DESIGN OF ISOLATED SLOPED FOOTING

Column
Loading condition

A1

NODE-1
DL+LL

Char.Strength of Concrete(fck)(N/mm2) Char. Strength of Steel (fy) (N/mm2) Column size a). Longer Side of Column(lc) (mm) b).Shorter Side of Column(bc) (mm) Unfactored Column Load(P) (KN) Unfactored Moment about Major axis(x-x) (Mxx) (KN-m) Unfactored Moment about Minor axis(y-y) (Myy) (KN-m) Self Wt. Of Footing(Sf) (Actual ) (KN) Total Load(TL) (KN) S.B.C. of Soil(qs) (KN/m2) Area of Footing reqd.for Vertical Load only(A) (m2) Projection(Equal) reqd. on 4 sides(mm) Size of Footing Reqd. a). Longer Side of Footing (lfr) (mm) b). Shorter Side of Footing(bfr) (mm) Size of Footing Provided. a). Longer Side of Footing (lf) (mm) b). Shorter Side of Footing(bf) (mm) Max.Upward Pressure at Right-Top Corner(Pmax) (KN/m2) Min. Upward Pressure at Left_Bottom (Pmin)) (KN/m2) Size of Pedestal -Required a). Longer Side of Pedestal(lpr) (lc+300)(mm) b). Shorter Side of Pedestal(bpr) (bc+300)(mm) Depth of Pedestal Required (dpr) (mm) Size of Pedestal -Provided a). Longer Side of Pedestal(lp) (mm) b). Shorter Side of Pedestal(bp) (mm) Depth of Pedestal Provided (dp) (mm) Net Cantilever along Longer Side(Lxx)(m) Net Cantilever along Shorter Side(Lyy)(m) Bending Moment (Mu_xx) (KN-m) '' (Mu_yy) (KN-m) Depth of Bottom Rect.portion(Dr) (mm) Effective Depth Required.(mm) a). w.r.t. Mu,xx (dfxxr) (mm) b). w.r.t. Mu,yy (dfyyr) (mm) Total Depth Provided(Df) (mm) Clear Cover( cr ) (mm) Dia of Tor (assumed) along L.Side(txx) Dia of Tor (assumed) along S.Side(tyy) Effective Depth Provided.(mm) a). W.r.t. xx (dxx) b). W.r.t. yy (dyy) Percent steel reqd. a).Along L.Side( w.r.t. xx) (Pt_xx) b). Along S.Side(w.r.t. yy) (Pt_yy) a).Steel required Along L.Side(w.r.t. x-x ) 1).Diameter of bar(dl_r) (mm) 2). No. of bars along L.Side(nl_r) 3).Spacing along S.Side(Sv_xx_s) (mm) b).Steel required Along S.Side(w.r.t. y-y ) 1).Diameter of bar(ds_r) (mm) 2). No. of bars along S.Side(ns_r)

25 415 600 300 472.90 20.10 44.90 250.00 722.90 120 6.03 1006 2612 2312 2100 1850 238.34 133.82 900 600 287 900 650 300 0.6 0.6 68.19 90.27 150 158 158 450 50 12 12 394 382 0.157 0.17 12 5 370 12 6

3). Spacing along L.Side(Sv_xx_l) (mm) ACTUAL STEEL PROVIDED a).Along L.Side(w.r.t. x-x )

350

1).Diameter of bar(dl) (mm) 2). No. of bars along L.Side(nl) 3).Spacing along S.Side(Sv_xx) (mm) b).Along S.Side(w.r.t. y-y ) 1).Diameter of bar(ds) (mm) 2). No. of bars along S.Side(ns) 3). Spacing along L.Side(Sv_yy) (mm)

12 6 308 12 6 350

NODE-1
CHECK FOR DEVELOPMENT LENGTH Reqd. development length along Longer Side(Ld_l_r) Available development length along Longer Side(Ld_l_a) Reqd. development length along Shorter Side(Ld_s_r) Available development length along Shorter Side(Ld_s_a) Actual Shear Stress(Tv) a). Along Length(Tv_l) (N/mm2) b). Along Width(Tv_s) (N/mm2) Per.of Steel at Critical Section a). Along L.Side(Pt_c_l) (%) b). Along S.Side(Pt_c_s) (%) Permissible Shear Stress(Tc) a). Along L.Side(Tc_l) (N/mm2) b). Along S.Side(Tc_s) (N/mm2) CHECK FOR TWO-WAY SHEAR Two-way Shear Force(T_tw) (KN) Actual Two-way Shear Stress(Tv_tw) (KN) Two-way Shear --Ks Permissible Shear Strength(KsxTc) (N/mm2) Transfer of Load from Pedestal to footing Allow. Bearing force at base of Pedestal(qo_p) SQRT(A1/A2) Allow. Bearing force at the top of footing(qo_tf) Force in Dowels,if Required(KN) (Fd) Dowel Area Required (mm2) (Ad_r) Minimum Dowel Area(mm2) (Ad_min) Area of Column Rods (Ac) (mm2) Area of addl. Steel reqd. in pedestal(Ap_r) Selected Diameter of bar(tp) (mm) No. of Bars required (np) No.of Additional bars provided 684 550 680 550 0.26 0.30 0.23 0.19 0.34 0.31 524.6 0.36 1 0.97 6581.3 2 13162.6 0 0 2925