Sie sind auf Seite 1von 35

Distribution List 1

1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. FAX : 011-26102045 3. Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore 560 009. FAX : 080-22259343 5. Member (Transmission) Karnataka State Power Transmission Corp.Ltd. Cauvery Bhawan Bangalore 560 009. FAX : 080 -22228367 7. Director (TANTRANSCO) Tamil Nadu electricity Board (TNEB) th 6 Floor, Eastern Wing, 800 Anna Salai, Chennai 600 002. FAX : 044-28516362 9. Superintending Engineer I First Floor, Electricity Department Gingy Salai Puducherry 605 001. FAX : 0413-2334277/2331556 2. Chief Engineer (SP & PA) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. FAX : 011-26102045 4. Director (Transmission) Transmission Corp. of Andhra Pradesh Ltd. Vidyut Soudha Hyderabad 500 082. FAX : 040-66665137 6. Member (Transmission) Kerala State Electricity Board Vidyuthi Bhawanam, Pattom, P.B. No. 1028 Thiruvananthapuram - 695 004. FAX : 0471-2444738 8. Director (Power) Corporate Office, Block I Neyveli Lignite Corp. Ltd. Neyveli , Tamil Nadu 607 801. FAX : 04142-252650 10. Director (Projects) National Thermal Power Corp. Ltd. (NTPC) NTPC Bhawan, Core-7, Scope Complex Lodhi Road, New Delhi-110003. FAX-011-24360912

Distribution List 2
1. Sh. Abhishek Dubey Manager (Commercial) Hinduja National Power Corporation Limited HNPCL, Hinduja House, 171 Dr. Annie Besant Road, Mumbai 400 018. 3. Sh. B. S. Rao General Manager M/s NSL Nagapatnam Power and Infratech Private Limited NSL ICON, 4th Floor, # 8-2-684/2/A, Road No. 12, Banjara Hills, Hyderabad 500 034 5. Sh. S Arounassalame Chief Operating Officer Empee Power & Infrastructure Private Limited "Empee Tower", No. 59, Harris Road, Pudupet Chennai - 600 002. 7. Sh. R Suresh General Manager Neyveli Lignite Corporation Limited Corporate Office Block-I Neyveli 607 801. 9. Sh. M. L. Jadhav Chief Engineer (Transmission) M/s Nuclear Power Corporation of India Limited VS Bhavan, Anushaktinagar Mumbai - 400 094 11. Sh. S Narayanan Managing Director PPN Power Generating Company Private Ltd. Jhaver Plaza III Floor, 1-A, Nungambakkam High Road, Chennai - 600 034. 13. Sh. S. Jagannadham Executive Director M/s Rajanagarm Gas Power Private Limited Madhucon Greenlands, 6-3-866/2, th 5 Floor, Begumpet, Hyderabad - 500 016 (A.P.) 15. Sh. Vishwa Nath Mathur Executive Director M/s Shree Renuka Energy Ltd. 23, Madhuli Apartment, 2nd Floor, Shiv Sagar Estate, Dr. Annie Desant Road, Worli, Mumbai - 400 018 17. Sh. B. N. Murthy Managing Director M/s VSF Projects Limited Plot no. 89/A, Aiswarya Sagar Society Road No. 2, Banjara Hills Hyderabad 500 034. 19. Shri S N Barde Executive Vice President GMR Rajahmundry Energy Limited th 10 floor, D Block, IBC Knowledge Bannerghatta Road Bangalore 560 029. 2. Sh. V Chandramoleeswaran Director Chettinad Power Corporation Private Limited th 5 Floor, Rani Seethai Hall Building, 603 Anna Salai, Chennai - 600 006. 4. Sh. M Subramanyam Business Head Sindya Power Generating Co. Pvt. Ltd. nd 2 Floor, 77-Potti pati Plaza Nunganbakkam High Road, Nunganbakkam, Chennai - 600 034. 6. Sh. J. R. D. Rajakumar Vice President North Chennia Power Co. Limited Janpriya Crest, 113, Pantheon Road, Egmore, Chennai - 600 008 8. Sh. Abhijit Sen AGM (PE-Elect) NTPC Limited Engineering Office Complex, A-8A, Sector-24 Noida - 201 301. 10. Sh. J. K. Agarwal Sheshadri Power & Infrastructure (P) Ltd. Surya Towers, 6th Floor, 105, Sardar Patel Road, Secunderabad - 500 003 12. Sh. K.L. Narayana General Manager M/s RVK Energy (Rajahmundry) Pvt. Ltd. 6-3-1109/A/1, 3rd Floor, Navabharath Chembers, Rajbhavan Road, Somajiguda, Hyderabad - 500 082 14. Sh. S. Jagannadham Executive Director M/s Simhapuri Energy Private Limited Madhucon Greenlands, 6-3-866/2, rd 3 Floor, Begumpet, Hyderabad - 500 016 (A.P.) 16. Sh. Sanjay Divakar Joshi Chief Operating Officer Vainateya/Pragdisa Power Private Limited Plot No. 397, Phase-III, Udyog Vihar Gurgaon - 122 016. 18. Sh. R. Arivu Chelvan Associate Vice President M/s Dandelion Properties Private Limited 10th Floor, D Block, IBC Knowledge Park, Bannerghatta Road, Bangalore 560 029. 20. Sh. N P Hanagodu Chief Executive Officer Meenakshi Energy Private Limited Meenakshi House, 8-2-418, Road #7 Banjara Hills Hyderabad 500 034.

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

Agenda Note for 12th Meeting of Southern Region contituents regarding Connectivity/Long-term Access Applications of IPPs in SR

1.0 AGENDA FOR THE MEETING


1.1 To consider grant of Connectivity for 20 nos. of applications who have applied for grant of Connectivity as per CERC (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009 as per details given below. Application from IPP developers
Sl. No 1. 2. Applicant Time frame

Table 1.1
Location IC (MW) 1040 1200 Connectivity Sought for (MW) 975 1200

Hinduja National Power Corporation Chettinad Power Corporation Private Limited NSL Nagapatnam Power and Infratech Pvt. Ltd. Sindya Power Generating Company Private Limited Empee Power & Infrastructure Pvt. Ltd. North Chennai Power Company Limited NLC TS-I (Replacement) NTPC Limited Kayamkulam-II Nuclear Power Corporation of India Ltd. - Kudankulam-II NTPC Limited - Kudgi RVK Energy (Rajahmundry) Private Limited PPN Power Generating Company Sheshadri Power & Infrastructure (Private) Limited Rajanagarm Gas Power Private Limited

January, 2013 September, 2013

Vishakhapatnam, Andhra Pradesh Nagapattinam Dist., Tamil Nadu Nagapattinam Dist., Tamil Nadu Nagapattinam Dist., Tamil Nadu Nagapattinam Dist., Tamil Nadu Tiruvallur Dist., Tamil Nadu Cuddalore Dist, Tamil Nadu Alapuzha Dist., Kerala Nagarcoil Dist., Tamil Nadu Kudgi, Karnataka East Godavari Dist., Andhra Pradesh Nagapattinam Dist., Tamil Nadu Mahabubnagar Dist., Andhra Pradesh East Godavari Dist., Andhra Pradesh

3.

April, 2014

1320

1240

4.

December, 2014

1320

1320

5. 6. 7. 8. 9.

April, 2013 February, 2015 April, 2014 / October, 2014 2013-14 2016

1320 1200 1000 1050 2000

1241 1105 1000 1050 2000

10. 11.

August, 2014 September, 2011

2400 360

2400 360

12. 13.

September, 2013 September, 2013

1080 1320

1080 1320

14.

December, 2012

1100

1100

Page-1 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

Sl. No 15. 16. 17. 18. 19.

