating the appropriate standards proposed by the Bidder, stating in each case the comparable standards specified.

FILE: Annexure-VII

SHEET 3 OF 3

ATTACHMENT I
COMPOSITION OF COMMISSIONING TEAM AND DETAILS OF TASK ASSIGNED & RESPONSIBILITIES

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE-VII Attachment-I

Composition of Commissioning Team and Details of Task Assigned & Responsibilities

1.

Technical/Managerial Name Position Task To be Assigned & Responsibilities

2.

Support Staff Name Position Task To be Assigned & Responsibilities

FILE: Attachment-I

SHEET 1 OF 1

ANNEXURE VIII
BIDDING FORM FORMAT

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE VIII

BIDDING FORM
(To be typed on Bidders Letterhead) Dated : ___________________________ To: General Manager SCM Oil & Gas Development Company Limited OGDCL House, Jinnah Avenue, Blue Area, Islamabad - Pakistan Tel: +92-51-920023652

Dear Sirs, Having examined your bidding document comprising of: Volume-I Project Background & Introduction (Section-I) Invitation to Bid (Section-II) Instruction to Bidders (Section-III) Forms & Conditions of Contract (Section-IV) Volume-II Scope of Work and Services for Design, Manufacturing, Supply, Installation, Construction & Commissioning of Gas Processing, LPG Recovery Plant & Allied Facilities. Volume-III Supplementary Technical Documents (Drawings, Specifications Datasheet) We, the undersigned, offer to supply and deliver ___________(description of goods________ in conformity with the requirements of the above documents for the sum of ______________(Total bid amount in words and figures)______________ or such other sum as be ascertained in accordance with the 'Prices Schedule' attached herewith and made part of this bid. We undertake, if our bid is accepted, to commence delivery within ________________ days and to complete delivery of all the items specified in the Contract within _______________ days calculated from the date of issuance of letter of credit.

FILE: Annexure-VIII

SHEET 1 OF 2

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

If our bid is accepted we will obtain the guarantee of a Bank for a sum not exceeding (10%) of the Contract sums for the due performance of the Contract. We agree to abide by this bid for a period of 120 days after the date fixed for financial bid opening under Instructions of I.T.B. and it shall remain binding upon us and may be accepted at any time before the expiration of that period. We agree to submit the Bid Bond for an amount equivalent to __________ along with the Technical Bid. Until a formal contract is prepared and executed, this bid, together with your written acceptance thereof shall constitute a binding contract between us. We understand that you are not bound to accept the lowest or any bid you may receive. Our bid proposal do not contain any deviation or exception from the conditions of contract given in the above referred tender document. Dated this ___________ day of _____________________, ______. _____________________ Stamp & Signatures _____________________ (In capacity of) Duly authorized to sign bid for and on behalf of ____________________________________ ___________________________________________________________________________ WITNESS: _____________________ Signature Address _________________________________________

FILE: Annexure-VIII

SHEET 2 OF 2

ANNEXURE IX
FIXED LUMPSUM PRICE SUMMARY

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Annexure-IX

NASHPA GAS PROCESSING, LPG RECOVERY PLANT & ALLIED FACILITIES FIXED LUMP SUM PRICE SUMMARY
SUPPLY In Foreign Equivalent Currency In Pak Rs. (US$) or Other (*) Currency In Local Currency (Pak Rs.) In Foreign Currency (US$) or Other Currency SERVICES Equivalent In Pak Rs. (*) In Local Total Currency Services (Pak Rs.) (in Pak Rs.) TOTAL (in Pak Rs.)

S. No.

DESCRIPTION

Total Supply (in Pak Rs.)

Supply of Equipment, bulk material items & consumables

Surveys & Soil Investigation

3 4 5 6

Design Engineering Works (including construction, installation/erection) Startup & Commissioning (including Performance Testing) Pre-Shipment Inspection (1) Startup & Commissioning Spares (Unit / System Wise List with item-wise prices to be attached ) Supply of two (02) years Recommended Spare Parts (Unit / System Wise List with item-wise prices to be attached ) Expenses on Design Review and HAZOP meetings, FATs etc. for OGDCL/Consultant's Representatives Expenses for Witness Testing & FATs Training to OGDCL Staff at Site for two (02) weeks Supply of Operational Consumables (Details with item-wise prices to be attached) Ocean freight & Insurance on Imported equipment and material Importation expenses (i.e. clearing & forwarding etc) Custom Duties & Taxes levied on imported equipment and material to be incorporated in the Project as per SRO 678(1)/2007 (2). Inland transportation and insurance expenses

10 11

12

13 14 15 16

TOTAL (1 TO 16)
(*) Equivalent Pak Rs. based upon Pak Rs./US$ or other currency exchange rate of Rs. _______ (1) The charges shall be supported by verified quotation of Inspection Agency. (2) Copy of the SRO 678(1)/2007 is given in Annexure-XVIII.

FILE: Annexure-IX

SHEET 1 OF 1

ANNEXURE IX ATTACHMENT - 1
PRICE BREAKDOWN FOR NASHPA GAS PROCESSING & LPG RECOVERY PLANT SYSTEM COSTS

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Attachment-1 of Annexure-IX
PRICE BREAKDOWN FOR NASHPA GAS PROCESSING & LPG RECOVERY PLANT SYSTEM COSTS
In Foreign Currency (US$) or Other Currency Equivalent In Pak Rs. (*) In Local Currency In (Pak Rs.) Total Price In (Pak Rs.)

S.No.

Item

1) i) ii) iii) iv) v) vi) vii) viii) 2) 2.1) 2.2) 2.3) 2.4) 2.5) 2.6) 3) 3.1) 3.2) 3.3) 3.4) 3.5) 3.6) 3.7) 3.8) 3.9)

GAS PROCESSING PLANT Slug Catcher & Gathering System Seperation System (Utilization of OGDCL's Oredered Seperators) Dehydration (Mol. Sieve) Unit LPG Recovery Unit (Including Mech. Refrigeration) Condensate Stabilization & Off Gas Compression Unit Sales Gas Compressor Package Sales Gas Metering Package DCS, ESD and F&G System. OFFSITES LPG Storage Condensate Storage (Revamping) LPG & Condensate Loading Flare System Wellhead Facilities (2 NOS. NEW & 2 NOS. Existing) Scada Telemetry System UTILITIES Power Generation Fuel Gas System Hot Oil System Drains & Slop System Instrument & Utility Air System Nitrogen Generation System Fire Fighting System Raw Water Treatment System Waste Water Treatment & Disposal System

TOTAL
(*) Equivalent Pak Rs. Based upon Pak Rs./US$ or other internationally convertable currency exchange rate of__________

Note:
1 The cost should include all inter connections between Units / Systems and Tie-ins with existing facilities. Any modifications / upgradation works in the existing facilities shall also be included. The Supply of imported Equipment & Materilal on the CFR value (inclusive of L/C Charges and other incidentals incurred by the Contractor) .

The Supply of local equipment and material items on ex project site delivery basis inclusive of sales tax levies. However, the details of sales tax inclusive levies should be provided seperately.

FILE: Annexure-IX (Attachment-1)

SHEET 1 OF 1

ANNEXURE IX ATTACHMENT - 2
PRICE DETAILS FOR SURVEYS & SOIL INVESTIGATION

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Attachment-2 of Annexure-IX

PRICE DETAILS FOR SURVEYS & SOIL INVESTIGATION

S.No

Item

In Local Currency (In Pak Rs. )

i)

Surveys & Soil Investigation

TOTAL

FILE: Annexure-IX (Attachment-2)

SHEET 1 OF 1

ANNEXURE IX ATTACHMENT - 3
PRICE DETAILS FOR DESIGN ENGINEERING

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Attachment-3 of Annexure-IX

PRICE DETAILS FOR DESIGN ENGINEERING


In Foreign Currency (US $) or Other Currency In Local Currency(In Pak Rs. )

S.No

Item

Equivalent in Pak Rs. (*)

Total Price (In Pak Rs.)

i)

Validation of FEED Document

ii)

Basic Engineering

iii)

Detailed Engineering

TOTAL

Note:

The Design Engineering cost should not exceed 5% of material & equipment cost. (*) Equivalent Pak Rs. based upon Pak Rs./US$ or other internationally convertible currency exchange rate of Rs.___________.

FILE: Annexure-IX (Attachment-3)

SHEET 1 OF 1

ANNEXURE IX ATTACHMENT - 4
PRICE DETAILS WORKS (CONSTRUCTION, INSTALLATION/ERECTION ETC.)

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Attachment-4 of Annexure-IX

PRICE DETAILS FOR WORKS (Construction, Installation/Erection etc)

S.No

Item

In Foreign In Local Equivalent in Pak Currency (US $) or Currency(In Pak Rs. (*) Other Currency Rs. )

Total Price (In Pak Rs.)

Civil / Steel Structural Works (including Supply of Material)

1.1

Gas Processing Plant

1.2

Offsites

1.3

Utilities

1.4

Buildings

1.5

Infrastructure Works (Roads / Pavements / Drains / Fencing etc.)

Mechanical Works

Instrumentation Works

Electrical Works

TOTAL

(*) Equivalent Pak Rs. based upon Pak Rs./US$ or other internationally convertable currency exchange rate of Rs.___________.

FILE: Annexure-IX (Attachment-4)

SHEET 1 OF 1

ANNEXURE IX ATTACHMENT - 5
PRICE DETAILS FOR START-UP & COMMISSIONING

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Attachment-5 of Annexure-IX

PRICE DETAILS FOR START-UP & COMMISSIONING

S.No

Item

In Foreign Currency (US Equivalent in $) or Other Pak Rs. (*) Currency

In Local Currency (In Pak Rs. )

Total Price (In Pak Rs.)

i)

Start-up & Commissioning (including Performance Test)

TOTAL

(*) Equivalent Pak Rs. based upon Pak Rs./US$ or other internationally convertable currency exchange rate of Rs.___________.

FILE: Annexure-IX (Attachment-5)

SHEET 1 OF 1

ANNEXURE X
DATA SUMMARY SHEET

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE X DATA SUMMARY SHEET

Following information regarding Nashpa Gas Processing & LPG Recovery Plant being procured must be stated categorically: NAME AND ADDRESS OF BIDDER

VALIDITY OF BID PROJECT COMPLETION PERIOD

AMOUNT OF BID BOND

ADDRESS OF BANKER WITH ACCOUNT NO.

NAME AND ADDRESS OF LOCAL AGENT IN PAKISTAN (IF ANY)

CONFIRMATION THAT QUOTED PRICED IS FIRMED/FIXED AND NOT BASED ON ANY PRICE ADJUSTABLE FORMULA/ANY ESCALATION YES NO

Sign & Seal

FILE: Annexure-X

SHEET 1 OF 1

ANNEXURE XI
DEVIATION FORM

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE XI

DEVIATION FORM
Bidder: _________________________________ List of Deviations: Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Bidders Signature: _________________________ Affix seal of Bidders company: Title/Description of Deviation Tender Document Reference Date: ________________

Proposed Change

Remarks

FILE: Annexure-XI

SHEET 1 OF 1

ANNEXURE XII
ADDRESSES OF THIRD PARTY INSPECTION AGENCIES

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE-XII

ADDRESSES OF THIRD PARTY INSPECTION AGENCIES


1. M/s SGS Pakistan (Pvt.) Ltd H-3/3, Sector 5, Korangi Industrial Area, Karachi-74900. Pakistan. Phone # 021-35121388-97 (Ext:192) Attn : Mr. Abdul Razzak Lakhani Director Operations 2. M/s Lloyds Register 3rd Floor, State Life Building No. 11, Abdullah Haroon Road, Karachi 74400 Phone # 021-35686397, 35683852 and 35683501 Attn : Mr. Bazlur Rahman Country Manager. 3. M/s VELOSI Off 401, 4th Floor, Business Centre PECHS Society, Block No. 6 Karachi. Phone # 021-34549503/4 Attn : Mr. Liaqat Hussain 4. M/s MOODY International Suite # 117, 1st Floor, the Forum G-20, Block-9, Khayabane-e-Jami, Clifton Karachi. Phone # 021-111-284-284 Attn : Mr. Ahmad Rafiq Area Manager-South

FILE: ANNEXURE-XII

SHEET 1 OF 1

ANNEXURE XIII-A
TERMS & CONDITIONS OF L/C FOR SUPPLY (TO BE STRICTLY COMPLIED BY THE BENEFICIARY)

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE-XIII-A

TERMS AND CONDITIONS OF THE L/C FOR SUPPLY (TO BE STRICTLY COMPLIED BY THE BENEFICIARY)

(To Be Provided Later)

FILE: ANNEXURE-XIII - A

SHEET 1 OF 1

ANNEXURE XIII-B
TERMS & CONDITIONS OF L/C FOR SERVICES

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE-XIII-B

TERMS AND CONDITIONS OF THE L/C FOR SERVICES

(To be Provided Later)

FILE: ANNEXURE-XIII - B-B

SHEET 1 OF 1

ANNEXURE XIV
MOBILIZATION ADVANCE PAYMENT BANK GUARANTEE

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE-XIV MOBILIZATION ADVANCE PAYMENT BANK GUARANTEE


Oil & Gas Development Company Limited Islamabad. PAKISTAN Dear Sirs, RE: ____________________________________________________ Guarantee No.. Date of Issue Date of Expiry. Amount

Since you have issued a Contract No. ___________ dated ____________ to ___________ _________________(hereinafter referred to as CONTRACTOR) and in consideration of value received from CONTRACTOR and since said Contract provides for mobilization advance payment to be made by you to CONTRACTOR to the extent of ____________________________ we hereby guarantee, agree and undertake as follows: 1. To make unconditional, immediate and forthwith payment of you as called upon of an amount (equivalent to 10% of total contract value in Pak Rs.) on your written FIRST and SIMPLE demand without further recourse, question, query, deferment, contestation or reference to CONTRACTOR or any other person in the event of default, nonperformance or non-fulfillment by CONTRACTOR of his obligations, liabilities responsibilities under the said Contract of which you shall be the sole and absolute judge. 2. To accept written intimation from you as conclusive, sufficient and final evidence of the existence of a default or breach as aforesaid on the part of the CONTRACTOR and to make payment immediately and forthwith upon receipt of your FIRST and SIMPLE written intimation. To keep this guarantee in full force and effect from the date hereof until the period specified in the Contract.

3.

FILE: Annexure-XIV

SHEET 1 OF 2

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

4.

That no grant of time or other indulgence to, amendment in the terms of the Contract between the parties, or imposition of Contract with CONTRACTOR in respect of the performance of his obligation under and in pursuance of said Contract with or without notice to us, shall in any manner discharge or otherwise however affect this Guarantee and our liabilities and commitments there under. This is an Independent and direct obligations Guarantee and shall be binding on us and our successor in-interest and shall be irrevocable. This Guarantee shall not be affected by any change in the constitution of the Guarantor or the constitution of the Contractor.

5.

6.

7.

This Guarantor warrants and represents that it is fully authorized, empowered and competent to issue this Guarantee.

SIGNATURE AND SEAL OF THE GUARANTOR

FILE: Annexure-XIV

SHEET 2 OF 2

ANNEXURE XV
PERFORMANCE GUARANTEE REQUIREMENTS

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE XV

PERFORMANCE GUARANTEE REQUIREMENTS

1.0

GENERAL The Plant shall be designed to meet the minimum performance specification and requirements set out in the corresponding data sheets and specifications. This performance may be higher than those given for the overall design. The Supplier shall provide the guarantees related to the Plant process performance and proper material to full fill the operating condition as required.

2.0

PLANT PERFORMANCE GUARANTEES General Supplier guarantees that, a) Plant shall be designed for a life of 25 years, and b) Plant shall be designed to withstand the environmental conditions (seismic/wind loads, weather extremes and temperatures) prevailing at site.

3.0

PROCESS 3.1 LPG Recovery Unit Plant shall be designed and guaranteed to deliver the LPG specifications as per Table-1 and capacity with out negative tolerance. The guaranteed operating conditions are stated below: a) LPG Recovery Unit shall be able to treat 98 MMSCFD of gas and able to recover maximum propane and butanes as specified. b) Turn-down Performance of Plant to 30% shall also be guaranteed. c) Battery Limit conditions as specified in Datasheet.

FILE: Annexure-XV

SHEET 1 OF 5

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

TABLE-1: PERFORMANCE FIGURES

S. No.

Parameter

Limit

Unit

Value

PROCESS GUARANTEES 1 2 3 4 Gas Flow To LPG Unit Debutanizer Condensate Flow To Stabilizer R/D Propane Recovery (1) Butane Recovery (1) Minimum Minimum MMSCFD BPD Mole % Mole % 98 1120 95 99

LPG SPECIFICATIONS 1 Vapor Pressure (@ 100oF) Minimum Maximum 2 3 4 5 Gross Heating Value 95% Boiling Point (@ 14.7 psia) Pentane and Heavier Contents Specific Gravity Liquid (Water = 1) Minimum Maximum Maximum Minimum Maximum 6 Production Throughput Minimum Metric Tons/Day MMBtu/h MMBtu/h kW Psig Psig Btu/lb
o

70 159 18,000 36 2 0.53 0.57 TBA *

Vol %

UTILITIES GUARANTEES 1 2 3 NOTE: 1- Percentage of total component entering in gas stream to the recovered component in De-Ethanizer bottom stream. * TBA = To Be Advised Heat Medium System Duty Cooling Water System Duty Power Requirement Minimum Minimum Minimum TBA* TBA* TBA*

FILE: Annexure-XV

SHEET 2 OF 5

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

3.2

Condensate Stabilization Unit Plant shall be designed and guaranteed to deliver the Condensate specifications as per Table-1 and capacity with out negative tolerance. The guaranteed operating conditions are stated below: d) Condensate Stabilization Unit shall be able to treat 18050 BPD of condensate. e) Turn-down Performance of Plant to 30% shall also be guaranteed. f) Battery Limit conditions as specified in Datasheet.

TABLE-1: PERFORMANCE FIGURES

S. No.

Parameter Condensate Flow To Stabilizer Discharge Temp. After Air Cooler Reid Vapor Pressure (@ 100 o F) Temperature to Storage Production Throughput

Limit

Unit

Value

PROCESS GUARANTEES 1 4 BPD Maximum F 18050 128

CONDENSATE SPECIFICATIONS 1 2 3 Maximum Maximum Minimum Psia


o

7 120 TBA *

BPD

UTILITIES GUARANTEES 1 2 3 NOTE: * TBA = To Be Advised Heat Medium System Duty Cooling Water System Duty Power Requirement Minimum Minimum Minimum MMBtu/h MMBtu/h kW TBA* TBA* TBA*

FILE: Annexure-XV

SHEET 3 OF 5

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

3.3

Molecular Sieve Dehydration Unit Plant shall be designed and guaranteed to deliver the Gas at the required outlet conditions as per Table-1 and capacity with out negative tolerance. The guaranteed operating conditions are stated below: g) Molecular Sieve Unit shall be able to treat 98** MMSCFD of Saturated gas and drop down its water content to less than 0.1 ppm. h) Turn-down Performance of Plant to 30% shall also be guaranteed. i) Battery Limit conditions as specified in Datasheet.

TABLE-1: PERFORMANCE FIGURES

S. No.

Parameter

Limit

Unit

Value

PROCESS GUARANTEES 1 2 3 Gas Flow To Molecular Sieve Unit Water Content at Outlet Turndown Maximum Minimum UTILITIES GUARANTEES 1 2 3 NOTE: * TBA = To Be Advised ** Regeneration gas flow rate to be added Heat Medium System Duty Cooling Duty Power Requirement Minimum Minimum Minimum MMBtu/h MMBtu/h kW TBA* TBA* TBA* MMSCFD ppm % 98** 0.1 30

FILE: Annexure-XV

SHEET 4 OF 5

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

3.4

Sales Gas
Sales gas has to provide at the following specifications: Sr. No. 1 2 3 4 5 6 7 8 Parameter Pressure Temperature Hydrocarbon Dew Point Water CO2 Gross Heating Value Wobbe Index (Gross) Quality Value 1230 psig (Min.) 120oF (Max.) 32oF (Max.) < 7 Ibs H2O / MMSCF Gas < 3.0 Mole % 950 BTU / SCF (Min.) 1220 BTU / SCF (Min.) Free of solid particles, gums & sticking material etc. At any pressure Remarks At SNGPL Battery Limit

FILE: Annexure-XV

SHEET 5 OF 5

ANNEXURE XVI
FORMAT OF PERFORMANCE BOND

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE-XVI FORMAT OF PERFORMANCE BOND


Oil & Gas Development Company Limited Islamabad. PAKISTAN Dear Sirs, Ref; Our Guarantee No. _____________________ in the sum of ________________ Account __________________ Amount of Contract/Job ___________. In consideration of you having entered into Contract No. _____________ dated ____________ with _____________ called CONTRACTOR and in consideration of value received from CONTRACTOR, we hereby agree and undertake as follows: 1. To make unconditional, immediate and forthwith payment of you as called upon of an amount (equivalent to 10% of total contract value in Pak Rs.) on your written FIRST and SIMPLE demand without further recourse, question, query, deferment, contestation or reference to CONTRACTOR or any other person in the event of default, non-performance or non-fulfillment by CONTRACTOR of his obligations, liabilities responsibilities under the said Contract of which you shall be the sole and absolute judge. 2. To accept written intimation from you as conclusive, sufficient and final evidence of the existence of a default or breach as aforesaid on the part of the CONTRACTOR and to make payment immediately and forthwith upon receipt of your FIRST and SIMPLE written intimation. To keep this guarantee in full force and effect from the date hereof until the period specified in the Contract. 4. That no grant of time or other indulgence to, amendment in the terms of the Contract by Agreement between the parties, or imposition of Agreement with CONTRACTOR in respect of the performance of his obligation under and in pursuance of said Agreement with or without notice to us, shall in any manner discharge or otherwise however affect this Guarantee and our liabilities and commitments there under. Guarantee No.. Date of Issue Date of Expiry. Amount

3.

FILE: Annexure-XVI

SHEET 1 OF 2

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

5.

This is an Independent and direct obligations Guarantee and shall be binding on us and our successor in-interest and shall be irrevocable. This Guarantee shall not be affected by any change in the constitution of the Guarantor or the constitution of the Contractor. This Guarantor warrants and represents that it is fully authorized, empowered and competent to issue this Guarantee.

6.

7.

SIGNATURE AND SEAL OF THE GUARANTOR

FILE: Annexure-XVI

SHEET 2 OF 2

ANNEXURE XVII
SCHEDULE RATES FOR ADDITIONAL EQUIPMENT AND MATERIAL ITEMS

MECHANICAL SCHEDULE OF RATES FOR SUPPLY OF ADDITIONAL PIPING MATERIAL

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Description Pipe plane ends Sch. 80 seamless Pipe plane ends Sch. 160 seamless Pipe plain ends Sch.160 seamless Pipe plain end Sch. 160 seamless Pipe plain ends Sch.160 seamless Pipe plain ends Sch.160 seamless pipe plain ends Sch. 80 seamless Pipe plane ends Sch. 80 seamless Pipe screwed Sch. 80 seamless Pipe plane ends Sch. 160 seamless pipe plain ends Sch. 80 seamless Pipe plain ends Sch.160 seamless Pipe plain ends Sch.160 seamless Pipe plane ends Sch. 160 seamless Pipe screwed Sch. 80 seamless pipe plain ends Sch. 80 seamless Pipe plain ends Sch.160 seamless Pipe plain ends Sch.160 seamless Pipe bevel ends Sch. 80 seamless Pipe bevel ends Sch. 80 seamless Pipe bevel ends Sch. 80 seamless Pipe screwed Sch. 80 seamless Pipe bevel ends Sch.40 seamless Pipe plane ends Sch. 160 seamless Pipe bevel ends Sch. 10s seamless Pipe bevel ends Sch. 80 seamless Pipe bevel ends sch 80 seamless Pipe bevel ends Sch.80 seamless Pipe bevel end Sch. 160 seamless Pipe plain ends Sch.120 seamless Pipe bevel ends Sch. 40 seamless Pipe bevel ends Sch. 80 seamless Pipe bevel ends Sch. 80 seamless Pipe screwed Sch. 80 seamless Pipe bevel ends Sch. 10s seamless Pipe bevel ends Sch. 40s seamless Material ASTM A106-B ASTM A106-B ASTM A 106 GR.B ASTM A 106 GR.B ASTM A 106 GR.B ASTM A790 UNS S31803 ASTM A106-B ASTM A106-B ASTM A 106 GR. B ASTM A - 333 GR. 6 ASTM A106-B ASTM A 106 GR.B ASTM A 106 GR.B ASTM A106-B ASTM A 106 GR. B ASTM A106-B ASTM A 106 GR.B ASTM A790 UNS S31803 ASTM A106-B ASTM A106-B ASTM A - 333 GR. 6 ASTM A 106 GR. B ASTM A106-B ASTM A106-B ASTM A 312 TP 316 ASTM A 106 GR.B ASTM A 106 GR.B ASTM A 312 TP 316 ASTM A 106 GR.B ASTM A790 UNS S31803 ASTM A106-B ASTM A106-B ASTM A - 333 GR. 6 ASTM A 106 GR. B ASTM A790 UNS S31803 ASTM A 312 TP 316 Size (Inches) Unit Rate (USD) 3/4 3/4 3/4 3/4 3/4 3/4 3/4 1 1 1 1 1 1 1 1/2 1 1/2 1 1/2 1 1/2 1 1/2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 Unit Rate (USD) Installation

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 1 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 Description Pipe bevel ends Sch.40 seamless Pipe bevel ends Sch. 10s seamless Pipe bevel ends sch 80 seamless Pipe bevel end Sch. 160 seamless Pipe bevel ends Sch. 40 seamless Pipe bevel ends Sch. 40 seamless Pipe screwed Sch. 80 seamless Pipe bevel ends Sch. 10S seamless Pipe bevel ends Sch. 10s seamless Pipe bevel ends Sch.40 seamless Pipe plane ends Sch. 80 seamless Pipe bevel ends Sch. 10s seamless Pipe bevel ends sch 80 seamless Pipe bevel ends Sch.80 seamless Pipe plain ends Sch.160 seamless Pipe bevel ends Sch. 40 seamless Pipe bevel ends Sch. 40 seamless Pipe bevel ends Sch.40 seamless Pipe plane ends Sch. 80 seamless Pipe bevel ends Sch. 10s seamless Pipe bevel ends Sch. 80 seamless Pipe bevel ends sch 80 seamless Pipe bevel ends Sch. 160 seamless Pipe bevel end Sch. 160 seamless Pipe plain ends Sch.XXS seamless Pipe bevel ends Sch. 10s seamless Pipe bevel ends Sch. 40 seamless Pipe bevel ends Sch. 40 seamless Pipe bevel ends Sch.40 seamless Pipe bevel ends Sch. 10s seamless Pipe bevel ends Sch. 80 seamless Pipe bevel ends sch 80 seamless Pipe bevel ends Sch.80 seamless Pipe bevel end Sch. 160 seamless Pipe bevel end 11.13Thk seamless Pipe bevel ends Sch. 40 seamless Material ASTM A106-B ASTM A 312 TP 316 ASTM A 106 GR.B ASTM A 106 GR.B ASTM A106-B ASTM A106-B ASTM A 106 GR. B ASTM A790 UNS S31803 ASTM A 312 TP 316 ASTM A106-B ASTM A106-B ASTM A 312 TP 316 ASTM A 106 GR.B ASTM A 312 TP 316 ASTM A 106 GR.B ASTM A106-B ASTM A106-B ASTM A106-B ASTM A106-B ASTM A 312 TP 316 ASTM A 106 GR.B ASTM A 106 GR.B ASTM A 106 GR.B ASTM A 106 GR.B ASTM A790 UNS S31803 ASTM A 312 TP 316 ASTM A106-B ASTM A106-B ASTM A106-B ASTM A 312 TP 316 ASTM A 106 GR.B ASTM A 106 GR.B ASTM A 312 TP 316 ASTM A 106 GR.B API 5L, X52 ASTM A106-B Size (Inches) Unit Rate (USD) 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 6 6 6 6 6 6 6 6 6 6 6 8 8 8 8 8 8 8 8 8 10 Unit Rate (USD) Installation

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 2 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 Description Pipe bevel ends Sch. 40 seamless Pipe bevel ends Sch.40 seamless Pipe plane ends Sch. 80 seamless Pipe bevel ends Sch. 10s seamless Pipe bevel ends Sch. 80 seamless Pipe bevel ends sch 80 seamless Pipe bevel ends Sch.80 seamless Pipe bevel end Sch. 120 seamless Pipe bevel ends Sch. 40 seamless Pipe bevel ends Sch.STD seamless Pipe bevel ends Sch. 20s seamless Pipe bevel ends sch 80 seamless Pipe bevel end Sch. 120 seamless Pipe bevel ends Sch.STD seamless Pipe bevel ends Sch.STD seamless Pipe bevel ends sch 80 seamless Pipe bevel end Sch. 120 seamless Pipe bevel ends Sch.Xs seamless Pipe bevel ends sch 80 seamless Pipe bevel ends SCH STD seamless Pipe bevel ends Sch.40 seamless Pipe bevel ends SCH STD seamless Flange S.W. RF 150# Sch. 80 ASME B 16.5 Flange S.W. RF 150# Sch 160 ASME B 16.5 Flange S.W. RF 300# Sch 80 ASME B 16.5 Flange S.W. RF 600# Sch 160 ASME B 16.5 Flange S.W. RTJ900# SCH 160 ASME B 16.5 Flange S.W. RTJ900# SCH 160 ASME B 16.5 Flange W.N RTJ2500# SCH 160 ASME B 16.5 Flange S.W. RF 150# Sch. 80 ASME B 16.5 Flange S.W. RF 150# Sch. 160 ASME B 16.5 Flange W.N. RF 150# Sch 80 ASME B 16.5 Flange S.W. RF 300# Sch 80 ASME B 16.5 Flange W.N. RF 600# Sch 160 ASME B 16.5 Flange S.W. RF 150# Sch 160 ASME B 16.5 Flange W.N. RF 150# Sch 80 ASME B 16.5 Material ASTM A106-B ASTM A106-B ASTM A106-B ASTM A 312 TP 316 ASTM A 106 GR.B ASTM A 106 GR.B ASTM A 312 TP 316 ASTM A 106 GR.B ASTM A106-B ASTM A106-B ASTM A 312 TP 316 ASTM A 106 GR.B ASTM A 106 GR.B ASTM A106-B ASTM A106-B ASTM A 106 GR.B ASTM A 106 GR.B ASTM A106-B ASTM A 106 GR.B ASTM A 106 GR.B ASTM A106-B ASTM A 106 GR.B ASTM A -105 ASTM A-105 ASTM A105 ASTM A 105 ASTM A 105 ASTM A 694 F52 ASTM A 182 Gr. F-51 ASTM A-105 ASTM A 350-LF2 ASTM A 105 (GALV) ASTM A105 ASTM A 105 ASTM A-105 ASTM A 105 (GALV) Size (Inches) Unit Rate (USD) 10 10 10 10 10 10 10 10 12 12 12 12 12 14 16 16 16 18 24 26 28 30 3/4 3/4 3/4 3/4 3/4 3/4 3/4 1 1 1 1 1 1 1/2 1 1/2 Unit Rate (USD) Installation

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 3 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 Description Flange S.W. RF 300# Sch 80 ASME B 16.5 Flange S.W. RF 600# Sch 160 ASME B 16.5 Flange S.W. RTJ900# SCH 160 ASME B 16.5 Flange W.N RTJ2500# SCH 160 ASME B 16.5 Flange W.N. RF 150# Sch. 80 ASME B 16.5 Flange W.N. RF 150# Sch 160 ASME B 16.5 Flange W.N. RF 150# Sch 80 ASME B 16.5 Flange W.N. RF 150# Sch 80 ASME B 16.5 Flange W.N. RF 300# Sch 40 ASME B 16.5 Flange W.N RF 300# Sch 160 ASME B 16.5 Flange W.N. RF 300# Sch 10S ASME B 16.5 Flange W.N. RF 600# Sch 80 ASME B 16.5 Flange W.N. RF 600# Sch 80 ASME B 16.5 Flange W.N. RF 600# Sch 80 ASME B 16.5 Flange W.N. RTJ900# SCH 160 ASME B 16.5 Flange W.N RTJ2500# SCH 120 ASME B 16.5 Flange W.N. RF 150# Sch. 40 ASME B 16.5 Flange W.N. RF 150# Sch 160 ASME B 16.5 Flange W.N. RF 150# Sch 80 ASME B 16.5 Flange W.N. RF 150# Sch 160 ASME B 16.5 Flange W.N. RF 150# Sch 10S ASME B 16.5 Flange W.N. RF 150# Sch 40s ASME B 16.5 Flange W.N. RF 300# Sch 40 ASME B 16.5 Flange W.N. RF 300# Sch 10S ASME B 16.5 Flange W.N. RF 600# Sch 80 ASME B 16.5 Flange W.N. RTJ900# SCH 160 ASME B 16.5 Flange W.N. RF 150# Sch. 40 ASME B 16.5 Flange W.N. RF 150# Sch 160 ASME B 16.5 Flange W. N. RF 150# Sch 80 ASME B 16.5 Flange W.N. RF 150# Sch 10S ASME B 16.5 Flange W.N. RF 150# Sch 10s ASME B 16.5 Flange W.N. RF 300# Sch 40 ASME B 16.5 Flange W.N RF 300# Sch 80 ASME B 16.5 Flange W.N. RF 300# Sch 10S ASME B 16.5 Flange W.N. RF 600# Sch 80 ASME B 16.5 Material ASTM A105 ASTM A 105 ASTM A 105 ASTM A 182 Gr. F-51 ASTM A-105 ASTM A-105 ASTM A 350-LF2 ASTM A 105 (GALV) ASTM A105 ASTM A105 ASTM A 182 F-304 ASTM A 105 ASTM A 105 ASTM A 182 F-304 ASTM A 105 ASTM A 182 Gr. F-51 ASTM A-105 ASTM A-105 ASTM A 350-LF2 ASTM A 105 (GALV) ASTM A 182 F-51 ASTM A 182 F-304 ASTM A105 ASTM A 182 F-304 ASTM A 105 ASTM A 105 ASTM A-105 ASTM A-105 ASTM A 105 (GALV) ASTM A 182 F-51 ASTM A 182 F-304 ASTM A105 ASTM A105 ASTM A 182 F-304 ASTM A 105 Size (Inches) Unit Rate (USD) 1 1/2 1 1/2 1 1/2 1 1/2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 Unit Rate (USD) Installation

