SUB HEAD : 15.

0 PILE WORK
Note: 1 2

SH:15/PILE WORK

Pile driving rigs including vibratory hammers are assumed to be self contained with power units and necessary accessories required for driving. The quantity of concrete which is required to be stripped off upto a minimum height of 600 mm above the designed top level of the pile has been taken into account in the rate analysis. Payment will be made upto design top level / bottom of pile cap. Rate analysis for various type of piles like driven cast-in-situ, bored cast-in-situ, driven precast RCC pile and other types of piles have been included. If the steel casing in case of driven pile is required to be retained, the same is required to be priced separately. The levelling course below the pile cap is proposed with M15 grade concrete. In case of cement concrete piles, the minimum grade of concrete shall be M35 with minimum cement content of 400 kg / cum. However the analysis has been made for other grades also for mostly used bored cast - in - situ piles as guided by the local factors. The top of the pile shall project 50 mm into the pile cap and reinforcement of pile shall be fully anchored in pile cap. The minimum thickness of pile cap should be atleast 0.6 m or 1.5 times the diameter of the pile whichever is more. Guidance for piles is to be obtained from IS : 2911. Concrete in driven cast-in-situ piles shall be cast upto a height of 600 mm above the designed top level of pile, which shall be stripped off to obtain sound concrete either before final set or after 3 days.

4 5

6 7 8 9

Code No. 15.1

Description Providing, driving and installing driven cast-in-situ reinforced cement concrete piles of specified diameter and length below the pile cap in M35 cement concrete, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete as per specification & the direction of Engineer in-charge (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap):-

Unit

Rate

15.1.1 15.1.2 15.1.3 15.1.4 15.1.5 15.1.6

400 mm dia piles. 450 mm dia piles. 500 mm dia piles. 550 mm dia piles. 600 mm dia piles. 750 mm dia piles.

Metre Metre Metre Metre Metre Metre

R 1549.10 R 1862.70 R 2215.10 R 2561.80 R 2987.50 R 4525.30

\\vboxsrv\conversion_tmp\scratch_2\218141313.xls.ms_office/Schedule

SH:15-Page:3

SH:15/PILE WORK Code No. 15.2 Description Boring, providing and installing bored cast-in-situ reinforced cement concrete pile of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads as per specification & the direction of Engineer in-charge (Length of pile for payment shall be measured upto bottom of pile cap) :Unit Rate

15.2.1

In M35 reinforced cement concrete:Metre Metre Metre Metre Metre Metre Metre R 868.80 R 1361.20 R 1669.10 R 2012.10 R 2394.70 R 2795.30 R 4327.00

15.2.1.1 300 mm dia piles. 15.2.1.2 400 mm dia piles. 15.2.1.3 450 mm dia piles. 15.2.1.4 500 mm dia piles. 15.2.1.5 550 mm dia piles. 15.2.1.6 600 mm dia piles. 15.2.1.7 750 mm dia piles. 15.2.2 In M30 reinforced cement concrete:-

15.2.2.1 300 mm dia piles. 15.2.2.2 400 mm dia piles. 15.2.2.3 450 mm dia piles. 15.2.2.4 500 mm dia piles. 15.2.2.5 550 mm dia piles. 15.2.2.6 600 mm dia piles. 15.2.2.7 750 mm dia piles. 15.2.3 In M25 reinforced cement concrete:-

Metre Metre Metre Metre Metre Metre Metre

R 856.70 R 1339.70 R 1641.80 R 1978.50 R 2356.00 R 2746.90 R 4251.30

15.2.3.1 300 mm dia piles. 15.2.3.2 400 mm dia piles. 15.2.3.3 450 mm dia piles. 15.2.3.4 500 mm dia piles. 15.2.3.5 550 mm dia piles. 15.2.3.6 600 mm dia piles. 15.2.3.7 750 mm dia piles.