Applicant

Time frame

Location

IC (MW) 1320 1050 1320 1320 350

Simhapuri Energy Private Limited Shree Renuka Energy Limited Vainateya Power Private Limited Pragdisa Power Private Limited VSF Projects Limited

4th Qtr, 2014 March, 2014 December, 2013 December, 2013 September, 2013

Nellore Dist., Andhra Pradesh Vantamuri, Belgaum Dist, Karnataka Tuticorin Dist., Tamil Nadu Nellore Dist., Tamil Nadu Nellore Dist., Andhra Pradesh

Connectivity Sought for (MW) 1235 956 1320 1320 350

Total Application from Bulk Consumers


Sl. No 20. Applicant Dandelion Properties Private Limited Time frame October, 2011

23070 Table 1.2


Location Krishnagiri Dist., Tamil Nadu

22572

Connectivity Sought for (MW) 250

1.2 To consider grant of Long-term Access for 5 nos. of applications who had applied for grant of LTA as per CERC Regulations, 2009 and their application for connectivity mentioned at sl. no. 1 to 5 in Table-1.1 is also proposed for consideration in the present meeting. The details of LTA application is given below. Table 1.3
Sl. No. 1. 2. 3. 4. 5. Applicant Installed Capacity (MW) 1320 1320 1040 1320 1320 6320 LTA applied for (MW) 1110 1240 725 1060 1241 5376 Time Frame Dec, 2013 Oct, 2014 Jan, 2013 Apr, 2015 Apr, 2014 Quantum allocated in the region SR WR NR 500 500 110 940 362.5 720 496 3018.5 300 362.5 270 496 1928.5 0 0 70 248 428

Chettinad Power Coporation Pvt. Ltd. NSL Nagapatnam Power and Infratech Pvt. Ltd. Hinduja National Power Corporation Ltd. Sindya Power Generation Co. Pvt. Empee Power & Infrastructure Pvt. Ltd. Total

1.3 To consider revision of grant of Long-term Access for 2 nos. of applications who had earlier granted LTA as per details given below. Table 1.4
Sl. No. 1. 2. Applicant Installed Capacity (MW) 800 350 LTA applied for (MW) 775 363 Time Frame Jan, 2012 Jun, 2012 Quantum allocated in the region SR WR NR 175 300 300 364 0 0

GMR Rajahmundry Energy Limited Meenakshi Energy Private Limited

Page-2 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

2.0 POWER SUPPLY SCENARIO OF SOUTHERN REGION


The likely power supply position of Southern Region has been estimated based the capacity additions and the load forecast as per 17th EPS. The details are as given below:
Sl. No. 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) Generation Capacity Existing (Without Renewable Energy Generations) th 11 Plan (Under construction) th 12 Plan (Under construction) LTOA Granted and BPTA signed Connectivity Granted BPTA not signed or required New Connectivity Applications Total Additions (2+3+4+5+6 above) Total Installed Capacity (Existing + Additions) Availability (@75%) Peak Demand by 2016-17 (as per 17 EPS) Surplus/Deficit
th

Southern Region (All figures in MW) 37632 8789 10580 13955 2060 23070 58454 96086 72065 60433 11632

From the above table it may be observed that if all the generation projects who have applied for connectivity then Southern Region shall be in surplus of the order of 11,600 MW during end of 12th plan (i.e. 2016-17),. However, if only 50% of the generation projects applied for Connectivity gets materialized then the surplus shall be of the order of 3000 MW only. In other words the power supply scenario with Southern region as a surplus shall be quite uncertain with respect to its quantum.

A. CONNECTIVITY APPLICATIONS
Till date POWERGRID has received 29 nos. of applications for connectivity (IC 34,000 MW & Connectivity - 33,700 MW ) from different IPPs & 1 no. of applications for connectivity from bulk consumer located in Southern Region as per CERC Regulations, 2009. Out of these 29 applications, 10 nos. applicants were granted Connectivity as per details given at Annexure-1. In the present meeting the remaining 19 applications from IPPs and 1 no. from bulk consumer is proposed to be discussed.

Page-3 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

3.0 PROGRESS OF GENERATION PROJECTS APPLIED FOR CONNECTIVITY The progress status of the IPP generation projects as submitted by the respective IPPs through affidavit as given below
Sl. No. Applicant Company Limited NLC TS-I (Replacement) Corporation Chettinad Power Corporation Private Limited NSL Nagapatnam Power and Infratech Pvt. Ltd. PPN Power Generating Company RVK Energy (Rajahmundry) Private Limited VSF Projects Limited Company Private Limited Rajanagarm Gas Power Private Limited Shree Renuka Energy Limited Limited Empee Power & Infrastructure Pvt. Limited Pragdisa Power Private Limited Simhapuri Energy Private Limited NTPC Limited - KayamkulamII Nuclear Power Corporation of India Ltd. - Kudankulam-II NTPC Limited - Kudgi Infrastructure (Pvt.) Limited Available IC (MW) 1200 1000 1040 1200 1320 1080 360 350 1320 1100 1050 1320 1320 1320 1320 1050 2000 2400 1320 Land Fuel MoE Forest EPC

1. North Chennai Power

268/411

2. 3. Hinduja National Power 4. 5. 6. 7.

91/654 650/1300

8. 9. Sindya Power Generating 10.

450/611

11. 12. Vainateya Power Private 13. 14. 15. 16. 17.

418/550 421/602

Gen. Status not updated Gen. Status not updated Gen. Status not updated Gen. Status not updated Gen. Status not updated
Not Available

18. 19. Sheshadri Power &

3.1 Transmission System for Connectivity (Already Finalised) Out of 19 applications of IPPs proposed to be discussed, 15 nos of applications were discussed and finalized in earlier meetings, however grant of connectivity were kept under hold due to non satisfactory progress of generation projects as they were yet to achieve major milestones. The details of the connectivity finalized in the earlier meetings are as given below

Page-4 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

Sl. No 1.

Applicant

IC (MW) 1200

North Chennai Power Company Limited

Connectivity Sought for (MW) 1105

System proposed for Connectivity

2.

NLC TS-I (Replacement)

1000

1000

3.

Hinduja National Power Corporation Chettinad Power Corporation Pvt. Ltd. PPN Power Generating Company RVK Energy (Rajahmundry) Private Limited Sindya Power Generating Company Private Limited Sheshadri Power & Infrastructure (Pvt.) Ltd. Rajanagarm Gas Power Pvt. Ltd.

1040

975

4.

1200

1200

5.

1080

1080

6.

360

360

7.

1320

1320

8.

1320

1320

9.

1100

1100

10.

Simhapuri Energy Private Limited Shree Renuka Energy Limited

1320

1235

11.

1050

956

12.

Vainateya Power Private Limited

1320

1320

400kV (Quad or Twin HTLS) D/c line to 400kV Tiruvalam POWERGRID substation 125 MVAR Bus Reactor at generation switchyard LILO of existing Neyveli TS-II Neyveli TS-I expansion 400 kV S/c at generation switchyard Provision of 2x315 MVA, 400/220 kV transformer 80 MVAR Bus Reactor at generation switchyard 400 kV D/c (Quad or Twin HTLS) line to Vemagiri Pooling Station 80 MVAR Bus Reactor at generation switchyard 400 kV Quad or Twin HTLS D/c line to Nagapattinam pooling station 125 MVAR Bus Reactor at generation switchyard 400 kV Quad or Twin HTLS D/c line to Nagapattinam pooling station 80 MVAR Bus Reactor at generation switchyard 400 kV D/c line to Vemagiri-II pooling station 80 MVAR Bus Reactor at generation switchyard 400 kV Quad or Twin HTLS D/c line to Nagapattinam pooling station 80 MVAR Bus Reactor at generation switchyard 400kV Quad or Twin HTLS D/c line to 765/400kV Raichur new substation 125 MVAR Bus Reactor at generation switchyard 400 kV Quad or Twin HTLS D/c line to Vemagiri-II pooling station 125 MVAR Bus Reactor at generation switchyard 400 kV Quad or Twin HTLS D/c line to Nellore pooling station 125 MVAR Bus Reactor at generation switchyard 400 kV D/c (Quad or Twin HTLS) line to Narendra new 80 MVAR Bus Reactor at generation switchyard 400 kV D/c (Quad or Twin HTLS) line to Tuticorin Pooling Station 125 MVAR Bus Reactor at generation switchyard

Page-5 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

Sl. No 13.

