2 CB Pit Design 2.1 Side Walls To accommodate the lateral forces due to earth retenction, designing as a box section under compression due to earth pressure fromm all sides
H= D= z d=
Ka x p = 0.33*62
Span of box side wall unit width Thickness of wall
= L= b= Dsw= c= d=
2 20.63 KN/m
Clear cover
Effective depth As per BS 8110 - 1:1997, Table-2.1
Ultimated Load qu = 1.4*DL+1.6*LL Ultimated Load qu = 1.4*4.39+1.6*20.63 As per Bs 8110 - 2:1985, Table-3.1
Ultimated Moment M = (qu*L )/8 = 39.16*1.4 )/8
2 2
2 39.16 KN/m
9.59 KNm
As per BS 8110 -1 : 1997, Clause 3.4.4.4 Area of Tension Reinforcement = Ast = M/(0.95 x fy x Z) Lever arm Z =dx((0.5+(0.25-k/0.90))1/2) k = 9.59*106/(1000*125*125*25) z = 125*(0.5+(0.25-(0.024/0.9)) (or) 0.95*125 = Consider Area of Tension Reinforcement = Ast = M/(0.95 x fy x Z) 9.59*106/(0.95*410*118.75) As per BS 8110 -1 : 1997, Table-3.25 Ast min = (0.13*D*b)/100 = (0.13*200*700)/100 Ast min=
2 182 mm /m 0.5
= = z= z=
Ast=
2 207.34 mm /m
Consider T12 of main steel bars Provide T12@200c/c(565mm2/m'>Astmin)main reinforcement Consider T10 of distribution steel bars Provide T8 @200c/c distribution reinforcement.
Load of equipment (assume) Total Dead Load = 18.48+11.76+7 Assuming one wheel on the cover slab Earth Pressure (Unfactured) = Load/Area = (62.5+37.24)/(1.42)
= = p=
50.89 KN/m
56.02 KN/m
As per BS 8110 Part 1 Clause 3.4.4.4 Area of Tension Reinforcement = Ast = M/(0.95* x fy x Z) Lever arm Z= d x ((0.5+(0.25-k/0.9)1/2) K = M/(b x d2 x fcu) K = 13.72*106/(1000*175*175*25)
1/2 Z = 175*(0.5+(0.25-(K/0.9)) Z= 171.50 ( or 0.95d whichever is less)
K= 0.018<K'=0.156
Z= 0.95*175*166.25 Area of Tension Reinforcement = Ast = M/(0.95* x fy x Z) 13.72*106/(0.95*410*166.25) Ast min = 0.13*D*b/100 0.13*1000*250/100 Consider T 12 of main steel bars
Z=
166.25
Ast=
2 211.95 mm /2
Ast min=
2 325.00 mm /m
Provide T12 @200 c/c (565mm2/m'>Ast min) main reinforcement in both sides