THIS SUBMISSION IS DECLARED TO BE STRICTLY IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT

CLIENT NAME

PROJECT DRAWING NUMBER

PH10-1C-10-15-P002

STAMP:

QATAR TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8


CONSULTANT NAME

SUBSTATION NAME / CIRCUIT NAME

COMMON

B A 0 REV. B B STAT.

02 Oct, 13 16 June, 13 24 APR, 13 DATE

ISSUED FOR CONSTRUCTION ISSUED FOR CONSTRUCTION ISSUED FOR COMMENTS DESCRIPTION

T.G. PARK T.G. PARK T.G. PARK DRAWN

S.T.M S.T.M S.T.M CHECK.

S.Y.SUNG S.Y.SUNG S.Y.SUNG APPRO.

CONTRACTOR NAME

MANUFACTUTRE NAME

MANUFACTUTRE DRAWING NUMBER

NA

NA

DRAWING / DOCUMENT TITLE

SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR


SUBSTATIONS: 220/66/11kV 220/66/11kV New Doha-B Super S/S, 220/66/11kV Abu Hamur Super S/S, 220/66/11kV Ain Khalid Super S/S, Lusail Development super 3 S/S, 66/11KV Ain Khalid North S/S, 66/11KV Al Wadi West S/S
SCALE N/A SIZE A4 REV. B PROJECT DRAWING NUMBER

SHEET 1 OF 105 SHEETS

PH10-1C-10-15-P002

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 2 OF 105 DATE:

LIST OF CONTENTS SL. NO. 1 2 3 4 DESCRIPTION Visual and Dimension check Power Frequency Withstand Voltage Test 2.1.Insulation Resistance Measurement 2.2.High Voltage AC Test Measurement of Insulation Resistance for Auxiliary circuit Vacuum Circuit Breaker Test 4.1 Insulation Resistance Measurement 4.2 Coil Resistance Measurement 4.3 Contact Resistance Measurement 4.4 Closing Coil And Tripping Coil Pickup(Operation) Test 4.5 Breaker Timing Test 4.6 Electrical & Mechanical Operation checks Measurement of Contact Resistance for Main Circuit Current Transformer Test 6.1. Incomer Feeder 6.1.1 General Checks 6.1.2 Insulation Resistance Measurement 6.1.3 Polarity Test 6.1.4 Winding Resistance Measurement 6.1.5 Knee Point Voltage Measurement 6.1.6 Ratio Test 6.2.Bus-Section 6.2.1 General Checks 6.2.2 Insulation Resistance Measurement 6.2.3 Polarity Test 6.2.4 Winding Resistance Measurement 6.2.5 Knee Point Voltage Measurement 6.2.6 Ratio Test 6.3.Outgoing Feeder 6.3.1 General Checks 6.3.2 Insulation Resistance Measurement 6.3.3 Polarity Test 6.3.4 Winding Resistance Measurement 6.3.5 Knee Point Voltage Measurement 6.3.6 Ratio Test 6.4.Station Transformer Feeder 6.4.1 General Checks 6.4.2 Insulation Resistance Measurement 6.4.3 Polarity Test 6.4.4 Winding Resistance Measurement 6.4.5 Knee Point Voltage Measurement
LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

PAGE NO. 6 8 10 10

5 6

14 16

HYOSUNG Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 3 OF 105 DATE:

8 9 10 11

6.4.6 Ratio Test Voltage Transformer Test 7.1.Incomer Feeder 7.1.1. General Check 7.1.2. Insulation Resistance Measurement 7.1.3. Polarity Test 7.1.4. Winding Resistance Measurement 7.1.5. Ratio Test 7.2.Bus VT & Outgoing Feeders 7.2.1. General Check 7.2.2. Insulation Resistance Measurement 7.2.3. Polarity Test 7.2.4. Winding Resistance Measurement 7.2.5. Ratio Test Meter Calibration test 8.1. Ammeter Calibration Test 8.2. Voltmeter Calibration Test CT Secondary Injection Test VT Secondary Injection Test CT Primary Injection Test