Applicant

IC (MW) 1320

Pragdisa Power Private Limited

Connectivity Sought for (MW) 1320

System proposed for Connectivity

14.

Empee Power & Infrastructure Private Limited NTPC Limited Kayamkulam-II

1320

1241

15.

1050

1050

400 kV Quad or Twin HTLS D/c line to Nellore pooling station 125 MVAR Bus Reactor at generation switchyard 400 kV Quad or Twin HTLS D/c line to Nagapattinam pooling station 125 MVAR Bus Reactor at generation switchyard LILO of existing one circuit of Thiruvelneli Muvattupuzha 400 kV D/c (Quad or Twin HTLS) line at generation switchyard. Provision of 2x315 MVA, 400/220 kV transformer 80 MVAR Bus Reactor at generation switchyard

3.2 Transmission System for Connectivity (New Applcaitions) 3.2.1 VSF Projects Limited (1x350 MW) Applicant Location Installed Capacity (MW) Connectivity Sought (MW) Connectivity required from Land Environment Clearance Fuel Arrangement Water Linkage EPC VSF Projects Limited Ankulapatur Village, Chillakur Mandal, Nellore District, Andhra Pradesh 350 350 September, 2013 In Possession Yet to be received. Available Available ---

The power plant of M/s VSF Projects Limited is proposed to be located in the proximity of the proposed Nellore 765/400 kV pooling substation of POWERGRID being developed as a part of the transmission system associated with Krishnapatnam IPP generation projects. Keeping above in view following connectivity of the VSF Projects generation is proposed based on examination as per CEA (Technical Standards for connectivity to the Grid) regulations, 2007: Transmission System proposed for Connectivity (under applicants scope): Generation switchyard Nellore Pooling station 400 kV D/c line Provision of Bus reactor of 1x80 MVAR at generation switchyard.

Page-6 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

3.2.2 Nuclear Power Corporation of India Ltd. - Kudankulam-II (2x1000 MW) Applicant Location Installed Capacity (MW) Connectivity Sought (MW) Connectivity required from Land Environment Clearance Fuel Arrangement Water Linkage EPC Nuclear Power Corporation of India Ltd. Kudankulam, Nagarcoil District, Tamil Nadu 2000 2000 2016 -----------

NPCIL has indicated that the proposed power plant is expansion of under construction Nuclear power plant of 2x1000MW at Kudankulam, Tamil Nadu. The under construction power plant is being stepped-up at 400kV level and its evacuation transmission system is already commissioned. NPCIL have indicated that the proposed expansion of generation shall also be stepped at 400 kV level. Keeping above in view and considering the proximity of above generation project, unit size, etc, following connectivity of the NPCIL project is proposed based on examination as per CEA (Technical Standards for connectivity to the Grid) regulations, 2007: Transmission System proposed for Connectivity: Bus extension of the under construction power plant switchyard Provision of Bus reactor of 1x125 MVAR at generation switchyard. 3.2.3 NTPC Limited (3x800 MW) Applicant Location Installed Capacity (MW) Connectivity Sought (MW) Connectivity required from Land Environment Clearance Fuel Arrangement Water Linkage EPC NTPC Limited Kudgi, Bijapur District, Karnataka 2400 2400 2014 Available Yet to be received. Available Available ---

The NTPC have indicated that the proposed power plant is located about 200 kms from existing Narendra 400/220kV substation of POWERGRID and about 200 kms from under construction Raichur (New) 765/400kV POWERGRID substation. NTPC

Page-7 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

has further indicated that the proposed generation shall be stepped at 400 kV level. Keeping above in view and considering the proximity of above generation project, unit size, etc, following connectivity of the NTPC project is proposed based on examination as per CEA (Technical Standards for connectivity to the Grid) regulations, 2007: Transmission System proposed for Connectivity: Generation switchyard Narendra (New) 400 kV D/c (Quad or Twin HTLS) line Generation switchyard Raichur (New) 400 kV D/c (Quad or Twin HTLS) line Provision of Bus reactor of 2x125 MVAR at generation switchyard. 3.2.4 NSL Nagapatnam Power and Infratech Pvt. Ltd. (2x660 MW) Applicant Location Installed Capacity (MW) Connectivity Sought (MW) Connectivity required from Land Environment Clearance Fuel Arrangement Water Linkage EPC NSL Nagapatnam Power and Infratech Pvt. Ltd. Thalanchankadu, Nagapattinam District, Tamil Nadu 1320 1240 April, 2014 --Available Available Available ---

The NSL Nagapatnam Power and Infratech Pvt. Ltd. have earlier been granted LTA under CERC regulation, 2004 with dedicated 400kV (quad) transmission lines to Nagapattinam pooling station. However the applicant has surrendered the earlier grant of LTA and applied for Connectivity & LTA under CERC regulations, 2009. Keeping above in view and considering the proximity of above generation project, unit size, etc, following connectivity of the NSL Nagapatnam Power project is proposed based on examination as per CEA (Technical Standards for connectivity to the Grid) regulations, 2007: Transmission System proposed for Connectivity: Generation switchyard Nagapattinam pooling station 400kV D/c (Quad or Twin HTLS) line Provision of Bus reactor of 1x125 MVAR at generation switchyard. 3.2.5 Dandelion Properties Private Limited POWERGRID have received the application for Connectivity of 250 MW from Ms/ Dandelion Properties Private Limited as bulk consumer in accordance with CERC regulations 2009.
Page-8 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

The bulk consumer is located at Thimjepalli Village, Krishnagiri District, Tami Nadu near to the existing Soolagiri (Hosur) 400/220 kV substation of POWERGRID. Accordingly, looking into the proximity of above bulk consumer following connectivity is proposed based on examination as per CEA (Technical Standards for connectivity to the Grid) regulations, 2007: Transmission System proposed for Connectivity (under applicants scope): Provision of 400/220kV, 1x315 MVA transformer at Soolagiri (Hosur) alongwith associated bays GMR Krishnagiri SEZ 220kV Sub-station Soolagiri (Hosur) 220 kV D/c line 4.0 INTER-CONNECTION STUDY AS PER CEA REGULATIONS, 2007 The inter-connection studies as per CEA regulations, 2007 have been carried out and the details of which are as given below: a) Transmission System capability The Transmission system capability involves (i) transmission capability of the immediate evacuation system and (ii) Capability of the grid to further disperse the power beyond immediate evacuation system. The grant of connectivity does not entitle the connectivity applicant to inject any power unless application for LTA is made therefore transmission beyond immediate evacuation system is to be evolved once the connectivity applicant applies for the LTA. Accordingly, for the sake of grant of connectivity the transmission system capability has been checked for the transmission system proposed for the immediate evacuation system only.
Sl. No Applicant IC (MW) System proposed for Connectivity Assessment of Transmission Capability of immediate evacuation system The 400 kV Quad or Twin HTLS line is capable of evacuating 1200 MW even under one circuit outage The 630 MVA transformer alongwith the LILO of one 400 kV system is adequate for the 1000 MW evacuation

1.

North Chennai Power Company Limited

1200

2.

NLC TS-I (Replacement)

1000

3.