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 4 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 Description Flange W.N. RF 600# Sch 80 ASME B 16.5 Flange W.N. RTJ900# SCH 160 ASME B 16.5 Flange W.N. RF 150# Sch. 40 ASME B 16.5 Flange W.N. RF 150# Sch 160 ASME B 16.5 Flange W.N. RF 150# Sch 160 ASME B 16.5 Flange W.N. RF 150# Sch 10s ASME B 16.5 Flange W.N. RF 300# Sch 40 ASME B 16.5 Flange W.N RF 300# Sch 80 ASME B 16.5 Flange W.N. RF 300# Sch 10S ASME B 16.5 Flange W.N. RF 600# Sch 80 ASME B 16.5 Flange W.N. RF 600# Sch 80 ASME B 16.5 Flange W.N. RTJ 900# Sch 160 ASME B 16.5 Flange W.N. RTJ900# SCH 160 ASME B 16.5 Flange W.N RTJ2500# SCH XXS ASME B 16.5 Flange W.N. RF 150# Sch. 40 ASME B 16.5 Flange W.N. RF 150# Sch 160 ASME B 16.5 Flange W.N. RF 300# Sch 40 ASME B 16.5 Flange W.N. RF 300# Sch 10S ASME B 16.5 Flange W.N. RF 600# Sch 80 ASME B 16.5 Flange W.N. RF 600# Sch 80 ASME B 16.5 Flange W.N. RF 600# Sch 80 ASME B 16.5 Flange W.N. RTJ900# SCH 160 ASME B 16.5 Flange W.N. RTJ900# 11.13THK ASME B 16.5 Flange W.N. RF 150# Sch. 40 ASME B 16.5 Flange W.N. RF 150# Sch 160 ASME B 16.5 Flange W.N. RF 300# Sch 40 ASME B 16.5 Flange W.N RF 300# Sch 80 ASME B 16.5 Flange W.N. RF 300# Sch 10S ASME B 16.5 Flange W.N. RF 600# Sch 80 ASME B 16.5 Flange W.N. RF 600# Sch 80 ASME B 16.5 Flange W.N. RTJ900# SCH 120 ASME B 16.5 Flange W.N. RF 150# Sch. 40 ASME B 16.5 Flange W.N. RF 300# Sch STD ASME B 16.5 Flange W.N. RF 300# Sch 10S ASME B 16.5 Flange W.N. RF 600# Sch 80 ASME B 16.5 Material ASTM A 182 F-304 ASTM A 105 ASTM A-105 ASTM A-105 ASTM A-105 ASTM A 182 F-304 ASTM A105 ASTM A105 ASTM A 182 F-304 ASTM A 105 ASTM A 105 ASTM A 105 ASTM A 105 ASTM A 182 Gr. F-51 ASTM A-105 ASTM A-105 ASTM A105 ASTM A 182 F-304 ASTM A 105 ASTM A 105 ASTM A 182 F-304 ASTM A 105 ASTM A 694 F52 ASTM A-105 ASTM A-105 ASTM A105 ASTM A105 ASTM A 182 F-304 ASTM A 105 ASTM A 182 F-304 ASTM A 105 ASTM A-105 ASTM A105 ASTM A 182 F-304 ASTM A 105 Size (Inches) Unit Rate (USD) 4 4 6 6 6 6 6 6 6 6 6 6 6 6 8 8 8 8 8 8 8 8 8 10 10 10 10 10 10 10 10 12 12 12 12 Unit Rate (USD) Installation

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 5 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 Description Flange W.N. RTJ900# SCH 120 ASME B 16.5 Flange W.N. RF 300# Sch STD ASME B 16.5 Flange W.N. RF 300# Sch STD ASME B 16.5 Flange W.N. RF 600# Sch 80 ASME B 16.5 Flange W.N. RTJ900# SCH 120 ASME B 16.5 Flange W.N. RF 300# Sch XS ASME B 16.5 Flange W.N. RF 600# Sch 80 ASME B 16.5 Flange W.N. RF 600# Sch STD ASME B 16.5 Flange W.N. RF 300# Sch 40 ASME B 16.5 Flange W.N. RF 600# Sch STD ASME B 16.5 Blind Flange RF 150# ASME B 16.5 Blind Flange RF 600# ASME B 16.5 Blind Flange RF 150# ASME B 16.5 Blind Flange RF 300# ASME B 16.5 Blind Flange RF 300# ASME B 16.5 Blind Flange RF 300# ASME B 16.5 Blind Flange RF 150# ASME B 16.5 Blind Flange RF 600# ASME B 16.5 Blind Flange RF 300# ASME B 16.5 Blind Flange RF 600# ASME B 16.5 Blind Flange RF 300# ASME B 16.5 Blind Flange RF 900# ASME B 16.5 Blind Flange RF 600# ASME B 16.5 Blind Flange RF 300# ASME B 16.5 Blind Flange RF 600# ASME B 16.5 GATE VALVE S.W. 800# API 602. bolted bonnet, bolted gland, solid renewable seats. Handwheel GATE VALVE S.W. 1500# API 602. bolted bonnet, bolted gland, solid renewable seats. Handwheel OS&Y, wedge, OS&Y, wedge, Material ASTM A 105 ASTM A105 ASTM A105 ASTM A 105 ASTM A 105 ASTM A105 ASTM A 105 ASTM A 105 ASTM A105 ASTM A 105 ASTM A - 105 ASTM A 105 ASTM A - 105 ASTM A105 ASTM A105 ASTM A105 ASTM A - 105 ASTM A 105 ASTM A105 ASTM A 105 ASTM A105 ASTM A 105 ASTM A 105 ASTM A105 ASTM A 105 BODY: Forged Steel. STEM & SEAT: 316 S.S BODY: Forged Steel. STEM & SEAT: 316 S.S Size (Inches) Unit Rate (USD) 12 14 16 16 16 18 24 26 28 30 2 2 3 3 4 6 8 8 10 12 16 16 26 28 30 3/4" Unit Rate (USD) Installation

205

3/4"

206

207

Body: Steel. Stem: 316 S.S. Ball, Seat & seal: Filled Teflon Body: Steel. Stem & Ball: Ball Valve S.W. 800# API 598. Bolted body, 316 S.S. Seat & seal: Filled replaceable seats, regular port. Lever operated Teflon Ball Valve S.W. 800# API 598. Bolted body, replaceable seats, regular port. Lever operated Ball Valve A6

3/4"

3/4"

208

3/4"

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 6 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No Description Material Size (Inches) Unit Rate (USD) 209 Body: Steel. Stem & Ball: Ball Valve S.W. 800# API 598. Bolted body, 316 S.S. Seat & seal: Filled replaceable seats, regular port. Lever operated Teflon Body: Steel. Stem & Ball: Ball Valve S.W. 800# API 598. Bolted body, 316 S.S. Seat & seal: Filled replaceable seats, regular port. Lever operated Teflon Ball Valve Ball valve S.W. 1500# API 598. Bolted body, replaceable seats, regular port. Lever Operated. Ball valve S.W. 1500# API 598. Bolted body, replaceable seats, regular port. Lever Operated. Ball valve S.W. 1500# API 598. Bolted body, replaceable seats, regular port. Lever Operated. Ball valve S.W. 1500# API 598. Bolted body, replaceable seats, regular port, fire safe. Lever Operated. Ball Valve RTJ 2500# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8) Globe Valve S.W. 800# MSS SP-84, OS&Y, bolted bonnet, bolted gland, renewable seats. Hand wheel operated. B6 Body: Steel. Stem & Ball: 316 S.S. Seat & seal: Filled Teflon Body: Steel. Stem & Ball: 316 S.S. Seat & seal: Filled Teflon Body: Steel. Stem & Ball: 316 S.S. Seat & seal: Filled Teflon Body: Steel. Stem: 13% Cr. Seats Seals: Filled teflon. Ball: A 182F6a Class 3. Body, stem & Ball: Duplex SS 22% Cr. Seal & Seats: Filled TFE BODY: Steel. STEM & SEAT: 316 S.S 3/4" Unit Rate (USD) Installation

210

3/4"

211

3/4"

212

3/4"

213

3/4"

214

3/4"

215

3/4"

216

3/4"

217

3/4"

218

Check Valve S.W. 800# MSS SP-84. Bolted Body: Steel. Ball, Seats & bonnet, swing type Pin: 316 S.S. GATE VALVE S.W. 800# API 602. OS&Y, bolted bonnet, bolted gland, solid wedge, renewable seats. Handwheel BODY: Forged Steel. STEM & SEAT: 316 S.S

3/4"

219

1/2"

220

Body: Steel. Stem & Ball: Ball Valve S.W. 800# API 598. Bolted body, 316 S.S. Seat & seal: Filled replaceable seats, regular port. Lever operated Teflon Ball Valve Threaded 800# ANSI B16.34. Bolted Body: Steel. Stem & Ball: body, replaceable seats, full port. Lever 13% CR, Seat & Seal: operated. Filled Teflon Body: Steel. Stem & Ball: Ball Valve S.W. 800# API 598. Bolted body, 316 S.S. Seat & seal: Filled replaceable seats, regular port. Lever operated Teflon Ball valve S.W. 1500# API 598. Bolted body, Body: Steel. Stem & Ball: replaceable seats, regular port. Lever 316 S.S. Seat & seal: Filled Operated. Teflon

1/2"

221

222

223

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 7 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No Description Material Size (Inches) Unit Rate (USD) Ball valve S.W. 1500# API 598. Bolted body, Body: Steel. Stem & Ball: replaceable seats, regular port. Lever 316 S.S. Seat & seal: Filled Operated. Teflon Globe Valve S.W. 800# MSS SP-84, OS&Y, bolted bonnet, bolted gland, renewable seats. Hand wheel operated. Globe Valve S.W.1500# MSS SP-84, OS&Y, bolted bonnet, bolted gland, renewable seats. Hand wheel operated. Unit Rate (USD) Installation

224

225

BODY: Steel. STEM & SEAT: 316 S.S

226

BODY: Steel. STEM & SEAT: 316 S.S

227

Body: Steel. Stem & Ball: Ball Valve S.W. 800# API 598. Bolted body, 316 S.S. Seat & seal: Filled replaceable seats, regular port. Lever operated Teflon Body: Steel. Stem & Ball: Ball Valve S.W. 800# API 598. Bolted body, 316 S.S. Seat & seal: Filled replaceable seats, regular port. Lever operated Teflon Globe Valve S.W. 800# MSS SP-84, OS&Y, bolted bonnet, bolted gland, renewable seats. Hand wheel operated. Globe Valve S.W. 800# MSS SP-84, OS&Y, bolted bonnet, bolted gland, renewable seats. Hand wheel operated. GATE VALVE RF 150#, API 600. OS&Y, bolted bonnet & gland, solid wedge, renewable seats. Handwheel

1 1/2

228

1 1/2

229

BODY: Steel. STEM & SEAT: 316 S.S

1 1/2

230

BODY: Steel. STEM & SEAT: 316 S.S

1 1/2

231

BODY: Steel. STEM & SEAT RINGS: 13% CR, HF SEATS

232

GATE VALVE RF 150#, API 600. OS&Y, bolted BODY: Steel. STEM & bonnet, bolted gland, solid wedge, renewable SEAT RINGS 13% CR, HF seats. Handwheel SEATS GATE VALVE RF 300#, API 600. OS&Y, bolted BODY: Steel. STEM & bonnet, bolted gland, solid wedge, renewable SEAT RINGS 13% CR, HF seats. Handwheel SEATS GATE VALVE RTJ 900#, API 600. OS&Y, bolted bonnet, bolted gland, solid wedge, renewable seats. Handwheel Ball Valve RF 150# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8)

233

234

BODY: Steel. STEM & SEAT: 316 S.S

235

Body: Steel. Stem: 13% CR, Seat & Seal: Filled TFE

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 8 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No Description Material Size (Inches) Unit Rate (USD) Ball Valve RF 150# ANSI B16.34. Bolted body, Body: Steel. Stem: 316S.S, replaceable seats, regular port, trunnion Seat & Seal: Filled TFE, mounted ball over 4 inch. Lever operated (Gear Ball: Chrome Plated Steel over 6) Ball Valve RF 150# ANSI B16.34. Bolted body, Body: Steel. Stem & Ball: replaceable seats, regular port, trunnion Nickel Plated steel, Seat & mounted ball over 4 inch. Lever operated (Gear Seal: Filled Teflon over 8) Ball Valve RF 300# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8) Body: Steel. Stem: 13% CR, Ball: Chrome Plated steel, Seat & Seal: Filled Teflon Unit Rate (USD) Installation

236

237

238

239

Ball Valve RF 300# ANSI B16.34. Bolted body, Body: Steel. Stem & Ball: replaceable seats, regular port, trunnion 316 S.S. Seat & seal: Filled mounted ball over 4 inch. Lever operated (Gear Teflon over 6) Ball Valve RF 300# ANSI B16.34. Bolted body, Body & Stem: 316 S.S. replaceable seats, regular port, trunnion Seats & Seal: Filled TFE. mounted ball over 4 inch. Lever operated (Gear Ball: 304 S.S. over 6) Ball Valve RF 600# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8) Body: Steel. Stem: 13% CR, Ball: Chrome Plated steel, Seat & Seal: Filled TFE

240

241

242

Ball Valve RF 600# ANSI B16.34. Bolted body, Body: Steel. Stem & Ball: replaceable seats, regular port, trunnion 316 S.S. Seat & seal: Filled mounted ball over 4 inch. Lever operated (Gear Teflon over 6) Ball Valve RF 600# ANSI B16.34. Bolted body, Body & Stem: 316 S.S. replaceable seats, regular port, trunnion Seats & Seal: Filled TFE. mounted ball over 4 inch. Lever operated (Gear Ball: 304 S.S. over 6) Ball Valve RTJ 900# ANSI B16.34. Bolted body, Body & Stem: 316 S.S. replaceable seats, regular port, trunnion Seats & Seal: Filled TFE. mounted ball over 4 inch. Lever operated (Gear Ball: 304 S.S. over 6) Ball Valve RTJ 2500# ANSI B16.34. Bolted Body, stem & Ball: Duplex body, replaceable seats, regular port, trunnion SS 22% Cr. Seal & Seats: mounted ball over 4 inch. Lever operated (Gear Filled TFE over 8) Globe Valve RF 150# ANSI B16.34 , OS&Y, BODY: Steel. STEM & bolted bonnet, bolted gland, renewable seats, SEAT RINGS 13% CR, HF loose disc. Hand wheel Operated. SEATS Globe Valve RF 150# ANSI B16.34 ,OS&Y, bolted bonnet, bolted gland, renewable seats . Hand wheel Operated.

243

244

245

246

247

BODY: Steel. STEM & SEAT: 316 S.S

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 9 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No Description Material Size (Inches) Unit Rate (USD) Globe Valve RF 150# ANSI B16.34 , OS&Y, BODY: Steel. STEM & bolted bonnet, bolted gland, renewable seats, SEAT RINGS 13% CR, HF loose disc. Hand wheel Operated. SEATS Globe Valve RF 300# ANSI B16.34 , OS&Y, BODY: Steel. STEM & bolted bonnet, bolted gland, renewable seats, SEAT RINGS 13% CR, HF loose disc. Hand wheel Operated. SEATS Globe Valve RF 300# ANSI B16.34 , OS&Y, bolted bonnet, bolted gland, renewable seats, loose disc. Hand wheel Operated. Unit Rate (USD) Installation

248

249

250

BODY: Steel. STEM & SEAT: 316 S.S

251

Globe Valve

b6

252

Globe Valve RF 600# ANSI B16.34 , OS&Y, BODY: Steel. STEM & bolted bonnet, bolted gland, renewable seats, SEAT RINGS 13% CR, HF loose disc. Hand wheel Operated. SEATS Globe Valve RF 600# ANSI B16.34 , OS&Y, bolted bonnet, bolted gland, renewable seats. Hand wheel Operated.

253

BODY: Steel. STEM & SEAT: 316 S.S

254

Globe Valve

d6

255

Check Valve RF 150# ANSI B16.34. Bolted bonnet, swing type, renewable seats.

BODY& DISC: Steel. PIN & SEAT: 13% CR, HF SEATS.

256

Check Valve RF 150# ANSI B16.34. Bolted bonnet, non-slam, piston type, renewable seats.

Body: Steel. Seats & Piston: 316 S.S.

257

Check Valve RF 300# ANSI B16.34. Bolted bonnet, swing type, renewable seats.

BODY& DISC: Steel. PIN & SEAT: 13% CR, HF SEATS.

258

Check Valve RF 300# ANSI B16.34. Bolted bonnet, swing type, renewable seats

Body,Pin, Seats & Plate: 316 S.S BODY& DISC: Steel. PIN & SEAT: 13% CR, HF SEATS.

259

Check Valve RF 600# ANSI B16.34. Bolted bonnet, swing type, renewable seats

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 10 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No Description Material Size (Inches) Unit Rate (USD) Check Valve RF 600# ANSI B16.34. Bolted bonnet, swing type, renewable seats Body,Pin, Seats & Disc: 316 S.S Unit Rate (USD) Installation

260

261

GATE VALVE RF 150#, API 600. OS&Y, bolted BODY: Steel. STEM & bonnet, bolted gland, solid wedge, renewable SEAT RINGS 13% CR, HF seats. Handwheel SEATS GATE VALVE RF 150#, API 600. OS&Y, bolted bonnet, bolted gland, solid wedge, renewable seats. Handwheel GATE VALVE RF 150#, API 600. OS&Y, bolted bonnet, bolted gland, solid wedge, renewable seats. Handwheel Ball Valve RF 150# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8)

262

BODY: Steel. STEM & SEAT: 316 S.S

263

BODY, STEM & SEAT : 316 S.S

264

Body: Steel. Stem: 13% CR, Seat & Seal: Filled TFE

265

Ball Valve RF 150# ANSI B16.34. Bolted body, Body: Steel. Stem: 316S.S, replaceable seats, regular port, trunnion Seat & Seal: Filled TFE, mounted ball over 4 inch. Lever operated (Gear Ball: Chrome Plated Steel over 6) Ball Valve RF 150# ANSI B16.34. Bolted body, Body & Stem: 316 S.S. replaceable seats, regular port, trunnion Seats & Seal: Filled TFE. mounted ball over 4 inch. Lever operated (Gear Ball: 304 S.S. over 6) Ball Valve RF 300# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8) Body: Steel. Stem: 13% CR, Ball: Chrome Plated steel, Seat & Seal: Filled Teflon

266

267

268

Ball Valve RF 300# ANSI B16.34. Bolted body, Body & Stem: 316 S.S. replaceable seats, regular port, trunnion Seats & Seal: Filled TFE. mounted ball over 4 inch. Lever operated (Gear Ball: 304 S.S. over 6) Ball Valve RF 600# ANSI B16.34. Bolted body, Body: Steel. Stem & Ball: replaceable seats, regular port, trunnion 316 S.S. Seat & seal: Filled mounted ball over 4 inch. Lever operated (Gear Teflon over 6) Globe Valve RF 150# ANSI B16.34 , OS&Y, BODY: Steel. STEM & bolted bonnet, bolted gland, renewable seats, SEAT RINGS 13% CR, HF loose disc. Hand wheel Operated. SEATS

269

270

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 11 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No Description Material Size (Inches) Unit Rate (USD) Globe Valve RF 300# ANSI B16.34 , OS&Y, BODY: Steel. STEM & bolted bonnet, bolted gland, renewable seats, SEAT RINGS 13% CR, HF loose disc. Hand wheel Operated. SEATS Globe Valve RF 600# ANSI B16.34 , OS&Y, bolted bonnet, bolted gland, renewable seats. Hand wheel Operated. Unit Rate (USD) Installation

271

272

BODY: Steel. STEM & SEAT: 316 S.S

273

Check Valve RF 150# ANSI B16.34. Bolted bonnet, swing type, renewable seats.

BODY& DISC: Steel. PIN & SEAT: 13% CR, HF SEATS.

274

Check Valve RF 150# ANSI B16.34. Bolted bonnet, non-slam, piston type, renewable seats.

Body: Steel. Seats & Piston: 316 S.S.

275

Check Valve RF 300# ANSI B16.34. Bolted bonnet, swing type, renewable seats.

BODY& DISC: Steel. PIN & SEAT: 13% CR, HF SEATS.

276

Check Valve RF 300# ANSI B16.34. Bolted bonnet, swing type, renewable seats

Body,Pin, Seats & Plate: 316 S.S

277

GATE VALVE RF 150#, API 600. OS&Y, bolted BODY: Steel. STEM & bonnet, bolted gland, solid wedge, renewable SEAT RINGS 13% CR, HF seats. Handwheel SEATS GATE VALVE RF 150#, API 600. OS&Y, bolted bonnet, bolted gland, solid wedge, renewable seats. Handwheel

278

BODY: Steel. STEM & SEAT: 316 S.S

279

GATE VALVE RF 300#, API 600. OS&Y, bolted BODY: Steel. STEM & bonnet, bolted gland, solid wedge, renewable SEAT RINGS 13% CR, HF seats. Handwheel SEATS GATE VALVE RF 600#, API 600. OS&Y, bolted bonnet, bolted gland, solid wedge, renewable seats. Handwheel Ball Valve RF 150# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8)

280

BODY: Steel. STEM & SEAT: 316 S.S

281

Body: Steel. Stem: 13% CR, Seat & Seal: Filled TFE

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 12 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No Description Material Size (Inches) Unit Rate (USD) Ball Valve RF 150# ANSI B16.34. Bolted body, Body: Steel. Stem: 316S.S, replaceable seats, regular port, trunnion Seat & Seal: Filled TFE, mounted ball over 4 inch. Lever operated (Gear Ball: Chrome Plated Steel over 6) Ball Valve RF 150# ANSI B16.34. Bolted body, Body: Steel. Stem & Ball: replaceable seats, regular port, trunnion Nickel Plated steel, Seat & mounted ball over 4 inch. Lever operated (Gear Seal: Filled Teflon over 8) Ball Valve RF 150# ANSI B16.34. Bolted body, Body & Stem: 316 S.S. replaceable seats, regular port, trunnion Seats & Seal: Filled TFE. mounted ball over 4 inch. Lever operated (Gear Ball: 304 S.S. over 6) Ball Valve RF 300# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8) Body: Steel. Stem: 13% CR, Ball: Chrome Plated steel, Seat & Seal: Filled Teflon Unit Rate (USD) Installation

282

283

284

285

286

Ball Valve RF 300# ANSI B16.34. Bolted body, Body: Steel. Stem & Ball: replaceable seats, regular port, trunnion 316 S.S. Seat & seal: Filled mounted ball over 4 inch. Lever operated (Gear Teflon over 6) Ball Valve RF 300# ANSI B16.34. Bolted body, Body & Stem: 316 S.S. replaceable seats, regular port, trunnion Seats & Seal: Filled TFE. mounted ball over 4 inch. Lever operated (Gear Ball: 304 S.S. over 6) Ball Valve RF 600# ANSI B16.34. Bolted body, Body: Steel. Stem & Ball: replaceable seats, regular port, trunnion 316 S.S. Seat & seal: Filled mounted ball over 4 inch. Lever operated (Gear Teflon over 6) Ball Valve RF 600# ANSI B16.34. Bolted body, Body & Stem: 316 S.S. replaceable seats, regular port, trunnion Seats & Seal: Filled TFE. mounted ball over 4 inch. Lever operated (Gear Ball: 304 S.S. over 6) Ball Valve RTJ 900# ANSI B16.34. Bolted body, Body & Stem: 316 S.S. replaceable seats, regular port, trunnion Seats & Seal: Filled TFE. mounted ball over 4 inch. Lever operated (Gear Ball: 304 S.S. over 6) Globe Valve RF 150# ANSI B16.34 ,OS&Y, bolted bonnet, bolted gland, renewable seats . Hand wheel Operated. BODY: Steel. STEM & SEAT: 316 S.S

287

288

289

290

291

292

Globe Valve RF 150# ANSI B16.34 , OS&Y, BODY: Steel. STEM & bolted bonnet, bolted gland, renewable seats, SEAT RINGS 13% CR, HF loose disc. Hand wheel Operated. SEATS Globe Valve RF 300# ANSI B16.34 , OS&Y, BODY: Steel. STEM & bolted bonnet, bolted gland, renewable seats, SEAT RINGS 13% CR, HF loose disc. Hand wheel Operated. SEATS

293

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 13 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No Description Material Size (Inches) Unit Rate (USD) Globe Valve RF 600# ANSI B16.34 , OS&Y, bolted bonnet, bolted gland, renewable seats. Hand wheel Operated. BODY: Steel. STEM & SEAT: 316 S.S Unit Rate (USD) Installation

294

295

Globe Valve

d6

296

Check Valve RF 150# ANSI B16.34. Bolted bonnet, swing type, renewable seats.

BODY& DISC: Steel. PIN & SEAT: 13% CR, HF SEATS.

297

Check Valve RF 150# ANSI B16.34. Bolted bonnet, non-slam, piston type, renewable seats.

Body: Steel. Seats & Piston: 316 S.S.

298

Check Valve RF 150# ANSI B16.34. Bolted bonnet, swing type, renewable seats.

BODY& DISC: Steel. PIN & SEAT: 13% CR, HF SEATS.

299

Check Valve RF 150# API 594 . Wafer, dual plate, resilient seal

Body,Pin, Seats & Plate: Duplex SS 22% Cr

300

Check Valve RF 300# ANSI B16.34. Bolted bonnet, swing type, renewable seats.

BODY& DISC: Steel. PIN & SEAT: 13% CR, HF SEATS.

301

Check Valve RF 300# ANSI B16.34. Bolted bonnet, non-slam, piston type, renewable seats.

Body: Steel. Seats & Piston: 316 S.S.

302

Check Valve RF 600# ANSI B16.34. Bolted bonnet, non-slam, piston type, renewable seats

Body: Steel. Seats & Piston: 316 S.S.

303

Check Valve RF 600# ANSI B16.34. Bolted bonnet, swing type, renewable seats

Body,Pin, Seats & Disc: 316 S.S

304

GATE VALVE RF 150#, API 600. OS&Y, bolted BODY: Steel. STEM & bonnet, bolted gland, solid wedge, renewable SEAT RINGS 13% CR, HF seats. Handwheel SEATS GATE VALVE RF 150#, API 600. OS&Y, bolted bonnet, bolted gland, solid wedge, renewable seats. Handwheel

305

BODY: Steel. STEM & SEAT: 316 S.S

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 14 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No Description Material Size (Inches) Unit Rate (USD) GATE VALVE RF 300#, API 600. OS&Y, bolted BODY: Steel. STEM & bonnet, bolted gland, solid wedge, renewable SEAT RINGS 13% CR, HF seats. Handwheel SEATS GATE VALVE RTJ 900#, API 600. OS&Y, bolted bonnet, bolted gland, solid wedge, renewable seats. Handwheel Ball Valve RF 150# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8) Unit Rate (USD) Installation

306

307

BODY: Steel. STEM & SEAT: 316 S.S

308

Body: Steel. Stem: 13% CR, Seat & Seal: Filled TFE

309

Ball Valve RF 150# ANSI B16.34. Bolted body, Body: Steel. Stem: 316S.S, replaceable seats, regular port, trunnion Seat & Seal: Filled TFE, mounted ball over 4 inch. Lever operated (Gear Ball: Chrome Plated Steel over 6) Ball Valve RF 150# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8) Body: Steel. Stem: 13% CR, Seat & Seal: Filled TFE

310

311

Ball Valve RF 150# ANSI B16.34. Bolted body, Body & Stem: 316 S.S. replaceable seats, regular port, trunnion Seats & Seal: Filled TFE. mounted ball over 4 inch. Lever operated (Gear Ball: 304 S.S. over 6) Ball Valve RF 300# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8) Body: Steel. Stem: 13% CR, Ball: Chrome Plated steel, Seat & Seal: Filled Teflon

312

313

Ball Valve RF 300# ANSI B16.34. Bolted body, Body & Stem: 316 S.S. replaceable seats, regular port, trunnion Seats & Seal: Filled TFE. mounted ball over 4 inch. Lever operated (Gear Ball: 304 S.S. over 6) Ball Valve RF 600# ANSI B16.34. Bolted body, Body: Steel. Stem & Ball: replaceable seats, regular port, trunnion 316 S.S. Seat & seal: Filled mounted ball over 4 inch. Lever operated (Gear Teflon over 6) Ball Valve RTJ 900# ANSI B16.34. Bolted body, Body & Stem: 316 S.S. replaceable seats, regular port, trunnion Seats & Seal: Filled TFE. mounted ball over 4 inch. Lever operated (Gear Ball: 304 S.S. over 6) Ball Valve RTJ 2500# ANSI B16.34. Bolted Body, stem & Ball: Duplex body, replaceable seats, regular port, trunnion SS 22% Cr. Seal & Seats: mounted ball over 4 inch. Lever operated (Gear Filled TFE over 8) Globe Valve RF 150# ANSI B16.34 ,OS&Y, bolted bonnet, bolted gland, renewable seats . Hand wheel Operated. BODY: Steel. STEM & SEAT: 316 S.S

314

315

316

317

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 15 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No Description Material Size (Inches) Unit Rate (USD) Globe Valve RF 150# ANSI B16.34 , OS&Y, BODY: Steel. STEM & bolted bonnet, bolted gland, renewable seats, SEAT RINGS 13% CR, HF loose disc. Hand wheel Operated. SEATS Unit Rate (USD) Installation

318

319

Globe Valve

A6

320

Globe Valve RF 300# ANSI B16.34 , OS&Y, BODY: Steel. STEM & bolted bonnet, bolted gland, renewable seats, SEAT RINGS 13% CR, HF loose disc. Hand wheel Operated. SEATS Globe Valve RF 600# ANSI B16.34 , OS&Y, bolted bonnet, bolted gland, renewable seats. Hand wheel Operated. Globe valve RTJ 900# ANSI B16.34. OS&Y, bolted bonnet, bolted gland, renewable seats. Hand wheel operated.

321

BODY: Steel. STEM & SEAT: 316 S.S

322

BODY: Steel. STEM & SEAT: 316 S.S

323

Check Valve RF 150# ANSI B16.34. Bolted bonnet, swing type, renewable seats.

BODY& DISC: Steel. PIN & SEAT: 13% CR, HF SEATS.

324

Check Valve RF 150# ANSI B16.34. Bolted bonnet, non-slam, piston type, renewable seats.

Body: Steel. Seats & Piston: 316 S.S.

325

Check Valve RF 150# ANSI B16.34. Bolted bonnet, swing type, renewable seats.

BODY& DISC: Steel. PIN & SEAT: 13% CR, HF SEATS. BODY& DISC: Steel. PIN & SEAT: 13% CR, HF SEATS.

326

Check Valve RF 300# ANSI B16.34. Bolted bonnet, swing type, renewable seats.

327

Check Valve RF 600# ANSI B16.34. Bolted bonnet, non-slam, piston type, renewable seats

Body: Steel. Seats & Piston: 316 S.S.

328

Check Valve RTJ 900# ANSI B16.34. Bolted bonnet, non-slam, piston type, renewable seats

Body: Steel. Seats & Piston: 316 S.S.

