Generators
Boise River Diversion Generators
Existing Number and Capacity
Original Capacity (kW) Capacity Increased (kW) Present Capacity (kW)
Unit #
1 2 3 3 units
Net Generation
10 Year Average
10-Year Average
2007
Water Spilled
Water Supply
All three units at Boise River Diversion came online during FY 2004
Admin 20%
Benefits 10%
Other 16%
Payroll 41%
60%
40%
Operation
Maintenance
General
Operation
Maintenance
Fiscal Years
Fiscal Year
Starts
Boise River Diversion Average Starts per Unit
25 20 Starts 15 10 5 0 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 Fiscal Years
24.8
*22.45
Not Available
*Weighted by Net Generation **2006 NERC Average *** Energy Information Administration Data