Hinduja National Power Corporation

1040

400kV (Quad or Twin HTLS) D/c line to 400kV Tiruvalam POWERGRID substation 125 MVAR Bus Reactor at generation switchyard LILO of existing Neyveli TS-II Neyveli TS-I expansion 400 kV S/c at generation switchyard Provision of 2x315 MVA, 400/220 kV transformer 80 MVAR Bus Reactor at generation switchyard 400 kV D/c (Quad or Twin HTLS) line to Vemagiri Pooling Station 80 MVAR Bus Reactor at

The 400 kV Quad or Twin HTLS line is capable of evacuating 1000 MW even under one circuit outage

Page-9 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

Sl. No

Applicant

IC (MW)

System proposed for Connectivity

Assessment of Transmission Capability of immediate evacuation system

generation switchyard 4. Chettinad Power Corporation Pvt. Ltd. 1200 400 kV Quad or Twin HTLS D/c line to Nagapattinam pooling station 125 MVAR Bus Reactor at generation switchyard Generation switchyard Nagapattinam pooling station 400kV D/c (Quad or Twin HTLS) line alongwith associated 400 kV bays at both ends. Provision of Bus reactor of 1x125 MVAR at generation switchyard. LILO of existing one circuit of Thiruvelneli Muvattupuzha 400 kV D/c (Quad or Twin HTLS) line at generation switchyard. Provision of 2x315 MVA, 400/220 kV transformer 80 MVAR Bus Reactor at generation switchyard Bus extension of the under construction power plant switchyard Provision of Bus reactor of 1x125 MVAR at generation switchyard. Generation switchyard Narendra (New) 400 kV D/c (Quad or Twin HTLS) line Generation switchyard Raichur (New) 400 kV D/c (Quad or Twin HTLS) line Provision of Bus reactor of 1x125 MVAR at generation switchyard. 400 kV D/c line to Vemagiri-II pooling station 80 MVAR Bus Reactor at generation switchyard 400 kV Quad or Twin HTLS D/c line to Nagapattinam pooling station 80 MVAR Bus Reactor at generation switchyard 400 kV Quad or Twin HTLS D/c line to Nagapattinam pooling station The 400 kV Quad or Twin HTLS line is capable of evacuating 1200 MW even under one circuit outage The 400 kV D/c (Quad or Twin HTLS) lines are capable of evacuating 1320MW even under one circuit outage

5.

NSL Nagapatnam Power and Infratech Pvt. Ltd.

1320

6.

NTPC Limited Kayamkulam-II

1050

The 630 MVA transformer alongwith the LILO of one 400 kV Quad or Twin HTLS system is adequate for the 1000 MW evacuation

7.

Nuclear Power Corporation of India Ltd. - Kudankulam-II

2000

8.

NTPC Limited - Kudgi

2400

With Kudankulam APP-I 400kV 2xD/c (Quad) lines are under implementation and with bus extension these lines shall be capable of evacuationg 4000MW power even under outage of one circuit The 2 nos. of 400 kV D/c (Quad or Twin HTLS) lines are capable of evacuating 2400MW even under one circuit outage

9.

RVK Energy (Rajahmundry) Private Limited PPN Power Generating Company

360

The 400 kV line is capable of evacuating 360 MW even under one circuit outage The 400 kV Quad or Twin HTLS line is capable of evacuating 1000 MW even under one circuit outage The 400 kV Quad or Twin HTLS line is capable of evacuating 1320 MW even

10.

1080

11.

Sindya Power Generating Company Private Limited

1320

Page-10 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

Sl. No

Applicant

IC (MW)

System proposed for Connectivity

80 MVAR Bus Reactor at generation switchyard 12. Sheshadri Power & Infrastructure (Pvt.) Ltd. 1320 400kV Quad or Twin HTLS D/c line to 765/400kV Raichur new substation 125 MVAR Bus Reactor at generation switchyard 400 kV Quad or Twin HTLS D/c line to Vemagiri-II pooling station 125 MVAR Bus Reactor at generation switchyard 400 kV Quad or Twin HTLS D/c line to Nellore pooling station 125 MVAR Bus Reactor at generation switchyard 400 kV D/c (Quad or Twin HTLS) line to Narendra new 80 MVAR Bus Reactor at generation switchyard 400 kV D/c (Quad or Twin HTLS) line to Tuticorin Pooling Station 125 MVAR Bus Reactor at generation switchyard 400 kV Quad or Twin HTLS D/c line to Nellore pooling station 125 MVAR Bus Reactor at generation switchyard 400 kV Quad or Twin HTLS D/c line to Nagapattinam pooling station 125 MVAR Bus Reactor at generation switchyard Generation switchyard Nellore Pooling station 400 kV D/c line alongwith associated 400 kV bays at both ends. Provision of Bus reactor of 1x80 MVAR at generation switchyard. Provision of 400/220kV, 1x315 MVA transformer at Soolagiri (Hosur) GMR Krishnagiri SEZ Pvt. Ltd. 220kV Sub-station Soolagiri (Hosur) 220 kV D/c line

Assessment of Transmission Capability of immediate evacuation system under one circuit outage The 400 kV Quad or Twin HTLS line is capable of evacuating 1320 MW even under one circuit outage The 400 kV Quad or Twin HTLS line is capable of evacuating 1100 MW even under one circuit outage The 400 kV Quad or Twin HTLS line is capable of evacuating 1320 MW even under one circuit outage The 400 kV Quad or Twin HTLS line is capable of evacuating 1000 MW even under one circuit outage The 400 kV Quad or Twin HTLS line is capable of evacuating 1320 MW even under one circuit outage The 400 kV Quad or Twin HTLS line is capable of evacuating 1320 MW even under one circuit outage The 400 kV Quad or Twin HTLS line is capable of evacuating 1320 MW even under one circuit outage The 400 kV twin line is capable of evacuating 350MW even under one circuit outage

13.

Rajanagarm Gas Power Pvt. Ltd.

1100

14.

Simhapuri Energy Private Limited

1320

15.

Shree Renuka Energy Limited

1050

16.

Vainateya Power Private Limited

1320

17.

Pragdisa Power Private Limited

1320

18.

Empee Power & Infrastructure Private Limited

1320

19.

VSF Projects Limited

350

20.

Dandelion Properties Private Limited

The 220 kV line is capable of drawing 250MW even under one circuit outage

Page-11 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

b) Transient Stability studies, Voltage Stability and Losses These studies pertain to the performance of the grid under the scenario when adequate transmission system strengthening not only for the immediate evacuation but system for further dispersal is evolved. In the instant case as only connectivity has been applied and the transmission system is to be evolved only for immediate evacuation. The data required for carrying out transient stability studies and voltage stability studies are submitted by the applicant at a later stage when detailed engineering is completed. Hence, these studies shall be carried out as and when the applicants apply for LTA and Connection Offer for signing of Connection Agreement to CTU. c) Voltage Regulation As per IEGC code, all Users shall take all possible measures to ensure that the grid voltage always remains within the following operating range of 380 kV 420 kV in the 400 kV systems. To maintain the voltage within the operating range at the generation plant, a suitable size bus reactor has been proposed to be implemented by the generation developer. d) Electro magnetic transient In 420 kV, the system is designed for a limit of Switching overvoltage to 2.5 pu and is expected to decay to 1.5 pu in 5 to 6 cycles. Consistent with these values and protective levels, following insulation levels are generally adopted: (i) Impulse withstand voltage for - Transformer and Reactors 1300 kVp - For Other Equipment 1425 kVp (ii) Switching surge withstand Voltage 1050 kVp (iii) Minimum creepage distance 10500 mm e) Harmonics & Voltage Flicker These studies are mainly applicable for Distribution Systems and Bulk Consumers and hence not carried out. f) Machine Dynamics, Ferro-resonance & Fault duty These studies shall be carried out during detailed engineering.