329

GATE VALVE RF 150#, API 600. OS&Y, bolted BODY: Steel. STEM & bonnet, bolted gland, solid wedge, renewable SEAT RINGS 13% CR, HF seats. Handwheel SEATS

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 16 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No Description Material Size (Inches) Unit Rate (USD) GATE VALVE RF 150#, API 600. OS&Y, bolted bonnet, bolted gland, solid wedge, renewable seats. Handwheel Ball Valve RF 300# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8) Ball Valve RF 600# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8) BODY: Steel. STEM & SEAT: 316 S.S Body: Steel. Stem: 13% CR, Ball: Chrome Plated steel, Seat & Seal: Filled Teflon Body: Steel. Stem: 13% CR, Ball: Chrome Plated steel, Seat & Seal: Filled TFE Unit Rate (USD) Installation

330

331

332

333

Ball Valve RF 600# ANSI B16.34. Bolted body, Body: Steel. Stem & Ball: replaceable seats, regular port, trunnion 316 S.S. Seat & seal: Filled mounted ball over 4 inch. Lever operated (Gear Teflon over 6) Ball Valve RF 600# ANSI B16.34. Bolted body, Body & Stem: 316 S.S. replaceable seats, regular port, trunnion Seats & Seal: Filled TFE. mounted ball over 4 inch. Lever operated (Gear Ball: 304 S.S. over 6) Ball Valve RTJ 900# ANSI B16.34. Bolted body, Body & Stem: 316 S.S. replaceable seats, regular port, trunnion Seats & Seal: Filled TFE. mounted ball over 4 inch. Lever operated (Gear Ball: 304 S.S. over 6) Body: Steel, Stem: ASTM A Ball Valve RTJ 900# ANSI B16.34. Bolted 182 F6, Ball: A 105/ 350LFBody, replaceable seats, full port, Trunion 2 + 3 Mil ENP, Seats mounted fire safe. Gear operated. Seals: Viton AED Globe Valve RF 600# ANSI B16.34 , OS&Y, bolted bonnet, bolted gland, renewable seats. Hand wheel Operated. BODY: Steel. STEM & SEAT: 316 S.S

334

335

336

337

338

Globe Valve Globe valve RTJ 900# ANSI B16.34. OS&Y, bolted bonnet, bolted gland, renewable seats. Hand wheel operated. Check Valve RF 150# ANSI B16.34. Bolted bonnet, swing type, renewable seats. Check Valve RF 300# ANSI B16.34. Bolted bonnet, swing type, renewable seats. Check Valve RF 300# ANSI B16.34. Bolted bonnet, swing type, renewable seats

d6

339

BODY: Steel. STEM & SEAT: 316 S.S BODY& DISC: Steel. PIN & SEAT: 13% CR, HF SEATS. BODY& DISC: Steel. PIN & SEAT: 13% CR, HF SEATS. Body,Pin, Seats & Plate: 316 S.S

340

341

342

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 17 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No Description Material BODY& DISC: Steel. PIN & SEAT: 13% CR, HF SEATS. Body: Steel. Seats & Piston: 316 S.S. Size (Inches) Unit Rate (USD) 343 Check Valve RF 600# ANSI B16.34. Bolted bonnet, swing type, renewable seats Check Valve RF 600# ANSI B16.34. Bolted bonnet, non-slam, piston type, renewable seats 8 Unit Rate (USD) Installation

344

345

GATE VALVE RF 150#, API 600. OS&Y, bolted BODY: Steel. STEM & bonnet, bolted gland, solid wedge, renewable SEAT RINGS 13% CR, HF seats. Handwheel SEATS Ball Valve RF 150# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8) Ball Valve RF 300# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8) Body: Steel. Stem: 13% CR, Seat & Seal: Filled TFE Body: Steel. Stem: 13% CR, Ball: Chrome Plated steel, Seat & Seal: Filled Teflon

10

346

10

347

10

348

Ball Valve RF 300# ANSI B16.34. Bolted body, Body: Steel. Stem & Ball: replaceable seats, regular port, trunnion 316 S.S. Seat & seal: Filled mounted ball over 4 inch. Lever operated (Gear Teflon over 6) Ball Valve RF 300# ANSI B16.34. Bolted body, Body & Stem: 316 S.S. replaceable seats, regular port, trunnion Seats & Seal: Filled TFE. mounted ball over 4 inch. Lever operated (Gear Ball: 304 S.S. over 6) Ball Valve RF 600# ANSI B16.34. Bolted body, Body: Steel. Stem: 13% replaceable seats, regular port, trunnion CR, Ball: Chrome Plated mounted ball over 4 inch. Lever operated (Gear steel, Seat & Seal: Filled over Valve 8) RF 600# ANSI B16.34. Bolted body, Body & Stem: TFE 316 S.S. Ball replaceable seats, regular port, trunnion Seats & Seal: Filled TFE. mounted ball over 4 inch. Lever operated (Gear Ball: 304 S.S. over 6) RTJ 900# ANSI B16.34. Bolted body, Body & Stem: 316 S.S. Ball Valve replaceable seats, regular port, trunnion Seats & Seal: Filled TFE. mounted ball over 4 inch. Lever operated (Gear Ball: 304 S.S. over 6) Globe Valve RF 150# ANSI B16.34 , OS&Y, BODY: Steel. STEM & bolted bonnet, bolted gland, renewable seats, SEAT RINGS 13% CR, HF loose disc. Hand wheel Operated. SEATS Globe Valve RF 300# ANSI B16.34 , OS&Y, BODY: Steel. STEM & bolted bonnet, bolted gland, renewable seats, SEAT: 316 S.S loose disc. Hand wheel Operated. BODY& DISC: Steel. PIN & Check Valve RF 150# ANSI B16.34. Bolted SEAT: 13% CR, HF bonnet, swing type, renewable seats. SEATS. BODY& DISC: Steel. PIN & Check Valve RF 300# ANSI B16.34. Bolted SEAT: 13% CR, HF bonnet, swing type, renewable seats. SEATS.

10

349

10

350

10

351

10

352

10

353

10

354

10

355

10

356

10

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 18 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No Description Material Size (Inches) Unit Rate (USD) 357 Check Valve RF 300# ANSI B16.34. Bolted bonnet, swing type, renewable seats Check Valve RF 600# ANSI B16.34. Bolted bonnet, swing type, renewable seats Check Valve RF 600# ANSI B16.34. Bolted bonnet, non-slam, piston type, renewable seats Ball Valve RF 150# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8) Ball Valve RF 300# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8) Body,Pin, Seats & Plate: 316 S.S BODY& DISC: Steel. PIN & SEAT: 13% CR, HF SEATS. Body: Steel. Seats & Piston: 316 S.S. Body: Steel. Stem: 13% CR, Seat & Seal: Filled TFE 10 Unit Rate (USD) Installation

358

10

359

10

360

12

361

Body: Steel. Stem: 13% CR, Ball: Chrome Plated steel, Seat & Seal: Filled Teflon

12

362

Ball Valve RF 600# ANSI B16.34. Bolted body, Body: Steel. Stem & Ball: replaceable seats, regular port, trunnion 316 S.S. Seat & seal: Filled mounted ball over 4 inch. Lever operated (Gear Teflon over 6) Ball Valve RTJ 900# ANSI B16.34. Bolted body, Body & Stem: 316 S.S. replaceable seats, regular port, trunnion Seats & Seal: Filled TFE. mounted ball over 4 inch. Lever operated (Gear Ball: 304 S.S. over 6)

12

363

12

364

Globe Valve RF 300# ANSI B16.34 , OS&Y, BODY: Steel. STEM & bolted bonnet, bolted gland, renewable seats, SEAT RINGS 13% CR, HF loose disc. Hand wheel Operated. SEATS Globe Valve RF 600# ANSI B16.34 , OS&Y, bolted bonnet, bolted gland, renewable seats. Hand wheel Operated. Check Valve RF 300# ANSI B16.34. Bolted bonnet, swing type, renewable seats. Check Valve RF 600# ANSI B16.34. Bolted bonnet, non-slam, piston type, renewable seats Ball Valve RF 300# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8) Globe Valve RF 300# ANSI B16.34 , OS&Y, BODY: Steel. STEM & SEAT: 316 S.S BODY& DISC: Steel. PIN & SEAT: 13% CR, HF SEATS. Body: Steel. Seats & Piston: 316 S.S. Body: Steel. Stem: 13% CR, Ball: Chrome Plated steel, Seat & Seal: Filled TeflonSTEM & BODY: Steel.

12

365

12

366

12

367

12

368

14

369

bolted bonnet, bolted gland, renewable seats, SEAT RINGS 13% CR, HF loose disc. Hand wheel Operated. SEATS

14

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 19 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No Description Material BODY& DISC: Steel. PIN & SEAT: 13% CR, HF SEATS. Body: Steel. Stem: 13% CR, Ball: Chrome Plated steel, Seat & Seal: Filled Teflon Body: Steel. Stem: 13% CR, Ball: Chrome Plated steel, Seat & Seal: Filled Teflon ASTM A234 Gr. WPB ASTM A 105 (GALV) ASTM A234 Gr. WPB ASTM A 105 (GALV) ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 403 WP-304 ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 234 GR. WPB ASTM A 403 WP-304 ASTM A234 Gr. WPB ASTM A-105 ASTM A234 Gr. WPB, ASTM A234 Gr. WPB, ASTM A234 Gr. WPB, Size (Inches) Unit Rate (USD) 370 Check Valve RF 300# ANSI B16.34. Bolted bonnet, swing type, renewable seats. Ball Valve RF 300# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8) Ball Valve RF 300# ANSI B16.34. Bolted body, replaceable seats, regular port, trunnion mounted ball over 4 inch. Lever operated (Gear over 8) Concentric Reducer SCH 80 ASME B16.9 Concentric Reducer THREADED.3000#, ASME B 16.11 Concentric Reducer SCH 40 ASME B16.9 Concentric Reducer THREADED.3000#, ASME B 16.11 Concentric Reducer SCH 40 ASME B16.9 Concentric Reducer SCH 40 ASME B16.9 Concentric Reducer SCH 80 ASME B16.9 Concentric Reducer SCH 40 ASME B16.9 Concentric Reducer SCH 40 ASME B16.9 Concentric Reducer B.W. SCH 40 ASME B16.9 Concentric Reducer SCH 40 ASME B16.9 Concentric Reducer SCH 40 ASME B16.9 Concentric Reducer SCH 80 ASME B16.9 Concentric Reducer SCH 40 ASME B16.9 Concentric Reducer SCH 40 ASME B16.9 Concentric Reducer SCH 80 ASME B16.9 Concentric Reducer SCH 20S ASME B16.9 Concentric Reducer SCH STD ASME B16.9 Tee Reducing S.W. 3000# ASME B16.11 Tee reducing B.W. SCH 80 ASME B16.9 Tee reducing B.W. SCH 40 ASME B16.9 Tee reducing B.W. SCH 40 ASME B16.9 14 Unit Rate (USD) Installation

371

18

372

20

373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394

2"x1 1/2" 3"x1 1/2" 3"x2" 3"x2" 3"x2" 4"x1 1/2" 4"x2" 4"x3" 6"x3" 6"x4" 6"x4" 6"x4" 8"x2" 10"x6" 10"x6" 12 x10 12"x10" 16"x10" 1 x 3/4 3 x2 4 x2 4 x2

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 20 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 Description Tee reducing B.W. SCH 80 ASME B16.9 Tee reducing B.W. SCH 10S ASME B16.9 Tee reducing B.W. SCH 40 ASME B16.9 Tee reducing B.W. SCH 10S ASME B16.9 Tee reducing B.W. SCH 160 ASME B16.9 Tee reducing B.W. SCH 40 ASME B16.9 Tee reducing B.W. SCH 40 ASME B16.9 Tee reducing B.W. SCH 40 ASME B16.9 Tee reducing B.W. SCH 40 ASME B16.9 Tee reducing B.W. SCH 40 ASME B16.9 Tee reducing B.W. SCH 40 ASME B16.9 Tee reducing B.W. SCH 40 ASME B16.9 Tee reducing B.W. SCH 40 ASME B16.9 Tee reducing B.W. SCH 40 ASME B16.9 Tee reducing B.W. SCH 40 ASME B16.9 Tee reducing B.W. SCH 10S ASME B16.9 Tee reducing B.W. SCH 80 ASME B16.9 Tee reducing B.W. SCH 40 ASME B16.9 Tee reducing B.W. SCH STD ASME B16.9 Tee reducing B.W. SCH 20S ASME B16.9 Tee reducing B.W. SCH 80 ASME B16.9 Tee reducing B.W. SCH 40 ASME B16.9 Tee reducing B.W. SCH STD ASME B16.9 Tee reducing B.W. SCH STD ASME B16.9 Tee reducing B.W. SCH 120 ASME B16.9 Tee reducing B.W. SCH STD ASME B16.9 Tee reducing B.W. SCH STD ASME B16.9 Tee reducing B.W. SCH STD ASME B16.9 Tee reducing B.W. SCH XS ASME B16.9 Material ASTM A 403 WP-304 ASTM A 815 UNS S31803 ASTM A234 Gr. WPB ASTM A 403 WP-304 ASTM A 234 WPB ASTM A234 Gr. WPB, ASTM A234 Gr. WPB, ASTM A234 Gr. WPB, ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB, ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB, ASTM A234 Gr. WPB ASTM A 403 WP-304 ASTM A 234 GR. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 403 WP-304 ASTM A 234 GR. WPB ASTM A234 Gr. WPB, ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 234 WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB Size (Inches) Unit Rate (USD) 4x2 4x3 4 x3 4x3 6x3 6 x3 6 x4 6 x4 6 x4 8 x4 8x6 8x6 10 x4 10 x6 10 x6 10x6 10x6 10 x8 12 x6 12x6 12x6 12 x 8 12 x8 16x8 16x8 16 x10 16 x12 16 x14 18 x16 Unit Rate (USD) Installation

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 21 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 Description Tee Equal B.W. SCH 160 ASME B16.9 Tee Equal S.W. 3000# ASME B16.11 Tee Equal B.W. SCH 80 ASME B16.9 Tee Equal B.W. SCH 80 ASME B16.9 Tee Equal Screwed 3000# ASME B16.11 Tee Equal B.W. SCH 40 ASME B16.9 Tee Equal B.W. SCH 10S ASME B16.9 Tee Equal B.W. SCH 80 ASME B16.9 Tee Equal B.W. SCH 80 ASME B16.9 Tee Equal B.W. SCH 40 ASME B16.9 Tee Equal B.W. SCH 40 ASME B16.9 Tee Equal B.W. SCH 80 ASME B16.9 Tee Equal Screwed 3000# ASME B16.11 Tee Equal B.W. SCH 40 ASME B16.9 Tee Equal B.W. SCH 10S ASME B16.9 Tee Equal B.W. SCH 80 ASME B16.9 Tee Equal B.W. SCH 40 ASME B16.9 Tee Equal B.W. SCH 40 ASME B16.9 Tee Equal B.W. SCH 80 ASME B16.9 Tee Equal B.W. SCH 80 ASME B16.9 Tee Equal B.W. SCH 40 ASME B16.9 Tee Equal B.W. SCH 40 ASME B16.9 Tee Equal B.W. SCH 40 ASME B16.9 Tee Equal B.W. SCH 80 ASME B16.9 Tee Equal B.W. SCH 160 ASME B16.9 Tee Equal B.W. SCH 40 ASME B16.9 Tee Equal B.W. SCH 40 ASME B16.9 Tee Equal B.W. SCH 80 ASME B16.9 Tee Equal B.W. SCH 80 ASME B16.9 Material ASTM A234 Gr. WPB ASTM A105 ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 105 (GALV) ASTM A234 Gr. WPB ASTM A 403 WP-304 ASTM A 403 WP-304 ASTM A 234 GR. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 420 WPL6 ASTM A 105 (GALV) ASTM A234 Gr. WPB ASTM A 403 WP-304 ASTM A 234 GR. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 234 GR. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 234 GR. WPB ASTM A 234 WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 234 GR. WPB ASTM A 234 GR. WPB Size (Inches) Unit Rate (USD) 1 1/2 1 1/2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 4 4 4 4 6 6 6 6 6 8 8 8 8 Unit Rate (USD) Installation

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 22 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 Description Tee Equal B.W. SCH 160 ASME B16.9 Tee Equal B.W. SCH 40 ASME B16.9 Tee Equal B.W. SCH 80 ASME B16.9 Tee Equal B.W. SCH 40 ASME B16.9 Tee Equal B.W. SCH STD ASME B16.9 Tee Equal B.W. SCH 20S ASME B16.9 Tee Equal B.W. SCH 80 ASME B16.9 Tee Equal B.W. SCH 80 ASME B16.9 Tee Equal B.W. SCH XS ASME B16.9 Weldolet S.W. 3000# ASME B16.11 Weldolet B.W. SCH 80 ASME B16.9 Weldolet B.W. SCH 80 ASME B16.9 Weldolet B.W. SCH 40 ASME B16.9 Weldolet B.W. SCH 10S ASME B16.9 Weldolet B.W. SCH 80 ASME B16.9 Weldolet B.W. SCH 80 ASME B16.9 Weldolet B.W. SCH 40 ASME B16.9 Weldolet B.W. SCH 40 ASME B16.9 Weldolet B.W. SCH 40 ASME B16.9 Weldolet B.W. SCH 80 ASME B16.9 Screwed Tee 3000#, ASME B 16.11 Sockolet S.W. 3000# ASME B16.11 Sockolet B.W. SCH 80 ASME B16.9 Sockolet S.W 6000#, ASME B 16.11 Sockolet S.W 6000#, ASME B 16.11 Sockolet B.W. SCH 80 ASME B16.9 Sockolet S.W 6000#, ASME B 16.11 Elbow 90 S.W .3000#, ASME B 16.11 Elbow 90 SW, 3000# ANSI B16.11 Material ASTM A 234 WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 403 WP-304 ASTM A 234 GR. WPB ASTM A 234 GR. WPB ASTM A234 Gr. WPB ASTM A-105, ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 403 WP-304 ASTM A 234 GR. WPB ASTM A 234 GR. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 234 GR. WPB ASTM A 105 (GALV) ASTM A105 ASTM A 234 GR. WPB ASTM A 105 ASTM A105 ASTM A 234 GR. WPB ASTM A105 ASTM A105, ASTM A-105 Size (Inches) Unit Rate (USD) 8 10 10 12 12 12 12 16 18 1 2 2 2 2 2 2 3 4 4 4 1 3/4 3/4 3/4 3/4 1 1/2 1 1/2 3/4 3/4 Unit Rate (USD) Installation

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 23 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 Description Elbow 90 SW, 6000# ANSI B16.11 Elbow 90 SW, 6000# ANSI B16.11 Elbow 90 BW SCH 160 ANSI B16.5 Elbow 90 SW, 3000# ANSI B16.11 Elbow 90 SW, 6000# ANSI B16.11 Elbow 90 SW, 3000# ANSI B16.11 Elbow 90 SW, 3000# ANSI B16.11 Elbow 90 Screwed .3000#, ASME B 16.11 Elbow 90 S.W .3000#, ASME B 16.11 Elbow 90 SW, 6000# ANSI B16.11 Elbow 90 SW, 6000# ANSI B16.11 Elbow 90 Screwed .3000#, ASME B 16.11 Elbow 90 S.W. .3000#, ASME B 16.11 Elbow 90 SW, 6000# ANSI B16.11 Elbow 90 BW SCH 160 ANSI B16.5 Elbow 90 SW, 3000# ANSI B16.11 Elbow 90 BW SCH 80 ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.9 Elbow 90 Screwed .3000#, ASME B 16.11 Elbow 90 BW SCH 40 ANSI B16.9 Elbow 90 BW SCH 160 ANSI B16.9 Elbow 90 BW SCH 10S ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.19 Elbow 90 BW SCH 160 ANSI B16.9 Elbow 90 BW SCH 120 ANSI B16.5 Elbow 90 BW SCH 40 ANSI B16.9 Material ASTM A 105 (EPOXY LINED) ASTM A 105 ASTM A - 815, UNS S31803 ASTM A-105 ASTM A 105 ASTM A-105 ASTM A350 LF2 ASTM A 105 (GALV) ASTM A105, ASTM A 105 ASTM A 105 (EPOXY LINED) ASTM A 105 (GALV) ASTM A105, ASTM A 105 ASTM A - 815, UNS S31803 ASTM A-105 ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 420 WPL6 ASTM A 105 (GALV) ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 403 WP-304 ASTM A 234 GR. WPB ASTM A 234 GR. WPB ASTM A 403 WP-304 ASTM A 234 WPB ASTM A - 815, UNS S31803 ASTM A234 Gr. WPB Size (Inches) Unit Rate (USD) 3/4 3/4 3/4 3/4 3/4 1 1 1 1 1 1 1 1/2 1 1/2 1 1/2 1 1/2 1 1/2 2 2 2 2 2 2 2 2 2 2 2 2 3 Unit Rate (USD) Installation

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 24 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 Description Elbow 90 BW SCH 80 ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.9 Elbow 90 Screwed .3000#, ASME B 16.11 Elbow 90 BW SCH 10S ANSI B16.9 Elbow 90 BW SCH 40S ANSI B16.9 Elbow 90 BW SCH 40 ANSI B16.9 Elbow 90 BW SCH 10S ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.10 Elbow 90 BW SCH 160 ANSI B16.9 Elbow 90 BW SCH 40 ANSI B16.9 Elbow 90 BW SCH 40 ANSI B16.9 Elbow 90 Screwed .3000#, ASME B 16.11 Elbow 90 BW SCH 10S ANSI B16.9 Elbow 90 BW SCH 10S ANSI B16.9 Elbow 90 BW SCH 40 ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.9 Elbow 90 BW SCH 10S ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.11 Elbow 90 BW SCH 80 ANSI B16.19 Elbow 90 BW SCH 160 ANSI B16.9 Elbow 90 BW SCH 40 ANSI B16.9 Elbow 90 BW SCH 40 ANSI B16.9 Elbow 90 BW SCH 40 ANSI B16.9 Elbow 90 BW SCH 10S ANSI B16.9 Elbow 90 BW SCH 40 ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.9 Elbow 90 BW SCH 10S ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.12 Material ASTM A234 Gr. WPB ASTM A 420 WPL6 ASTM A 105 (GALV) ASTM A 815 UNS S31803 ASTM A 403 WP-304 ASTM A234 Gr. WPB ASTM A 403 WP-304 ASTM A 234 GR. WPB ASTM A 234 WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 105 (GALV) ASTM A 815 UNS S31803 ASTM A 403 WP-304 ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 403 WP-304 ASTM A 234 GR. WPB ASTM A 403 WP-304 ASTM A 234 WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB, ASTM A 403 WP-304 ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 403 WP-304 ASTM A 234 GR. WPB ASTM A 234 GR. WPB Size (Inches) Unit Rate (USD) 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 6 6 6 6 6 6 6 6 6 Unit Rate (USD) Installation

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 25 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 Description Elbow 90 BW SCH 160 ANSI B16.9 Elbow 90 BW SCH 160 ANSI B16.9 Elbow 90 BW SCH 120 ANSI B16.5 Elbow 90 BW SCH 40 ANSI B16.9 Elbow 90 BW SCH 40 ANSI B16.9 Elbow 90 BW SCH 40 ANSI B16.9 Elbow 90 BW SCH 10S ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.13 Elbow 90 BW SCH 80 ANSI B16.19 Elbow 90 BW SCH 160 ANSI B16.9 Elbow 90 BW 11.13THK ANSI B16.9 Elbow 90 BW SCH 40 ANSI B16.9 Elbow 90 BW SCH 40 ANSI B16.9 Elbow 90 BW SCH 40 ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.9 Elbow 90 BW SCH 10S ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.14 Elbow 90 BW SCH 80 ANSI B16.19 Elbow 90 BW SCH 120 ANSI B16.9 Elbow 90 BW SCH 40 ANSI B16.9 Elbow 90 BW SCH STD ANSI B16.9 Elbow 90 BW SCH 20S ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.15 Elbow 90 BW SCH 120 ANSI B16.9 Elbow 90 BW SCH STD ANSI B16.9 Elbow 90 BW SCH STD ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.16 Material ASTM A 234 WPB ASTM A 234 WPB ASTM A - 815, UNS S31803 ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 403 WP-304 ASTM A 234 GR. WPB ASTM A 234 GR. WPB ASTM A 403 WP-304 ASTM A 234 WPB ASTM A 860 Gr WPHY 52 ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 403 WP-304 ASTM A 234 GR. WPB ASTM A 234 GR. WPB ASTM A 403 WP-304 ASTM A 234 WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 403 WP-304 ASTM A 234 GR. WPB ASTM A 234 WPB ASTM A234 Gr. WPB ASTM A234 Gr. WPB ASTM A 234 GR. WPB Size (Inches) Unit Rate (USD) 6 6 6 8 8 8 8 8 8 8 8 8 10 10 10 10 10 10 10 10 10 12 12 12 12 12 14 16 16 Unit Rate (USD) Installation

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 26 OF 27

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL PIPING MATERIAL
Supply S.No 569 570 571 572 573 574 575 576 577 578 579 580 581 582 Description Elbow 90 BW SCH 120 ANSI B16.9 Elbow 90 BW SCH XS ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.17 Elbow 90 BW SCH 80 ANSI B16.18 Elbow 90 BW SCH 40 ANSI B16.9 Elbow 90 BW SCH 80 ANSI B16.19 Y Strainer Y Strainer Y Strainer Y Strainer Y Strainer Y Strainer Y Strainer Barred TEE B.W. 11.13 THK ASME B16.9 ASTM A 860 Gr WPHY 52 Material ASTM A 234 WPB ASTM A234 Gr. WPB ASTM A 234 GR. WPB ASTM A 234 GR. WPB ASTM A234 Gr. WPB ASTM A 234 GR. WPB Size (Inches) Unit Rate (USD) 16 18 24 26 28 30 2 3 4 6 8 10 12 8 Unit Rate (USD) Installation

FILE: ANNEXURE-XVII (MECHANICAL)

SHEET 27 OF 27

SCHEDULE OF RATES FOR ADDITIONAL CIVIL AND STRUCTURAL WORKS (IF ANY)

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF ADDITIONAL CIVIL WORKS

1.0

CLEANING, GRADING & LEVELLING Cleaning, Grading and Leveling of site, including cut and fill (if required), providing slopes to match elevation difference between finished ground levels, removal of debris, trees, shrubs and any other undesired material from site. Complete as per drawings, specifications and approval of OGDCL / Engineering Consultant.

2.0

EXCAVATION Excavation for foundation / trenches in all kinds of soils, dry or wet, hard or soft, up to required depth as shown on drawings. Including compaction of excavation bottom by approved mechanical plate, compactor, backfilling (in layers), leveling, dressing, watering and disposal of surplus excavated material to lead as directed. Complete as per drawing, specifications and approval of OGDCL/ Engineering Consultant. CLASS E (1:4:8) CONCRETE (Using S. R. Cement or O.P. Cement) Providing and laying plain cement concrete Class "E" in foundation for blinding or under floors where required using approved quality 25 mm maximum size graded crushed stone and approved quality sand including all formwork, roding, vibrating, leveling, compacting and curing etc. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant. CLASS B (1:1/2:3) CONCRETE (Using S. R. Cement or O.P.Cement)(Sub Structure) Providing and laying R.C.C. Class "B" of specified strength using approved quality18 mm maximum size graded crushed aggregate and fine aggregate including steel formwork and its removal, scaffolding, vibrating, leveling, consolidating and curing etc. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

3.0

4.0

5.0

CLASS A (1:1:2) CONCRETE (Using O. P. Cement) (Super Structure) Providing and laying R.C.C. Class "A" of specified strength using approved quality 18 mm maximum size graded crushed aggregate and fine aggregate including steel formwork and its removal, scaffolding, vibrating, leveling, consolidating and curing etc. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

FILE: ANNEXURE-XVII (CIVIL)

SHEET 1 OF 19

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

6.0

STEEL REINFORCEMENT Providing, placing and fixing in position TOR Steel Reinforcement including straightening, cutting, bending, placing, wastage, overlap and tying with approved quality Binding Wire (10 kg/ton) and all Spacer and Steel Chairs wherever required etc. Complete as per drawing, specifications and approval of OGDCL / Engineering Consultant.

7.0

STEEL EMBEDDED ITEMS Providing, fabricating and fixing Steel Embedded Parts and Anchor Bolts (with Nuts) in concrete including M.S Anchor Lugs Welded with M.S. Plate, Channel and Angle etc. Complete as per drawing, specifications and approval of OGDCL / Engineering Consultant.

8.0

COARSE SAND FILLING Providing and laying Coarse Sand of approved quality at any location in layers not exceeding 150 mm (6) thick including compaction of layer with approved mechanical compactor to achieve 95% of maximum dry density at optimum moisture content. Complete as per drawing, specifications and approval of OGDCL / Engineering Consultant.

9.0

BITUMEN/ ASPHALT SAND LAYER Providing and laying Bitumen Sand Layer 75 mm (3) thick. Comprises of bitumen 65 Kg, (10/20/PB4 Grade) mixed with sand including compaction of layer with approved mechanical roller/ plate compactor. Complete as per drawing, specifications and approval of OGDCL / Engineering Consultant.

10.0

PVC PIPE SLEEVES Providing and fixing in position heavy duty PVC Pipe Sleeves of diameter and length as listed below. Including removal of sleeves after concreting and filling pockets with Class A (1:1:2) concrete after final inspection of Anchor Bolt position. Complete as per drawing, specifications and approval of OGDCL / Engineering Consultant. i. 50 mm x 150 mm long (50 mm x 150 mm long) ii. 100 mm x 150 mm long (100 mm x 150 mm long) iii. 150 mm x 300 mm long (150 mm x 300 mm long)

11.0

HIGH DENSITY THERMOPOLE SHEET Providing & fixing 100 mm (4) thick High Density Thermopole Sheet including cutting and jointing of sheets. Complete in all respects as per drawing, specifications and approval of OGDCL / Engineering Consultant.

FILE: ANNEXURE-XVII (CIVIL)

SHEET 2 OF 19

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

12.a

EARTH FILLING FROM OUTSIDE SOURCE Filling earth obtained from outside approved sources and filling the same in foundation, plinth, under floor and wherever specified / required to maintain the required FGL. Including breaking clods, dressing, watering and consolidating by ramming in layers not exceeding 150 mm (6) depth and to obtain 95% compaction modified AASHTO density including all lead and lift. Complete as per drawings, specifications and approval of OGDCL / Engineering Consultant.

12.b

EARTH FILLING USING SURPLUS EXCAVATED MATERIAL Filling earth obtained from surplus excavated material within plant boundary and filling the same in plinth, under floor and wherever specified / required to maintain the required FGL. Including breaking clods, dressing, watering and consolidating by ramming in layers not exceeding 150 mm (6) depth and to obtain 95% compaction modified AASHTO density including all lead and lift. Complete as per drawings, specifications and approval of OGDCL / Engineering Consultant. CLASS D (1:3:6) CONCRETE (Using S. R. Cement or O.P. Cement) Providing and laying plain cement concrete Class "D" cast in situ in floors, in foundations, under walls etc., using 25 mm maximum graded crushed stone and approved quality sand including formwork, roding, vibrating, leveling, compacting and curing etc. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant. CLASS C 1:2:4 IN PAVEMENT / FLOOR Providing and laying in Panels plain cement concrete Class "C" 1:2:4 in Pavement / Floor using O.P. Cement, approved sand and 18 mm maximum graded crushed (aggregate) including formwork, compaction, leveling, vibration, steel trowel finishing, curing and filling joints with bitumen sand filler, etc. Complete as per drawing, specifications and approval of OGDCL / Engineering Consultant. i. 100 mm thick (4 thick) ii. 150 mm thick (6 thick) iii. 200 mm thick (8 thick)

13.0

14.0

15.0

STONE SOLING Providing and laying Soling Stone from an approved quarry, including hand packing and filling voids with coarse sand, consolidating and compacting with power roller. Complete as per drawings, specifications and approval of OGDCL / Engineering Consultant.

FILE: ANNEXURE-XVII (CIVIL)

SHEET 3 OF 19

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

16.0

BLOCK MASONRY (Solid) Providing and laying 1st Class Solid Burnt Block Masonry of specified thickness in super structure set in 1:4 cement sand mortar including all required scaffolding raking out and cleaning of joints and curing of masonry etc. Complete in all respects as per drawings, specifications and approval of OGDCL / Engineering Consultant a) b) c) d) 100 mm 150 mm 200 mm 300 mm thick Wall thick wall thick Wall thick Wall

17.0

PLAIN PLASTER (Internal) Providing and applying 12 mm thick Internal Cement Plaster to walls, columns, beams, ceiling, soffits of beams and chajjas and wherever required with cement mortar 1:4 (one part cement, four part sand) including all corners, recesses, jambs and raking out joints of masonry, roughing the surface and cement slurry backing to all surfaces, all finished smooth, curing etc., complete with corner slabs and rounding of corners at junctions as specified, including all scaffolding. Also including 1 5 0 m m wide heavy duty metal lath strip nailed at the joints of masonry and concrete members. Complete in all respects as per drawings, specifications and approval of OGDCL / Engineering Consultant.

18.0

PLAIN PLASTER (External) Providing and applying 20 mm thick External Cement Plaster in two layers to walls, columns, beams, ceiling, etc., with cement mortar 1:4, including all corners, recesses, jambs and raking out joints of masonry, scaffolding, making drip courses, curing etc., nailing 150 mm wide heavy duty meal lath strip nailed at junction of RCC & masonry. Complete in all respects as per drawings, specifications and approval of OGDCL / Engineering Consultant.

19.0

TYROLINE PLASTER Providing and laying 20 mm thick Tyroline Plaster consisting of 6 mm thick topping of 1:2 cement mortar (one part of grey cement and two parts of fine aggregate) sprayed with tyroline machine in approved manner over a base of 12 mm thick cement plaster in 1:4 cement mortar including nailing of 150 mm wide heavy duty meal lath at junction of RCC & masonry, curing, scaffolding, finishing, etc. Complete in all respects as per drawings, specifications and approval of OGDCL / Engineering Consultant.

FILE: ANNEXURE-XVII (CIVIL)

SHEET 4 OF 19

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

20.0

DISTEMPER PAINT Providing and applying one coat of primer and three coats of Distemper of approved make and quality, in required shade and colours, to all internal faces of beam, column, wall and ceiling including preparation of base, filling, etc. Complete as per drawings, specifications and approval of OGDCL / Engineering Consultant.

21.0

PLASTIC EMULSION PAINT Providing and applying or DULUX or equivalent Plastic Emulsion Paint of approved quality and shade including 3 coats over a coat of primer, including scaffolding, preparation of base, rubbing, sand papering, filling depressions with putty, etc Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

22.0

WEATHER SHIELD PAINT Providing and applying Weather Shield paint of ICI or equivalent of approved shade, 3 coats complete including preparation of base, scaffolding, rubbing, sand papering, cleaning, etc Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

23.0

TERRAZZO FLOOR Providing and laying Terrazzo Floor laid in panels having 20 m m thick Terrazzo topping 1:2 (one white cement and 2 approved marble chips over 32 mm thick CC 1:2:4 base including curing, grinding, rubbing and polishing etc., also providing 5 mm thick and 50 mm wide glass dividing strips. Complete in all respects as per drawings, specifications and approval of OGDCL / Engineering Consultant.

