Beruflich Dokumente
Kultur Dokumente
Job : Mr. Gopala Rao, Multi Storey Bldg Pile Foundation for Column Type C1
Prepared by Checked by Date Venkat KSR Aug-13 Note No: 001 Revision: R0
4.0 1} 2} 3} 4} 5) 5.0
Pile Cap Data : Concrete grade = M 25 Steel Grade used = Fe 500 Clear cover to the pile cap 50 mm plan area of pile cap = 8.15 m x 8.15 m Depth of Pile Cap = 1.5 m Calculation of Depth of Pile cap Lever Arm: Dist upto the face of pier Lever Arm for general case Longitudinal Direction c/c distance between pier and pile c/c distance between pier and pile c/c distance between pier and pile c/c distance between pier and pile = c/c distance betwn pier and pile - half the pier width 3.75 0.75 /2 = = 3.375 m Lever Arm (e) e1 = e2 = e3 = e4 =
= = = =
m m m m
m m m m
Bending Moment M = P1xe1+P2xe2+P3xe3+P4xe4 Factored Pile Forces Pile P1 V (t) (+/+) 622 V (t) (+/-) 622 V (t) (+/+) 622 622 V (t) (+/+)
Moment In Pile Cap from Load Calculation Bending Moment Case B.M.(kN-m) 1.5(DL+SDL+LL) 10576.94 10574.04 10571.84 10568.94 10576.94 Max.
Depth Required
= 0.136 = 617.8
M fck mm <
b 1500 mm OK
D d
= =
1500 1500
mm - 50 - 25 /2
= 1437.5 mm
Ast required
0.5 x fck fy
1-
4.6 x fck 1 -
x b x d
x b x d
6 2
Ast required
x 8150 x 1438
2 19916.6 mm
20483
OK
6.0
Check for Punching Shear in Pile Cap Max reaction from Column = 9951 kN (Factored) Width/ Depth of Column = 0.90 m Effective depth of pile cap = 1.438 m Section for punching shear at a distance d/2 = 0.719 from the face of the pier Perimeter of critical section = 6.175 m Punching shear stress= 6.175 9951 x 1.44 = 1.12 OK N/mm2
kN/m2 = 1121 Permissible shear stress = 0.25 sqrt(fck) 2 = 1.25 N/mm > 1.12
Max reaction from pile = 622.3 kN Diameter of Pile = 0.5 Perimeter = 0.399 m Effective depth of pile cap = 1.438 m Section for punching shear at a distance d/2 = 0.719 from the face of the pile Perimeter of critical section = 5.930 m Punching shear stress= 622 5.930 x 1.44 2 2 = 73.0 kN/m = 0.073 N/mm Permissible shear stress = 0.25 sqrt(fck) = 1.25 N/mm2 > 0.07 OK
7.0
Check for one-way Shear in Pile Cap One Way shear on Pile Foundations shall be checked at d from Pier face = 1438 mm
2488.7
kN
Effective Depth of the Pile cap, d Width at the section, b Shear Stress
uc max = 3.7 N/mm2 Percentage of steel provided at support, Pt = 0.17 Maximum allowable shear stress, = 16.6 N/mm Permissible shear stress in concrete, uc
2
2 0.21 N/mm
OK