Page-12 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

g) Metering requirements, Protective relaying, Substation grounding The metering details shall as per the CEA (Installation and Operation of Meters) regulations, 2006. The metering requirements, Protective relaying and substation grounding shall be detailed during the preparation of Connection Agreement. 5.0 TERMS AND CONDITIONS APPLICABLE FOR CONNECTIVITY The following may be noted by all the applicants who have applied for Connectivity: 5.1 The grant of connectivity shall not entitle to interchange any power with the grid unless it obtains long-term access, medium term open access or short term open access. However, the IPPs shall be allowed to undertake interchange of power including drawl of power for commissioning activities and injection of infirm power in to the grid during full load testing before being put into commercial operation, even before availing any type of open access, after obtaining permission of the concerned regional load dispatch centre, which shall keep grid security in view while granting such permission. 5.2 Transmission system strengthening shall be identified to facilitate power transfer on long-term basis once above applicants apply for Long-term Access as per CERC Regulations, 2009. 5.3 All the applicants are required to inform/confirm following to facilitate connectivity: i. Likely date of synchronization, likely quantum and period of injection of infirm power before being put into commercial operation to the SLDC and RLDC concerned at least one month in advance. ii. As per the procedure for connectivity approved by CERC, the time frame for commissioning of dedicated transmission system from the signing of Transmission Agreement would be 9 months plus the time lines as specified by CERC in tariff regulations, 2009. If the time available is less than the above stipulated time frame then CTU shall approach CERC for appropriate direction in the matter. iii. In case the dedicated transmission system upto point of connection is to be undertaken as a party of coordinated transmission plan, then it shall be implemented by ISTS Inter-State Transmission Licensee (including CTU) as per the decision by Empowered Committee. In such case, the applicants need to sign transmission agreement within one month of grant of connectivity, furnish requisite Bank Guarantee and fulfill other terms & conditions as stipulated in the CERC Regulations/Detailed Procedure, 2009 in this regard.

Page-13 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

iv. The scope of works at generation switchyard like line terminal bays, bus/line reactors, associated bays etc. shall be under the scope of respective generation developer/applicant. v. The applicants shall abide by all provisions of the Electricity Act, 2003, CERC(Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State transmission and related matters) Regulations, 2009, CEA (Technical Standards for connectivity to the Grid) and Indian Electricity Grid Code as amended from time to time. vi. The applicant shall have to apply for Connection Offer to CTU at least more than 2 years prior to physical interconnection as well as have to sign Connection Agreement with CTU prior to physical interconnection as per CERC Regulations, 2009.

B. LONG-TERM ACCESS APPLICATIONS


6.0 TRANSMISSION SYSTEM FOR GENERATION PROJECTS IN NAGAPATTINAM / CUDDALORE AREA OF TAMIL NADU In the Nagapattinam/Cuddalore area LTOA under CERC regulations 2004 was earlier granted to 3 nos. applicants viz. PEL Power, IL&FS and NSL Power. Of these, PEL Power and IL&FS have signed the BPTA on 24.12.2010 and PEL Power also submitted requisite Bank Guarantee. IL&FS is yet to submit the requisite Bank Guarantee. Further, NSL has re-applied under CERC regulations, 2009. The comprehensive transmission system evolved for IPP generation projects in Nagapattinam/Cuddalore Area are as given below Common Transmission System Associated Nagapattinam/Cuddalore area of Tamil Nadu: (i) with ISGS Projects in

New 765/400kV Pooling station at Nagapattinam (GIS) with 4x1500 MVA transformers (ii) Nagapattinam Pooling Station Salem 765kV D/c line (iii) Salem Madhugiri 765 kV S/c line 2 (iv) Madhugiri Narendra 765kV D/c line (v) Narendra Kolhapur 765kV D/c line (vi) Kolhapur Padghe 765 kV D/c one circuit via Pune

Page-14 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

(vii) New 765/400kV Pooling station each at Narendra (GIS) and Kolhapur with 2x1500 MVA transformers (viii) Provision of 2x1500 MVA, 765/400 kV transformers each at Madhugiri and Salem (ix) LILO of both circuits of Kolhapur Mapusa 400 kV D/c line at Kolhapur 765/400 kV Ss (x) Charging of Salem Madhugiri 765 kV S/c line 1 (planned with Tuticorin LTOA projects) at its rated voltage (xi) LILO of Neyveli Trichy 400kV S/c line at Nagapattinam Pooling Station for interim arrangement which later shall be bypassed (xii) 400 kV interconnection between Narendra (existing) and Narendra 765/400 kV GIS Ss In addition to PEL power and IL&FS 4 nos. of generation projects have applied for LTA. The comprehensive details of all the generation projects in Nagapattinam / Cuddalore area are as follows Sl. No. Applicant IC (MW) LTA applied for (MW) 987 1150 Time Frame Quantum allocated in the region SR 700 575 SR 500 WR 0 575 WR 500 NR 287 0 NR 110

Under Regulations 2004 1. PEL Power Ltd. 2. IL&FS Tamil Nadu Power Co. Ltd. Under Regulations 2009 3. Chettinad Power Coporation Pvt. Ltd. 4. NSL Nagapatnam Power and Infratech Pvt. Ltd. 5. Sindya Power Generation Co. Pvt. 6. Empee Power & Infrastructure Pvt. Ltd. Total

1050 1200

June, 2013 June, 2013 Jul, 2014 Oct, 2014 April, 2015 April, 2014

1320

1110

1320

1240

940

300

1320 1320

1060 1241

720 496

270 496

70 248

7530

6788

3931

2141

715

From the above it is seen that 6,800MW of LTA is required from Nagapattinam / Cuddalore area. The transmission system already evolved includes two nos. of 765kV circuits which is capable of transferring about 4000MW under normal condition and about 2500MW under contingency conditions. Therefore, it is clear that

Page-15 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

additional outlet from Nagapaatinam/Cuddalore pooling station shall be required for accommodating more no. of generation projects. Load flow studies considering dispatch of 6800MW and additional 765kV D/c line to Tiruvalam has been carried out, the results of Load Flow study is enclosed at Exhibit-I. From the study results it may be observed that the all the transmission lines are well within the limits and the planned transmission system is adequate for evacuation of power from these generation projects. However the loading on Madhugiri Yelhanka 400kV (quad) line is carrying about 2200MW which is on higher side and needs strengthening, therefore, additional 400kV outlet from Madhugiri shall be required towards suitable location in 400kV Bangalore ring based on the feasibility of laying transmission line. Therefore in addition to above comprehensive transmission system following system shall be required (i) Nagapattinam Pooling Station Tiruvalam 765kV D/c line and associated 765kV bays (ii) Provision of 765/400kV, 2x1500 MVA transformer at Tiruvalam (iii) Madhugiri Bangalore 400kV (quad) D/c line

Progress of generation project in Nagapattinam/Cuddalore area The updated status of preparedness of the generation projects in Nagapattinam / Cuddalore area seeking LTA is as given below
Applicant Chettinad Power Corporation Pvt. Ltd. NSL Nagapatnam Power and Infratech Pvt. Ltd. Sindya Power Generation Co. Pvt. Ltd. Empee Power & Infrastructure Pvt. Ltd. IC (MW) 1200 1320 1320 1320 Available Land Fuel MoE Forest EPC

91/654 650/1300
357/600

421/602
Not Available

Sharing of Transmission Charges As the IPP generation projects does not have firmed up beneficiaries hence as per CERC regulations, the transmission charges shall be borne by the generation developers only.
Page-16 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

The transmission charges on account of Common Transmission System as mentioned earlier and the Additional transmission system as mentioned above shall be shared by all the IPPs in the Nagapattinam/Cuddalore in the ratio of LTA capacity sought by each applicant. Further, the applicants shall also share transmission charges for the High Capacity Power Transmission Corridor IX to transfer power to Western & Northern region beneficiaries in proportion to their allocation of power in WR & NR and inter-regional charges like Raichur-Sholapur 765 kV S/c (under Private Sector). Additionally applicable transmission charges on account Southern regional ISTS grid in proportion to the capacity for LTA shall also have to be borne by the IPPs. Proposal: In view of above it is proposed to grant LTA to following applicants only as the progress of other generation projects is non-satisfactory, as per details given below subject to following strengthening of grid:
Sl. No. 1. Applicant Installed Capacity (MW) 1200 LTOA applied for (MW) 1110 Location Time Frame Dec, 2013 Oct, 2014 Quantum allocated in the region SR WR NR 500 500 110

2.