24.0

MARBLE TILES FLOOR Providing and laying Botichena Marble Tiles of 3 0 0 m m x 30 0 m m x 2 5 m m size in floor at any level laid over 2 5 m m thick cement concrete base of 1:2:4, setting the tiles with cement slurry over cement mortar 1:4 grouting the tiles joints with white cement slurry, including leveling, curing, grinding, rubbing & polishing etc. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

FILE: ANNEXURE-XVII (CIVIL)

SHEET 5 OF 19

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

25.0

MARBLE TILES ON STAIRS & LANDING Providing and laying approved Botichena Marble Tiles of 3 0 0 m m x 3 0 0 m m x 2 5 m m size over treads / landing and 300 mm x 150 mm x 10 mm in risers of steps laid in 1:4 cement mortar, over a bed of 2 5 m m thick CC 1:2:4, setting the tiles with cement slurry grouting the tiles joints with white cement slurry, including leveling, curing, grinding, rubbing & polishing etc. Complete in all respect as per drawings, specifications and approval of OGDCL/ Engineering Consultant.

26.0

NON-SKID CERAMIC TILES (Flooring) Providing and laying Non-skid Ceramic Tiles of approved make and shade in floor set with cement slurry over and including 38 mm thick bed of cement concrete 1:2:4, including grouting and filling the joints with cement slurry of matching colour, washing and cleaning the tiles, etc. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

27.0

PVC TILES FLOOR Providing and fixing floor of heavy duty flexible PVC Tiles of (300 mm x 300 mm x 2 mm thick) of approved make and shade, laid with approved adhesive, over and including a base of 50 mm thick C.C. 1:2:4 including finishing, curing, etc. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

28.0

ACID RESISTANCE CLAY TILES FLOOR Providing and laying on floor Acid Resistance Ceramic Tiles 150 mm x 150 mm x 12 mm size in approved pattern, laid with cement slurry over and including a bed of 38 mm thick Class C Concrete 1:2:4 jointing and grouting the tiles with cement slurry of matching colour, curing etc. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant

29.0

GLAZED CERAMIC TILES (Dado) Providing and laying on walls Ceramic Glazed Tiles flush with plaster in Dado of approved make, size and filling the joints with neat white cement slurry to match the colour of tiles including 12 mm thick base of 1:4 cement plaster, curing, washing and cleaning the tiles, etc. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

FILE: ANNEXURE-XVII (CIVIL)

SHEET 6 OF 19

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

30.0

ACID RESISTANCE VITRIFIED CLAY TILES WALL FACING Providing and laying Acid Resistance Ceramic Tiles 150 mm x 150 mm x 12 mm on vertical faces of internal walls, set in any pattern with cement slurry over and including 12 mm thick base plaster of 1:4, grouting the tile joints with cement slurry of matching colour, including leveling, curing etc. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

31.0

CONCRETE SKIRTING Providing and laying 12 mm thick cement concrete (1:2) (one part cement and two parts sand). Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

32.0

MARBLE SKIRTING Providing and laying Botichena Marble Tiles of 150 mm x 300 mm x 10 mm size on walls and columns set over 1 2 m m thick cement mortar base of 1:4, including grouting the joints with white cement slurry, grinding, rubbing & polishing etc. Complete in all respect as per drawings, specifications and approval of OGDCL/ Engineering Consultant.

33.0

MOSAIC / TERRAZZO SKIRTING Providing and laying cast in situ 12 mm thick Terrazzo Skirting 10 mm high in 1:2 (one part of white cement and two parts of approved marble chips of required shade), over 12 mm thick base of cement plaster in 1:4 C.M., including curing, grinding, rubbing and polishing etc. Complete in all respects as per drawings, specifications and approval of OGDCL / Engineering Consultant.

34.0

PVC TILE SKIRTING Providing and fixing (300 mm x 100 mm x 2 mm) size heavy duty PVC Tiles of approved make and shade in skirting laid with approved adhesive, over 12 mm thick in cement plaster 1:4 including finishing, curing, etc. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

35.0

WOODEN DOOR FRAMES Providing and fixing first class Deodar Wood Frames fixed with 50 mm x 3 mm size and 200 mm long M.S. hold fasts (6 Nos. to each door frame), complete with 50 mm x 12 mm thick deodar wood architrave on both sides and a coat of approved quality of Solignum (Wood preservative and three coats of approved enamel paint over a coat of primer). Complete in all respect as per drawings, specifications and approval of OGDCL/ Engineering Consultant.

FILE: ANNEXURE-XVII (CIVIL)

SHEET 7 OF 19

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

a) b) c)

225 mm wide 150 mm wide 125 mm wide

36.0

COMMERCIAL PLY FLUSH DOOR (WITH FRAME) Providing and fixing 38 mm thick solid core Deodar Wood Flushed Veneered Door Shutter having five ply of commercial ply wood facing on both sides fixed over best quality deodar wood frame 1 2 5 m m wide around and 1 2 5 m m wide lock rail, 1 2 m m thick deodar wood lipping on all sides as per approved drawing manufactured under power driven hydraulic press, including cost of approved fittings, magnetic door stopper and locks (Alpha, Yale / Anchor or equivalent). Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

37.0

ALUMINUM GLAZED DOOR AND PANEL Providing and fixing Glazed Aluminum Bronze Anodized Door made with heavy duty Premium model, approved aluminum sections 1 0 0 m m or 125 mm and 2 mm thick with collar and fixed glazed panels on either sides and fan light, glazed with 6 mm thick Tinted Glass fitted with PVC gasket including self closing floor hinges, all hardware fittings locking arrangements and caulking all masonry / aluminum joints with silicon sealant as per manufacturer specification. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

38.0

ALUMINUM SLIDING WINDOWS / VENTILATORS Providing and fixing Aluminum Bronze anodized fully Glazed Sliding Windows/ Ventilators with aluminum fly-proof screen shutters of heavy duty Premium model, approved aluminum sections 100 mm or 125 mm and 2 mm thick with collar and fixed glass panels on top or bottom, glazed with 6 mm thick Tinted Glass fixed with PVC gasket, all hardware fittings, handles, latches etc., complete including caulking all masonry / aluminum joints with silicon sealant all as per manufacturers instructions. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

39.0

LOUVERED STEEL DOOR Providing, fabricating and fixing in position Louvered Steel Door, comprising of M.S. Angle Frame, 16 B.G. M.S. Sheet Louver, M.S. tee and M.S. Angle Bracing, Lock Rails, Tower Bolts and Hold Fast etc. Including painting with 3 coats of approved enamel paint (ICI, Berger or equivalent) over a coat of red lead primer after cleaning with wire brush etc. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

FILE: ANNEXURE-XVII (CIVIL)

SHEET 8 OF 19

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

40.0

STEEL SLIDING DOOR Providing, fabricating and fixing in position M.S. Sliding Door of approved design fabricated from M.S. channels and angles frame covered with 16 gauge G.I. sheets on both sides including all necessary hardware and fittings M.S. rollers and rail, heavy duty hinged pivot and locking arrangement, complete including painting 3 coats with approved enamel paint over a coat of primer. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

41.0

SCREEDING (1:2:4) Providing and laying Screeding comprising of concrete (1:2:4) and a mesh of nominal steel of #3@300 c/c 50 mm thick screeding with a layer of Bitumen Sand mix in slope using O.P. Cement. Including leveling, vibrating, compacting, curing and providing slopes. Complete in all respects as per drawings, specifications and approval of the OGDCL / Engineering Consultant. a) 50 mm or 75 mm thick (Average) at Roof Level b) 75 mm or 100 mm thick (Average) at Channel Bed

42.0

ROOF TREATMENT Providing and laying Water-proof Treatment over Roof with the following: i) ii) iii) iv) v) 2 Coats of Hot Bitumen 10 / 20 @ 2.5 Kg/m2 50 mm thick Clay mixed with Rice Husk 50 mm thick Clay Tiles Set in Cement Mortar 1:4 2 Coats of Hot Bitumen @ 2.5 Kg/m2 Coarse Sand over Bitumen Coat

Complete in all respects as per drawings, specifications and approval of the OGDCL / Engineering Consultant.

43.0

A.C. RAIN WATER PIPE Providing and fixing 100 mm/ 150 mm AC Rain Water Pipe fixed to wall, column with bend, tees and clamps including making 25 mm deep groove and grating on roof etc. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

FILE: ANNEXURE-XVII (CIVIL)

SHEET 9 OF 19

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

44.0

GALVANIZED IRON PIPES & FITTINGS Providing, laying and fixing G. I. Pipe (K.P.M. I.I.L. or approved equivalent) for cold water supply with all fittings (Japanese or Chinese) including cutting, trench, refilling, water, ramming and disposal of surplus earth to all leads and lifts (if laid underground) and if fixed to wall or column upto any height etc., or suspended from slab with all types of hangers, supports and clamps etc., cutting holes or chased in wall, column and floor for pipes and making good the same in cement concrete as per required finishes and testing pipes & fittings to a pressure of 3.5 Kg/cm2 etc. Complete in all respect as per drawings, specifications and approval of OGDCL/ Engineering Consultant. i) ii) iii) iv) v) 12 mm 18 mm 25 mm 38 mm 50 mm

45.0

INSULATED PIPES & FITTINGS FOR HOT WATER Providing, laying and fixing C. S. insulated Pipes & Fittings for hot water supply with all fittings (Japanese or Chinese) including cutting, trenching, refilling, watering, fixed to wall, column or suspended from slab with all types of hangers, supports and clamps etc., cleaning of pipe by wire brushing / sand blasting, applying two coats of anti-corrosion paint, insulation of pipe by fibre glass, and testing of pipes and fittings to a pressure of 3.5 Kg/cm2 etc. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant. i) ii) iii) iv) 12 mm 18 mm 25 mm 38 mm

46.0

CAST IRON SOIL AND WASTE WATER PIPE Providing and fixing Cast Iron Soil and Waste Water (C.M.E. or approved equivalent) and fittings comprising of plain or plug bends, plain or plug tees, plain socket and spigot ends, branches, off-sets, reducer off-sets, pass overs, clamps, terminals, guards and loose collars etc. Including embedded pipes under floors, walls or columns, making holes as required and making good the same as per required finishes, cutting, filling joints with caulked compound / molten lead sealing or as specified and testing prior backfilling etc. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

FILE: ANNEXURE-XVII (CIVIL)

SHEET 10 OF 19

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

i) 150 mm ii) 100 mm iii) 75 mm

47.0

CAST IRON VENT PIPES Providing and fixing 75 mm Cast Iron Vent Pipes (C.M.E. or approved equivalent) and fittings comprising of plain or plug bends, plain or plug tees, plain socket and spigot, branches, off-sets, reducer off-sets, pass overs, clamps, terminals, guards and loose collars, cowels etc., including clamped on walls and columns or suspended from slab making holes as required and making good the same as per required finishes, cutting, filling joints with calking compound / molten lead sealing or specified and testing prior covering etc. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

48.0

HDPE GEOMEMBRANE Providing and installation of minimum 0.75 mm (30 Mil) thick HDPE Geomembrane, of approved manufacturer, on slopes / levelled ground including making slopes, leveling, dressing, watering and compaction of slopes / levelled ground, welding, jointing, cutting, anchoring and over-lapping and wastage of Geomembrane. Complete in all respects as per drawings, specifications and approval of the OGDCL / Engineering Consultant.

49.0

ELECTRIC WATER HEATER Supply and installation of Electric Water Heater of approved manufacturer like Ambassador / General Electric or equivalent, including installation of heater on Block masonry / concrete base, or fixed to wall, supply and making connections for inlet / outlet pipes and vents etc Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

50.0

FIBRE GLASS OVERHEAD TANK Supply and installation of Fibre Glass Overhead Tank of approved manufacturer like Ambassador / General Electric or equivalent, including installation of tank at roof at any height, preparation of Block masonry / concrete base, supply and making connections for inlet / outlet and air pipes etc Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant. a) b) c) d) 500 Gallons 1000 Gallons 1500 Gallons 2000 Gallons
SHEET 11 OF 19

FILE: ANNEXURE-XVII (CIVIL)

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

51.0

STORM WATER DRAINS Providing and constructing of Storm Water Drains in slopes comprising of 1:3:6 & 1:1/2:3 cement concrete using S.R/ O.P. cement, including steel reinforcement, excavation/ backfilling, steel formwork and its removal, leveling, vibrating, compacting, curing and providing expansion joint at 30 meter interval. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

52.0

RCC CATCH BASIN Providing and constructing RCC Catch Basin comprising of 1:3:6 & 1:1/2:3 cement concrete using S.R./ O.P. Cement connection with C.S./ UPVC Pipes (to be supplied by piping), steel reinforcement, applying 12 mm thick water-proof plaster, providing and installation C. I. grating cover with frame. Complete as per details and invert levels shown on drawings including excavation/ backfilling, form work and its removal, leveling, vibrating, compacting, curing, cutting, bending and placing steel bars etc. Complete as per drawing, specifications and approval of OGDCL / Engineering Consultant.

53.0

RCC MANHOLES Providing and constructing RCC Manholes comprising of 1:3:6 & 1:1/2:3 cement concrete using S.R. Cement, connection with C.S./ UPVC Pipes (to be supplied by piping), steel reinforcement, applying 12 mm thick water-proof plaster, providing and installation of C.I. Cover (weight 55 Kg.) with frame and ladder rungs. Complete as per details and invert levels shown on drawings including excavation / backfilling, form work and its removal, leveling, vibrating, compacting, curing, cutting, bending and placing steel bars etc. Complete as per drawing, specifications and approval of OGDCL / Engineering Consultant.

54.0

R.C.C. VALVE PIT Providing and constructing R.C.C. Valve Pit comprising of 1:3:6 and 1:1/2:3 cement concrete using S.R./ O.P. Cement, connection with C.S./ UPVC Pipes (to be supplied by piping), steel reinforcement, providing and installation of steel checkered plate cover with frame and ladder rungs. Complete as per details and invert levels shown on drawings including excavation / backfilling, formwork and its removal, leveling, vibrating, compacting, curing, cutting, bending and placing steel bars, etc. Complete in all respects as per drawings, specifications and approval of the OGDCL / Engineering Consultant.

FILE: ANNEXURE-XVII (CIVIL)

SHEET 12 OF 19

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

55.0

BLOCK MASONRY MANHOLES Providing and constructing Block Masonry Manholes, comprising of 1:3:6 & 1:1/2:3 cement concrete using S.R./ O.P. Cement in bed and Block masonry (225 mm thick) set in 1:4 cement sand mortar in walls. Applying 2 mm thick water-proof plaster on walls and 1:2:4 CC benching on bed, installation of C.I. Cover with frame (C.M.E. or equivalent), including excavation, backfilling, leveling, compaction and curing etc. Complete as per drawing, specifications and approval of OGDCL / Engineering Consultant.

56.0

FENCING Providing and fixing Chain Link Fencing with M.S. Angle posts struts line wires, tying wire, barbed wire & stirrup wire etc. Including fittings, accessories PCC (1:3:6) at the bottom of fence and foundations. Complete as per drawing, specifications and approval of OGDCL / Engineering Consultant.

57.0

ROAD WORKS Providing, laying & constructing the following structural of Road and Bitumen Pavement in gantry area as per line, levels and cross section as shown on drawings or as per specifications or as directed including supply of all material, labour, plant / equipment and submission of design mix for premix carpeting and seal coat from the approved laboratory etc. Complete as per drawing, specifications and approval of OGDCL / Engineering Consultant. Preparation of sub-grade including stripping top soil, any cut or fill side slopes (1:2:5) along with sides of road as per Cross-sectional detail of road and compacting with 10 ton vibratory roller to 95% maximum dry density, leveling, dressing and watering etc. Filling sub-base course with crushed stones (100 mm down) to a consolidated thickness of 175 mm including filling voids with smaller size stones and coarse sand, leveling, dressing, watering and consolidating with 10 Tons vibratory roller. Filling base-course with crushed stone (40 mm down) to a consolidated thickness of 200 mm including filling voids with smaller size stones and approved filler, leveling, dressing, watering and consolidating with 10 Tons vibratory roller Applying tack coat over base-course with hot bitumen 80/100 grade at the rate of 15lbs/100 ft2. Laying premix carpeting as per approved design mix to a consolidated thickness of 50 mm in two layers using crush stones, fine graded chips and bitumen etc. including mixing, laying and compacting with 10 Tons vibratory roller
SHEET 13 OF 19

FILE: ANNEXURE-XVII (CIVIL)

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Laying seal coat as per approved design mix to a consolidated thickness of 10 mm using 80/100 bitumen, fine graded chips and application of tack coat over the carpeted surface prior to laying seal coat including mixing, and compacting with 10 Tons vibratory roller

58.0

GRAVEL FILLING Providing and laying Gravel (50 mm down) from an approved quarry, at locations shown on drawings or as directed. Including leveling, dressing, watering and compaction of sub-grade by means of mechanical plate compactor / roller. Complete as per drawings, specifications and approval of OGDCL / Engineering Consultant.

59.0

CHECKERED PLATE COVER Providing, fabricating and fixing Checkered Plate Cover, comprises of thick M.S. Plate welded over frame of angles (50 mm x 50 mm x 6 mm and 38 mm x 38 mm x 6 mm) including lifting arrangement, cutting, welding and painting etc. Complete in all respects as per drawings, specifications and approval of the OGDCL / Engineering Consultant.

60.0

CHAIN LINK FENCING GATE Providing, fabricating and fixing in position Chain Link Fencing Gate, comprises of following components: RCC footing and column (for 6.0 M Gate) backfilling formwork, concreting, curing etc. including excavation /

G. I. Pipe (139.7 x 4.5 thick) Gate Post for 1.2 M Gate including PCC (1:2:4) base G. I. Pipe (48.3 x 3.2 thick) gate frame & bracing for both type of gates. Chain Link Fence with mesh size of 50 mm and woven from galvanized wire of outside diameter 4.75 mm and core 3.55 mm. Locking arrangement, tower bolts, hinges etc.

61.0

PRE-CAST R.C.C. SLABS Providing, constructing and fixing in position Pre-cast R.C.C. Slab of 3 thickness and size as per site requirement and steel reinforcement (1.2 lb/ft2). Complete in all respects as per drawings, specifications and approval of the Engineer.

FILE: ANNEXURE-XVII (CIVIL)

SHEET 14 OF 19

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

62.0

CARBON STEEL PIPE SLEEVES Providing & fixing carbon steel pipe sleeves (API 5L Gr. B) including welding of pipe with 50 mm wide x 6 mm thick plate and epoxy coating both internally and externally. Complete as per drawing, specifications and approval of OGDCL / Engineering Consultant. 450 mm 300 mm 200 mm 150 mm 100 mm

63.0

DISMANTLING / REMOVAL OF MISCELLANEOUS R.C.C. STRUCTURES Dismantling of existing R.C.C. / P.C.C Structures, at any height, as per location / dimensions shown on drawing or as directed, including cutting / removal of reinforcement bars and embedded items etc., (if required) scaffolding and disposal of surplus material outside Plant limits or as directed. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant.

64.0

DISMANTLING /REMOVAL O F EXISTING CONCRETE PAVEMENT Dismantling o f Existing Concrete o f varying t hi ckness o f Pavement. Including dismantling / removal of Stone Soling, blinding and any other RCC / PCC elements encountered during dismantling or excavation etc. Complete as per locations / dimensions shown on drawing or as directed, including disposal of surplus material outside Plant limits or as directed. Complete as in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant

65.0

DISMANTLING / REMOVAL O F EXISTING ROADS Dismantling / Removal of entire formation of existing roads up to FGL including Dismantling / Removal of Base course, Sub-base course, Premix carpeting shoulder and embankment. Complete as per location / dimensions shown on drawing or as directed including disposal of surplus material outside Plant limits or as directed. Complete in all respect as per drawings, specifications and approval of OGDCL / Engineering Consultant

FILE: ANNEXURE-XVII (CIVIL)

SHEET 15 OF 19

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

66.0

BRICK MASONRY (Solid) Providing and laying 1st Class Solid Red Brick Masonry of specified thickness in super structure set in 1:4 cement sand mortar including all required scaffolding raking out and cleaning of joints and curing of masonry etc. Complete in all respects as per drawings, specifications and approval of OGDCL / Engineering Consultant a) b) 150 mm 225 mm thick wall thick Wall

67.0

R.C.C PIPE Providing and laying RCC pipes of class "a" (Razia brand or equivalent) including scrubbing of existing bitumen, base course and sub-base course, excavation and fixing in trench including cutting, fitting, jointing with rubber rings and cement mortar (1:1), including fine sand cushion bed around the RCC pipe and reinstatement of road . Complete in all respects as per drawings, specifications and to the approval of OGDCL / engineering consultant 450 mm 300 mm 200 mm 150 mm 100 mm

FILE: ANNEXURE-XVII (CIVIL)

SHEET 16 OF 19

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Supply S. No. 1 2 3 4 5 6 7 Item Cleaning, Grading, Leveling as per BOQ Item No.1 Excavation as per BOQ Item No. 2 Class "E" (1:4:8) as per BOQ Item No. 3 Class "C" (1:2:4) as per BOQ Item No. 4 Class "C" (1:2:4) as per BOQ Item No. 5 Steel Reinforcement as per BOQ Item No. 6 Steel Embedded Parts as per BOQ Item No. 7 i) Angle Qty. Unit m3 m3 m3 m3 m3 Tons Kg Kg Kg m2 m2 R.m. m2 m3 m3 m3 m3 m3 m3 m2 m2 m2 m2 m2 m2 m2 m2 m2 Unit Rate (USD)

Installation Unit Rate (USD)

ii) Channel 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Coarse Sand Filling as per BOQ Item No. 8 Bitumen/ Asphalt Sand Layer as per BOQ Item No.9 PVC Pipe Sleeves as per BOQ Item No.10 High density Thermopole Sheet as per BOQ Item No.11 Earth Filling from Outside source as per BOQ Item No.12a Earth Filling using surplus excavated material as per BOQ Item No.12b Class "D" (1:3:6) concrete as per BOQ Item No. 13 Class "C" (1:2:4) in pavement / floor as per BOQ Item No. 14 Stone Soling as per BOQ Item No.15 Block Masonry as per BOQ Item No.16 Plain Plaster (Internal) as per BOQ Item No.17 Plain Plaster (External) as per BOQ Item No.18 Tyroline Plaster as per BOQ Item No,19 Distemper Paint as per BOQ Item No.20 Plastic Emulsion Paint as per BOQ Item No.21 Weather Sheild Paint as per BOQ Item No.22 Terrazzo Floor as per BOQ Item No.23 Marble Tiles Floor as per BOQ Item No.24 Marble Tiles on stairs and & landing as per BOQ Item No.25

FILE: ANNEXURE-XVII (CIVIL)

SHEET 17 OF 19

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Supply S. No. 27 28 29 30 Item Non-skid ceramics tiles (flooring) as per BOQ Item No.26 PVC tiles floor as per BOQ Item No.27 Acid resistance clay tiles floor as per BOQ Item No.28 Glazed ceramics tiles (Dado) as per BOQ Item No.29 Acid resistance vitrified clay tiles wall facing as per BOQ Item No.30 Concrete skirting as per BOQ Item No.31 Marble skirting as per BOQ Item No.32 Mosaic / Terrazo Skirting as per BOQ Item No. 33 PVC Tile Skirting as per BOQ Item No. 34 Wooden Door Frame as per BOQ Item No. 35 i) 225 mm Wide ii) 150 mm Wide ii) 125 mm Wide Commercial Ply Flush Door as per BOQ Item No. 36 Aluminum Glazed Door & Panel as per BOQ Item No. 37 Aluminum Sliding Windows per BOQ Item No. 38 Louvered Steel Door as per BOQ Item No.39 Steel Sliding Doo r as per BOQ Item No.40 Screeding as per BOQ Item No. 41 42 42 i) 50 mm or 75 mm Thick (Average) at Roof Level ii) 100 mm or 75 mm Thick (Average) at Channel Bed 43 44 45 Roof Treatment as per BOQ Item No. 42 A. C. Rain Water Pipe as per BOQ Item No. 43 Galvanized Iron (G.I.) Pipes & Fittings as per BOQ Item No. 44 i) 50 mm ii) 38 mm iii) 25 mm iv) 18 mm b) 12 mm Insulated Pipes & Fittings as per BOQ Item No. 45 i) 38 mm ii) 25 mm iii) 18 mm iv) 12 mm Qty. Unit m2 m2 m2 m2 m2 R.m. R.m. R.m. R.m. R.m. R.m. R.m. m2 m2 m2 m2 m2 m2 m2 m2 m2 R.m. Unit Rate (USD)

Installation Unit Rate (USD)

31 32 33 34 35 36 36

37 36 38 39 40 41

R.m. R.m. R.m. R.m. R.m. R.m. R.m. R.m. R.m.


SHEET 18 OF 19

46 46 46 46 46 46 FILE: ANNEXURE-XVII (CIVIL) 46

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Supply S. No. 47 Item Cast Iron Soil & Waste Water Pipe as per BOQ Item No. 46 a) 150 mm b) 100 mm c) 75 mm a) Pipe as per BOQ Item No. 47 Cast Iron Vent HDPE Geomembrane as per BOQ Item No.48 Electric Water Heater as per BOQ Item No. 49 Fibre Glass Overhead Tank as per BOQ Item No. 50 i) 500 Gallons ii) 1000 Gallons iii) 1500 Gallons iv) 2000 Gallons Strom Water Drain as per BOQ Item No. 51 RCC Catch Basin as per BOQ Item No.52 RCC Manholes as per BOQ Item No.53 RCC Value Pit as per BOQ Item No.54 Masonry Manholes as per BOQ Item No.55 Fencing as per BOQ Item No.56 Road Works as per BOQ Item No.57 Gravel Filling as per BOQ Item No.58 Checkered Plate Cover as per BOQ Item No. 59 Chain Link Fencing Gate as per BOQ Item No.60 Pre-Cast R.C.C. Slabs as per BOQ Item No.61 Carbon Steel Pipe Sleeves as per BOQ Item No. 62 i) 450 mm ii) 300 mm iii) 200 mm iv) 150 mm v) 100 mm Dismantling / Removal of miscellaneous RCC / PCC structures as per BOQ Item No.63 Dismantling / Removal of existing Concrete Pavement as per BOQ Item No.64 Dismantling / Removal of existing Roads as per BOQ Item No.65 Brick Masonry As per BOQ item no. 66 RCC Pipe as per BOQ item no. 67 i) ii) iii) iv) v) 450 mm 300 mm 200 mm 150 mm 100 mm R.m. R.m. R.m. R.m. R.m. Qty. Unit Unit Rate (USD)

Installation Unit Rate (USD)

48 49 50 51

R.m. R.m. R.m. R.m. m2 No. Nos.

52 53 54 55 56 57 58 59 60 61 62 63

R.m. Nos. Nos. Nos. Nos. R.m. m2 m2 m2 Nos. m2 R.m. R.m. R.m. R.m. R.m. m3 m3 m2 m3

64 65 66 67 68

FILE: ANNEXURE-XVII (CIVIL)

SHEET 19 OF 19

SCHEDULE OF RATES FOR ADDITIONAL SUPPLY AND INSTALLATION OF ELECTRICAL EQUIPMENT

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR ADDITIONAL ELECTRICAL WORKS SUPPLY AND INSTALLATION OF ELECTRICAL EQUIPMENT
SUPPLY S. NO. DESCRIPTION QTY UNIT RATE (Rs.) TOTAL PRICE (Rs.) INSTALLATION UNIT RATE (Rs.) TOTAL PRICE (Rs.)

1.0

MCC / DISTRIBUTION BOARDS Supply and installation of 3 phase 4 wire 50 Hz Motor Control Centre panel free standing indoor floor mounted type complete with bus bars, coupler, incoming breakers, drawout type DOL and StarDelta starters and feeders, mechanical and electrical interlocking, metering and indications, protection systems and all other accessories etc. as per MCC vendor drawings. Complete in all respect. a b. (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (iX) c. (i) (ii) (iii) (iv) (v) (iv) d. (i) (ii) (iii) (iii) Cubicle (L=800 x B=400 x H =2200 mm) DOL Starters 0.37 KW 3.7 KW 4 KW 5.7 KW 7.5 KW 11 KW 11.2 KW 15 KW 22 KW Star-Delta starters 30 KW 37 KW 45 KW 55 KW 75 KW 100 KW Air Circuit Breaker 800 A 1600 A 2000 A 3200 A

2.0

CONTROL STATIONS Supply and Installation of industrial type local control station (Ex-proof, NEMA4 & 7 with ammeter and without ammeter, start push button and mashroom head type stop push button with lock. Complete in al respects. 30/5 A 50/5 A 100/5 A without ammeter 30/5 A 50/5 A 100/5 A

FILE: ANNEXURE-XVIII (ELECTRICAL)

SHEET 1 OF 7

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR ADDITIONAL ELECTRICAL WORKS SUPPLY AND INSTALLATION OF ELECTRICAL EQUIPMENT
SUPPLY S. NO. DESCRIPTION QTY UNIT RATE (Rs.) TOTAL PRICE (Rs.) INSTALLATION UNIT RATE (Rs.) TOTAL PRICE (Rs.)

3.0 3.1

MCC / DISTRIBUTION BOARDS POWER AND DISTRIBUTION CABLES Supply and Installation, excavation of cable trenches, laying, back filling, connection and testing of power and control cables of following sizes CU/PVC/PVC, 600/1000V grade cables together with shrouds, compression type lugs etc. at both ends of the termination including directly burried under ground, in paved area laid in performed cable channel ( cable channel of RCC slabs), in road crossing RCC pipe of proper dia, the equipment above ground/foundation installed on trays/ ladder /conduit with supply of fine sand and baked bricks, caution tape, complete in all respects as per site requirements. Civil work for cable channel with RCC slabs shall also include in the EPCC contractor's scope.

a) b) c) d) e) f) g) h) i) j) k) l) m) n) o) p) q) r) s) t) u) v) w) x) y) z) aa) ab) ac)

2C- 2.5 sq. mm. 3C- 2.5 sq. mm. 3C- 4 sq. mm. 3C- 6 sq. mm. 3C- 10 sq. mm. 3C- 16 sq. mm. 3C- 25 sq. mm. 3C- 35 sq. mm. 3C- 50 sq. mm. 3C- 70 sq. mm. 3C- 120 sq. mm. 3C- 150 sq. mm. 3C- 185 sq. mm. 3C- 240 sq. mm. 3C- 300 sq. mm. 4C- 2.5 sq. mm. 4C- 4 sq. mm. 4C- 6 sq. mm. 4C- 10 sq. mm. 4C- 16 sq. mm. 4C- 25 sq. mm. 4C- 35 sq. mm. 4C- 50 sq. mm. 4C- 70 sq. mm. 4C- 120 sq. mm. 4C- 150 sq. mm. 4C- 185 sq. mm. 4C- 240 sq. mm. 4C- 300 sq. mm.

m m m m m m m m m m m m m m m m m m m m m m m m m m m m m

FILE: ANNEXURE-XVIII (ELECTRICAL)

SHEET 2 OF 7

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR ADDITIONAL ELECTRICAL WORKS SUPPLY AND INSTALLATION OF ELECTRICAL EQUIPMENT
SUPPLY S. NO. DESCRIPTION QTY UNIT RATE (Rs.) TOTAL PRICE (Rs.) INSTALLATION UNIT RATE (Rs.) TOTAL PRICE (Rs.)

3.2

MCC / DISTRIBUTION Supply and Installation,BOARDS excavation of cable trenches, laying, back filling, connection and testing of power and control cables of following sizes CU/PVC/SWA/PVC, 600/1000V grade cables together with shrouds, compression type lugs etc. at both ends of the termination including directly burried under ground, in paved area laid in performed cable channel ( cable channel of RCC slabs), in road crossing RCC pipe of proper dia, the equipment above ground/foundation installed on trays/ ladder /conduit with supply of fine sand and baked bricks, caution tape, complete in all respects as per site requirements. Civil work for cable channel with RCC slabs shall also include in the EPCC contractor's scope. 2C- 2.5 sq. mm. 3C- 2.5 sq. mm. 3C- 4 sq. mm. 3C- 6 sq. mm. 3C- 10 sq. mm. 3C- 16 sq. mm. 3C- 25 sq. mm. 3C- 35 sq. mm. 3C- 50 sq. mm. 3C- 70 sq. mm. 3C- 120 sq. mm. 3C- 150 sq. mm. 3C- 185 sq. mm. 3C- 240 sq. mm. 3C- 300 sq. mm. 4C- 2.5 sq. mm. 4C- 4 sq. mm. 4C- 6 sq. mm. 4C- 10 sq. mm. 4C- 16 sq. mm. 4C- 25 sq. mm. 4C- 35 sq. mm. 4C- 50 sq. mm. 4C- 70 sq. mm. 4C- 120 sq. mm. 4C- 150 sq. mm. 4C- 185 sq. mm. 4C- 240 sq. mm. 4C- 300 sq. mm. m m m m m m m m m m m m m m m m m m m m m m m m m m m m m

a) b) c) d) e) f) g) h) i) j) k) l) m) n) o) p) q) r) s) t) u) v) w) x) y) z) aa) ab) ac)

FILE: ANNEXURE-XVIII (ELECTRICAL)

SHEET 3 OF 7

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR ADDITIONAL ELECTRICAL WORKS SUPPLY AND INSTALLATION OF ELECTRICAL EQUIPMENT
SUPPLY S. NO. DESCRIPTION QTY UNIT RATE (Rs.) TOTAL PRICE (Rs.) INSTALLATION UNIT RATE (Rs.) TOTAL PRICE (Rs.)

3.3 a) b) c) d) e) f) g) h) 3.4 a) b) c) d) e) f) g) h) 3.5 a) b) c) d) e) f) 4.0 a) b) c) d) e) f) 5.0 a) b) c) d) e) f)

MCC / Glands DISTRIBUTION BOARDS Cable (Ex d type) including Protection Shrouds M16 M20/20S M25 M32 M40 M50 M50S M63 Cable Glands (industrial weather proof type) including Protection Shrouds M16 M20/20S M25 M32 M40 M50 M50S M63 EARTH CABLES (Cu/PVC yellow green) 1C- 2.5 sq. mm. 1C- 6 sq. mm. 1C- 16 sq. mm. 1C- 25 sq. mm. 1C- 35 sq. mm. 1C- 70 sq. mm. GI CABLE TRAY (perforated type)- including cover 900mm X 150mm 600mm X 150mm 450mm X 150mm 300mm X 100mm 150mm X 100mm 100mm X 50mm GI CABLE LADDER - including cover 900mm X 150mm 600mm X 150mm 450mm X 150mm 300mm X 100mm 150mm X 100mm 100mm X 50mm m m m m m m SHEET 4 OF 7 m m m m m m m m m m m m NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO.

