Oil India Limited

Well-wise Daily Report for Workover Wells


Shifts Current Shifts Planned

06-03-2014

Wellno Outfit
Exptd Pot

Rig-Up Date

Operations Carried Out


Operation hampered due to Bandh. Next Well : NHK 524/ NHK 318 (space constrnt.)/URG 1 (heavy oil- No tie bolt)/ NHK 121/MTN 1 (R)/NHK 594 (GW-APB)

DKM014 RG-A 14-02-2014 19 KHB003 RG-B 24-02-2014 3 NHK492 RG-C 17-12-2013 71 NHK535 RG-D 13-02-2014 18 NHK462 RG-E 06-09-2013 1 NHK146 Skytop-B 22-01-2014 23 KLN033 Cardwell-B 14-02-2014 3 MRN025 Cardwell-C 05-03-2014 1 NHK511 BHEL-C 27-11-2013 49 BMR002 BHEL-D 26-12-2013 57 DKM003 KREMCO 16-01-2014 49 WDW125 K-600 14-02-2014 2 NHK329 CH-1 28-12-2013 49 KMC012 CH-2 22-12-2013 59 JRN047 CH-5 07-02-2014 18 NHK378 CH-6 22-01-2014 45 WDW020 BHEL-B-S 19-02-2014 2 SLM006 Prod Setup 18-02-2014 1 1 WLD Mast 25-02-2014 Note:

Operation hampered due to Bandh. (P/out packer) Next Well : BPR 1/BPR 3 (R-SRP)/DKM 17 (R)/DKM 16 (R)/ BPR 9 (ESP)/BHJ 2(GW)/BHJ 1 (GW)/BHJ 4 Operation hampered due to Bandh. [R/in production string with hydraulic packer down to 1061 m] Next Well : NHK 509 (R)/NBJ 4 (R)/NHK 314/NHK 569/NHK 321 (R)/KLN13 (APB-producing) Operation hampered due to Bandh. Next Well : NHK 392 (GW)(R)/NHK 521/NHK 23(GW)/MKM 22 (ESP)/ KLN 32/ NHK509