Chettinad Power Corporation Private Ltd. NSL Nagapatnam Power and Infratech Pvt. Ltd. Total

Nagapattinam, Tamil Nadu Nagapattinam, Tamil Nadu

1320

1240

940

300

2520

2350

1440

800

110

Common Transmission System Associated Nagapattinam/Cuddalore area of Tamil Nadu: (i) (ii) (iii) (iv) (v) (vi) (vii) (viii)

with

ISGS

Projects

in

New 765/400kV Pooling station at Nagapattinam (GIS) with 4x1500 MVA transformers Nagapattinam Pooling Station Salem 765kV D/c line Salem Madhugiri 765 kV S/c line 2 Madhugiri Narendra 765kV D/c line Narendra Kolhapur 765kV D/c line Kolhapur Padghe 765 kV D/c one circuit via Pune New 765/400kV Pooling station each at Narendra (GIS) and Kolhapur with 2x1500 MVA transformers Provision of 2x1500 MVA, 765/400 kV transformers each at Madhugiri and Salem

Page-17 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

(ix) LILO of both circuits of Kolhapur Mapusa 400 kV D/c line at Kolhapur 765/400 kV Ss (x) Charging of Salem Madhugiri 765 kV S/c line 1 (planned with Tuticorin LTOA projects) at its rated voltage (xi) LILO of Neyveli Trichy 400kV S/c line at Nagapattinam Pooling Station for interim arrangement which later shall be bypassed (xii) 400 kV interconnection between Narendra (existing) and Narendra 765/400 kV GIS Ss Additional transmission system required for LTA to Nagapattinam / Cuddalore area of Tamil Nadu: (i) Nagapattinam Pooling Station Tiruvalam 765kV D/c line and associated 765kV bays (ii) Provision of 765/400kV, 2x1500 MVA transformer at Tiruvalam (iii) Madhugiri Bangalore 400kV (quad) D/c line

7.0 TRANSMISSION SYSTEM FOR HINDUJA NATIONAL POWER CORPORATION GENERATION PROJECTS IN VISHAKHAPATNAM OF ANDHRA PRADESH Project Details
Sl. No. 1. Applicant Installed Capacity (MW) 1040 LTA applied for (MW) 725 Time Frame Jan, 2013 Quantum allocated in the region SR WR NR 362.5 362.5 0

Hinduja National Power Corporation Ltd.

Status of preparedness
Applicant Hinduja National Power Corporation Ltd. Schedule Jan, 2013 Available Not Available Land Fuel MoE Forest EPC

As discussed above in the Connectivity section, the power from Hinduja generation project power shall be pooled at GIS Vemagiri pooling stations which is being developed as part of Common Transmission System for IPP generation projects located in Vemagiri area, Andhra Pradesh for providing connectivity at 400kV level as well as to evacuate power from the IPP generation projects. At the Vemagiri pooling station, 4 nos. of IPPs with 5150 LTA quantum viz. Spectrum Power (1350MW), GVK Power (800), GVK Industries (800) and Reliance Infrastructure (2200MW) were granted LTA with a comprehensive transmission

Page-18 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

system as given below and all the developers have signed BPTA on 24.12.210 and requisite Bank Guarantee is yet to submitted. Common Transmission System Associated with ISGS Projects in Vemagiri Area of Andhra Pradesh: (i) Establishment of 765/400kV GIS Pooling station at Vemagiri with 4x1500 MVA transformer with sectionalisation arrangement to control short circuit MVA LILO of Gazuwaka Vijayawada 400kV S/c line at Vemagiri Pooling Station for initial integration with SR grid and which later shall be bypassed Establishment of 765/400kV GIS Pooling station at Khammam & Hyderabad with 2x1500 MVA transformers each Hyderabad 765/400 kV S/s Hyderabad (existing) 400 kV D/c (Quad or Twin HTLS) line Khammam 765/400 kV S/s Khammam (existing) 400 kV D/c (Quad or Twin HTLS) line Vemagiri Pooling Station Khammam 2x765kV D/c line Khammam Hyderabad 2x765 kV D/c line Hyderabad Wardha 765 kV D/c line Wardha Jabalpur Pooling station 765 kV D/c

(ii) (iii) (iv) (v) (vi) (vii) (viii) (ix)

Further in the Vemagiri pooling station power from Hinduja (725MW) & GMR (775MW) is proposed to be injected, with these the total injected capacity at Vemagiri pooling station shall be around 6,700MW. The comprehensive transmission system as mentioned above comprises 2 nos. of 765kV D/c line from Vemagiri pooling station to Hyderabad via Khammam. This system prima-face is adequate for transfer of 6700MW. The load flow study result with the above transmission system is enclosed at Exhibit-II. From the study results it may be observed that the loading all the transmission lines are generally well within the limits except for loading on Khammam NSagar 400kV S/c line is on higher side. The load flow study results considering strengthening of this section with additional Khammam NSagar 400kV D/c line is given at Exhibit-IIa, wherein it is seen that the planned transmission system is adequate for evacuation of power from these generation projects. Sharing of Transmission charges The sharing of transmission charges is mentioned in subsequent para 8.0.

Page-19 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

Proposal : In view of above it is proposed to grant LTA to following applicant as per details given below subject to following strengthening of grid.
Sl. No. 1. Applicant Installed Capacity (MW) 1040 LTA applied for (MW) 725 Time Frame Jan, 2013 Quantum allocated in the region SR WR NR 362.5 362.5 0

Hinduja National Power Corporation Ltd.

Common Transmission System Associated with ISGS Projects in Vemagiri Area of Andhra Pradesh: (i) Establishment of 765/400kV GIS Pooling station at Vemagiri with 4x1500 MVA transformer with sectionalisation arrangement to control short circuit MVA LILO of Gazuwaka Vijayawada 400kV S/c line at Vemagiri Pooling Station for initial integration with SR grid and which later shall be bypassed Establishment of 765/400kV GIS Pooling station at Khammam & Hyderabad with 2x1500 MVA transformers each Hyderabad 765/400 kV S/s Hyderabad (existing) 400 kV D/c (Quad or Twin HTLS) line Khammam 765/400 kV S/s Khammam (existing) 400 kV D/c (Quad or Twin HTLS) line Vemagiri Pooling Station Khammam 2x765kV D/c line Khammam Hyderabad 2x765 kV D/c line Hyderabad Wardha 765 kV D/c line Wardha Jabalpur Pooling station 765 kV D/c

(ii) (iii) (iv) (v) (vi) (vii) (viii) (ix)

Additional Transmission system required for ISGS projects pooled at Vemagiri pooling station: (i) Khammam NSagar 400kV D/c line

C. LONG-TERM ACCESS APPLICATIONS - REVISION


8.0 REVISION OF LTA APPLICATIONS OF GMR RAJAHMUNDRY ENERGY LTD. (2x400 MW) POWERGRID had granted LTA vide letter ref. no. C/ENG/SEF/TA/L/S/10/06 dated 06.05.2010 to GMR Rajahmundry Energy Limited for 775MW for 25 years. The applicant was to ensure implementation of the identified dedicated transmission line viz. GREL switchyard Khammam 400kV D/c (quad) line & provision of 1x80 MVAR
Page-20 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

Bus Reactor at generation switchyard. Further as an interim arrangement only with the understanding that this line shall be extended to Khammam, the 400 kV line from generation switchyard to Khammam has been permitted LILO of Vijayawada Gazuwaka 400kV S/c line. The details of the generation project are as given below:
Sl. No. 1. Applicant Installed Capacity (MW) 800 LTA applied for (MW) 775 Time Frame Jan, 2012 Quantum allocated in the region SR WR NR 175 300 300

