Orlan-M Familiarization Briefing

MOD Orlan Team DX35

DC-1 EVA Support Equipment

-3 Oxygen Tanks Vacuum Monometer - EVA Control Panel

Depress Valves (only open & closed visible)

Onboard Spacesuit Control Assembly (OSCA) -3 Oxygen Tanks Emergency O2 Umbilicals Cue Cards frag-minty

- EVA Control Panel

Onboard Interface Unit


To Onboard Heat Exchanger

(OSCA)

Emergency O2 Umbilical

Integrated Fluid Umbilical

Emergency O2 Umbilical

Electrical Umbilical

Electrical Umbilical

Orlan 1

Orlan 2

- Onboard Spacesuit Control Assembly (OSCA)

Pressue Indicator Blinker

Fluid Umbilical Connector

Depress Valves

2 (below 350mm)

Vacuum Monometer

Orlan Entry

Radio-Telemetry Unit

Radio

Battery

- Pneumohydrolic Control Panel


O2 Flow Selector OFF (.) INJECTOR (.) EMERGENCY () O2 Tank Selector Regulator Selector Temperature Control Lever Sublimator Actuator

O-4 Electrical Control Panel

Orlan-M Interfaces

Orlan Fluid Umbilical Connector

Orlan Electrical Umbilical Connector Emergency O2 Umbilical Connector

Orlan-M Replaceable Components

-4 Feedwater Filter

-9 LiOH Canister

Measurement Unit Filter

Moisture Collector

External Water Refill, Degassing, & Separation Components

5 Water Reservoir

Pressure Relief Valve

Manual Pump -2 Bag External Degassing & Separation Unit

EV Hatch -1

Hatch Removal Latches (Behind Closout MLI)

EV Hatch -1 (-2) Components

Emergency Closure Latches PUSHER (Hatch Opener)

Hatch Tool Installed & Deployed

June 1 (8 crew hours)

June 5: Orlan Practice Run (12 crew hours)

- Suit Checkouts - Donning Gear - Comm Check - Fit, Task, and Leak Checks - Post EVA Activities

- Prep Orlan Spares - Inspect Orlan - Checkout - Orlan Battery Install - Orlan Equipment Prep - Separation of Orlan & Water Systems - Orlan Fitcheck

June 1st through 7th, Pre-EVA Activities

June 6 (5 crew hours)

- Soyuz Prep for EVA - EVA Prep

June 4 (14 Crew Hours)

June 7 (10 crew hours)

- Glisser Video Cam Setup - ITCS Reconfig for EVA - Timeline Updates - Medical Conferences

- EVA Timeline Review - EVA Tool Prep - Comm Mode C/O - Leak Check - Install Portable Repress Tank - Orlan/ TLM C/O - Orlan Comm Check - Pressure Checks

Legend

EVA from (-) Orlan Operations () ISS RS EVA Radiogram Other

EVA

POST 1510h - Airlock Ops Post EVA


40 min 30 min 30 min

PREP 0755h - Vozdukh Deact and Hatch Positioning 0825h - Prep for EVA/Deact

0800h

150 min

1550h - ISS Act, comm reconfig, ventilation reconfig

0900h
80 min

0850h - Suit & Status Checks

1000h

30 min

1820h - Body mass/ Urine Test

15 15

1010h - Body Mass and Urine Biochemistry Tests


50 min 45 min

1600h 1700h 1800h 1900h

1850h - Meal

1040h - Medical Monitoring Comm Config Check


30 min

1125h - Subsystems Deact


90 min

June 8th, Day of Docking Cone Transfer EVA

1100h 1200h

EVA1: Transfer of Docking Cone to Docking Cone Assy, Plane Y in

1940h - ISS Act, Suit reconfig, removal of consumables, prep for drying

45 min 105 min

1200h - Don Gear

1300h

Legend

EVA from (-) Orlan Operations () ISS RS EVA Radiogram Other

1245h - Airlock Ops Before EVA

June 9th, Post-EVA Activities

June 9 (7 crew hours)

- Reconfig ISS to Pre-EVA - Spacesuit Drying and Reconfig - Spacesuit Drying and Water Refill - Spacesuit Drying and Stowage

Legend
EVA from (-) Orlan Operations () ISS RS EVA Radiogram Other