Objectives: These Guidelines are intended for use by Project Champions and Master Black Belt coaches in order to:
Assist Coaches to better support Project Design Managers while running design projects
Support Project Design Managers in preparing Process Design tollgate reviews
Ensure a consistent level of quality of Process Design projects
Note: The questions marked with “T”, are useful questions for preparation of tollgate reviews.
Manage Change
Main Objectives: To identify and address change management Has the team prepared a formal Change Management Plot to assess process owner and stakeholder readiness for change? T
issues among stakeholders, the process owner and team that What specific change management issues exist? Specific actions are planned to mitigate them? T
could adversely affect the design project. Are all team members supportive of the project and enthusiastic about their participation? T
Gate 4: Design
Gate 5: Realization
Realize Design
Main Objectives: To bring the detailed design into reality, Can the detailed design actually be built? What vendors must be involved? Can the vendors deliver to the design schedule? T
reassess change management and confirm cost-benefits. Has the team verified that all design parts meet specification? If not, what corrective actions are planned? T
Is the predicted overall design performance still in accordance with initial expectations? If not, what actions are planned? T
Are the process owner and other stakeholders still supportive of the design? T
Has a formal cost-benefit analysis been performed? Was this analysis validated by the Finance Analyst? T
Gate 6: Prototype/Pilot
Analyze Results
Main Objectives: To evaluate pilot test results and identify any Was all necessary data gathered in accordance with the Pilot Test Plan? T
actions necessary to improve design performance. Were the pilot test results in accordance with requirements? If not, why? What corrective actions are necessary? T
Were there any unexpected events that occurred? If so, how might these affect the design? The implementation schedule? T
Has the Design FMEA been updated?
Has the cost-benefit analysis been confirmed? T
Gate 7: Pre-launch
Update Design
Main Objectives: To implement all actions necessary to raise Have all open actions from Tollgate 6 been successfully completed? T
design performance to the desired level. Have any remaining vendor-related issues been resolved? T
Have any remaining support resource and infrastructure issues been resolved? T
Have any remaining design cost or budget issues been resolved? T
Gate 8: Launch
Gate 9: Management
Demonstrate Performance
Main Objectives: To validate ongoing performance using Are expected process sigmas still being attained? T
process design data gathered in accordance with the PM Does customer feedback indicate greater customer satisfaction? If not, why? What actions are necessary? T
System. Are design costs and benefits in accordance with expectations? T
Have there been any new and unexpected benefits identified? T