GMR Rajahmundry Energy Limited

Now the applicant vide its letter ref. no. GREL:LTOA:10-11/1 dated 14.01.2011 has requested for review of transmission system earlier finalized for grant of connectivity & LTA and also changed the unit size from 400MW to 384 MW of proposed generation project in Vemagiri area. The connectivity & LTA applications were reviewed as per the request of applicant and load flow studies were conducted, the study results are placed at Exhibit-III. The Connectivity of generating station to ISTS is proposed through 400 kV Quad or Twin HTLS D/c line to Vemagiri pooling station. Proposal : In view of above, it is proposed to grant fresh connectivity & LTA to above applicant as per details given below:
Sl. No. 1. Applicant Installed Capacity (MW) 768 LTA applied for (MW) 768 Time Frame Jan, 2012 Quantum allocated in the region SR WR NR 175 300 300

GMR Rajahmundry Energy Limited

Transmission system for Connectivity: (i) 400 kV Quad or Twin HTLS D/c line to Vemagiri pooling station (ii) 80 MVAR Bus Reactor at generation switchyard Common Transmission System Associated with ISGS Projects in Vemagiri Area of Andhra Pradesh: (i) Establishment of 765/400kV GIS Pooling station at Vemagiri with 4x1500 MVA transformer with sectionalisation arrangement to control short circuit MVA

Page-21 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

(ii) (iii) (iv) (v) (vi) (vii) (viii) (ix)

LILO of Gazuwaka Vijayawada 400kV S/c line at Vemagiri Pooling Station for initial integration with SR grid and which later shall be bypassed Establishment of 765/400kV GIS Pooling station at Khammam & Hyderabad with 2x1500 MVA transformers each Hyderabad 765/400 kV S/s Hyderabad (existing) 400 kV D/c (Quad or Twin HTLS) line Khammam 765/400 kV S/s Khammam (existing) 400 kV D/c (Quad or Twin HTLS) line Vemagiri Pooling Station Khammam 2x765kV D/c line Khammam Hyderabad 2x765 kV D/c line Hyderabad Wardha 765 kV D/c line Wardha Jabalpur Pooling station 765 kV D/c

Additional Transmission system required for ISGS projects pooled at Vemagiri pooling station: (ii) Khammam NSagar 400kV D/c line Sharing of Transmission Charges As the IPP generation projects in Vemagiri area does not have firmed up beneficiaries hence as per CERC regulations, the transmission charges shall be borne by the generation developers only. The transmission charges on account of Common Transmission System as mentioned earlier and the Additional transmission system as mentioned above shall be shared by all the IPPs connected to Vemagiri pooling station in the ratio of LTA capacity sought by each applicant. Further, the applicants shall also share transmission charges for the High Capacity Power Transmission Corridor IX to transfer power to Western & Northern region beneficiaries in proportion to their allocation of power in WR & NR and inter-regional charges like Raichur-Sholapur 765 kV S/c (under Private Sector). Additionally applicable transmission charges on account Southern regional ISTS grid in proportion to the capacity for LTA shall also have to be borne by the IPPs. 9.0 REVISION OF CONNECTIVITY & LTA APPLIACTIONS OF MEENAKSHI ENERGY PRIVATE LIMITED POWERGRID had granted connectivity vide letter ref. no. C/SEF/TA/C/S/10/03 dated 06.05.2010 & LTA vide letter ref. no. C/ENG/SEF/TA/L/S/10/008 dated
Page-22 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

10.12.2010 to Meenakshi Energy Private Limited. Subsequent to the above grant the applicant has signed BPTA with POWERGRID and submitted requisite Bank Guarantee. However the applicant has submitted revised applications for seeking Connectivity and LTA due to revision in the unit sizes from 300MW to 350MW. The revised details of the generation project are as given below:
Sl. No. 1. Applicant Installed Capacity (MW) 350 LTA applied for (MW) 364 Time Frame Jun, 2012 Quantum allocated in the region SR WR NR 364 0 0

Meenakshi Energy Private Limited

In this regard it may be mentioned that Meenakshi Energy Private Limited (MEPL) and Simhapuri Energy Private Limited (SEPL) are developing generatyion projects in te Krishnapatnam area. Further, they are also developing the dedicated transmission line 400 kV D/c (quad) from their generation swicthyards to the Nellore substation. This dedicated transmission line is to be LILOed at the Nellore Pooling station being developed for pooling of power from generation proehcst in krishnapatnam area. The chronology for grant of LTOA/LTA for MEPL and SEPL are as given below: MEPL and SEPL had applied and granted LTOA under CERC, Regulations, 2004 for 546 MW and 491 MW from the proposed capacity of 600 MW each. Subsequently, MEPL had applied and granted connectivity and LTA under CERC, Regulations, 2009 for 273 MW from additional generation unit of 300 MW. Recently, MEPL have indicated change in unit configuration from 2x300 to 2x350 MW and have accordingly connectivity and LTA for additional capacity of 364 MW 273 MW earlier granted. In this regard SEPL have expressed their apprehension regarding adequacy of the transmission system to handle additional power due to enhanced unit size at MEPL. As regards, the power handling capacity of the system for enhanced unit size, it may be mentioned that this matter has two pronged aspects (i) adequacy of the immediate transmission system (ii) adequacy of the grid beyond immediate connectivity for absorbing and dispersal of additional power.

Page-23 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

With regard to adequacy of the immediate evacuation system it is to mention that dedicated transmission line is quad conductor double circuit line and the total power to be handed is 1401 MW, which is well within carrying capacity of quad conductor of very small length. Therefore, the dedicated line shall be adequate for enhanced capacity of units. Further, the common transmission system for IPP generation projects in Krishnapatnam area comprise of 765kV D/c line which shall have to cater to 1240 MW from Thermal Powertech other than above mentioned 1401 MW. Hence the transmission system is adequate to absorb and disperse power beyond pooling station. However in the interim period till the time common transmission system is commissioned there may be some constraints beyond Nellore (Existing). Proposal : In view of above it is proposed to revise the earlier granted LTA to MEPL from 273MW to 364MW subject to the following additional conditions keeping earlier conditions same. 1) Till the time the Common Transmission System for Krishnapatnam area is commissioned, a. 491 MW of SEPL and 546MW of MEPL shall have equal priority b. additional 364 MW of MEPL shall have lower priority as compared to (a.) above 2) Mutual agreement between SEPL & MEPL shall be arrived at and submitted to CTU for sharing of transmission charges & losses. Also SEPL & MEPL are to sort out issues pertaining to scheduling, metering, UI, etc in consultation with SRLDC.

Members may discuss the above proposals and decide.


-----X------X-----X-----

Page-24 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

Annexure-I
Applicants as per CERC, Regulations 2009 to whom Connectivity has been granted Sl. No 1. 2. 3. 4. Applicant GMR Rajahmundry Energy Limited Nelcast Energy Corporation Limited Meenakshi Energy Private Limited Lanco Kondapalli Power Private Limited Alfa Infraprop Private Limited Thermal Powertech Corporation India Ltd GVK Gautami Power Limited GVK Industries Limited Spectrum Power Generation Limited Reliance Infrastructure Limited Total Time frame June, 2011 January, 2014 March, 2012 June, 2011 Location East Godavari Dist., AP Nellore Dist., AP Nellore Dist., AP Krishna Dist., AP Vizianagaram Dist., AP Nellore Dist., Andhra Pradesh East Godavari Dist., Andhra Pradesh East Godavari Dist., Andhra Pradesh East Godavari Dist., Andhra Pradesh East Godavari Dist., Andhra Pradesh IC (MW) 800 1320 300 740 Sought (MW) 775 1320 273 740 Connectivity GREL Khammam 400 kV D/c (Quad) line Nelcast Nellore Pooling Station 400 kV D/c (Quad) line Bus Extension Bus Extension

5. 6.

January, 2014 November, 2013

2640 1320

2640 1320

Alfa Srikakulam Pooling station 765 kV S/c Thermal - Nellore Pooling Station 400 kV D/c (Quad) line. GVK Gautami - Vemagiri Pooling Station 400 kV D/c (Quad) line. GVK Industries - Vemagiri Pooling Station 400 kV D/c (Quad) line. Spectrum - Vemagiri Pooling Station 400 kV D/c (Quad) line. Reliance - Vemagiri Pooling Station 400 kV D/c (Quad) line.