FILE: ANNEXURE-XVIII (ELECTRICAL)

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR ADDITIONAL ELECTRICAL WORKS SUPPLY AND INSTALLATION OF ELECTRICAL EQUIPMENT
SUPPLY S. NO. DESCRIPTION QTY UNIT RATE (Rs.) TOTAL PRICE (Rs.) INSTALLATION UNIT RATE (Rs.) TOTAL PRICE (Rs.)

6.0 a) b) c) d) e) f) g) h) i) j) k) l) m) n) 7.0 a) b) c) d) e) f) g) 8.0 8.1 a) b) c) d) e) f) g)

MCC / DISTRIBUTION BOARDS EXPLOSION PROOF LIGHT FIXTURE 2x40W fluorescent, Class I, Div. 1 2x40W fluorescent, Class I, Div. 2 Well glass type HID luminaires, Class I, Div. 1 (150W SON) Well glass type HID luminaires, Class I, Div. 1 (250W SON) Well glass type HID luminaires, Class I, Div. 2 (150W SON) Well glass type HID luminaires, Class I, Div. 2 (250W SON) Well glass type HID luminaires, Class I, Div. 1 (150W MV) Well glass type HID luminaires, Class I, Div. 1 (250W MV) Well glass type HID luminaires, Class I, Div. 2 (150W MV) Well glass type HID luminaires, Class I, Div. 2 (250W MV) Flood light fixture, 400W Class I, Div. 1 Flood light fixture, 250W Class I, Div. 1 Flood light fixture, 400W Class I, Div. 2 Flood light fixture, 250W Class I, Div. 2 WEATHER PROOF LIGHT FIXTURE 2x40W fluorescent, IP 56 Well glass type HID luminaires, IP56 (250W, SON) Well glass type HID luminaires, IP56 (150W, SON) Well glass type HID luminaires, IP56 (250W, MV) Well glass type HID luminaires, IP56 (150W, MV) Streetlight / Road light IP56 (250W, SON) Streetlight / Road light IP56 (150W, SON) ELECTRICAL ACCESSORIES ACCESSORIES FOR SAFE AREAS Local push button station for motor control (on-off push buttons+indication light) Local push button station for motor control (on-off push buttons+indication light+ammeter) industrial type weather proof 3-phase, 5 pin socket outlet 63A industrial type weather proof 3-phase, 5 pin socket outlet 32A Lighting Junction box (weather proof) Industrial isolator switch, 125A Industrial isolator switch, 63A NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO.

FILE: ANNEXURE-XVIII (ELECTRICAL)

SHEET 5 OF 7

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR ADDITIONAL ELECTRICAL WORKS SUPPLY AND INSTALLATION OF ELECTRICAL EQUIPMENT
SUPPLY S. NO. DESCRIPTION QTY UNIT RATE (Rs.) TOTAL PRICE (Rs.) INSTALLATION UNIT RATE (Rs.) TOTAL PRICE (Rs.)

h) i) j) 8.2 a) b) c) d) e) f) g) h) i) j) 8.3

MCC / DISTRIBUTION BOARDS Industrial isolator switch, 32A Industrial isolator switch, 16A Field mounted light switches, 16 A, IP 56 ACCESSORIES FOR HAZARDOUS AREAS Local push button station for motor control (on-off push buttons+indication light) - Class I, Div. 1 Local push button station for motor control (on-off push buttons+indication light) - Class I, Div. 2 Local push button station for motor control (on-off push buttons+indication light+ammeter) - Class I, Div. 1 Local push button station for motor control (on-off push buttons+indication light+ammeter) - Class I, Div. 2 industrial type weather proof 3-phase, 5 pin socket outlet 63A Class I Div.1 industrial type weather proof 3-phase, 5 pin socket outlet 32A Class I Div.1 Lighting Junction box (weather proof)- Class I, Div. 1 Lighting Junction box (weather proof)- Class I, Div. 2 Field mounted light switches, 16 A, Class I, Div. 1 Field mounted light switches, 16 A, Class I, Div. 2 ELECTRICAL CABLE CORE TERMINATION Core termination including all necessary forming, looming, identification, crimped or sweated lugs

NO. NO. NO.

NO. NO. NO. NO. NO. NO. NO. NO. NO. NO.

a) b) c) d) e) f) g) h) i)

Not exceeding 1.5 mm Exceeding 1.5 mm but not exceeding 4 mm Exceeding 4 mm but not exceeding 16 msqr.m Exceeding 16 mm but not exceeding 50 msqr.m Exceeding 50 mm but not exceeding 90 msqr.m Exceeding 90 mm but not exceeding 150msqr.m Exceeding 150 mm but not exceeding 150msqr.m Exceeding 150 mm but not exceeding 300msqr.m Exceeding 300 msqr.m

NO. NO. NO. NO. NO. NO. NO. NO. NO.

FILE: ANNEXURE-XVIII (ELECTRICAL)

SHEET 6 OF 7

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR ADDITIONAL ELECTRICAL WORKS SUPPLY AND INSTALLATION OF ELECTRICAL EQUIPMENT
SUPPLY S. NO. DESCRIPTION QTY UNIT RATE (Rs.) TOTAL PRICE (Rs.) INSTALLATION UNIT RATE (Rs.) TOTAL PRICE (Rs.)

9.0 i) ii) iii) a) b) c) d) e)

MCC / DISTRIBUTION BOARDS ELECTRICAL / INSTRUMENTATION CABLE AND TUBING TRAYS GRP ELECTRICAL / INSTRUMENTATION CABLE / TUBING TRAYS INCLUDING COVERS ACCESSORIES AND FIXINGS Not exceeding 100 mm wide Exceeding 100 mm wide but not exceeding 250 mm wide Exceeding 250 mm wide but not exceeding 500 mm wide m m m

Total (Rs.)

GRAND Total (Rs.)

FILE: ANNEXURE-XVIII (ELECTRICAL)

SHEET 7 OF 7

SCHEDULE OF RATES FOR ADDITIONAL SUPPLY AND INSTALLATION OF INSTRUMENT ITEMS

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR ADDITIONAL INSTRUMENTATION WORKS SUPPLY AND INSTALLATION OF INSTRUMENT ITEMS
SUPPLY S. NO. DESCRIPTION QTY. 1.0 1.1 a) b) 1.2 a) b) 2.0 2.1 2.1.1 a) b) c) d) e) f) g) h) i) j) k) l) m) n) o) p) q) r) s) t) 2.1.2 a) b) c) COMMUNICATIONS SYSTEM FOR SAFE AREAS Telephone P.A. Speaker FOR HAZARDOUS AREAS Telephone P.A. Speaker INSTRUMENTATION WORKS CONTROL AND INSTRUMENTATION CABLES Un-armoured Cables to BS 5308 1 pair - 1.5 sq. mm. with collective screen 1 pair - 1.5 sq. mm. with individual and collective screen 2 pair - 1.5 sq. mm. with collective screen 2 pair - 1.5 sq. mm. with individual and collective screen 5 pair - 1.5 sq. mm. with collective screen 5 pair - 1.5 sq. mm. with individual and collective screen 10 pair - 1.5 sq. mm. with collective screen 10 pair - 1.5 sq. mm. with individual and collective screen 20 pair - 1.5 sq. mm. with collective screen 20 pair - 1.5 sq. mm. with individual and collective screen 1 pair - 2.5 sq. mm. with collective screen 1 pair - 2.5 sq. mm. with individual and collective screen 2 pair - 2.5 sq. mm. with collective screen 2 pair - 2.5 sq. mm. with individual and collective screen 5 pair - 2.5 sq. mm. with collective screen 5 pair - 2.5 sq. mm. with individual and collective screen 10 pair - 2.5 sq. mm. with collective screen 10 pair - 2.5 sq. mm. with individual and collective screen 20 pair - 2.5 sq. mm. with collective screen 20 pair - 2.5 sq. mm. with individual and collective screen Armoured Cables to BS 5308 1 pair - 1.5 sq. mm. with collective screen 1 pair - 1.5 sq. mm. with individual and collective screen 2 pair - 1.5 sq. mm. with collective screen m m m m m m m m m m m m m m m m m m m m m m m NO. NO. NO. UNIT RATE (Rs.) TOTAL PRICE (Rs.) QTY. INSTALLATION UNIT RATE (Rs.) TOTAL PRICE (Rs.)

FILE: ANNEXURE-XVIII (INSTRUMENTATION)

SHEET 1 OF 5

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR ADDITIONAL INSTRUMENTATION WORKS SUPPLY AND INSTALLATION OF INSTRUMENT ITEMS
SUPPLY S. NO. DESCRIPTION QTY. d) e) f) g) h) i) j) k) l) m) n) o) p) q) r) s) t) 2.1.3 a) b) 3.0 3.1 a) b) c) d) e) 3.2 2 pair - 1.5 sq. mm. with individual and collective screen 5 pair - 1.5 sq. mm. with collective screen 5 pair - 1.5 sq. mm. with individual and collective screen 10 pair - 1.5 sq. mm. with collective screen 10 pair - 1.5 sq. mm. with individual and collective screen 20 pair - 1.5 sq. mm. with collective screen 20 pair - 1.5 sq. mm. with individual and collective screen 1 pair - 2.5 sq. mm. with collective screen 1 pair - 2.5 sq. mm. with individual and collective screen 2 pair - 2.5 sq. mm. with collective screen 2 pair - 2.5 sq. mm. with individual and collective screen 5 pair - 2.5 sq. mm. with collective screen 5 pair - 2.5 sq. mm. with individual and collective screen 10 pair - 2.5 sq. mm. with collective screen 10 pair - 2.5 sq. mm. with individual and collective screen 20 pair - 2.5 sq. mm. with collective screen 20 pair - 2.5 sq. mm. with individual and collective screen Armoured Optical Fibre Cables Optical Fibre Cables Optical Fibre termination CABLE GLANDS Cables glands including all necessary cut backs of armor and sheaths, earthing ring and protection shrouds and tightening 1 pair/triple/quad 7 pairs/triples/quads 12 pairs/triples/quads 19 pairs/triples/quads 27 pairs/triples/quads Instrument Cable Core Termination Core termination including all necessary forming looming, identification, crimped or sweated lugs a) b) c) Not exceeding 1.5 mm Exceeding 1.5 mm but not exceeding 4 mm Exceeding 4 mm NO. NO. NO. NO. NO. NO. NO. NO. m NO. m m m m m m m m m m m m m m m m m UNIT RATE (Rs.) TOTAL PRICE (Rs.) QTY. INSTALLATION UNIT RATE (Rs.) TOTAL PRICE (Rs.)

FILE: ANNEXURE-XVIII (INSTRUMENTATION)

SHEET 2 OF 5

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR ADDITIONAL INSTRUMENTATION WORKS SUPPLY AND INSTALLATION OF INSTRUMENT ITEMS
SUPPLY S. NO. DESCRIPTION QTY. 4.0 INSTRUMENTS AND ACCESSORIES Instruments including process connection / connection to air subheader / hook up and fixing / electrical connection to JB Orifice plate 4.1 i) ii) iii) iv) 4.2 i) ii) iii) iv) 4.3 i) ii) 4.4 i) ii) 4.5 i) ii) iii) iv) v) 4.5 i) ii) iii) iv) v) PRESSURE GAUGE (as per UOP Specification) Pressure Gauge with block and bleed valve Pressure Gauge with block and bleed valve, Pulsation dampener Pressure Gauge with block and bleed valve, diaphragm seal Pressure Gauge with block and bleed valve, Pulsation dampener, diaphragm seal and Flow check excess PRESSURE TRANSMITTER (as per UOP Specification) Pressure transmitter with valve manifold Pressure transmitter with valve manifold and diaphragm seal Pressure transmitter with valve manifold and pulsation dampener Pressure transmitter with valve manifold, diaphragm seal and pulsation dampener DIFFERENTIAL Specification) PRESSURE GAUGE (as per UOP NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. UNIT RATE (Rs.) TOTAL PRICE (Rs.) QTY. INSTALLATION UNIT RATE (Rs.) TOTAL PRICE (Rs.)

Differential Pressure gauge with valve manifold Differential Pressure gauge with valve manifold and diaphragm seal DIFFERENTIAL PRESSURE TRANSMITTER (as per UOP Specification) Differential Pressure transmitter with valve manifold Differential Pressure transmitter with valve manifold and diaphragm seal DIFFERENTIAL PRESSURE TYPE LEVEL TRANSMITTER (as per UOP Specification) Differential Pressure type level transmitter, measuring range 0-30 inches H2O Differential Pressure type level transmitter, measuring range 0-50 inches H2O Differential Pressure type level transmitter, measuring range 0-100 inches H2O Differential Pressure type level transmitter, measuring range 0-150 inches H2O Differential Pressure type level transmitter, measuring range 0-200 inches H2O FLOW TRANSMITTER ORIFICE TYPE (as per UOP Specification) Differential Pressure type flow transmitter, for 2" Line size Differential Pressure type flow transmitter, for 3" Line size Differential Pressure type flow transmitter, for 4" Line size Differential Pressure type flow transmitter, for 6" Line size Differential Pressure type flow transmitter, for 8" Line size

NO. NO.

NO. NO. NO. NO. NO.

NO. NO. NO. NO. NO.

FILE: ANNEXURE-XVIII (INSTRUMENTATION)

SHEET 3 OF 5

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR ADDITIONAL INSTRUMENTATION WORKS SUPPLY AND INSTALLATION OF INSTRUMENT ITEMS
SUPPLY S. NO. DESCRIPTION QTY. 4.6 i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) 4.7 i) ii) iii) iv) v) vi) vii) 4.8 i) ii) iii) iv) v) 4.9 i) ii) iii) iv) v) vi) vii) TEMPERATURE GAUGE BI-METTALIC TYPE (as per UOP Specification) Temperature gauge with thermowell length 2-1/2" Temperature gauge with thermowell length 3" Temperature gauge with thermowell length 4" Temperature gauge with thermowell length 5" Temperature gauge with thermowell length 6" Temperature gauge with thermowell length 8" Temperature gauge with thermowell length 10" Temperature gauge with thermowell length 12" Temperature gauge with thermowell length 13" Temperature gauge with thermowell length 14" Temperature gauge with thermowell length 16" Temperature gauge with thermowell length 18" TEMPERATURE TRANSMITTER RTD TYPE (as per UOP Specification) Temperature transmitter required ranges 0-100 F Temperature transmitter required ranges 0-200 F Temperature transmitter required ranges 0-1100 F Temperature transmitter required ranges 50-250 F Temperature transmitter required ranges 200-400 F Temperature transmitter required ranges 300-700 F Temperature transmitter required ranges 400-750 F LEVEL TRANSMITTER DISPLACER TYPE (as per UOP Specification) For measuring range 0-14" For measuring range 24"-48" For measuring range 48"-64" For measuring range 64"-92" For measuring range greater than 92" CONTROL VALVE Specification) GLOBE TYPE (as per UOP NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. UNIT RATE (Rs.) TOTAL PRICE (Rs.) QTY. INSTALLATION UNIT RATE (Rs.) TOTAL PRICE (Rs.)

Body size 1", inlet size 1", outlet size 1" Body size 1-1/2", inlet size 1-1/2", outlet size 1-1/2" Body size 2", inlet size 2", outlet size 2" Body size 3", inlet size 3", outlet size 3" Body size 4", inlet size 4", outlet size 4" Body size 6", inlet size 6", outlet size 6" EXCEEDING 6".

FILE: ANNEXURE-XVIII (INSTRUMENTATION)

SHEET 4 OF 5

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

NASHPA GAS PROCESSING & LPG RECOVERY PLANT SCHEDULE OF RATES FOR ADDITIONAL INSTRUMENTATION WORKS SUPPLY AND INSTALLATION OF INSTRUMENT ITEMS
SUPPLY S. NO. DESCRIPTION QTY. 4.10 i) ii) iii) iv) v) vi) vii) 4.11 i) ii) iii) iv) v) vi) vii) 5.0 a) b) c) CONTROL VALVE -BUTTERFLY TYPE (as per UOP Specification) Body size 1", inlet size 1", outlet size 1" Body size 1-1/2", inlet size 1-1/2", outlet size 1-1/2" Body size 2", inlet size 2", outlet size 2" Body size 3", inlet size 3", outlet size 3" Body size 4", inlet size 4", outlet size 4" Body size 6", inlet size 6", outlet size 6" EXCEEDING 6". CONTROL VALVE Specification) (REGULATOR) (as per UOP NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. UNIT RATE (Rs.) TOTAL PRICE (Rs.) QTY. INSTALLATION UNIT RATE (Rs.) TOTAL PRICE (Rs.)

inlet size 1/2", outlet size 1/2" inlet size 3/4", outlet size 3/4" Push button Intrinsic safety barrier Gas detector Fire detector Control System, CPU/Power Supply/Input output cables ACCESSORIES Control or instrument junction box 40 way Control or instrument junction box 100 way Refer to Electrical / Instrument Cable and Tubing Trays

NO. NO.

FILE: ANNEXURE-XVIII (INSTRUMENTATION)

SHEET 5 OF 5

ANNEXURE XVIII
COPY OF SRO 678(1)/2007

Zishan Engineers (Pvt.) Ltd.


An ISO 9001-2008 certified company,
47/F, Block 6, PECHS, Karachi-Pakistan Tel: (92-21) 34393045-48 & 34310151-54 Fax: (92-21) 34533430 & 34310156 E-mail : contact@zishanengineers.com, Web : www.zishanengineers.com

Document No. Revision Date Total Pages (inc front cover)

165-3-SPG-027 0 24-12-2012 105

OIL & GAS DEVELOPMENT COMPANY LTD.

TENDER ENQUIRY NO: PROC-FD/CB/PROJ(NASHPA)-732/2012

(SECTION IV) FORM & CONDITIONS OF CONTRACT FOR GAS PROCESSING, LPG RECOVERY PLANT AND ALLIED FACILITIES AT NASHPA OIL FIELD

24-12-2012

Issued for Tender

SP

SFA

MRF

Rev.

Date

Description

Prepared By

Checked By

Approved By

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

TABLE OF CONTENTS

S. NO.

DESCRIPTION

PAGE NO.

1.0

FORM OF CONTRACT

04

2.0

CONDITIONS OF CONTRACT

07

ANNEXURES: ANNEXURE A:
FIXED LUMP SUM PRICE SUMMARY ATTACHMENT 1: PRICE BREAKDOWN FOR NASHPA GAS PROCESSING & LPG RECOVERY PLANT SYSTEM COSTS PRICE DETAILS FOR SURVEYS & SOIL INVESTIGATION PRICE DETAILS FOR DESIGN ENGINEERING PRICE DETAILS FOR WORKS (CONSTRUCTION, INSTALLATION / ERECTION ETC.) PRICE DETAILS FOR START-UP & COMMISSIONING

ATTACHMENT 2: ATTACHMENT 3: ATTACHMENT 4:

ATTACHMENT 5:

ANNEXURE-B-1: ANNEXURE-B-2: ANNEXURE-C: ANNEXURE-D:

TERMS & CONDITIONS OF L/C FOR SUPPLY TERMS & CONDITIONS OF L/C FOR SERVICES BANK GUARANTEE FOR ADVANCE PAYMENT FORMAT PERFORMANCE GUARANTEE REQUIREMENTS

FILE: 165-3-SPG-027, Rev.0

SHEET 2 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ATTACHMENTS:
ATTACHMENT I : ATTACHMENT II : ATTACHMENT III : ATTACHMENT IV : ATTACHMENT V : ATTACHMENT VI : MECHANICAL ACCEPTANCE CERTIFICATE PROVISIONAL ACCEPTANCE CERTIFICATE FINAL ACCEPTANCE CERTIFICATE CERTIFICATE OF COMPLETION CERTIFICATE OF COMPLIANCE UNDERTAKING

FILE: 165-3-SPG-027, Rev.0

SHEET 3 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

FORM OF CONTRACT
THIS Contract is made this _____________ day of _________, __________ between Oil & Gas Development Company Limited having its Office at OGDCL House, Plot No.3, Jinnah Avenue, Blue Area, Islamabad, Pakistan (hereinafter referred to as OGDCL, which expres sion where the context admits shall include and mean its successors in interest and assigns) of the FIRST PART and ___________________________________________________________ having its offices at __________________________________________________ (hereinafter referred to as Contractor, which expression wherever the context admits shall include and mean its successors in interest and assigns) of the SECOND PART. WHEREAS OGDCL as Owner & Operator of various fields is constructing Nashpa Gas Processing and LPG Recovery Plant (hereinafter referred to as Plant/Project). This Plant/Project envisages design, supply and installation of gas processing equipment & LPG Recovery Plant and related utilities, civil, mechanical and electrical/instrumentation works. WHEREAS OGDCL invited Bids for execution of the Project on Engineering, Procurement, Construction and Commissioning (EPCC) basis on single responsibility basis. AND WHEREAS the Contractor after reviewing the Tender document including Feed Document and related technical documents/drawings, and understanding the complete details of the Project work involved and requirements given in the OGDCLs Tender Document No: PROCFD/CB/PROJ(NASHPA)-732/2012 dated December 22, 2012 submitted the Bid No. ________ dated _____________ 2012 and has agreed to execute the Project as per terms, conditions and specifications mentioned hereinafter. WHEREAS the Contractor represent and warrants to OGDCL that it is fully qualified, experienced and professionally competent and possess the necessary skills and resources and is able and willing to execute the Project, strictly so as to achieve the objective of the Contract. The Contractor further acknowledges that FEED Document provided by OGDCL has been thoroughly reviewed at the bidding stage and the cost of removing any error, omission and/or discrepancy to make it fit and sufficient for the purpose for which it is intended has been included in the Contract Price for the equipment, materials and construction works accordingly. WHEREAS OGDCL through letter no. ___________ dated ___________ communicated its intention to award the Contract for Engineering, Procurement, Construction and Commissioning of Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities to ______________. NOW THEREFORE IN CONSIDERATION OF THE ABOVE PREMISES AND THE MUTUAL COVENANTS HEREINAFTER STIPULATED THE PARTIES AGREE AS FOLLOWS: 1.0 CONTRACT & ITS OBJECT In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the conditions of the Contract hereinafter referenced.

FILE: 165-3-SPG-027, Rev.0

SHEET 4 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

The following documents (hereinafter called the Contract Documents) comprise the entire Contract between the parties and supersede and replace any prior correspondence, agreement or understanding between the parties: a) b) c) This Contract Conditions of Contract Complete Tender Document (including Feed Document, Scope of Work/Services, Technical Drawings & Specifications) Price Schedule Bidders Bid Proposal (Technical & Financial) OGDCL/Consultant Pre-Bid and Post bid Clarifications & Bidders Response Detailed Work Schedule Notification of Intention to Award Mobilization Advance Payment Guarantee Format Performance Bond (Bank Guarantee) Format Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Appendix G Appendix H Appendix I

d) e) f)

g) h) i) j)

Notwithstanding anything contained in the documents: Any inconsistency between the above listed documents of this Contract shall be resolved by giving precedence in the order in which they are listed. To the extent of any conflict between this Contract and Contract documents including Annexures, Appendices and Addendums, the Contract shall prevail. To the extent of any conflict between the Conditions of Contract and Technical Specifications, the later shall prevail; similarly drawings/data sheets shall have precedence over technical specifications.

The object of the Contract is the performance of all the required Works i.e. engineering, procurement, construction and commissioning of Nashpa Gas Processing, LPG Recovery Plant and Allied Facilities by the Contractor on fixed lumpsum price basis capable of achieving guaranteed performance within the Time for Completion, and in strict accordance with all the requirements of the Contract. The Contractor acknowledges, agrees and undertakes that the performance of its obligations under the Contract would result in the achievement of the object of the Contract. This Contract shall become effective upon the date after formal execution of the Contract by the duly authorized representatives of OGDCL and Contractor, provided that all of the following conditions have been fulfilled:
FILE: 165-3-SPG-027, Rev.0 SHEET 5 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

a) The submission of the Performance Bond (Bank Guarantee) by the Contractor to OGDCL. b) The payment of the Mobilization Advance by OGDCL to Contractor, the same to be secured by the Performance Bond Bank Guarantee to be simultaneously furnished by Contractor to OGDCL pursuant to Article 21 of Conditions of Contract. c) The confirmation, by Contractor to OGDCL, in form and substance satisfactory to OGDCL, that Contractor has put into force and effect such of the policies of insurance specified in Article 46 of Conditions of Contract. After conditions specified above have been fulfilled and OGDCL gives written advice to Contractor to proceed ahead with the execution of the Project the Contractor shall diligently commence execution of the Work forthwith and shall proceed with the same with due expedition and without delay in accordance with the terms of this Contract. The Contractor and OGDCL agrees that this Contract, including all the documents incorporated by reference earlier express all of the covenants and agreements of the parties and that this Contract integrates, combines and supersedes all earlier negotiations and Understanding whether written or verbal. It is also understood that no modification or alteration of this Contract shall be valid or binding on either party, unless agreed in writing by both the parties. In WITNESS whereof the parties hereto have caused their respective Common Seals to be hereunto affixed (or have hereunto set their respective hands and seals) the day and year first above written. SIGNED, SEALED AND DELIVERED

By the said (Signature & Stamp) __________________________________ Name: ____________________________ For and on behalf of the Oil & Gas Development Company Limited (OGDCL) in the presence of: __________________________________ Name: ____________________________ Address: __________________________ __________________________________

By the said (Signature & Stamp) _______________________________ Name: _________________________ For and on behalf of the Contractor in the presence of:

__________________________________ Name: ____________________________ Address: __________________________ __________________________________

FILE: 165-3-SPG-027, Rev.0

SHEET 6 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

CONDITIONS OF CONTRACT
1.0 GENERAL These Conditions of Contract, together with the other parts of the Contract Documents shall apply to the Contract entered for execution of Nashpa Gas Processing, LPG Recovery Plant and Allied Facilities involving engineering, procurement, construction and commissioning. The commissioning (including performance testing) of the plant shall also be the responsibility of the Contractor. This Contract shall be drawn between Oil and Gas Development Company Limited (OGDCL) and the successful Bidder for the facility. 2.0 DEFINITIONS In the Contract the following words and expressions shall have the meanings hereby assigned to them except where the context otherwise requires: a) Tender Documents means the documents issued by OGDCL for inviting Bids, for engineering, procurement, construction and commissioning of Nashpa Gas Processing, LPG Recovery Plant and Allied Facilities which constitute the basis for bid proposals and the Contract. Bid/Bid Proposal means the offer of the successful Bidder to perform the Work in response to the Bidding Documents. Contract means the finally executed Contract between OGDCL and Contractor (i.e. successful Bidder). Contractor means the person or persons, firm or company whose Bid has been accepted by OGDCL for engineering, procurement, construction and commissioning and start-up (including performance testing) of Nashpa Project and includes the Contractors representatives, successors and permitted assignees. Contract Documents means the documents forming the contract and shall include: This Contract Conditions of Contract Appendix A Complete Tender Document (including Feed Document, Scope of Work/Services, Technical Drawings & Specifications) Appendix B Price Schedule Appendix C Bidders Bid Proposal (Technical & Financial) Appendix D OGDCL/Consultant Pre-Bid and Post bid Clarifications & Bidders Response Appendix E Detailed Work Schedule Appendix F Notification of Intention to Award Appendix G Mobilization Advance Payment Guarantee Format Appendix H Performance Bond (Bank Guarantee) Format Appendix I
SHEET 7 OF 50

b)

c)

d)

e)

FILE: 165-3-SPG-027, Rev.0

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

f)

The Consultant referred to herein means M/s Zishan Engineers (Pvt) Limited (ZEL) appointed by OGDCL for providing Consultancy Services for Nashpa Gas Processing, LPG Recovery Plant and Allied Facilities. Final Acceptance Certificate means the certificate to be issued by OGDCL stating that the Contractor has fulfilled all his obligation under the Contract. Goods, Equipment & Material means items to be procured (supplied) under the Contract. Contractor, Vendor means the person or party who will manufacture and supply the goods as specified complete or in part. Mechanical Acceptance Certificate means the Certificate issued by OGDCL/ Consultant that all works of the project are completed and ready for commissioning and start-up (including performance testing etc). OGDCL/Owner/Company means OIL & GAS DEVELOPMENT COMPANY LIMITED. Person means firm, company, corporation or consortium. Project/Plant means all the facilities included in Nashpa Gas Processing, LPG Recovery Plant and Allied Facilities. Provisional Acceptance Certificate means the Certificate to be issued by OGDCL confirming that all the plant has been commissioned and performance acceptance tests performed. Provisional Acceptance Period means the period between the date of issuance of the Provisional Acceptance Certificate and the Final Acceptance Certificate. Project Site means the area of Nashpa field where the Gas Processing, LPG Recovery Plant and Allied Facilities shall be constructed. Wellheads are also included. Permanent Works means and includes all Works which will be incorporated and form part of the Project. Specification or Specified shall mean the requirements of the documents. Sub-Contractor means the person or party to whom any part of the work has or will be sublet by the Contractor with the written approval of OGDCL and includes his heirs, executors, administrators, representatives, successors, or assignees as approved by OGDCL/Consultant. Temporary Works means all temporary works of every kind required for execution and completion of the Project.
SHEET 8 OF 50

g)

h)

i)

j)

k)

l) m)

n)

o)

p)

q)

r) s)

t)

FILE: 165-3-SPG-027, Rev.0

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

u)

Vendors/Suppliers means any person or company having direct Contract with Contractor for supply of equipment and material required for the Project. Warranties means all the warranties to be furnished or cause to be furnished by the Contractor in favor of OGDCL under the Contract and more particularly described in Article 40 hereof. Work means and includes all the works to be performed and all the services to be provided by the Contractor under the Contract for execution of the Project on complete responsibility including engineering, procurement (supply), construction, commissioning and startup (including performance testing).

v)

w)

3.0

SINGULAR AND PLURAL Words imparting the singular only also include the plural and vice versa where the context requires.

4.0

COMPLIANCE WITH BIDDING DOCUMENTS The engineering, procurement, construction and commissioning of Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities shall be completed in all respects and in strict accordance with the Contract Documents. These Conditions of the Contract shall supersede any conditions made by the Contractor, in his proposal unless such conditions have been specifically included in the Contract.

5.0

USE OF CONTRACT DOCUMENTS AND INFORMATION 5.1 The Contractor shall not, without OGDCLs prior written consent, disclose the contents of Contract Documents, or any provision thereof, or any specification plan, drawing, pattern, sample or information furnished by or on behalf of the OGDCL in connection therewith, to any person other than a person employed by the Contractor in the performance of the Contract. Disclosure to any such employed person shall be made in confidence and shall extend only so far as may be necessary for purposes of such performance. The Contractor shall not, without OGDCLs prior written consent, make use of any document or information enumerated in Sub-Article 5.1 except for purposes of performing the Contract. Any documents, other than the Contract itself, enumerated in Sub-Article 5.1 shall remain the property of OGDCL and shall be returned (all copies) to OGDCL on completion of Contractors performance under the Contract, if so required by OGDCL.

5.2

5.3

FILE: 165-3-SPG-027, Rev.0

SHEET 9 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

6.0

SUFFICIENCY OF TENDER The Contractor shall be deemed to have satisfied himself before tendering as to the correctness and sufficiency of his Tender for the Project and that the prices stated in the BOQ Prices schedule cover all his payment obligations and under the throughout term of the Contract and all matters and things necessary for the proper execution of the Project as per requirement of the Project

7.0

INTERPRETATION 7.1 Decision by the Consultant shall be conclusive as to the true intent and meaning of Consultant's drawings and technical specifications. Any discrepancy which may exist between drawings and the technical specifications shall be referred to the Consultant, whose decision as to the true meaning shall be final and binding for the Contractor. The Contractor shall study and review the drawings, technical specifications and other information given to him by OGDCL/Consultant. During this review, if it comes across any discrepancies, inconsistencies the same shall be reported in writing to the OGDCL/Consultant. All drawings and technical specifications, being instruments of services, are the property of OGDCL and shall be returned when the Work is completed. Verbal instructions or information received from the OGDCL/Consultant's office will not be recognized by him unless confirmed in writing. The drawings and technical specifications are intended to be complementary to each other so that any items set-forth in either shall be recognized as if duly setforth in both.

7.2

7.3 7.4 7.5

8.0

ASSIGNMENT The Contractor shall not assign the Contract or any part thereof, or any benefit or interest therein or there under without the prior written consent of OGDCL.

9.0

STANDARDS The equipment and materials to be supplied, installation and construction work to be performed by the Contractor under this Contract shall conform to the standards specified in the Technical Specifications and Drawings given in VolumeIII of Tender Document, unless specified/agreed between OGDCL and the Contractor.

10.0

PATENT RIGHTS The Contractor shall indemnify OGDCL against all actions, claims, demands, costs, charges, damages and expenses arising from or incurred by reason of any infringement of patent, trade mark or industrial design rights arising from Contractors performance under this Contract.