Operation hampered due to Bandh. [ILM to NHK 460 in progress]. Next Well : NHK 460 (GW) (R)/TRN004 (GW) (R)/KMT 6(APB) (R)/NHK 558 (GW -APB) (R)/NHK 416/NHK 319 (WIencroachment)/NHK479 (WI-Land dispute)/NHK 253 (WI)-Land dispute/NHK 448 Operation hampered due to Bandh. [Sample analysis of 27.02.2014 at 01:00 PM showed Water: 100% (Salinity: 600 ppm; CO3: NIL; HCO3: .305 ppm; pH:7.5)] Next Well : NHK 58 (abd)/NHK 152(GW-tbg restriction) (R)/JRN 8 (R)/ NHK 263 (WDW)/NHK 197/NHK 80 (WDW Conv)/NHK 159/NHK119/NHK107/NHK 216/NHK 84(WI)/NHK 185 Operation hampered due to Bandh. [Well killing] Next Well : MKM 7 (Aph-GLV compln)/ MKM 4 (Aph-GLV compln) (R)/ NHK 124 (Aph) (R)/NHK 153 (Aph) (R)/NHK 202 (Aph)/NHK 160 (GW) (Aph)/NHK 340 (pebbles in well) (R)/NHK 316 (filled with stones and pebbles)/NHK 505 ILM completed. R/up mast. Boring of source water in progress. Next Well : MRN 25 (R)/ MRN 80 (WIconvers) (R)/MRN 70(WIconvers) (R)/MRN 24 (WIconvers) (R)/MRN 94(WIconvers)/MRN 71/MRN 98/MRN78/MRN 104/MRN 43 (WI-Leakage at hanger flange)/MRN 101 (APB) Operation hampered due to Bandh. [General R/dn in progress.] Next Well : NHK 576 (GW-R)/ NHK 565 (R)/ NHK 519/ HJN 7 (GW) Operation hampered due to Bandh. [cum : 21 bbls. Sample analysis of 27.02.2014 at 01:00 PM showed Water: 100% (Salinity: 49000 ppm; CO3: 180 ppm; HCO3: 120 ppm; pH:9.0)] Next Well : SLM 12 (R)/SLM 29 (R)/ JRN 1 (Abd)/ TNL 2 (SRP/ESP)/ NHK54 (Abd police stn)/NHK 128/NHK 261/JRN 18 Operation hampered due to Bandh. [Cum : 50 bbls. Sample analysis of 28.02.2014 at 03:10 PM showed Water: 100% (Salinity: 100 ppm; CO3: NIL; HCO3: 366 ppm; pH:7.5)] Next Well : CBA 2 (R)/NHK 187 (R)/HJN 16/HJN 24 (WI) (R)/HJN 45 (WI)/HJN 41 (WI)/NHK 308 (GW)/NHK 246 (WI)/NHK 207/MKM 12 (GP Prep-producing)/MKM 28 (GP-Prp)/BZL 4 (GP-Prp)/UTR-1 Operation hampered due to Bandh. [Arranging to lower mill] Next Well : WDW 74 (NHK429-P) (R)/NHK117 (WDW-OCS-2)/NHK 501/SLM 21(Sand ingression - WDW)/WDW 46 (KLN-14Psand ingression)/KLN 3 (WDW-tbg puncture Operation Hampered due to Bandh. At 6:00am today SITP = 1700psi. [Sample analysis of 27.02.2014 at 3:15 PM showed Oil/Condensate: 23% (API-42.1o, PP<9oC), Water: 77% (Salinity: 9500 ppm; CO3: Nil; HCO3: 549 ppm; pH: 7.5)] Next Well : HJN 28 (GW) (R)/ LHL 1 (GW-GP Prep)/ NHK 609 (GW-GP prep)/ NHK 423 (GW)(R)/NHK 375 (GW)/NHK 504 (GW)/HJN 35 (GP retrieval)-review/HJN 34 (G-P Retrieval)-review/NHK 170 (GW-tbg fish) Nitrogen Unit could not be mobilized due to Bandh. (Cum=256 bbls) [Sample analysis of 27.02.2014 at 05:00 PM showed Water: 100% (Salinity: 100 ppm; CO3: 60 ppm; HCO3: 9455 ppm; pH:8.5).] Next Well : KMC 5 (R)/ KMC 11 tbg fish(WDW)(R)/ BGN 5 (GW) (R)/BGN 1 (GW) (R)/BGN 3 (GW-isolation repair)/NHK 173 /NHK 447/NHK574 (Restrctn. in hole)/TLG 1 ( BD) Operation hampered due to Bandh. Next Well : BGN 7 (R)/ JRN 48 (GW-GP prep) (R)/NHK613 (HVK-GW-GP Prep)/HJN 54 (GL Compl) (R)/NHK 262/NHK 295/NHK 339/NHK 489/NHK162 (GW-encroachment)/NHK 470 /NHK 265 (GW)/KJN004 (GW-no xmas tree)/SCM 4(Loc. DFW- 10 M fittings reqrd) Operation hampered due to Bandh. [cum : 97 bbls. Sample analysis of 28.02.2014 at 03:15 PM showed Water: 100% (Salinity: 4200 ppm; CO3: Nil; HCO3: 549 ppm; pH: 7.5).] Next Well :NHK 466 (R)/NHK 274 (GW-fish ) (R)/NHK 606 (R)/SLG-1 (SRP)/NHK030 (GW-Spool prob/no xmas tree) (R)/NHK025 (GW)/NHK372 (GW)/NHK 12 (GW plinth problem) Operation hampered due to Bandh. Next Well : MKM 053 (acidisation)/ WDW 48 (HJN 1-P)/WDW 56 (HJN 3-P)/WDW 87 (HJN 2-P)

Operation hampered due to Bandh. [Hooking up of line in progress.] Next Well : SLM 10 (WI)/SLM 25 (WI)/NHK 74 (WI)/NHK 244 (WI) Next Well : NHK 169 (GW+CTU/NPU-unloading)/NMK 2(GW+CTU/NPU-unloading)/ NHK269(GW+CTU/NPU-unloading

: MMC crew deployed in RG-A, RG-B, RG-C, RG-D, BHEL-D, KREMCO

Database developed and maintained by Geology and Reservoir Engineering Department along with Prod(Oil) Dept