7.

8.

9.

10.

30th September, 2012 or date of estb. of VemagiriII PS which ever is later 30th September, 2012 or date of estb. of VemagiriII PS which ever is later December, 2012 or date of estb. of Vemagiri-II PS which ever is later September, 2012 or date of estb. of Vemagiri-II PS which ever is later

800

800

800

800

1400

1400

2400

2400

12520

12468

Page-25 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

Applicants as per CERC, Regulations 2009 to whom Connectivity is yet to be granted Sl. No 11. Applicant North Chennai Power Company Limited Time frame February, 2015 Location Tiruvallur Dist., Tamil Nadu IC (MW) 1200 Sought (MW) 1105 Proposed Connectivity 400kV (Quad or Twin HTLS) D/c line to 400kV Tiruvalam POWERGRID substation 125 MVAR Bus Reactor at generation switchyard LILO of existing Neyveli TS-II Neyveli TS-I expansion 400 kV S/c at generation switchyard Provision of 2x315 MVA, 400/220 kV transformer 80 MVAR Bus Reactor at generation switchyard 400 kV D/c (Quad or Twin HTLS) line to Vemagiri Pooling Station 80 MVAR Bus Reactor at generation switchyard 400 kV Quad or Twin HTLS D/c line to Nagapattinam pooling station 125 MVAR Bus Reactor at generation switchyard LILO of existing one circuit of Thiruvelneli Muvattupuzha 400 kV D/c (Quad or Twin HTLS) line at generation switchyard. Provision of 2x315 MVA, 400/220 kV transformer 80 MVAR Bus Reactor at generation switchyard 400 kV D/c line to Vemagiri-II pooling station 80 MVAR Bus Reactor at generation switchyard Remarks Discussed in 10 Connectivity / LTA meeting, Under hold yet to achieve milestone
th th

12.

NLC TS-I (Replacement)

April, 2014 / October, 2014

Cuddalore Dist, Tamil Nadu

1000

1000

Discussed in 11 Connectivity / LTA meeting, Under hold yet to achieve milestone

13.

Hinduja National Power Corporation

January, 2013

Vishakhapatnam, Andhra Pradesh

1040

975

Discussed in 11 Connectivity / LTA meeting, Under hold yet to achieve milestone Discussed in 11 Connectivity / LTA meeting, Under hold yet to achieve milestone Discussed in 11 Connectivity / LTA meeting, Under hold yet to achieve milestone
th th

th

14.

Chettinad Power Corporation Pvt. Ltd.

September, 2013

Nagapattinam Dist., Tamil Nadu

1200

1200

15.

NTPC Limited Kayamkulam-II

2013-14

Alapuzha Dist., Kerala

1050

1050

16.

RVK Energy (Rajahmundry) Private Limited

September, 2011

East Godavari Dist., Andhra Pradesh

360

360

Finalized in 10 Connectivity / LTA meeting, Under hold yet to achieve milestone

th

Page-26 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

Sl. No 17.

Applicant PPN Power Generating Company

Time frame September, 2013

Location Nagapattinam Dist., Tamil Nadu

IC (MW) 1080

Sought (MW) 1080

Proposed Connectivity 400 kV Quad or Twin HTLS D/c line to Nagapattinam pooling station 80 MVAR Bus Reactor at generation switchyard 400 kV Quad or Twin HTLS D/c line to Nagapattinam pooling station 80 MVAR Bus Reactor at generation switchyard 400kV Quad or Twin HTLS D/c line to 765/400kV Raichur new substation 125 MVAR Bus Reactor at generation switchyard 400 kV Quad or Twin HTLS D/c line to Vemagiri-II pooling station 125 MVAR Bus Reactor at generation switchyard Bus extension of existing power plant 125 MVAR Bus Reactor at generation switchyard 400 kV D/c (Quad or Twin HTLS) line to Narendra new 80 MVAR Bus Reactor at generation switchyard 400 kV D/c (Quad or Twin HTLS) line to Tuticorin Pooling Station 125 MVAR Bus Reactor at generation switchyard 400 kV Quad or Twin HTLS D/c line to Nellore pooling station 125 MVAR Bus Reactor at generation switchyard 400 kV Quad or Twin HTLS D/c line to Nagapattinam pooling station 125 MVAR Bus Reactor at generation switchyard

Remarks Discussed in 11 Connectivity / LTA meeting, Under hold yet to achieve milestone Finalized in 11 Connectivity / LTA meeting, Under hold yet to achieve milestone Discussed in 10 Connectivity / LTA meeting, Under hold yet to achieve milestone Finalized in 10 Connectivity / LTA meeting, Under hold yet to achieve milestone Discussed in 10 Connectivity / LTA meeting, Under hold yet to achieve milestone th Discussed in 11 Connectivity / LTA meeting, Under hold yet to achieve milestone Discussed in 11 Connectivity / LTA meeting, Under hold yet to achieve milestone Discussed in 11 Connectivity / LTA meeting, Under hold yet to achieve milestone Discussed in 11 Connectivity / LTA meeting, Under hold yet to achieve milestone
th th th th th th th th

18.

Sindya Power Generating Company Private Limited Sheshadri Power & Infrastructure (Pvt.) Ltd. Rajanagarm Gas Power Pvt. Ltd.

April, 2013

Nagapattinam Dist., Tamil Nadu

1320

1320

19.

September, 2013

Mahabubnagar Dist., Andhra Pradesh East Godavari Dist., Andhra Pradesh Nellore Dist., Andhra Pradesh Vantamuri, Belgaum Dist, Karnataka Tuticorin Dist., Tamil Nadu

1320

1320

20.

December, 2012

1100

1100

21.

Simhapuri Energy Private Limited Shree Renuka Energy Limited

4th Qtr, 2014

1320

1235

22.

March, 2014

1050

956

23.

Vainateya Power Private Limited

December, 2013

1320

1320

24.

Pragdisa Power Private Limited

December, 2013

Nellore Dist., Tamil Nadu

1320

1320

25.

Empee Power & Infrastructure Private Limited

April, 2013

Nagapattinam Dist., Tamil Nadu

1320

1241

Page-27 of 28

Agenda for 12th Meeting of SR contituents regarding Connectivity/LTA applications

Sl. No 26.

Applicant NSL Nagapatnam Power and Infratech Pvt. Ltd. Nuclear Power Corporation of India Ltd. - Kudankulam-II NTPC Limited - Kudgi

Time frame April, 2014

Location Nagapattinam Dist., Tamil Nadu

IC (MW) 1320

Sought (MW) 1240

Proposed Connectivity 400 kV Quad or Twin HTLS D/c line to Nagapattinam pooling station 125 MVAR Bus Reactor at generation switchyard Bus extension of the under construction power plant switchyard Provision of Bus reactor of 1x125 MVAR at generation switchyard. Generation switchyard Narendra (New) 400 kV D/c (Quad or Twin HTLS) line Generation switchyard Raichur (New) 400 kV D/c (Quad or Twin HTLS) line Provision of Bus reactor of 1x125 MVAR at generation switchyard. Generation switchyard Nellore Pooling station 400 kV D/c line alongwith associated 400 kV bays at both ends. Provision of Bus reactor of 1x80 MVAR at generation switchyard. Dandelion Properties Private Limited Soolagiri (Hosur) 220 kV D/c line

Remarks LTA granted under CERC regulations, 200, Application revised under CERC regulations, 2009 New application

27.

2016

Nagarcoil Dist., Tamil Nadu

2000

2000

28.

August, 2014

Kudgi, Karnataka

2400

2400

New application

29.

VSF Projects Limited

September, 2013

Nellore Dist., Andhra Pradesh

350

350

New application

30.

Dandelion Properties Private Limited Total Grand-total

October, 2011

Krishnagiri Dist., Tamil Nadu

0 23070 35590

250 22822 35290

New application of Bulk Consumer

Page-28 of 28

II

IIa

III

Das könnte Ihnen auch gefallen