Sie sind auf Seite 1von 2

DIPLOMA IN MECHANICAL ENGINEERING, ASNT LEVEL-II,Member of I.

E
KEY SKILLS :

PROJECT CONSTRUCTION ENGINEERING: [ TANK,PIPING&EQUIPMENTS CONST. ENGINEERING AS PER API/ASME/ASTM


CODES. QAP,ITP, CAT PLAN, JOB PROCEDURES. DPR,MAKING ISOMETRIC AND REVIEW, ORTHO DRAWING
UNDERSTANDING, MTO , UNDERSTANDING WPS, PQR, WQR, QAP, ITP,KNOWLEDGE IN RT/UT/MPT/PT DETAILS, HIGH
PRESSURE FABRICATION FOR PIPING AND STRUCTURAL BODY. MAINTAINING RADIOGRAPHIC QUALITY , SYSTEMS OF
WELDING-GMAW , GTAW, GENERAL-ARC ETC.USES OF ELECTRODE WITH SUITABLE CODE, FABRICATION IN
STAINLESS-STEEL,MILDSTEEL, ETC. CRUDE OIL PIPE LINE,DIESEL LINE, FIRE WATER LINE, UTILITY LINE, RA-BILL,
DPR, JOB PRESENTATION,HYDRAULIC SYSTEM AND ELECTRO-HYDRAULIC NETWORK ANALYSIS, DRAWING
SENSATION, ERRECTION SYSTEM, ABILITY TO MAINTAINING WORK PROGRESS, HOUSE-KEEPING ]

Education:
+ Total Years of Experience : 11

years

Diploma in Mechanical Engineering - 2003

ASNT LEVEL II. (Complete NDT Technique)

+ Location Preference : No preference

Member of I.E

+ Desired Job Type : Permanent

Computer Literate. [ MS-OFFICE, AUTOCAD , INTERNET ]

+Desired Employment Status: Full Time

Trained in oil hydraulic systems.

+ Passport No. : G 7752275 ( Valid-May 2018)

H.U.E.T & H2S--Trained ( For OFFSHORE works)

+ Father,s Name : Lakshmikanta Chatterjee

General Education : Honours Graduate

+ Religion : Hindu

Current Employment : Hindustan Dorr-Oliver Ltd.


Current Position
: Asst. Manager (Mechanical Construction)
(Tank, Piping&Equipment )
Job Details
:

1. Understanding of Drawings(ORTHO & ISOMETRIC) for proper


Work.
2. Understanding and Preparation of MTO, WPS,PQR,WQR.
3. Understanding and implementation of Weld Matrix,NDT
detailing as follow as required field of fabrication.
4. Fabrication operation process of Tank, Spools and
Piping support structures, Understanding the defects of
welding and ensure the quality.

5. Equipments Erection
i.
Static : Cruid oil storage tank(26D X 18H) Cone and Flooting Roof
type,Dosing tank,Bioreactor tank,thickner,DAF,Heat Exchanger(Fin
Tube&Shell 6L X 2.4W X 350H),Valves
(Gate,Globe,Check,Butterfly),Spool,Pannel, Steam trap,Sump,Filter,
etc.
ii.
Rotary: Pump(Driven-20 to 1600m3/h),Compressor(Driven250,350cfh2stage,3stage,watercooled),Blower(Driven),Agitator(Drive
n),DG Set(Driven),Dryer(Driven),Gear(Transmission
Device),Coupling(TD),Motor(Driver-16 to 2200kw),Engines(Driver)

6. Work to ensuring QAP.

7. Making Job Procedure,QAP&ITP.


8. Ensuring NDT With Protocol, performance.
9. Ensuring Hydro test of spool and valves(Ball, Gate,
Globe,Check etc) as per API-598.
10. Co-or dination with site,client,vendors.
11. Prepairing the RA-Bill,DPR,Presentation,Quality Documents
as follow as project requirement.

Period From
Position
Period From

:
:
:
:

Position
Period From
4) Organization
Position
Period

:
:
:
:
:

2) Organization

3) Organization

Expected Salary :
Notice Period
:

November -2009 to Cont.


DOHA PETROLEUM CO. ( QATAR )
Project Engineer(TANK, PIPING &EQUIPMENTS)
November-2008 to November- 2009.
JESSOP&CO.LTD [ AN ISO 9001 ]
(A GOVT. OF INDIA UNDERTAKING CO.)
Jr. Engineer ( PROJECT )
March-2008 to October-2008
INDUSS LTD.
Asst. Engineer ( Project )
2003(Aug)-To- 2008 (March).

Negotiable
ONE MONTH

( DEBASHISH CHATTERJEE )

Das könnte Ihnen auch gefallen