CONSTRUCTION
Cost of Estimate
Rs. 15,72,000.00
(Rupees Fifteen Lakhs Seventy Two thousand only)
S.
No
1.
Descriptions of Works
Nos.
L
(m)
B
(m)
D/H
(m)
Qty.
(m3/m2)
1X1
27.53
0.61
1.83
30.73
Cross Wall
2X1
6.37
0.61
1.83
7.11
Long wall
1X1
7.39
0.61
1.83
8.25
Amount
275/-
m3
12675.00
950/-
m3
43786.00
1800/-
m3
25974.00
1X1
27.53
0.61
1.83
30.73
Cross Wall
2X1
6.37
0.61
1.83
7.11
Long wall
1X1
7.39
0.61
1.83
8.25
46.09m3
Per
Earth work excavation in all classes of soil including lead and lift for foundation etc complete
46.09m3
2.
Rate
1X1
27.53
0.46
0.76
9.62
Cross Wall
1X1
6.37
0.46
0.76
2.23
Long wall
1X1
7.39
0.46
0.76
2.58
14.43m3
R.C.C works for plinth Beam, Lintel cum sunshade and roof slab in C.C 1:2:4 mix including
centering and steel fabrication works etc., complete in G.F & F.F
Plinth Beam in G.F
Main Walls alround
1X1
27.53
0.23
0.15
0.95 m3
Long Wall
1X1
6.37
0.23
0.15
0.22 m3
Cross Wall
1X5
7.39
0.23
0.15
0.25 m3
1.42 m3
1X1
27.53
0.23
0.23
1.46 m3
Long Wall
1X1
6.37
0.23
0.23
0.37 m3
Cross Wall
1X1
7.39
0.23
0.23
0.39 m3
Total
2.22 m3
F.F
Main Walls alround
1X1
21.96
0.23
0.23
1.16m3
Partition
1X1
6.86
0.23
0.23
0.36m3
Total
1.52m3
Roof Slab
G.F
1X1
F.F
1X1
1X2
6.60
43.78
6.1
1.0
0.11
5.54 m3
0.11
4.82 m3
0.11
1.34 m3
Total
11.70 m3
Net Total
16.86 m3
22000
m3
3,70,920.00
35.35 m3
750
m3
26,513.00
m3
2,20,932.00
6.
7.63
1X1
6.71
5.79
0.91
Super structure in B.W in c.m 1:6 mix using country bricks including etc complete
Main Walls alround
1X1
27.53
0.23
7.85
49.70 m3
Long wall
2X1
6.39
0.23
3.05
8.94 m3
Cross Wall
2X1
7.39
0.23
3.05
10.37 m3
69.01 m3
Total
Deduct Door & Window Opens
D = Door
2X4
0.91
0.23
2.13
3.57 m3
D1 = Door
2X1
0.76
0.23
2.13
0.74 m3
W = Window
2X4
1.22
0.23
1.37
3.08 m3
V = ventilator
2X1
0.91
0.23
0.61
0.25 m3
Total
7.64 m3
61.37 m3
3600
Supplying and fixing of Doors & windows are held in position frames are best quality of malasiyan
sal wood doors are company manufacturing flush doors including etc complete
G.F & F.F
D = Door
1X6
0.91
2.13
11.63m2
D1 = Door
1X2
0.76
2.13
3.24 m2
W = Window
1X6
1.22
1.37
10.03 m2
V = ventilator
1X2
0.91
0.61
1.11 m2
Total
26.01m2
2300
m2
59823.00
300
m2
27651.00
300
m2
1,64,421.00
1X2
Room
2X2
Hall
1X2
Kit
1X2
Toilet
1X2
6.10
1.0
3.35
3.05
4.04
3.05
3.20
1.22
2.17
1.52
12.20 m2
40.93 m2
24.64 m2
7.81 m2
6.59 m2
Total
9.
92.17 m2
Wall plastering in c.m. 1:4 mix inside & outside including etc complete
G.F & F.F
Main wall alround
2X1
Long wall
2X2
Cross wall
2X2
27.53
6.37
7.39
7.85
3.05
3.05
Total
432.22 m2
77.71 m2
90.16 m2
600.09 m2
10
26.01 X 2 sides
52.02m2
Net quantity
600.09 52.02
548.07m3
Flooring in P.C.C 1:5:10 mix using 1 stone jelly 0.11m t.k over floor finishing in 0.61 x 0.61
vetrified tiles including etc complete.
As Per S.No: 8 Quantity
11
92.17m2
Provision for Weathering course in Brick Jelly lime concrete and top
finishing with cement mortar including etc complete
140
L.S
m2
129038.00
60,000.00
12
Provision for Painting for doors and windows are 2 coat with best
quality of enamel paint over a coat of primer and patty.
13
Provision for White and colour washing over the whole building inner
distemper and outer snocem 2 coats over a coat of white cement primer
L.S
40,000.00
L.S
40,000.00
14
L.S
80,000.00
15
L.S
60,000.00
16
L.S
80,000.00
17
L.S
40,000.00
18
L.S
40,000.00
19
Provision for 4/2 Bore well 450 0 deep with 2 HP motar and
compressor
L.S
90,000.00
20
20,000.00
Total 15,71,733.00
Say Rs.
15,72,000/-