Metre Metre Metre Metre Metre Metre Metre

R 844.60 R 1318.20 R 1614.60 R 1944.80 R 2313.30 R 2700.60 R 4175.60

\\vboxsrv\conversion_tmp\scratch_2\218141313.xls.ms_office/Schedule

SH:15-Page:4

SH:15/PILE WORK Code No. 15.2.4 Description In M20 reinforced cement concrete:Metre Metre Metre Metre Metre Metre Metre R 842.80 R 1315.00 R 1610.60 R 1939.90 R 2307.40 R 2691.40 R 4164.60 Unit Rate

15.2.4.1 300 mm dia piles. 15.2.4.2 400 mm dia piles. 15.2.4.3 450 mm dia piles. 15.2.4.4 500 mm dia piles. 15.2.4.5 550 mm dia piles. 15.2.4.6 600 mm dia piles. 15.2.4.7 750 mm dia piles. 15.3 Boring, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M35 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete as per specification & the direction of Engineer in-charge (Length of pile for payment shall be measured upto to the bottom of pile cap) :-

15.3.1 15.3.2 15.3.3 15.3.4 15.3.5 15.4

300 mm dia piles. 400 mm dia piles. 450 mm dia piles. 500 mm dia piles. 550 mm dia piles. Extra over item No. 15.3 for boring, providing and installing cast-in-situ additional bulb in under reamed reinforced cement concrete piles, under specified dia meter as per specification & the direction of Engineer in-charge (only the quantity of extra bulbs are to be paid):300 mm dia piles. 400 mm dia piles. 450 mm dia piles. 500 mm dia piles. 550 mm dia piles.

Metre Metre Metre Metre Metre

R 826.10 R 1468.40 R 1861.70 R 2314.80 R 2835.40

15.4.1 15.4.2 15.4.3 15.4.4 15.4.5

Each Each Each Each Each

R 651.10 R 1056.50 R 1345.20 R 1719.80 R 2215.70

\\vboxsrv\conversion_tmp\scratch_2\218141313.xls.ms_office/Schedule

SH:15-Page:5

SH:15/PILE WORK Code No. 15.5 Description Providing, driving and installing driven Pre-cast reinforced cement concrete piles of specified diameter and length below the pile cap in M35 cement concrete to carry safe working load not less than specified with a central through preformed hole with M.S. black pipe of dia. 40mm for grouting with cement sand grouting of mix 1:2 (1 cement : 2 fine sand) under sufficient positive pressure to ensure complete filling including centring, shuttering, driving and removing the steel casing pipe and lifting casing etc. complete but excluding the cost of steel reinforcement as per specification & the direction of Engineer in-charge (Length of pile for payment shall be measured from top of the shoe to the bottom of pile cap):Unit Rate

15.5.1 15.5.2 15.5.3 15.5.4 15.5.5 15.5.6 15.6

400 mm dia piles. 450 mm dia piles. 500 mm dia piles. 550 mm dia piles. 600 mm dia piles. 750 mm dia piles. Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge:-

Metre Metre Metre Metre Metre Metre

R 1910.60 R 2273.70 R 2679.10 R 3127.50 R 3616.20 R 7131.20

15.6.1

Single pile upto 50 tonne capacity pile:Each Each R 26917.80 R 16150.70

15.6.1.1 Initial test. 15.6.1.2 Routine test. 15.6.2 Single pile above 50 tonne and upto 100 tonne capacity pile:-

15.6.2.1 Initial test. 15.6.2.2 Routine test. 15.6.3 Group of two or more piles upto 50 tonne capacity pile each:-

Each Each

R 38881.20 R 25721.40

15.6.3.1 Initial test. 15.6.3.2 Routine test.

Each Each

R 53237.40 R 32301.30

\\vboxsrv\conversion_tmp\scratch_2\218141313.xls.ms_office/Schedule

SH:15-Page:6

SH:15/PILE WORK Code No. 15.7 Description Cyclic vertical load testing of pile in accordance with IS Code of practice IS: 2911 (part IV) including preparation of pile head etc. as per specification & the direction of Engineer in-charge for:Unit Rate

15.7.1

Single Pile:Each Each R 16150.70 R 25721.40

15.7.1.1 Upto 50 tonne capacity pile. 15.7.1.2 Above 50 tonne and upto 100 tonne capacity pile. 15.7.2 Group of two or more piles:-

15.7.2.1 Upto 50 tonne capacity pile each. 15.8 Lateral load testing of single pile in accordance with IS Code of practice IS : 2911 (Part IV) for determining safe allowable lateral load on pile as per specification & the direction of Engineer in-charge :-

Each

R 32301.30

15.8.1 15.8.2

Upto 50 tonne capacity pile. Above 50 tonne and upto 100 tonne capacity pile.

Each Each

R 16150.70 R 25721.40

3.0 6.30