FILE: 165-3-SPG-027, Rev.0

SHEET 10 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

11.0

CONTRACTORS OBLIGATIONS 11.1 General Obligations The Contractor shall carry out engineering, procurement, construction and commissioning (EPCC) of the Project on complete responsibility basis and accordingly shall carry out all activities necessary to make operational Nashpa Gas Processing, LPG Recovery Plant and Allied Facilities in accordance with the Contract. The Contractor shall also remedy any defects at its cost in the project during commissioning performance testing and startup until issuance of final acceptance certificate. When completed, the Project shall be fit for which it is intended and as defined in the Contract. The Contractor shall ensure that the Plant is designed and performs in such manner that local Plant and services are used to the maximum extent possible, without in any manner affecting Guaranteed Performance, project execution schedule, any codes, standards and specifications set out in the Contract, or the cost and quality of the Works. The Contractor shall also ensure that the OGDCL is not deprived of exemption or concession from taxes/ import duties available to OGDCL under the Laws of Pakistan. All machinery, equipment, materials, spare parts, components, apparatus, accessories, and articles, and all other items, which the OGDCL has paid for, shall at all times remain the property of the OGDCL. All such machinery, equipment, materials, spare parts, components, apparatus, accessories, and articles, and other items, which have not been incorporated into the Project shall be handed over to the OGDCL prior to the issuance of the Provisional Acceptance Certificate. The Contractor shall be responsible for obtaining, at its own cost, water and power required for the Works, including construction of camps, Site offices, etc. OGDCL will not be responsible for any cost in this regard. The Contractor shall provide the documents specified in the Contract, and all construction plant, Contractors personnel, goods, consumables and other things and services, whether of a temporary or permanent nature, required in and for completion of Project in all respects. The Work shall include any work, which is necessary to satisfy OGDCL/Consultants requirements, or is implied by the Contract, and all works, which (although not mentioned in the Contract) are necessary for the completion, or safe and proper operation, of the Project. The Contractor shall, whenever required by OGDCL/Consultant, submit details of the arrangements and method, which the Contractor proposed to adopt for the execution of the Project. No significant alteration to these arrangements and methods shall be made without this having previously intimated and approved by OGDCL/Consultant.

FILE: 165-3-SPG-027, Rev.0

SHEET 11 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

The Contractor warrants and undertakes to OGDCL that: a) During operation the Plant will perform to the standards set out in the Contract and shall achieve Guaranteed Performance at the time of Performance Tests. The Plant shall be specified using internationally approved engineering practices and (where applicable) the standards and specifications set out in the Contract, will be fit and sufficient for their intended purpose, will comply with all the requirements of the Contract and will meet the highest international professional standards; The materials, equipment, plant, machinery, components, apparatus, accessories, articles and other goods to be procured (supplied) by Contractor shall be brand new, state of the art, of sound and merchantable quality, of first class workmanship, and shall be fit for their purpose, and shall be of the highest internationally approved standards, and that the various items of material, machinery, equipment & plant shall result in a completely coordinated Plant capable of achieving Guaranteed Performance and that various items procured shall only be from good, reputable and recognized Vendors listed in Scope of Work and supplied with valid test certificates; d) The Plant will successfully complete the tests and trials stipulated in the Contract and the Performance Tests and shall achieve the Guaranteed Performance; The Contractor and Sub-contractor(s) have all the resources (financial and otherwise), experience, qualifications, capabilities and personnel at their disposal as are required to perform the Works in accordance with internationally approved engineering practices and standards of design/engineering, procurement and project management all in order to achieve the objective of the Contract; The Plant will be designed, manufactured, fabricated, procured and erected strictly in accordance with industry standards, provisions contained in the Contract and with design consented by the OGDCL/ Consultant and laws of Pakistan; The Contractor's obligations, Performance, guarantees, warranties, representations, undertakings and responsibilities under the Contract shall not be waived or modified in any way by reason of reviews and/ or Consents of OGDCL reviews, consents and approvals of Consultant; The Contractor shall commence Work on the Project immediately on the Effective Date;

b)

c)

e)

f)

g)

h)

FILE: 165-3-SPG-027, Rev.0

SHEET 12 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

i)

The Contractor has inspected and examined the available Site and its surrounding areas and has fully satisfied itself before signing this Contract as to the nature, location, physical conditions, prevailing local conditions applicable to the Project and has obtained all necessary information as to risks contingencies and other circumstance which may influence or affect of the Project. The Contractor shall design, manufacture and procure the Plant and perform the Works in such manner as will ensure compatibility with the existing facilities and will further ensure that the operations of the existing facilities are not disrupted in any manner and that the Existing Facilities are able to operate to the fullest extent of their capacities. The Contractor shall remedy in accordance with the Contract, defects in the Plant resulting from faulty erection, engineering operation Plant and workmanship at its cost. The Contractor shall execute, complete and maintain the Project strictly in accordance with the Contract. The mode, manner and speed of execution of the Project shall be conducted in a manner which is in accordance with this Contract. The Contractor shall not be relieved of any of its obligations under the Contract as a result of any act or omission, examination, review, inspection, approval or instruction, or Consent, or failure to examine, review, inspect, approve or instruct or Consent, by the OGDCL or the Consultant.

j)

k)

l)

m)

11.2

Contractors Representative The Contractor shall appoint the Contractors Representative and shall give him all authority necessary to act on the Contractors behalf under the Contract. The Contractor shall obtain OGDCL/Consultant consent of Contractors representative, if not named in the contract. For obtaining the consent, the particulars of the persons, his qualification experience, is required to be submitted. The Contractor shall not, without the prior consent of OGDCL/Consultant, revoke the appointment of the Contractors Representative or appoint a replacement. The Contractors Representative may delegate any powers, functions and authority to any competent person and may at any time revoke the delegation. Any delegation or revocation shall not take effect until OGDCL/ Consultant has received prior notice signed by the Contractors Representative, naming the person and specifying the powers, functions and authority being delegated or revoked.

FILE: 165-3-SPG-027, Rev.0

SHEET 13 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

11.3

Sub-Contractors The Contractor shall not subcontract the whole of the Work. The Contractor shall be responsible for the acts or defaults of any subcontractor, his agents or employees, as if they were the acts or defaults or the Contractor. Unless otherwise agreed by OGDCL/Consultant, the Contractor shall give OGDCL/ Consultant not less than one (1) week notice of: a) The intended appointment of a subcontractor for a part of the Work, with detailed particulars, which shall include the relevant experience of the subcontractor whom the Contractor intend to appoint. Qualification and experience of the sub-contractors staff as may be asked by OGDCL/ Consultant. Details of manpower and other resources available with the sub-contractor. The intended commencement of each sub-contractors work, and The intended commencement of each sub-contractors Work on Project Site.

b)

c) d) e)

OGDCL/Consultant after reviewing the above information shall give his approval for the intended sub contracting arrangement. The approved sub-contractor shall not be allowed to further sub contract the Work under his scope. If more than one Sub-Contracts are awarded to one subcontractor it shall not be managed by the same team simultaneously. Approval of a sub-contractor by OGDCL/Consultant shall not release the Contractor of any of its obligation and responsibilities under the Contract nor OGDCL/Consultant shall have any obligation with regard to the sub contracting arrangement between the Contractor and the sub-contractor. Approved sub-contractor shall be responsible for carrying out the Work in accordance with the requirement of the Contract Documents, and all conditions of the Contract shall be applicable to him. 11.4 Cooperation The Contractor shall, as specified in the Contract or as instructed by OGDCL/ Consultant, responsible free access at all times for carrying out inspection or work to: a) b) c) d) OGDCLs personnel, The Consultants personnel, any other contractors employed by OGDCL, and the personnel of any legally constituted public authorities,

FILE: 165-3-SPG-027, Rev.0

SHEET 14 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

who may be employed in the execution on or near the Site of any Work not included in the Contract. The Contractor shall be responsible for his construction activities at Project Site, and shall co-ordinate his own activities with OGDCL and other contractors. 11.5 Safety Procedures During the execution of the Work, the Contractor shall strictly follow OGDCL safety requirements. The Contractor shall also exercise due care for facilities of other parties. In any event the Contractor shall be liable for any damages and/or losses incurred including third party losses. The Contractor shall: a) b) c) d) e) comply with all applicable safety regulations, take care for the safety of all persons entitled to be on the site, use reasonable efforts to keep the Project Site and Work clear from unnecessary obstruction so as to avoid danger to these persons, provide fencing, lighting, guarding and watching of the Work until completion, and provide any Temporary Work (including roadway, footways, guards and fences) which may be necessary, because of the execution of the Work, for the use and protection of the public and of Owners and occupiers of adjacent lands.

11.6

OGDCL/ Consultant Not Liable for Information/Data The Contractor shall bear sole responsibility for obtaining all information required by it to perform the Work in strict compliance with this Contract and shall rely on the same at its own exclusive responsibility and risk. OGDCL/Consultant shall provide to the Contractor information and engineering data required by the Contractor in order to ensure performance of the Work in strict accordance with the requirements of this Contract. The Contractor shall consider and check information and engineering data received from OGDCL/ Consultant at its own cost.

11.7

Quality Assurance The Contractor shall institute a quality assurance and document control system to demonstrate compliance with the requirements of the Contract. The system shall be in accordance with the details stated in the Contract. OGDCL/ Consultant shall be entitled to audit any aspect of the system. Details of all procedures and compliance documents shall be submitted to OGDCL/ Consultant Representative for information before each execution stage is commenced. When any document of a technical nature is issued to OGDCL/Consultant, evidence of the prior review, check and approval by the Contractor himself shall be apparent on the document itself.

FILE: 165-3-SPG-027, Rev.0

SHEET 15 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Compliance with the quality assurance system shall not relieve the Contractor of any of his duties, obligations, or responsibilities under the Contract. 11.8 Unforeseeable Difficulties The Contractor shall be deemed to have obtained all necessary information as to risks, contingencies and other circumstances including the variation in price of material of construction, cost of living, labor cost, etc. which may influence or affect the Work. By signing the Contract, the Contractor accepts responsibility for having foreseen all difficulties and cost for successfully completing the Work. The Contract Price shall not be adjusted to take account of any unforeseen difficulties or cost, except as otherwise stated in the Contract. 11.9 Protection of the Environment and Wildlife & Responsibility The Contractor shall take all reasonable steps to protect the environment (both on and off the Project Site) and to limit damage, the nuisance to people and property resulting from pollution, noise and other results of his operations. Damage to any property and environment shall be restored by the Contractor at its own cost. The Contractor shall ensure that emissions, surface discharges and effluent from the Contractors activities shall not exceed the permissible values prescribed by applicable laws. Contractor or its sub-contractor shall not adopt any method for Work or camps living which may be damaging to environment or wildlife. Contractor/Subcontractor shall not violate any law which may be in force for the protection of environment and wild life. Work in any protected zone shall be planned and executed in accordance with the requirement of the concerned department. Work shall be planned and executed to avoid any damage to any archeological or historical site in the vicinity of the Project Site, Contractor shall take necessary precautions to protect its workers from indulging, in shooting, hunting, cutting of trees or any other activity which may be against the law or damaging to environment or wildlife. Contractor agrees to inform himself and his Sub-Contractor of environmental protection laws, orders and regulations and to make all his employees and the Sub-Contractor fully cognizant of their responsibilities there under. Contractor agreed that all Work shall be completed in a manner which complies with Federal and Provincial or Local Governments environmental and wildlife laws, regulations, procedures, etc. Contractor shall clean-up and remove any pollutant resulting from Contractors non-compliance with the provisions of this Clause at his cost and expense; and if Contractor fails to do so, OGDCL may cleanup and remove the pollutant at Contractors cost and expense. Without in any way limiting the generality of any other indemnity provisions contained in the Contract, Contractor agrees to indemnify and hold OGDCL harmless from and against all liability, loss, cost, damage and/or expense of every nature caused by, arising from, growing out of or incidental to any failure of Contractor to comply with the provisions of this Article.
FILE: 165-3-SPG-027, Rev.0 SHEET 16 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

11.10 Security a) b) The Contractor shall be responsible for keeping unauthorized persons off the Project Site, and Authorized persons shall be limited to the Contractor's Personnel, subContractor and OGDCLs/Consultants Personnel and other personnel notified to the Contractor, by (or on behalf of) OGDCL/ Consultant, as authorized personnel of OGDCLs/ Consultants other contractors of the Project Site. The Contractor shall be solely responsible for the safety and security of the Site area until its handover to OGDCL on Completion of Work.

c)

11.11 Contractors Operations on Site The Contractor shall confine his operations to the Site, and to any additional areas, which may be obtained by the Contractor and agreed by OGDCL as working areas. During the execution of the Project, the Contractor shall keep the assigned site area free from all unnecessary obstruction, and shall store or dispose off any Contractor's Equipment or surplus materials. The Contractor shall clear away and remove from the assigned site area any wreckage, rubbish and Temporary Work at Contractors own cost, which are no longer required. Removal of construction equipment from the assigned site area shall, however, be with prior permission of OGDCL. Upon completion of the Project, the Contractor shall clear away and remove all Contractor's equipment, surplus material, wreckage, rubbish and Temporary Work. All surplus and packing materials shall be handed over to OGDCL and shifted by the Contractor, at place(s) designated by OGDCL. The Contractor shall leave the assigned site area and the Work in a clean and safe condition. Except that the Contractor may retain at assigned site area, such Goods as are required for the Contractor to fulfill obligations under the Contract. 11.12 Fossils All fossils, coins, articles of value or antiquity, and structures and other remains or items of geological or archaeological interest found on the Project Site shall be promptly notified to OGDCL and placed under their care and custody. The Contractor shall take reasonable precautions to prevent Contractor's Personnel or other persons from removing or damaging any of these findings. 12.0 CONSULTANTS RESPONSIBILITIES OGDCL has appointed ZEL Consultant for providing consultancy services to ensure timely project completion complying with quality specifications and performance requirements. ZEL responsibilities shall include:

FILE: 165-3-SPG-027, Rev.0

SHEET 17 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Process selection & Preparation of Front End Engineering Design (FEED) document. Preparation of tender document for execution of project on EPCC basis and required procurement support & assistance in Contract formulation & negotiations. Review of Contractors design and timely review and approval of all documents. Procedures, prepared by Contractor and verification of Contractors invoices. Inspection & Testing of main equipment & material items. Supervision during civil construction, fabrication, installation/erection, commissioning testing of Nashpa plant.

13.0

OGDCLS RESPONSIBILITIES OGDCL shall be responsible for providing Contractor following: a) Land for Gas Processing, LPG Recovery Plant & Allied Facilities and temporary construction (Camp). Gas production wells when required. Information, engineering data/documents and equipment & materials as stipulated in the Contract Document. Providing facilitation to obtain permits and approvals which Contractor may require for execution of work. However, the Contractor shall timely submit the list of required permits/approvals. Ensure timely review and approvals of documents submitted by the Contractor and his payments. Access to Project Site.

b) c)

d)

e)

f) 14.0

PROJECT COMPLETION PERIOD The timely completion of the work by the Contractor shall be the essence of the Contract, as OGDCL has to meet its obligations for completion of the work and Supply of Gas. Accordingly, the Contractor is required to complete the Project in fourteen (14) months from the Effective Date of the Contract to be executed between OGDCL and the Contractor. The Detailed Work schedule shall be submitted by the Contractor.

15.0

MOBILIZATION/COMMENCEMENT OF WORK The Contractor shall mobilize at the Site and commence the work on Project within the required period after the receipt by him of a written order to this effect from OGDCL and shall proceed with the same with due expedition and without delay.

FILE: 165-3-SPG-027, Rev.0

SHEET 18 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

16.0

PROGRESS REPORTING 16.1 At thirty (30) days intervals during the performance and duration of the Contract the Contractor shall submit progress report (six copies) to OGDCL/Consultant. The reports shall show clearly and accurately the position of all activities associated with the design, supply, construction, installation, commissioning and start-up (including performance testing) of the Project. The progress reports shall be set out in a format approved by OGDCL/ Consultant. 16.2 The progress report shall indicate each item of progress of Work giving the percentage completion and expected completion date vis--vis agreed project execution schedule. 16.3 A delay due to any reason which may affect the completion, commissioning and testing dates of any item of Work shall be reported by the Contractor to OGDCL/Consultant giving specific reasons for such delay therein. The report shall state the action being taken to overcome such delay and to ensure adherence to the agreed project schedule. 16.4 The Contractors Site Office shall prepare and submit to OGDCL/Consultant three (3) copies of Weekly Activity Report summarizing the main activities undertaken and completed each week such as welding, piping, hydrostatic tests, etc.

17.0

RATE OF PROGRESS If for any reason, the rate of progress of the Work or any section is at any time, in the opinion of OGDCL/Consultant, too slow to ensure completion by the prescribed time or extended time for completion, OGDCL/Consultant shall so notify the Contractor in writing and the Contractor shall thereupon take such steps as are necessary to expedite progress so as to complete the Project or such section by the prescribed time or extended time, if agreed to by OGDCL/Consultant.

18.0

OGDCL/ CONSULTANT ACCESS TO THE WORK 18.1 OGDCLs/ Consultants representatives and any person(s) so authorized by them shall at all times have access to the Work and to the Site where work is being performed. No Work shall be covered up or put out of view without prior approval of OGDCLs/ Consultants representatives and the Contractor shall afford full opportunity for OGDCLs/Consultants representatives to examine, measure and test any work, which is going to be covered up or put out of view. The Contractor shall give notice to OGDCL/Consultant, which shall be reasonably in advance and OGDCL/Consultant without unreasonable delay examine, measure and inspect such Work.

18.2

FILE: 165-3-SPG-027, Rev.0

SHEET 19 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

18.3

The Contractor to arrange proper and safe access for the OGDCL/Consultant staff, in a manner that all Work can be inspected at any time until permission for its cover up backfill has been given by the concerned OGDCL/ Consultant.

19.0

DETAILED WORK PROGRAMME/SCHEDULE 19.1 The Contractor shall, within fifteen (15) days of the notification with the intent to award the Contract, submit to OGDCL/ Consultant for their approval Detailed Work Programme /Schedule showing the sequence/order of activities procedures and methods in which he proposes to fulfill his obligations under the Contract within the stipulated completion time. The Programme/Schedule shall be comprehensive and shall show break-up of principal elements and major items of Work, the date upon which design, engineering, procurement (supply) equipment/materials, each type of construction or activity and pre-commissioning, commissioning & startup, including performance testing is scheduled to begin and complete. Full particulars of the organization staff by which the Contractor proposes to direct and administer for due and faithful performance of the Contract shall also be furnished along with the Detailed Work Programme/Schedule. The Contractor shall whenever required by OGDCL/Consultant or their representatives, also provide in writing approach, methods plans, which the Contractor proposes to adopt for execution of various components of Work. If at any time it should appear to OGDCL/Consultant that the actual progress of the Work does not conform to the approved programme/schedule, the Contractor shall produce, at the request of OGDCL/Consultant, the Contractor shall apprise OGDCL/Consultant for such non conformance of the approved programme/schedule and if agreed by OGDCL/Consultant, the Contractor shall provide a revised programme/schedule showing the modifications to the approved programme/ schedule necessary to ensure completion of the Work within the stipulated completion time. The submission to and approval by OGDCL/Consultant of such programmes or the furnishing of such particulars shall not relieve the Contractor of any of his duties or responsibilities under the Contract.

19.2

19.3

19.4

20.0

COMPLIANCE WITH STATUTES, REGULATIONS, ETC. 20.1 The Contractor shall conform in all respects with the provisions of any and all applicable laws, regulations, by-laws, rulings and orders which may be applicable to the Work and with such rules and regulations of public bodies and companies as aforesaid and shall keep the OGDCL indemnified against all penalties and liabilities of every kind for breach of any such Statute, Ordinance or Law, regulation or by-law. The Contractor shall pay particular attention to all legal, technical and safety requirements in force concerning Work to be performed in the Project.

20.2

FILE: 165-3-SPG-027, Rev.0

SHEET 20 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

20.3

OGDCL/Consultant shall assist the Contractor by advising Contractor on such laws, regulations and bye-laws from time to time in force which are in OGDCLs/Consultants knowledge and possession. The Contractor shall at all time be liable to comply with the provisions of labor legislations. The OGDCL shall have the right but not the obligation to carry out periodic checks to ensure the Contractor's compliance with the said labor legislations, should the Contractor however be in default of these obligations the OGDCL may serve a notice of such default on the Contractor. The Contractor shall obligated to rectify the default within fifteen (15) days of the notice.

20.4

21.0

PERFORMANCE BOND (BANK GUARANTEE) 21.1 Within seven (7) days of the receipt of notification of intent to award the Contract from OGDCL, the Contractor shall furnish a Performance Bond in the Form of Insurance Guarantee to be issued by National Insurance Company (NIC) for an amount of ten percent (10%) of the Contract Price as a guarantee for the due and faithful performance of the Contract. The said Performance Bond shall be valid upto twelve (12) months from the date of the Provisional Acceptance Certificate is issued. The said Guarantee and the terms of the said security shall be in accordance with format given in Appendix K. The procurement of such Guarantee and the cost of the security to be so entered into shall be at the expense of the Contractor. The proceeds of the Performance Bond/Insurance Guarantee shall be payable to OGDCL as compensation for any loss resulting from the Contractors failure to fulfill its obligations under the Contract (including guarantee/warranty). The Performance Bond/Insurance Guarantee shall be released to the Contractor after twelve (12) months from the date of the Provisional Acceptance Certificate (PAC), provided that the Contractor has performed and fulfilled guarantee/warranty obligations in pursuance of the Conditions of Contract. If Contractor is unable to meet its obligations the Performance Bond will be extended or encashed as per OGDCLs discretion.

21.2

21.3

21.4

22.0

CONTRACT PRICE The Contract shall be on EPCC basis with fixed lumpsum price. This concept entails that the Contractor shall be fully responsible for complete execution of the Project as defined in the tender document meeting the technical specifications, applicable standards and OGDCLs objectives. All prices are on fixed lumpsum basis as per format given in Annexure-A of this document. The prices are for complete scope of work and the obligations of Design, Engineering, Supply, Construction, Installation, Commissioning, Testing and overall Project management with no exceptions. The quoted process shall be firm and fixed during the Contract performance period and shall not be subject to any escalation on any account.

FILE: 165-3-SPG-027, Rev.0

SHEET 21 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

The prices are mentioned separately in the following currencies: a) For those inputs to the Project which the Bidder expects to supply by importing them from outside Pakistan (referred to as the foreign currency component) shall be in US Dollars or other internally convertible currency. The prices shall inclusive of taxes (If applicable) of the exporting country. b) For those inputs to the project which the Bidder expects to supply from within Pakistan in Pak Rupees. The price shall be on ex-Project site delivery basis (inclusive of applicable sales tax/levies). However, the Bidder shall provide separately the details of sales tax/levies considered, and shall take into account the provisions of relevant SROs applicable to OGDCL. The custom duties/taxes etc as levied on import of plant and machinery required for construction of Nashpa Gas Processing, LPG Recovery Plant & Allied Facilities which do not form part of the Plant shall be on Contractors account. 22.1 Payment Terms The payment for the foreign currency component of Bid Price shall be made by OGDCL through irrevocable Letter of Credits (L/C) established through a bank of OGDCLs choice. Letter of Credit (L/C) shall be established in accordance with the requirements of State Bank of Pakistan, customs authorities and other concerned governmental organizations. The terms & conditions of L/C for supply of foreign equipment and material items and foreign component of services (if any) i.e. design engineering, works covering construction, installation & erection are given in Annexure-B-1. Foreign currency payment can only be made to the foreign beneficiary of the L/C. Payments in local currencies shall be made through account payee cheques issued in favor of the Contractor Payment shall be subject to ten (10%) advance adjustment and 10% retention money and deduction of withholding tax as per relevant laws/regulations/ Payments shall be subject to deduction of withholding tax as per relevant laws/regulations. All payments shall be according to terms of payment, milestones and invoicing procedure, which are described in detail in the Conditions of Contract. Mobilization Advance Payment Ten Percent (10%) of the total Contract Price shall be paid by OGDCL to Contractor as advance separately for foreign currency component through letter of credit (L/C) and local currency component though account payee cheque. The Mobilization Advance shall be paid to the Contractor on submission of Advance Payment Guarantee of equivalent amount issued as per format given in Annexure-C and by bank acceptable to OGDCL. No advance shall be paid before the submission of Performance Bond required as per relevant clause of Conditions of Contract. The amount of advance payment shall be deducted proportionately from Contractor each invoice.
FILE: 165-3-SPG-027, Rev.0 SHEET 22 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

The payment schedule for various components of the Contract Price is outlined below: Procurement (Supply) of Equipment and Materials

Foreign Currency Payments The payment of foreign currency component of the contract price shall be made under the L/C on the following milestones: Ten percent (10%) on the placement of order of major equipment & material items on submission of un-priced copy of purchase order and suppliers acceptance along with Contractors invoice duly verified by OGDCL. Ten percent (10%) of the L/C amount shall be paid on satisfactory completion of Shop Witness Testing accompanied by a Certificate of the Contractor to that effect and Contractors invoice duly verified by OGDCL. Forty Five percent (45%) of the L/C amount shall be paid upon shipment of materials and equipment against presentation of below given documents by Contractor; One (01) Original and four (04) manually signed copies of Contractors separate invoices specifying the amount to be paid through the Letter of Credit. One (01) original and four (04) photocopies (attested by the Contractor as true copies) of the certificate(s) of origin for the shipment in question. One (01) original and four (04) photocopies (attested by Contractor as true copies) of the relevant negotiable clean, onboard, shipped bills of lading or of negotiable, clean on-board Combined Transport Bills of Lading (to allow for feeder carriage by truck or rail) or airway bills, where relevant. One (01) original and one (01) photocopy (attested by the Contractor to be a true copy) of the Contractors packing list.

The documents will accompany a certificate of the Contractor stating that the shipment of materials and equipment items in question has passed applicable tests and is strictly in accordance with the requirements and specifications of the Contract.

FILE: 165-3-SPG-027, Rev.0

SHEET 23 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Ten percent (10%) of the L/C amount shall be paid on clearance of equipment and material items from Karachi Port accompanied with relevant documents and duly verified Contractors invoice. Ten percent (10%) of the L/C amount shall be paid upon delivery of materials and equipment items at Project Site against presentation of following documents by the Contractor: One (01) original and four (04) manually signed copies of the Contractors Invoice and OGDCLs certificate that the materials and equipment has been delivered at Project Site and duly inspected by OGDCL.

Five percent (05%) of the L/C amount shall be paid on submission of operating manuals by the Contractor accompanied with a invoice and Certificate of OGDCL receipt. Ten percent (10%) of the L/C amount shall be paid on issuance of Provisional Acceptance Certificate by OGDCL.

The payment shall be made after deducting ten (10) percent amount for adjustment on account of advance till the total amount of advance is recovered and ten (10) percent for retention money. The five percent (5%) of retention money shall be released by OGDCL to the Contractor within thirty (30) days of issuance of Provisional Acceptance Certificate by OGDCL. The remaining five percent (5%) of retention money shall be released within thirty (30) days of submission of Final Payment documents. In order to be entitled to payment for any particular milestone all previous milestones must have been achieved.

Local Currency Payments The payment for local supply of equipment & material shall be made by OGDCL to the Contractor as per following schedule: Fifteen percent (15%) shall be paid on placement of equipment & material order(s) by Contractor evidenced by unpriced copy of purchase order duly acknowledged by the Supplier and Contractors invoice duly verified by OGDCL. Forty five percent (45%) shall be paid on satisfactory shop inspection of equipment & material items by OGDCL/ Consultant and submission of Contractor invoice duly verified by OGDCL.

FILE: 165-3-SPG-027, Rev.0

SHEET 24 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Thirty percent (30%) shall be paid on delivery/Inspection of equipment & material at project site duly and submission of Acceptance Certificate by OGDCL and verified Contractors invoice. Ten percent (10%) shall be paid on issuance of Provisional Acceptance Certificate by OGDCL.

The payment shall be made after deducting ten (10) percent amount for adjustment on account of advance till the total amount of advance is recovered and ten (10) percent for retention money. The retention money shall be released by OGDCL to the Contractor within thirty (30) days of issuance of Provisional Acceptance Certificate by OGDCL. The remaining five percent (5%) of retention money shall be released within thirty (30) days of submission of Final Payment documents. The above payments shall be subject to deduction of withholding tax as per relevant laws/regulations. Services The local currency payments shall be made through account payee cheques issued in favor of the Contractor. For the foreign component of Services (if any) an irrevocable L/C shall be established by OGDCL as per requirements of Custom Authorities and other concerned government authorities as per format given in Annexure-B-2. Surveys & Soil Investigation

Forty percent (40%) shall be paid on submission of preliminary report on completion of field work and Contractors invoice duly verified by OGDCL. Sixty percent (60%) shall be paid on submission of surveys drawings & final soil investigation report and Contractors invoice duly verified by OGDCL.

Design Engineering Ninety Percent (90%) design engineering (including inspection) work price shall be paid in accordance with the valuation/completion of engineering work. The valuation shall be done on the basis of the documents received by OGDCL. For this purpose the Contractor within two (2) weeks of the Contract award shall submit a list of major engineering documents. Each document shall be assigned a weightage in proportion of its size and complexity. Documents / Drawings submitted by the Contractor but not yet approved by the Company / Consultant shall be considered 70% complete.

FILE: 165-3-SPG-027, Rev.0

SHEET 25 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Ten percent (10%) of engineering & project management work price shall be paid on Issuance of Provisional Acceptance Certificate The payment shall be made after deducting ten (10%) percent amount for adjustment on account of advance till the total amount of advance is recovered and ten (10) percent of the retention money. The retention money shall be released by OGDCL to the Contractor within thirty (30) days of issuance of Provisional Acceptance Certificate by OGDCL. The remaining five percent (5%) of retention money shall be released within thirty (30) days of submission of Final Payment documents. Works (Covering Construction, installation & erection) OGDCL shall make progressive payments to Contractor on monthly basis against Contractors invoices giving details of that specific work and its completion status. The payment shall be made considering the Bid Price Schedule and verified percentage completion of work. The measurement/verification mechanism for progressive payments of works shall be mutually agreed between Contractor and Company/Consultant. The progressive payment shall be made after deducting ten (10) percent amount for adjustment on account of advance till the total amount of advance is recovered and ten (10) percent for retention money. The retention money shall be released by OGDCL to the Contractor within thirty (30) days of issuance of Provisional Acceptance Certificate by OGDCL. The remaining five percent (5%) of retention money shall be released within thirty (30) days of submission of final payment documents. Start-up & Commissioning (including performance Testing) The start-up & commissioning charges shall be paid on successful commissioning & performance testing of the Plant by OGDCL and submission of Contractors invoice duly verified by OGDCL. The payment shall be made after deducting ten (10) percent amount for adjustment on account of advance till the total amount of advance is recovered and ten (10) percent for retention money. The retention money shall be released by OGDCL to the Contractor within thirty (30) days of submission of final payment documents. Invoicing Procedure For progress payment of engineering & project management, and work on a day in each month, to be agreed between the OGDCLs representative and the Contractors representative the Contractor shall in respect of all amount owing to him submit an invoice with relevant supporting documents, in three copies, to the OGDCLs Representative with a Work progress report for OGDCLs approval and signature. OGDCLs Representative shall authorize in writing payment to the Contractor as ascertained in accordance with the above clause.
FILE: 165-3-SPG-027, Rev.0 SHEET 26 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Timing for Payment The Payment of undisputed invoices shall be made in full not later than thirty (30) days after OGDCL has authorized such payment in writing, provided OGDCLs representative has first certified such invoice and Contractor has fulfilled all requirements for the release of payment, OGDCL shall pay the amount due less applicable taxes and any amounts which may be due to OGDCL. Deduction of Withholding Tax All payments made locally shall be subject to deduction of withholding tax as applicable. If the Contractor is entitled for any exemption from the withholding tax or a reduced rate of withholding tax, he shall obtain a certificate from the relevant tax authority in Pakistan and submit it to OGDCL. Disputed Invoices If any invoice or an amount of invoice is disputed, OGDCL shall within ten (10) days of receipt of invoice inform the Contractor the grounds on which payment of the invoice or an amount is disputed. Efforts shall be made by both parties to resolve the dispute within a period of thirty (30) days. 23.0 INSPECTION OF SITE 23.1 The Contractor shall also be deemed to have inspected and examined the Site and its surrounding areas and information available in connection therewith and to have satisfied himself, before submitting his Tender, as to the form and nature thereof, the extent and nature of work and materials necessary for the completion of the work, the means of access to the Site and in general, shall be deemed to have obtained all necessary information, subject as above mentioned, as to risks, contingencies and all other circumstances which may influence or affect his Tender. Any neglect or failure on the part of the Contractor in obtaining the necessary information mentioned in Sub-Article of this Article hereinabove or any other matter affecting the Contract, shall not relieve the Contractor from any risks or liabilities or from the responsibility for the completion of the Works in strict accordance with the Contract Documents. In no case will OGDCL/Consultant assume responsibility nor any liability of any kind what so ever for lack of any such information as is mentioned in Sub-Article of this hereof.

23.2

FILE: 165-3-SPG-027, Rev.0

SHEET 27 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

24.0

CONTRACTORS SUPERINTENDENCE 24.1 The Contractor shall give or provide all necessary superintendence during engineering, procurement, construction, pre-commissioning, commissioning, performance testing and startup works and as long thereafter as OGDCL may consider necessary for the proper fulfilling of the Contractors obligation under the Contract. The Contractor shall fully comply to Quality Assurance, Quality Control & Safety Procedures, stipulated in the Contract Document and Safety Policy/Procedures of OGDCL. The Contractor authorized representative, approved of in writing by OGDCL shall be constantly on the Project and shall give his whole time to the superintendence of the same. Such authorized representative shall receive on behalf of the Contractor, directions and instructions from OGDCL/Consultant.

24.2

24.3

24.4

25.0

TAXES 25.1 Any taxes, duties, fees, levies and other relevant charges, present or future, assessed or payable outside Pakistan by the Contractor and/or by the expatriate personnel deputed by Contractor in connection with the services performed under the contract shall be the exclusive responsibility of the Contractor. Any taxes, duties, fees, levies and other relevant charges, present or future, assessed or payable in Pakistan by the Contractor and/or by the expatriate personnel deputed by the Contractor in connection with the services performed under the contract shall be the exclusive responsibility of the Contractor. The Contractor shall be responsible and pay all taxes on its income outside and in particular on its income in Pakistan under the Contract and under the laws of Pakistan. OGDCL shall have the right, as provided under the laws of Pakistan to meet its obligations and in particular to deduct from the payment due to the Contractor, income tax at source at the rates prevailing from time to time, from the invoiced amounts, or such reduced rates fixed by the taxation authorities for the Contractor on production of documentary evidence by the Contractor and pay such amount to appropriate authorities. The Contractor shall also be responsible for any income taxes levied on the Contractors expatriate personnel, under the laws of Pakistan and for all social security issuances and other contributions for the Contractors expatriate personnel regardless of whether such contributions are levied on employer or employee or both in Pakistan.

25.2

25.3

25.4

25.5

FILE: 165-3-SPG-027, Rev.0

SHEET 28 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

25.6

The Contractor shall keep OGDCL duly informed about the steps taken by the Contractor in order to meet its obligations under the contract and provide the necessary documents to OGDCL in this connection. The Contractor shall indemnify OGDCL against any claim, which might occur due to non-compliance by the Contractor of any legal obligation regarding the taxes, duties, fees, levies, or other charges, including taxes on income in Pakistan and any other payments to the Government or Governmental agencies.

25.7

26.0

LIQUIDATED DAMAGES 26.1 Subject to clause 67 of conditions of contract, if the Contractor fails to deliver any or all of the goods within the time period(s) specified in the Contract, OGDCL shall, without prejudice to other remedies under the Contract, deduct from the Contract Price/Bank Guarantee as liquidated damages, a sum not more than 0.5% of the Contract price per week or part thereof for first four weeks, 1.00% per week for next four weeks and 1.5% per week exceeding four weeks up to maximum extent of 10% of the Contract value. In case OGDCL is satisfied that the delayed/defective shipment was due to some mistake or circumstances beyond the control of the Contractor and the Contractor has not intentionally or negligently contributed in the delay, OGDCL may impose Liquidated Damages for not more than a sum equivalent to 0.5% of the delayed or defective shipment per week or part thereof for first two weeks, 1.00 per week for next three weeks and 1.5% per week exceeding five weeks but not exceeding 10 % of the Contract Value of the remedial measures for the replacement of defective shipment and takes prompt steps to mitigate the delay. The purchaser may, however, impose Liquidated Damages as per Article 26.1 above if the delayed or defective shipment has affected the project completion schedule or has resulted in production losses. Even after imposition of LDs, if the Contractor fails to materialize the delivery (material and or services); the Purchaser reserves the right to cancel Contract/LC and to forfeit the Guarantee (if applicable) after intimating the Contractor for such cancellation/forfeiture.

26.2

26.3

27.0

CHANGE ORDERS 27.1 Subject to the provisions of Article 28.0 hereof OGDCL shall have the power to order the Contractor at any time when necessary, prior to the completion of the Project to make variations to the Work as outlined below: a) Require supply of additional equipment/material, items or carryout additional/extra work, which may be required for the Project. b) Change the character or quality or kind of equipment/material, item or Work, or c) Omit any equipment/material, item or work, or

FILE: 165-3-SPG-027, Rev.0

SHEET 29 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

No such variation shall in any way validate or invalidate the Contract but the value (if any) of all such variations shall be taken into account in ascertaining the amount of the Contract Price and shall be calculated and paid to or deducted from the Contractor as per the prices given in Price Schedule, Schedule of Prices/Rates for additional supply/work or on cost plus handling/services charges @ 10% of the value of item/work. 27.2 Any such request by OGDCL for variations, changes or additions to the Scope of Work shall be submitted to Contractor in writing, signed by OGDCLs Representative in the form of a written change request. 27.3 When Contractor has received any written change request from OGDCL, which may involve a change in the Contract Price, Contractor shall, as soon as possible and before proceeding with the changes, advise OGDCL in writing to that effect, and obtain OGDCL approval. The price and program effects, if any occasioned by any such changes, shall be added to or deducted from the Contract Compensation as the case may be. The amount of such difference shall be determined in accordance with the prices/rates given in Price Schedule, Schedule of Prices/Rates for additional supply/work or on cost plus handling/service charges @ 10%. In case of cost plus basis all the required details shall be provided to OGDCL/Consultant so that the price reasonableness can be determined. 27.4 In all cases Contractor shall furnish a breakdown in sufficient details to permit an analysis of all equipment/materials, labor, equipment, subcontracts and the estimated project time schedule overruns and under-runs covering all elements resulting in a change in the Contract Price or Project Execution Schedule. 27.5 Any changes or alterations ordered by OGDCL shall not in any way vitiate or invalidate the obligations of Contractor under the Contract, unless expressly stated in the Change Orders. 27.6 After OGDCL has accepted all the consequences resulting from a change request, a Change Order shall be signed by both OGDCL & Contractor. 27.7 Contractor shall make no additions, changes, alterations, omissions, perform no additional/extra work nor supply additional/extra equipment/materials of any kind, except when a prior approval of OGDCL in form of a Change Order has been obtained. 27.8 All additional payments for supply of equipment/material, required work or services under the provisions of this Article shall be embodied in a Change Order upon conditions specified therein which shall be signed by OGDCL and Contractor, and such Change Orders shall be deemed to form part of the Contract and subject to all terms and conditions therein, unless otherwise clearly exempted in Change Order.

FILE: 165-3-SPG-027, Rev.0

SHEET 30 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

27.9 Contractor shall proceed with additional/extra supply or work or changes after a Change Order has been signed. Until that time Contractor shall proceed with the original work unless instructed by OGDCL/ Consultant to stop such work, which may be affected by the change request. 27.10 Change requests may also be initiated by Contractor in which case it shall follow the same procedure as mentioned above after having been approved by OGDCL. 27.11 Notwithstanding the content of any Change Order by OGDCL the Contractor shall use his best endeavors to complete the Project by the Completion date provided that if the Contractor should by reason of such Change Order be unable to complete the Project by the Completion date he shall give notice in writing to OGDCL/Consultant. 28.0 CONTRACT AMENDMENTS Change Orders may be carried out by the Contractor without an amendment to the Contract provided that the cumulative value of all Change Orders made hereof do not exceed 10% of the Contract Price. Before any work shall be performed under a Change Order the effect of which is that the cumulative value of all Change Orders made hereof would exceed 10% of the Contract Price OGDCL and the Contractor shall sign an amendment to the Contract. Subsequently, if the value of change orders exceeds 10% of the contract price, OGDCL and the Contractor shall sign a further amendment to the Contract. 29.0 DISCLOSURE Contractor hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GOP) through any corrupt business practices. Without limiting the generality of the foregoing, Contractor represents and warrants that it has fully declared the brokerage, commission, fees etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification. bribe, finder's fee or kickback, whether described as consultation fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GOP, except that which has been expressly declared pursuant hereto. Contractor certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GOP and has not taken any action or will not take any action to circumvent the above declaration, representation or warranty.

FILE: 165-3-SPG-027, Rev.0

SHEET 31 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Contractor accepts full responsibility and strict liability for making any false declaration, not making full disclosure, misrepresenting facts or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right, interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other rights and remedies available to GOP under any law, contract or other instrument, be voidable at the option of GOP. Notwithstanding any rights and remedies exercised by GOP in this regard, Contractor agrees to indemnify GOP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GOP in an amount equivalent to ten times the sum of any commission, gratification, bribe, finder's fee or kickback given by Contractor as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GOP. 30.0 WORKS TO BE MEASURED OGDCL/Consultant shall, except as otherwise stated, ascertain and determine by measurement the value in terms of the Contract of work done in accordance with the Contract. He shall, when he requires any part or parts of the works to be measured, give notice to the Contractor's authorized agent or representative, who shall forthwith attend or send a qualified agent to assist OGDCL/ Consultant or their representatives in making such measurement, and shall furnish all particulars required by either of them. Should the Contractor not attend, or neglect or omit to send such agent, then the measurement made by OGDCL/ Consultant or approved by him shall be taken to be the correct measurement of the work. For the purpose of measuring such permanent work as is to be measured by records and drawings OGDCL/ Consultant or their representatives shall prepare records and drawings month by month of such work and the Contractor, as and when called upon to do so in writing, shall, within fourteen days, attend to examine and agree such records and drawings with OGDCL/Consultant or their representatives and shall sign the same when so agreed. 31.0 STORAGE AND HANDLING FACILITIES 31.1 The Contractor shall be responsible for handling and storage of all equipment and material at Project Site at his risk and cost. The Contractor shall also be responsible for maintaining a proper warehouse at Project Site by employing a storekeeper to keep upto date record of the equipment/material issued & consumed. The Contractor will have to submit a complete material balance/audit report after completion of the job. 31.2 The Contractor shall protect all equipment/materials against corrosion, mechanical damage or deterioration during storage and erection at the Site. The protection shall be to the approval of OGDCL/ Consultant. 31.3 Motors, valves, instruments, etc., shall be stored indoors in a Warehouse provided by Contractor. Motor windings shall be kept dry by either the use of external heat, or energizing of the strip heaters in the motors.
FILE: 165-3-SPG-027, Rev.0 SHEET 32 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

31.4 Bearings and other machined wearing surfaces of machinery shall be protected against corrosion, and shall be kept clean. 31.5 Structural steel, miscellaneous steel, grating walkways, plate-work, cable trays, etc., shall be kept painted throughout the storage and erection period to prohibit rusting unless such items are galvanized or have other corrosion proof finish. 31.6 Thermal insulation if used for the project shall be stored indoors, or otherwise protected against getting wet. 31.7 The Contractor shall always exercise due care and pre-caution and follow acceptable practices during loading/un-loading, handling, transportation/ shifting and installation of equipment and material. 32.0 UTILITIES FOR CONSTRUCTION The Utilities i.e. electric power, water, air etc. necessary for the entire construction/installation works will be arranged by the Contractor. All expenditure and costs thereof shall be to the Contractor's account. 33.0 PAYMENT OF FEES The Contractor shall obtain and pay for all permits, licenses or other privileges necessary in relation to the execution of the Work and abide by the rules and regulations of all public bodies and companies whose property or rights are affected or may be affected in any way by the Work. Certificates of which shall be delivered to OGDCL and will become the property of OGDCL. 34.0 WATCHING AND LIGHTING 34.1 The Contractor shall in connection with the Work provide and maintain at his own cost all lights, guards, fencing and watching when and where necessary or required by OGDCL/Consultant or their representatives, or by any duly constituted authority, for the protection of the temporary/permanent Work, or for the safety and convenience of others. The Contractor shall review with OGDCL/Consultant its programme for Project Site security and lighting for the Work. The standard of lighting shall conform to industrial lighting standard of Pakistan as prescribed by law to OGDCL's/Consultants review and approval of the Contractor's programme by OGDCL/Consultant will be for coordination purposes and does not relieve the Contractor of its responsibility for security and lighting.

34.2

FILE: 165-3-SPG-027, Rev.0

SHEET 33 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

35.0

CARE OF FINISHED WORKS 35.1 The Contractor shall at all times during the performance of the works be fully responsible for the care of the Work and of all Temporary Work. 35.2 The Contractor shall effectively protect his work from action of weather and from injury or defacement, and shall cover finished parts where required for their thorough protection. Finished work shall be left perfectly clean and free from defects. 35.3 The Contractor and/or his Sub-Contractors who are installing equipment, material, etc., shall be responsible for protecting work. Heavy planking shall be used when moving any cable and other buried structures. Metal rollers shall not be permitted. 35.4 In the event of Phased Completion, the Contractor shall be responsible for the due care of those parts of the works not completed and shall where required provide fencing, security, separate access, additional lighting, so that the parts of the works completed may be used for the purposes for which they were designed without inconvenience to that use and the performance of the remaining works may be completed without undue interference.

36.0

WITNESS TESTING & INSPECTION 36.1 At all stages of the Work, including, supply, construction and commissioning, the Contractor shall perform, any and all review, inspection and tests in accordance with the standard, regulations, the applicable laws and requirements specified in the Contract. The proof of these inspections & tests in the form of certificates shall be provided to OGDCL/Consultant. OGDCL/ Consultant shall be entitled to witness, collect evidence and report with respect to all and any such review, inspection and tests. The arrangement & costs of all such review, inspections and test, including those performed in any offices, workshops facility and worksites shall be borne by the Contractor and are included in the Contract price. OGDCL/ Consultant will participate in test conducted at Contractors works. For test and inspection conducted in the premises of the Contractors works all reasonable facilities and assistance (including access to drawings and production data apart from workshop drawings and data and according to VDL (Vendor Drawing List) to be mutually agreed upon production data) shall be furnished to the inspectors at no charge to OGDCL. The participation/presence for acceptance of such test by OGDCL/Consultant shall not relieve the Contractor from its obligations liabilities under the Contract. Should any inspected or tested equipment, material fails to conform to the Specifications, the OGDCL/Consultant may reject them and the Supplier shall at its discretion, following best industrial practices, either replace the rejected equipment/material and installation work or make all alterations necessary to meet specification requirements free of cost to OGDCL.

36.2

36.3

FILE: 165-3-SPG-027, Rev.0

SHEET 34 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

36.4

The OGDCL shall be informed two (02) weeks in advance regarding the test date. If any acceptance test or acceptance procedure (if applicable) cannot take place due to reasons beyond Contractors control and attributable to the OGDCL, then such acceptance test/procedure shall be performed in the absence of OGDCLs representative not later than ten days from the date of notification of Supplier of its readiness for such tests or acceptance procedures. If the results are within the specification, the test shall be deemed to have been successfully performed. Nothing in Clause 36.0 shall in any way release the Contractor from any warranty, obligations or liabilities under this contract. The Contractor shall arrange to carryout a pre-shipment inspection of the supplies through a renowned third party inspection agency. The scope of the pre-shipment inspection shall include: Review the complete list of equipment, spare parts, commissioning and startup spares, systems/ auxiliaries etc. being supplied and compare it with the relevant purchase document. Presence of all items shall be verified. Dimensional Inspection. Review the available inspection and testing reports. Verification of name plate sizing rating model numbers, port numbers, tag numbers. Packing and marking check. Check that all manuals, instructions, guidelines and procedures are included. Verification of number of packing cases and marking against contractual specifications. Checking for appropriate handling during loading. Checking the stowing, fastening and wedging on the means of transport. Compilation & submission of Pre-Shipment inspection report to OGDCL

36.5

36.6

37.0

EXAMINATION OF WORK BEFORE COVERING-UP No work shall be covered-up or put out of view without the approval of OGDCL/Consultant or their representatives and the Contractor shall afford full opportunity for OGDCLs/ Consultants representative to examine and measure any work which is about to be covered-up or put out of view. The Contractor shall give due notice to OGDCLs/Consultants representative whenever any such work is or are ready or about to be ready for examination and OGDCLs/Consultants representative shall, without unreasonable delay, unless he considers it unnecessary and advises the Contractor accordingly, attend for the purpose of examining and measuring such work or of examining such work.

FILE: 165-3-SPG-027, Rev.0

SHEET 35 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

38.0

WORK AT SITE 38.1 The Contractor shall submit to OGDCL/ Consultant in due time for approval and discussion his proposals and plans as to the method and procedure to be adopted for the installation of the equipment and particulars of constructional equipment and temporary works involved. The submitting of these suggestions and arrangements, and the approval thereof by OGDCL/ Consultant or his Representatives shall not relieve the Contractor of his responsibilities and duties under the Contract. The Contractor's representative on the site or his nominated deputy is to be given full responsibility to enter into negotiations regarding points arising from erection. The carrying out of all work included in the Contract is to be supervised by a sufficient number of qualified representatives of the Contractor and full facilities and assistance are to be afforded by the Contractor for the Consultant or his representative to check the execution of the Work. OGDCL/ Consultant reserves the right to inspect all parts of equipment in the works and/or site, but may at his discretion waive inspection on certain items, but he shall, in no way, absolve the Contractor from his responsibilities. This particularly applies to the checking of materials, the accurate setting out of foundations, the plumbing of all stanchions and columns and to the leveling, setting and aligning of the various parts, and to the fitting and adjusting of bearings and other parts. The Contractor may be required to work on weekly & gazetted holidays without any extra compensation. The Contractor may also be required to work on overtime or in two shifts depending on the workload without any extra compensation or obligation to OGDCL. No claim by the Contractor in terms of extra cost or compensation would been entertained due to temporary stoppages in the flow of work and subsequent idle labor & machine hours caused by observance of safety & security regulations. In the event of night working, the Contractor shall provide sufficient lighting and shall supply the necessary labor for the continuation of the work after normal hours. The Contractor, witnessed by OGDCL/ Consultant or its representative, shall check the civil works and the electrical, instrument and mechanical connections to all equipment before such equipment is brought in to commission and shall be responsible for the correctness of such connections in accordance with Consultant's drawings and the Specifications.

38.2

38.3

38.4

38.5

38.6

38.7

38.8

38.9

FILE: 165-3-SPG-027, Rev.0

SHEET 36 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

39.0

QUALITY OF MATERIALS & WORKMANSHIP AND TESTS 39.1 All equipment/materials and workmanship shall be of the respective kinds described in the Contract and in accordance with OGDCLs/ Consultant's instructions and shall be subject from time to time to such tests as OGDCL/Consultant may direct at the place of manufacture or fabrication, or at Project Site or at such other place or places as may be specified in the Contract, or at all or any of such places. The Contractor shall provide inspection and testing equipment, instruments, machines, labor and material as are normally required for examining, measuring and testing any works and for execution of various quality control tasks, mechanical, destructive, non-destructive tests, etc., as may be required by OGDCL/Consultant. The quality control tasks shall be performed by the Contractor's competent personnel in accordance with a site testing and quality control programme to be established by the Contractor and approved by OGDCL/Consultant or their representatives. The Contractor shall keep a complete record of all quality tests performed on site. Hydrostatic tests on site shall generally be carried out on all the pipelines, piping & equipment. All quality controls and tests shall be carried out in accordance with applicable industrys standards and codes. The Contractor shall carry out all necessary surveying work to ensure that the position and elevation of all works erected or constructed by him are correct. The measuring methods and devices used must meet the standard of accuracy required for this purpose. All the surveying work must be based on a geodetic grid established with adequate accuracy with levels and positions continuously checked and supplemented. The cost of all tests provided in the Contract shall be borne by the Contractor.

39.2

39.3 39.4

39.5

39.6

39.7 40.0

WARRANTIES 40.1 The Contractor warrants that the equipment supplied under the Contract shall be brand new, having good title and fit for the use intended. The Contractor further warrants that: a) Equipment & materials supplied against the Contract conforms in all respects with the specifications and requirements contained in contract document. Equipment supplied under this Contract shall be of good quality and free from all defects arising from design, materials or workmanship.

b)

FILE: 165-3-SPG-027, Rev.0

SHEET 37 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

40.2

The Contractor shall provide to OGDCL required process guarantees/warranties (i.e. original Contractors warranty) of the equipment supplied by it from vendors and Contractors. The guarantees/warranties shall be obtained in the name of OGDCL. The Contractor warrants that the construction/installation, erection and other work shall be good quality, free from fault or defect and shall perform so as to comply with the specifications contained in the contract documents or with any revisions thereof pursuant to any changes. The Contractor further warrants that all work performed under the Contract shall be in accordance with industrys recognized codes and standards. The foregoing warranties shall remain valid for a period of twelve (12) months from the date of Provisional Acceptance Certificate. If the supplied equipment/materials, construction, installation/erection and related work fail to meet the warranty conditions set forth in Sub-Articles 40.1 & 40.3 OGDCL shall promptly notify the Contractor in writing about the defects and claims under the warranty. Upon receipt of such notice the Contractor shall within the time specified by OGDCL repair/replace the defective equipment, material and or portion of works, with no cost or expense to OGDCL. The repaired or replaced equipment, material or works shall be warranted by Contractor for twelve (12) months from the date of repair(s) or replacement(s). If the Contractor having been notified, fails to remedy the defect(s) within the specified time, OGDCL shall proceed to take remedial actions as may be necessary, at the Contractors risk and cost. All costs thereof shall be charged to the Contractor or recovered from performance bond. The Contractor shall have no objection to the above and he hereby acknowledges the rights of OGDCL to recover such sums as a debt due to OGDCL from defaulting Contractor. It is understood that in this case the Contractor shall not be relieved from the provided warranties and contractual obligations.

40.3

40.4

40.5

40.6

The Supplier shall also provide warranties of original Contractors where applicable.

41.0

PERFORMANCE GUARANTEE 41.1 The Contractor shall guarantee satisfactory performance of the Plant as defined in the performance guarantee requirements given in Annexure-D. The Contractor shall also provide and prove during commissioning the performance parameters of all major equipment of the Plant. Prior to Performance Test the Contractor will have to operate the Plant for continuous seven (7) days in a steady state. The Plant shall be evaluated over a seventy two (72) hours continuous Acceptance Test over which the process conditions and products specs shall be required to be met.

41.2

FILE: 165-3-SPG-027, Rev.0

SHEET 38 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

41.3

If the Plant does not achieve satisfactory performance or otherwise adhere to the requirements outlined in the Contract, the Contractor shall promptly analyze the cause(s) of failure. The Contractor shall take all necessary corrective measures in a prompt manner to ensure such that the Plant gives satisfactory performance. If the Plant still fails to give satisfactory performance or otherwise adhere to the requirements outlined in the Contract in a subsequent Performance Test the date of which will be mutually agreed then Contractor shall determine the cause of this failure and advise changes/modifications or additions. OGDCL can also independently determine the cause of such failure. The Contractor shall be liable to bear all expenses of the design, purchase, delivery and installation of such changes, modifications or additions. The liability of such addition, modifications shall be unlimited. If after all such additions/modifications the Plant still fails to meet performance in a final test to be demonstrated within three (3) months of the agreement to changes to be made to the Plant, the Contractor shall pay to OGDCL as liquidated damages an amount equal to ten percent (10%) of the Contract Value. In the event of malfunction or failure of the Plant to meet the performance test, the Performance Guarantee shall be further extended for a period of _____ months.

41.4

41.5

41.6

42.0

DELAYS IN THE CONTRACTORS PERFORMANCE 42.1 Completion of required construction, installation, pre-commissioning, commissioning, performance testing shall be made by the Contractor in accordance with the stipulated completion time specified in the Contract. An unexcused delay by the Contractor in performance of the Contract including delivery of equipment/material being supplied and timely completion of the Project shall render the Contractor liable to any or all of the following sanctions: Forfeiture of its performance bond (bank guarantee) Imposition of liquidated damages Termination of contract for default Any other remedies available and action to be taken by OGDCL as per the terms of this Contract and applicable law.

42.2

43.0

DEFAULT OF CONTRACTOR IN COMPLIANCE In case of default on the part of the Contractor in carrying out such order, OGDCL shall be entitled to employ and pay other persons to carry out the same and all expenses consequent thereon or incidental thereto shall be recoverable from the Contractor by OGDCL, or may be deducted by OGDCL from any monies due or which may become due to the Contractor.

FILE: 165-3-SPG-027, Rev.0

SHEET 39 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

44.0

DAMAGE TO PERSONS AND PROPERTY The Contractor shall, indemnify OGDCL against all losses and claims in respect of injuries or damage to any person or material or physical damage to any property whatsoever which may arise out of or in consequence of the execution of the Work under the Contract and against all claims, proceedings, damages, costs, charges and expenses whatsoever in respect of or in relation thereto. The Contractor shall indemnify OGDCL against all losses, claims and demand made by any third party/persons arising out in performance of its obligations under this Contract whether such claims, demands and actions are made while this Contract is in force or at any time after its execution or termination. The Contractor shall be responsible for similar indemnify for any sub contractors performing work under this directions.

45.0

ACCIDENT OR INJURY TO WORKMEN The Contractor shall indemnify and nor OGDCL shall be liable for or in respect of any damages or compensation payable at law in respect or in consequence of any accident or injury to any workman or other person in the employment of the Contractor or any SubContractor. The Contractor shall indemnify and keep indemnified OGDCL against all such damages and compensation, and against all claims, proceedings, costs, charges and expenses whatsoever in respect thereof or in relation thereto.

46.0

INSURANCE & LIABILITIES 46.1 The Contractor shall procure following insurance policies: Construction All Risk Physical Damage Policy Third Part Liability Policy, AND Workmen Compensation Policy

Such insurances shall be evidenced by standard insurance policies in form and substance satisfactory to OGDCL and shall be issued by such insurance companies in respect of which consent of OGDCL has been obtained. A copy of each of the policies will be endorsed to OGDCL by the insurer. Each policy shall name OGDCL as the insured. The Contractor shall cause all such insurances to be maintained in full force and effect till commissioning and handover of the Project to OGDCL. 46.1.1 Construction All Risk Policy The Contractor shall procure and maintain a construction (erection) all risk policy including sabotage and terrorism for sum assured value of not less than contract value. The policy will cover all physical loss or damage caused or done to permanent and temporary works completed or in progress, construction, commissioning and performance testing phases of work with extended coverage for equipment/material stored at the Site and OGDCLs existing facilities (if any).
FILE: 165-3-SPG-027, Rev.0 SHEET 40 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

46.1.2 Third Party Liability Policy The Contractor shall procure and maintain Third Party Liability Insurance for sum insured to cover any claim(s) arisen on account of death, injury and /or disease to persons (other than employees of the Contractor), or loss or damage to any other party/ property out of/ in connection with/in the course of performance of the Contract. 46.1.3 Workmen Compensation Policy The Contractor for itself and for its Sub-Contractors shall obtain insurance covering damages or compensation payable in respect of, or in consequence of any accident or injury resulting to any workman, or any other person, in the employment of the Contractor or any of its SubContractors, with an insurer approved, by OGDCL. 47.0 ENGAGEMENT OF LABOR The Contractor shall make his own arrangements for the engagement of all labor, transport, meals, etc., and payment thereof. 48.0 FESTIVALS & RELIGIOUS CUSTOMS The Contractor shall in all dealings with labor in his employment have due regard to all recognized festivals, days of rest and religious or other customs. 49.0 DISORDERLY CONDUCT, ETC. The Contractor shall at all times take all reasonable precautions to prevent any unlawful, riotous or disorderly conduct by or amongst his employees and for the preservation of peace and protection of persons and property in the neighborhood of the Work against the same. 50.0 SPARE PARTS The Contractor shall propose in the Bid recommended list of spare parts along with Contractors address required during two years of operation for the equipment/material supplied by it. The Contractor should ensure an arrangement whereby the spare parts inventory/backup facilities for the equipment is maintained for minimum period of five (5) years. In the event of termination of production of spare parts an advance notification should be given to OGDCL giving sufficient time enabling it to procure the required spare parts and following such termination, furnishing at no cost to OGDCL, the blue prints, drawings and specifications of the spare parts.

FILE: 165-3-SPG-027, Rev.0

SHEET 41 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

51.0

CONTRACTOR TO KEEP SITE CLEAR During the progress of the Work the Contractor shall keep the Site reasonably free from all unnecessary obstruction and shall store or dispose of any Constructional Material and other materials and clear away and remove from the Site any wreckage, rubbish or Temporary Work no longer required.

52.0

REMOVAL OF IMPROPER WORK & MATERIALS OGDCL/Consultant shall during the progress of the Work have power to order in writing from time to time: a) the removal from the Project Site, within such time or times as may be specified in the order, of any materials which, in the opinion of OGDCL/Consultant, are not in accordance with the Contract the substitution of proper and suitable materials and the removal and proper re-execution of any work which in respect of materials or workmanship is not, in the opinion of OGDCL/Consultant, in accordance with the Contract.

b) c)

53.0

REMOVAL OF CONSTRUCTIONAL EQUIPMENT, ETC. Upon completion of the Works the Contractor shall remove from the Site all the said Constructional Plant and Temporary Work remaining thereon and any unused materials provided by the Contractor. OGDCL shall not at any time liable for the loss or damage to any of the said construction plant and temporary works or materials.

54.0

CLEARANCE OF SITE ON COMPLETION On the completion of the Project the Contractor shall clear away and remove from the Site all Constructional Plant, surplus materials, rubbish and Temporary Work of every kind, and leave the whole of the Site and Work clean and in a workmen like condition at its own cost.

55.0

MECHANICAL COMPLETION, INSPECTION & TESTING 55.1 All equipment and material installed under this Contract shall be subject to test or inspection in accordance with relevant clauses of the Specifications. For the vendor supplied equipment required arrangements for checking, testing and commissioning will be made by the Contractor. After completion/ installation of, and before being put into operation the flow lines and the equipment shall be thoroughly cleaned and then inspected under the supervision of OGDCL/Consultant for correctness and completeness of installation and acceptability for placing in operation.

55.2

FILE: 165-3-SPG-027, Rev.0

SHEET 42 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

55.3

The time consumed in the inspection and checking of the units shall be considered as a part of the erection and installation period. The Contractor shall arrange for necessary inspection and testing of the works performed by the Contractor upon its installation thereof in accordance with the Tender Documents. The Contractor shall maintain adequate record of all tests carried out and their results thereof and make the same available to OGDCL/Consultant. The Contractor shall remedy promptly any defects or deficiencies, which appear as a result of such inspection and tests, on his supply and workmanship entirely at his own cost and responsibility. Contractor shall prepare the piping and allied facilities for operation which will include but not limited to the following tests: Cleaning of all lines and equipment of loose material by flushing or blowing and performing any other cleaning as may be required. Clean-out and boxing-up of all pressure vessels including installation of internals such as filter elements, etc. Hydrostatic, pneumatic and other field testing (weld radiography, coat and wrap, quality, etc.) of the pipelines and equipment as required. Alignment, lubrication and running tests of pumps/drives and operational tests of all types of valves.

55.4

55.5

55.6

56.0

MECHANICAL ACCEPTANCE 56.1 The Contractor shall prepare project for operation, which will include but not be limited to the following: a) Hydrostatic, testing of piping, equipment, etc. as required in the Contract Documents. Running tests of drivers, compressors, pumps and operational tests of all types of valves, etc.. Circulation of lubricating and seal oil in compressors. Radiography of all piping. Stress relieving of all piping where applicable/required as per API Code. Short duration operations with air on all compressors in accordance with Vendor's instructions.

b)

c) d) e) f)

FILE: 165-3-SPG-027, Rev.0

SHEET 43 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

g) h)

Pump operation with water circulation. After hot operation, rechecking the alignment and, if necessary, re-aligning all rotaries (with drivers) and hot checking the drivers related to pumps and compressors. Cleaning all lines of loose materials by flushing or blowing and performance of any other special cleaning as may be required in these specifications. Placement of all blinds in position for operation. Installation of orifice plates after hydrostatic tests. Installation of relief valves Thermo-couple connection and checking out. Cleaning out and boxing-up of all exchangers and pressure vessels. Preparation to meet safety requirements.

i)

j) k) l) m) n) o) 56.2

The Contractor shall also be required to complete and thoroughly clean-up the operating facilities which shall include all painting, removal of all temporary works and general site clean-up in accordance with the Contract. Pursuant to the mechanical completion of the work, the Contractor shall, in the presence of OGDCLs/Consultants representatives, provide services to successfully complete the operability tests to establish that the facilities are in proper operating conditions and free from leaks, defects and deficiencies. Prior to introduction of First Gas into the system the Contractor shall carry out a leak test, at a pressure to be specified by OGDCL. This test shall ensure mechanical integrity of the newly constructed facility. It shall be responsibility of OGDCL to provide nitrogen for leak testing. The Contractor shall provide other necessary tools, equipments and manpower, necessary for such testing. After the test, nitrogen shall be left in the system, at a pressure slightly higher than the atmosphere until the gas is introduced.

56.3

56.4

57.0

COMMISSIONING The Contractor shall be responsible for carrying out commissioning and testing of work.

FILE: 165-3-SPG-027, Rev.0

SHEET 44 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

58.0

ACCEPTANCE CERTIFICATES 58.1 Mechanical Acceptance Certificate When whole of the work have been completed mechanically & have satisfactorily passed the mechanical completion, inspection & testing and mechanical acceptance as that prescribed in relevant of the conditions of the contract, the Contractor may request OGDCL to issue mechanical acceptance certificate. The format of Mechanical Acceptance Certificate is enclosed in Attachment-I. 58.2 Provisional Acceptance Certificate When all the equipment have been commissioned and construction equipment have been removed as per Article of the Conditions of Contract and performance test have been performed successfully, the Contractor may request OGDCL to issue Provisional Acceptance Certificate. The format of Provisional Acceptance Certificate is enclosed in Attachment-II. 58.3 Final Acceptance Certificate When the facilities have remained in operation for twelve (12) months from the date of Provisional Acceptance Certificate the Contractor may request OGDCL to issue Final Acceptance Certificate. The format of Final Acceptance Certificate is enclosed in Attachment-III.

59.0

COMPLIANCE & COMPLETION CERTIFICATES The Project/Contract shall not be considered as completed until final acceptance certificate, compliance and completion certificate has been issued by OGDCL to the Contractor Attachment-IV & V.

60.0

TITLE Title of equipment and facilities furnished by Contractor or its Sub-Contractors under the Contract shall pass to OGDCL on the date the project is completed.

61.0

WITHHOLDING PAYMENT 61.1 OGDCL may withhold the whole or part of any payment claimed by the Contractor, which in the opinion of OGDCL is necessary to protect himself from loss on account of: 1. 2. 3. 4. 5. 6. Defective equipment and material not replaced/repaired or remedied. Warranties/Guarantees not met. Claims filed against Contractor. Failure of Contractor to make payments due for materials or labour employed by him. Damages to other Contractor (if any). Contractor's non-compliance with the provisions of the Contract.
SHEET 45 OF 50

FILE: 165-3-SPG-027, Rev.0

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

61.2

When the conditions for withholding the payment are removed, payments of the amount due to the Contractor will be made by OGDCL without delay.

62.0

FINAL PAYMENT DOCUMENTS The Contractor shall execute and deliver to OGDCL the following documents before receiving payment of retention money:
a) b) c) d)

Final acceptance Certificate Certificate of Completion Certificate of Compliance Undertaking

Blank Forms of these are given in Attachment-III, IV, V and VI respectively. 63.0 LIENS The Contractor for himself and for any persons directly or indirectly responsible to him, and for his or their material equipment and employees, and for all other persons performing any labor or furnishing any labor or materials for any of the work covered by his contracts, will be required to release or waive, to the full extent permitted by law, all liens, for or on account of the work done or equipment and materials furnished hereunder, and the improvement or structures wherein some may be incorporated, and the land to which they are appurtenant shall at all times and clear of all such liens. 64.0 SUSPENSION OF WORK 64.1 The Contractor shall, on the written order of OGDCL, suspend the progress of the engineering, procurement (supply), construction and commissioning works or any part thereof for such time or times and in such manner as OGDCL may consider necessary and shall during such suspension properly protect and secure the Works, so far as is necessary in the opinion of OGDCL. The Contractor shall not be entitled for any extra cost for such suspension upto a maximum period of forty five (45) days. This period may be in one or more suspensions. In case the suspension period exceeds forty five (45) days, then the Contractor may claim, if he gives notice in writing of his intention to OGDCL within seven (7) days of expiry of forty five (45) days suspension period. The Contractor can claim the cost of his permanent employees and hired equipment only employed on the Project. Charges for daily paid workers and Contractors own equipment will not be paid. OGDCL will verify the claims for payments to be made to the Contractor in this respect.

64.2

64.3

FILE: 165-3-SPG-027, Rev.0

SHEET 46 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

65.0

TERMINATION OF DEFAULT 65.1 OGDCL shall have the right to terminate the Contract if the Contractor. a) b) c) Does not mobilize and/or commence execution of the Contract/Order within the agreed date(s). Stops work during the execution of the Contract/Order. Fails to supply sufficient and/or adequate construction equipment, temporary works, labor, materials or satisfactory performance and delays in the progress of work. Becomes bankrupt or insolvent. Has judiciary liquidation filled by/or against him, and the Contractor does not have the right to continue his industrial activities. Fails to fulfill any of his obligations as defined in the Contract Documents.

d) e) f) 65.2

OGDCL shall have the right to notify deadline to be met by the Contractor. Should the Contractor not reply within 7 days to the above notification, or in case that the reply is not found satisfactory, OGDCL would be entitled to terminate this Contract. OGDCL shall then give notice of termination, and thereupon, OGDCL shall have the right to take over the performance of the Works, take possession of the engineering drawings and data and all materials and stocks located at the Site, and to complete the Works in any manner OGDCL deems fit, and to use of cause to be used for that purpose the temporary works and equipment of Contractor located at the Project Site. In the event of such termination, after all works, services, deliveries, etc., effected by Contractor under this Contract have been stated and recorded, OGDCL will been titled to withhold any further payments due to Contractor under this Contract. At the time of termination, OGDCL and Contractor shall determine by mutual agreement the amount, if any, of damages suffered by OGDCL, and the amount to which Contractor is entitled for his performance of the work upto the date of such termination. Termination of the Contract shall not relieve Contractor of any of its obligations to make repairs and replacements with respect to any workmanship, material, equipment, part or item incorporated in the Works prior to such termination, nor shall termination relieve Contractor of any its obligations under any other provision of the Contract with respect to the Works performed by Contractor prior to such termination. The defaulting Contractor shall also be liable for all costs and expenses incurred, including those of cleaning the site and removal of Contractor's equipment and material if required by OGDCL, because of the default and, the Contractor shall fully indemnify OGDCL.

65.3

65.4

65.5

FILE: 165-3-SPG-027, Rev.0

SHEET 47 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

66.0

TERMINATION FOR CONVENIENCE 66.1 OGDCL may, by written notice to the Contractor, terminate the Contract, in whole or in part, at any time at its convenience. The action of termination shall specify that the termination is for the convenience of OGDCL, the extent to which performance of Works under the Contract is terminated, and the date upon which such termination becomes effective. The Works and equipment/material that are complete and ready for delivery within 15days after receipt of notice of termination by the Contractor, shall be accepted by OGDCL, at the Contract terms and prices. For the remaining works/equipment & material OGDCL may elect: i) to have any portion completed or delivered at the Contract terms and prices and/or

66.2

ii) to cancel the remainder and pay to the Contractor an agreed amount for partially completed works and for materials previously procured by the Contractor, which will become property of OGDCL. 67.0 FORCE MAJEURE 67.1 In the event of either party hereto being rendered unable, wholly or in part, by Force Majeure Circumstances to carry out its obligations under the Contract Documents, then on such party giving notice and full particulars and other satisfactory evidence of such Force Majeure circumstance(s) relied upon the obligations of the party giving such notice so far as they are affected by such Force Majeure shall be suspended for the period during which the party, is rendered unable as aforesaid, but for no longer period, and such cause(s) shall, as far as possible, be remedied and obviated with all reasonable dispatch. The term `Force Majeure as employed therein, shall mean Acts of God or public enemy, civil insurrection, fires, floods earthquakes or other physical disasters, order or request of Government, blockade or embargo, acts of terrorism and mobs attacks etc. It is, however, clarified that strikes, lockouts, shortage or non availability of raw materials, rains disturbances, other labour disputes or congestion ports on the Contractors side shall not be included in the term `Force Majeure. During the period of established Force Majeure as contained herein above, neither Contractors would be entitled for payment nor OGDCL/ Consultant would impose penalty as required under this Contract. In case the Force Majeure contingencies last continuously for more than fifteen days, both parties will agree on the necessary arrangements for the further implementation of the Contract. In case further implementation is unforeseeable and impossible, both parties shall arrange for the termination of the Contract, but without prejudice to their rights and obligations prior to such termination it being understood that each party shall fulfill their contractual obligations so far as they have fallen due before the operation of Force Majeure. In case of Force Majeure no idle time claim will be paid by OGDCL to the Contractor for what so ever reason.
SHEET 48 OF 50

67.2

67.3

FILE: 165-3-SPG-027, Rev.0

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

68.0

ARBITRATION 68.1 If any dispute or difference of any kind whatsoever shall arise between OGDCL and the Contractor in connection with, or arising out of the Contract, or the execution of the works, whether during the progress of the works or after their completion and whether before or after the termination, abandonment or breach of the Contract, it shall, in the first place, be referred to and settled by OGDCL who shall, give written notice of his decision to the Contractor. Subject to arbitration, as hereinafter provided, such decision in respect of every matter so referred shall be final and binding upon the Contractor and shall forthwith be given effect to by the Contractor, who shall proceed with the execution of the Works with all due diligence whether he requires arbitration, as hereinafter provided, or not. If OGDCL has given written notice of his decision to the Contractor and no claim to arbitration has been communicated to him by the Contractor within a period of thirty days from receipt of such notice, the said decision shall remain final and binding upon the Contractor. If OGDCL fails to give notice of his decision, as aforesaid, within a period of thirty days after being requested as aforesaid, or if the Contractor be dissatisfied with any such decision, then and in any such case or within thirty days after the expiration of the first-named period of thirty days, as the case may be require that the matter or matters in dispute be referred to arbitration as hereinafter provided. All disputes or differences in respect of which the decision, if any, of OGDCL has not become final and binding as aforesaid shall be finally referred to two Arbitrators, one to be appointed by each party or in the event of the Arbitrators not agreeing to an umpire to be appointed by Arbitrators before entering upon the reference, who shall proceed to arbitrate in accordance with the provisions of the Pakistan Arbitration Act1940 and rules hereunder any statutory amendment in that behalf for the time being in force and the award made by the Arbitrators or the umpire as the case be, shall be final and binding on both the parties Arbitration proceeding shall be conducted in the English Language. Contractor shall continue to execute his work with full speed during the pending of the Arbitration proceedings. However, OGDCL shall have the power to order the Contractor in writing to stop the work in full or in part if considered necessary.

68.2

68.3

69.0

JURISDICTION The venue of Arbitration proceedings shall be Islamabad, Arbitration shall be governed under Arbitration Act. 1940. Expenses of Arbitration shall be borne equally by the parties. The Agreement and any interpretation and construction thereof including Arbitration proceedings shall be subject to and governed by the laws of Pakistan.

FILE: 165-3-SPG-027, Rev.0

SHEET 49 OF 50

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

70.0

SERVICE OF NOTICES TO CONTRACTOR All certificates, notices or written orders to be given by OGDCL or by Consultant to the Contractor under the terms of the Contract shall be served by sending by post to or delivering the same to the Contractor's principal place of business, or such other address as the Contractor shall nominate for this purpose. The Address and contact details of Contractor are; ____________________ ____________________

71.0

SERVICE OF NOTICES TO OGDCL/CONSULTANT All notices to be given to OGDCL or to the Consultant under the terms of the Contract shall be served by sending by post or delivering the same to the respective addresses nominated for that purpose. The Address and contact details of OGDCL are; ____________________ ____________________

72.0

EFFECTIVE DATE OF CONTRACT 72.1 This Contract shall become effective upon the date after formal execution of the Contract by the duly authorized representatives of OGDCL and Contractor provided that all of the following conditions have been fulfilled: a) b) The submission of the Performance Bond by the Contractor to OGDCL. The payment of the Mobilization Advance by OGDCL to Contractor, the same to be secured by the Mobilization Advance Payment Guarantee(s) to be simultaneously furnished by Contractor to OGDCL pursuant to Article 22.1 of Conditions of Contract. The confirmation, by Contractor to OGDCL, in form and substance satisfactory to OGDCL, that Contractor has put into force and effect such of the policies of insurance specified in Article 46.0 of Conditions of Contract.

c)

73.0

APPLICABLE LAW 73.1 73.2 This Contract or any amendment thereto shall be construed, interpreted and governed by the Laws of Islamic Republic of Pakistan. Applicable laws mean all laws, treaties, regulations, standards, decrees, rules, decisions, judgments, order, injunction, authorizations, directives, permits, licenses or authorizations applicable to the performance of the Works in accordance with the Contract and issued by or adopted by an Governmental Authority having jurisdiction over the matter in question and which are in effect at the time in question and, for the avoidance of doubt, includes compliance with the requirements of the Environmental Impact Assessment, environmental laws, regulations, codes, standards etc and policies of the Federal Government, Provincial Governments and Local Bodies of Pakistan.
SHEET 50 OF 50

FILE: 165-3-SPG-027, Rev.0

ANNEXURE A FIXED LUMPSUM PRICE SUMMARY

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Annexure-A

NASHPA GAS PROCESSING, LPG RECOVERY PLANT & ALLIED FACILITIES FIXED LUMP SUM PRICE SUMMARY
SUPPLY In Foreign Equivalent Currency In Pak Rs. (US$) or Other (*) Currency In Local Currency (Pak Rs.) In Foreign Currency (US$) or Other Currency SERVICES Equivalent In Pak Rs. (*) In Local Total Currency Services (Pak Rs.) (in Pak Rs.) TOTAL (in Pak Rs.)

S. No.

DESCRIPTION

Total Supply (in Pak Rs.)

Supply of Equipment, bulk material items & consumables

Surveys & Soil Investigation

3 4 5 6

Design Engineering Works (including construction, installation/erection) Startup & Commissioning (including Performance Testing) Pre-Shipment Inspection (1) Startup & Commissioning Spares (Unit / System Wise List with item-wise prices to be attached ) Supply of two (02) years Recommended Spare Parts (Unit / System Wise List with item-wise prices to be attached ) Expenses on Design Review and HAZOP meetings, FATs etc. for OGDCL/Consultant's Representatives Expenses for Witness Testing & FATs Training to OGDCL Staff at Site for two (02) weeks Supply of Operational Consumables (Details with item-wise prices to be attached) Ocean freight & Insurance on Imported equipment and material Importation expenses (i.e. clearing & forwarding etc) Custom Duties & Taxes levied on imported equipment and material to be incorporated in the Project as per SRO 678(1)/2007 (2). Inland transportation and insurance expenses

10 11

12

13 14 15 16

TOTAL (1 TO 16)
(*) Equivalent Pak Rs. based upon Pak Rs./US$ or other currency exchange rate of Rs. _______ (1) The charges shall be supported by verified quotation of Inspection Agency. (2) Copy of the SRO 678(1)/2007 is given in Annexure-A-Attachment-6.

FILE: Annexure-A

SHEET 1 OF 1

ANNEXURE A ATTACHMENT - 1
PRICE BREAKDOWN FOR NASHPA GAS PROCESSING & LPG RECOVERY PLANT SYSTEM COSTS

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Attachment-1 of Annexure-A
PRICE BREAKDOWN FOR NASHPA GAS PROCESSING & LPG RECOVERY PLANT SYSTEM COSTS
In Foreign Currency (US$) or Other Currency Equivalent In Pak Rs. (*) In Local Currency In (Pak Rs.) Total Price In (Pak Rs.)

S.No.

Item

1) i) ii) iii) iv) v) vi) vii) viii) 2) 2.1) 2.2) 2.3) 2.4) 2.5) 2.6) 3) 3.1) 3.2) 3.3) 3.4) 3.5) 3.6) 3.7) 3.8) 3.9)

GAS PROCESSING PLANT Slug Catcher & Gathering System Seperation System (Utilization of OGDCL's Oredered Seperators) Dehydration (Mol. Sieve) Unit LPG Recovery Unit (Including Mech. Refrigeration) Condensate Stabilization & Off Gas Compression Unit Sales Gas Compressor Package Sales Gas Metering Package DCS, ESD and F&G System. OFFSITES LPG Storage Condensate Storage (Revamping) LPG & Condensate Loading Flare System Wellhead Facilities (2 NOS. NEW & 2 NOS. Existing) Scada Telemetry System UTILITIES Power Generation Fuel Gas System Hot Oil System Drains & Slop System Instrument & Utility Air System Nitrogen Generation System Fire Fighting System Raw Water Treatment System Waste Water Treatment & Disposal System

TOTAL
(*) Equivalent Pak Rs. Based upon Pak Rs./US$ or other internationally convertable currency exchange rate of__________

Note:
1 The cost should include all inter connections between Units / Systems and Tie-ins with existing facilities. Any modifications / upgradation works in the existing facilities shall also be included. The Supply of imported Equipment & Materilal on the CFR value (inclusive of L/C Charges and other incidentals incurred by the Contractor) .

The Supply of local equipment and material items on ex project site delivery basis inclusive of sales tax levies. However, the details of sales tax inclusive levies should be provided seperately.

FILE: Annexure-A (Attachment-1)

SHEET 1 OF 1

ANNEXURE A ATTACHMENT - 2
PRICE DETAILS FOR SURVEYS & SOIL INVESTIGATION

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Attachment-2 of Annexure-A

PRICE DETAILS FOR SURVEYS & SOIL INVESTIGATION

S.No

Item

In Local Currency (In Pak Rs. )

i)

Surveys & Soil Investigation

TOTAL

FILE: Annexure-A (Attachment-2)

SHEET 1 OF 1

ANNEXURE A ATTACHMENT - 3
PRICE DETAILS FOR DESIGN ENGINEERING

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Attachment-3 of Annexure-A

PRICE DETAILS FOR DESIGN ENGINEERING


In Foreign Currency (US $) or Other Currency In Local Currency(In Pak Rs. )

S.No

Item

Equivalent in Pak Rs. (*)

Total Price (In Pak Rs.)

i)

Validation of FEED Document

ii)

Basic Engineering

iii)

Detailed Engineering

TOTAL

Note:

The Design Engineering cost should not exceed 5% of material & equipment cost. (*) Equivalent Pak Rs. based upon Pak Rs./US$ or other internationally convertible currency exchange rate of Rs.___________.

FILE: Annexure-A (Attachment-3)

SHEET 1 OF 1

ANNEXURE A ATTACHMENT - 4
PRICE DETAILS WORKS (CONSTRUCTION, INSTALLATION/ERECTION ETC.)

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Attachment-4 of Annexure-A

PRICE DETAILS FOR WORKS (Construction, Installation/Erection etc)

S.No

Item

In Foreign In Local Equivalent in Pak Currency (US $) or Currency(In Pak Rs. (*) Other Currency Rs. )

Total Price (In Pak Rs.)

Civil / Steel Structural Works (including Supply of Material)

1.1

Gas Processing Plant

1.2

Offsites

1.3

Utilities

1.4

Buildings

1.5

Infrastructure Works (Roads / Pavements / Drains / Fencing etc.)

Mechanical Works

Instrumentation Works

Electrical Works

TOTAL

(*) Equivalent Pak Rs. based upon Pak Rs./US$ or other internationally convertable currency exchange rate of Rs.___________.

FILE: Annexure-A (Attachment-4)

SHEET 1 OF 1

ANNEXURE A ATTACHMENT - 5
PRICE DETAILS FOR START-UP & COMMISSIONING

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

Attachment-5 of Annexure-A

PRICE DETAILS FOR START-UP & COMMISSIONING

S.No

Item

In Foreign Currency (US Equivalent in $) or Other Pak Rs. (*) Currency

In Local Currency(In Pak Rs. )

Total Price (In Pak Rs.)

i)

Start-up & Commissioning (including Performance Test)

TOTAL

(*) Equivalent Pak Rs. based upon Pak Rs./US$ or other internationally convertable currency exchange rate of Rs.___________.

FILE: Annexure-A (Attachment-5)

SHEET 1 OF 1

ANNEXURE A ATTACHMENT - 6
COPY OF SRO 678(1)/2007

ANNEXURE B - 1 TERMS & CONDITIONS OF L/C FOR SUPPLY (TO BE STRICTLY COMPLIED BY THE BENEFICIARY)

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE-B-1

TERMS AND CONDITIONS OF THE L/C FOR SUPPLY (TO BE STRICTLY COMPLIED BY THE BENEFICIARY)

(To Be Provided Later)

FILE: Annexure-B-1

SHEET 1 OF 1

ANNEXURE B - 2 TERMS & CONDITIONS OF L/C FOR SERVICES

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE-B-2

TERMS AND CONDITIONS OF THE L/C FOR SERVICES

(To be Provided Later)

FILE: Annexure-B-2

SHEET 1 OF 1

ANNEXURE C MOBILIZATION ADVANCE PAYMENT BANK GUARANTEE

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE-C MOBILIZATION ADVANCE PAYMENT BANK GUARANTEE


Oil & Gas Development Company Limited Islamabad. PAKISTAN Dear Sirs, RE: ____________________________________________________ Guarantee No.. Date of Issue Date of Expiry. Amount

Since you have issued a Contract No. ___________ dated ____________ to ___________ _________________(hereinafter referred to as CONTRACTOR) and in consideration of value received from CONTRACTOR and since said Contract provides for mobilization advance payment to be made by you to CONTRACTOR to the extent of ____________________________ we hereby guarantee, agree and undertake as follows: 1. To make unconditional, immediate and forthwith payment of you as called upon of an amount (equivalent to 10% of total contract value in Pak Rs.) on your written FIRST and SIMPLE demand without further recourse, question, query, deferment, contestation or reference to CONTRACTOR or any other person in the event of default, nonperformance or non-fulfillment by CONTRACTOR of his obligations, liabilities responsibilities under the said Contract of which you shall be the sole and absolute judge. 2. To accept written intimation from you as conclusive, sufficient and final evidence of the existence of a default or breach as aforesaid on the part of the CONTRACTOR and to make payment immediately and forthwith upon receipt of your FIRST and SIMPLE written intimation. 3. To keep this guarantee in full force and effect from the date hereof until the period specified in the Contract.

FILE: Annexure-C

SHEET 1 OF 2

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

4.

That no grant of time or other indulgence to, amendment in the terms of the Contract between the parties, or imposition of Contract with CONTRACTOR in respect of the performance of his obligation under and in pursuance of said Contract with or without notice to us, shall in any manner discharge or otherwise however affect this Guarantee and our liabilities and commitments there under. This is an Independent and direct obligations Guarantee and shall be binding on us and our successor in-interest and shall be irrevocable. This Guarantee shall not be affected by any change in the constitution of the Guarantor or the constitution of the Contractor.

5.

6.

7.

This Guarantor warrants and represents that it is fully authorized, empowered and competent to issue this Guarantee.

SIGNATURE AND SEAL OF THE GUARANTOR

FILE: Annexure-C

SHEET 2 OF 2

ANNEXURE D PERFORMANCE GUARANTEE REQUIREMENTS

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ANNEXURE D

PERFORMANCE GUARANTEE REQUIREMENTS

1.0

GENERAL The Plant shall be designed to meet the minimum performance specification and requirements set out in the corresponding data sheets and specifications. This performance may be higher than those given for the overall design. The Supplier shall provide the guarantees related to the Plant process performance and proper material to full fill the operating condition as required.

2.0

PLANT PERFORMANCE GUARANTEES General Supplier guarantees that, a) Plant shall be designed for a life of 25 years, and b) Plant shall be designed to withstand the environmental conditions (seismic/wind loads, weather extremes and temperatures) prevailing at site.

3.0

PROCESS 3.1 LPG Recovery Unit Plant shall be designed and guaranteed to deliver the LPG specifications as per Table-1 and capacity with out negative tolerance. The guaranteed operating conditions are stated below: a) LPG Recovery Unit shall be able to treat 98 MMSCFD of gas and able to recover maximum propane and butanes as specified. b) Turn-down Performance of Plant to 30% shall also be guaranteed. c) Battery Limit conditions as specified in Datasheet.

FILE: Annexure-D

SHEET 1 OF 5

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

TABLE-1: PERFORMANCE FIGURES

S. No.

Parameter

Limit

Unit

Value

PROCESS GUARANTEES 1 2 3 4 Gas Flow To LPG Unit Debutanizer Condensate Flow To Stabilizer R/D Propane Recovery (1) Butane Recovery (1) Minimum Minimum MMSCFD BPD Mole % Mole % 98 1120 95 99

LPG SPECIFICATIONS 1 Vapor Pressure (@ 100oF) Minimum Maximum 2 3 4 5 Gross Heating Value 95% Boiling Point (@ 14.7 psia) Pentane and Heavier Contents Specific Gravity Liquid (Water = 1) Minimum Maximum Maximum Minimum Maximum 6 Production Throughput Minimum Metric Tons/Day MMBtu/h MMBtu/h kW Psig Psig Btu/lb
o

70 159 18,000 36 2 0.53 0.57 TBA *

Vol %

UTILITIES GUARANTEES 1 2 3 NOTE: 1- Percentage of total component entering in gas stream to the recovered component in De-Ethanizer bottom stream. * TBA = To Be Advised Heat Medium System Duty Cooling Water System Duty Power Requirement Minimum Minimum Minimum TBA* TBA* TBA*

FILE: Annexure-D

SHEET 2 OF 5

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

3.2

Condensate Stabilization Unit Plant shall be designed and guaranteed to deliver the Condensate specifications as per Table-1 and capacity with out negative tolerance. The guaranteed operating conditions are stated below: d) Condensate Stabilization Unit shall be able to treat 18050 BPD of condensate. e) Turn-down Performance of Plant to 30% shall also be guaranteed. f) Battery Limit conditions as specified in Datasheet.

TABLE-1: PERFORMANCE FIGURES

S. No.

Parameter Condensate Flow To Stabilizer Discharge Temp. After Air Cooler Reid Vapor Pressure (@ 100 o F) Temperature to Storage Production Throughput

Limit

Unit

Value

PROCESS GUARANTEES 1 4 BPD Maximum F 18050 128

CONDENSATE SPECIFICATIONS 1 2 3 Maximum Maximum Minimum Psia


o

7 120 TBA *

BPD

UTILITIES GUARANTEES 1 2 3 NOTE: * TBA = To Be Advised Heat Medium System Duty Cooling Water System Duty Power Requirement Minimum Minimum Minimum MMBtu/h MMBtu/h kW TBA* TBA* TBA*

FILE: Annexure-D

SHEET 3 OF 5

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

3.3

Molecular Sieve Dehydration Unit Plant shall be designed and guaranteed to deliver the Gas at the required outlet conditions as per Table-1 and capacity with out negative tolerance. The guaranteed operating conditions are stated below: g) Molecular Sieve Unit shall be able to treat 98** MMSCFD of Saturated gas and drop down its water content to less than 0.1 ppm. h) Turn-down Performance of Plant to 30% shall also be guaranteed. i) Battery Limit conditions as specified in Datasheet.

TABLE-1: PERFORMANCE FIGURES

S. No.

Parameter

Limit

Unit

Value

PROCESS GUARANTEES 1 2 3 Gas Flow To Molecular Sieve Unit Water Content at Outlet Turndown Maximum Minimum UTILITIES GUARANTEES 1 2 3 NOTE: * TBA = To Be Advised ** Regeneration gas flow rate to be added Heat Medium System Duty Cooling Duty Power Requirement Minimum Minimum Minimum MMBtu/h MMBtu/h kW TBA* TBA* TBA* MMSCFD ppm % 98** 0.1 30

FILE: Annexure-D

SHEET 4 OF 5

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

3.4

Sales Gas
Sales gas has to provide at the following specifications: Sr. No. 1 2 3 4 5 6 7 8 Parameter Pressure Temperature Hydrocarbon Dew Point Water CO2 Gross Heating Value Wobbe Index (Gross) Quality Value 1230 psig (Min.) 120oF (Max.) 32oF (Max.) < 7 Ibs H2O / MMSCF Gas < 3.0 Mole % 950 BTU / SCF (Min.) 1220 BTU / SCF (Min.) Free of solid particles, gums & sticking material etc. At any pressure Remarks At SNGPL Battery Limit

FILE: Annexure-D

SHEET 5 OF 5

ATTACHMENT I MECHANICAL ACCEPTANCE CERTIFICATE

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ATTACHMENT-I MECHANICAL ACCEPTANCE CERTIFICATE


Effective Date: CONTRACT No.. Dated. Between: Oil & Gas Development Company Limited (hereinafter called OGDCL) And (hereinafter called Contractor) 1. Pursuant to Article 58.1 of the Contract, OGDCL hereby certifies that the following functional Systems of the PLANT are mechanically completed, accepted and have been tested and pre-commissioned in accordance with the requirements of the Contract and are therefore in readiness for commencement of the associated commissioning activities, in accordance with the requirements of the Contract, with the exception of the outstanding items listed upon the attached Punch List, it being understood that should Contractor fail to complete all of the outstanding items in respect of a System within the respective period stated upon the Punch List the present Certificate shall be null and void in respect of such Systems: 2. Issuance of the Mechanical Acceptance Certificate shall not relieve the Contractor from his warranty obligations and other provisions of the Contract which expressly or by their nature survive the said certificate. For and on behalf of (Contractor) Signature: Name: Position:

For and on behalf of (Oil & Gas Development Company Limited) Signature: Name: Position:

.. Consultant

FILE: Attachment-I

SHEET 1 OF 1

ATTACHMENT II PROVISIONAL ACCEPTANCE CERTIFICATE

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ATTACHMENT-II PROVISIONAL ACCEPTANCE CERTIFICATE


Effective Date: CONTRACT No.. Dated. Between: Oil & Gas Development Company Limited (hereinafter called OGDCL) And (hereinafter called Contractor) 1. Pursuant to Article 58.2 of the Contract, it is hereby certified that the PLANT and the WORK performed by the Contractor under the Contract are, effective upon the // provisionally accepted, with the exception of the outstanding items listed upon the attached Punch List. In accordance with the Contract, the Warranty Period will commence on the // which shall be the Effective Date for the purpose of this PROVISIONAL ACCEPTANCE CERTIFICATE, it being understood that should Contractor fail to complete all outstanding Punch List items by the // the PROVISIONAL ACCEPTANCE CERTIFICATE shall be null and void and the requirements of subArticle ____ shall apply in full and the Effective Date of the PROVISIONAL ACCEPTANCE CERTIFICATE shall be revised accordingly. Issuance of this PROVISIONAL ACCEPTANCE CERTIFICATE shall not relieve Contractor from his warranty obligations and other provisions of the Contract which expressly or by their nature survive the said certificate. For and on behalf of (Contractor) Signature: Name: Position: In presence of: Signature: Name: Position: Date:

2.

3.

For and on behalf of (Oil & Gas Development Company Limited) Signature: Name: Position: In presence of: Signature: Name: Position: Date: .. Consultant

FILE: Attachment-II

SHEET 1 OF 1

ATTACHMENT III FINAL ACCEPTANCE CERTIFICATE

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ATTACHMENT-III FINAL ACCEPTANCE CERTIFICATE


Effective Date: CONTRACT No.. Dated. Between: Oil & Gas Development Company Limited (hereinafter called OGDCL) And (hereinafter called Contractor) Whereas the PLANT and the WORK, as specified in the Contract, have been accepted under the form of the TAKE OVER CERTIFICATE dated: ...//. And Whereas the Warranty Period pursuant to Article 40 of the Contract is now completed, both PARTIES agree that: 1. Pursuant to Article 40 (Warranties) of the Contract, it is hereby certified and agreed, by the issuance of the FINAL ACCEPTANCE CERTIFICATE, that the Contractor obligations under the Contract have, effective upon the //, been fulfilled. Issuance of this FINAL ACCEPTANCE CERTIFICATE shall not relieve Contractor from any obligations and other provisions of the Contract which expressly or by their nature survive the said certificate. For and on behalf of (Contractor) Signature: Name: Position: In presence of: Signature: Name: Position: Date:

2.

For and on behalf of (Oil & Gas Development Company Limited) Signature: Name: Position: In presence of: Signature: Name: Position: Date: .. Consultant

FILE: Attachment-III

SHEET 1 OF 1

ATTACHMENT IV CERTIFICATE OF COMPLETION

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ATTACHMENT-IV

CERTIFICATE OF COMPLETION FOR __________________________________________________


(Contract Designation)

To:

________________________________________________________ (OGDCL) I, the undersigned Contractor for the above Designated Contract (hereinafter called the Contractor) with oil and gas development company limited (OGDCL) (hereinafter called the OGDCL)) do hereby certify that: 1. The work to be performed by__________________________pursuant to the contact dated _______________________is completed and is in all respect in strict compliance with the provision of the Contract, including all plants, specification, maps and contract drawings and modification thereof and vendor information, complete in all respects. 2. Payments have been made in fully by the Contractor to all person/firms who have furnished labor and material for this contract. 3. The Contractor has obtained valid release of lien from all person, firms, and/or corporation furnishing materials, supplies and appliance, which were employed by the Contractor in the performance of this contract, and such releases have been delivered by the Contractor or the OGDCL/Consultant. 4. The complete cost account statement attached hereto and made a part hereof a complete and accurate cost break-down, and in accordance with the cost account code, given to the Contractor by OGDCL, of all materials, equipment and work performed in accordance with the contract. 5. All defects in equipment, materials and workmanship OGDCL/Consultant have been corrected by the Contractor. reported by the

6. The total true and correct cost of the contract as so completed is ______________total currency in Pakistan Rupees _________________________ of this total the entire balance now due to the Contractor is ___________________________ total currency in Pakistani Rupees _____________________________________________________________________ ______________________________.

FILE: Attachment-IV

SHEET 1 OF 2

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

We certify that the above designation contract has been completed in accordance with the provisions of said contract dated ______________________ provided however that the acceptance of the Contractors work by OGDCL shall not be deemed to relive the Contractor of his obligation contained in the con tract with respect to defective workmanship, materials, or equipment discovered with the guarantee period.

_________________ (Contractor)

By:____________________ Title:___________________ Date:__________________

____________________________________________________________________

FILE: Attachment-IV

SHEET 2 OF 2

ATTACHMENT V CERTIFICATE OF COMPLIANCE

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ATTACHMENT-V

CERTIFICATE OF COMPLIANCE FOR __________________________________________________


(Contract Designation)

To:

________________________________________________________ (OGDCL) I, the undersigned Contractor for the Contract above do hereby certify that: The work to be performed by ___________________ (hereinafter called the Contractor) pursuant to the Contract dated ____________ has been completed as of _____________ and, to the best of my knowledge, was performed in all respects in strict compliance with the terms and conditions of the Contract and all laws of the city of __________ and the country of Pakistan.

_________________ (Contractor)

By:____________________ Title:___________________ Date:__________________

____________________________________________________________________

FILE: Attachment-V

SHEET 1 OF 1

ATTACHMENT VI UNDERTAKING

ZISHAN ENGINEERS (PVT.) LTD.

OGDCL

ATTACHMENT-VI UNDERTAKING
Oil & Gas Development Company Limited (hereinafter called OGDCL) Islamabad. Contract No. and Date:___________________________________ DESCRIPTION OF WORK

The above WORKS have been completed in accordance with the provision of the Contract. The undersigned hereby releases and for ever discharges the Oil and Gas Development Company Limited (OGDCL) their successors and assigns, and their property, from all claims and demands whatsoever in any manner arising out of or related to the Contract or labor performed or material furnished by the undersigned in connection with, or incidental to the execution and completion of the WORKS. In consideration of and for the purpose of OGDCL/Consultant to issue the Acceptance Certificate and make the final payment, the undersigned hereby presents, warrants and agrees that: 1- All sums due to become due and all debts, accounts, damages, obligations, claims and demands of every nature and kind whatsoever in any manner arising out of, or related to labor performed or material furnished in connection with, or incidental to the contract have been paid and satisfied. 2- There are no unsettled claims of any nature what so ever including for injuries to or death of person or damage to, or destruction of property in any manner arising out or related to the Contract and 3- The undersigned shall indemnify and hold harmless OGDCL successors and assigns from and against all claims, demands, liens, claims of lien, judgements, attachments and related costs and expenses in any manner, arising out of, or related to the Contract.

IN WITNESS WHEREOF, the Contractor has caused this instrument to be executed by its duly authorized representative(s) this ____ day of _______.

_______________ (Contractor) FOR AND BEHALF OF _____________________________ _____________________________ _____________________________

FILE: Attachment-VII

SHEET 1 OF 1

Das könnte Ihnen auch gefallen