44

54

56 80 105

Reference Drawings:
S.NO 1 2 3 4 5 6 7 8 9 10 11 12 13 Description Schematic for 11kV SWGR Incomer feeder Schematic for 11kV SWGR Bus section Schematic for 11kV SWGR Cable feeder Schematic for 11kV SWGR Aux transformer feeder Schematic for 11kV SWGR Capacitor feeder Schematic for 11kV SWGR Interlock Diagram Schematic for 11kv SWGR SYNCRO check Schematic for 11kv SWGR Bus1 CT Diagram Schematic for 11kv SWGR Bus2 CT Diagram Schematic for 11kv SWGR Bus Bar VT Diagram 11KV SWGR General Arrangement Diagram 11KV SWGR Name Plate Diagram 11KV SWGR Outline & Foundation Diagram Doc.No PH10-1C-10-15-3-001 PH10-1C-10-15-3-012 PH10-1C-10-15-3-008 PH10-1C-10-15-3-007 PH10-1C-10-15-3-009 PH10-1C-10-15-3-010 PH10-1C-10-15-3-011 PH10-1C-10-15-3-002 PH10-1C-10-15-3-006 PH10-1C-10-15-3-003 PH10-1C-10-15-2-002 PH10-1C-10-15-5-001 PH10-1C-10-15-2-001 Approval Status A A A A A I B I I B B I I

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 4 OF 105 DATE:

LIST OF TEST INSTRUMENTS

S.NO 1 2 3

EQUIPMENT

MAKE/TYPE

SERIAL NUMBER

CALIBRATION DATE

CALIBRATION DUE DATE

Note: Calibration Certificates will be produced along with the Testing equipments at site during testing activities.

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 5 OF 105 DATE:

1. VISUAL CHECK Equipment information


DESCRIPTION Make Type Installation Serial no Rated current Rated frequency Rated voltage Short time withstand rating Control voltage Auxiliary voltage Year of manufacture 2500 A 50 Hz 12 kV 40 KA for 3Sec 110 VDC 240 VAC 3150 A 50 Hz 12 kV 40 KA for 3 Sec 110 VDC 240 VAC 630A 50 Hz 12 kV 40 KA for 3 Sec 110 VDC 240 VAC INDOOR INCOMER BUS SECTION SCHNEIDER OUT GOING

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 6 OF 105 DATE:

Sl.No. 1 2

DESCRIPTION Name Plate Inspection Check each nameplate according to drawing Space Heater Check and breaking of wires of heater of HV and LV compartment Check setting of thermostat Others 3.1. Check doors closing completely 3.2. Check earthing state of doors and frame 3.3. Check all indication lamps of local panel 3.4. Check wiring condition 3.5. Check any joint in middle of wire 3.6. Check terminal block cover 3.7. Check the door limit switches 3.8. Check phase marks 3.10. Check construction and inspection of operating mechanism After self test and official test check interlock levers set-up and its smooth operation Check cable number tag at cables Check the proper dressing at wire duct Check the cable proper glanding at the panel Check insulation cover on CT&AC/DC supply terminals Conformity of power/control cable connection and identification labels. Check the power/control cable connection and tightness. Check of component pad lock facilities. All TB are numbered at both sides.

RESULTS

4 5 6 7 8 9 10 11 12

2. POWER FREQUENCY WITHSTAND VOLTAGE TEST


HYOSUNG Signature: Name: Date: LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date: KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 7 OF 105 DATE:

Test procedure: 1. Carry out Insulation Resistance Test (Before HV). 2. Carry out HV Test. 3. Carry out Insulation Resistance Test (After HV). Pre-conditions: 1. Check and confirm the CT circuits should be shorted and earthed. 2. Check and confirm Bus and line VT are isolated. 3. Check and confirm Switchboard is earthed. 4. Check all VT Fuse Removed. 5. CVD contact shorted at front of Display terminals in each phase of HV test. (Note: CVD indications to be tested at 6KV AC during the HV test.) Safety Procedures: (i)During the HV test 11kv SWGR Room all the access points are should be closed and locked, No-one not permitted to remain with in the 11KV SWGR room during testing. (ii) All the energize component will be barricaded off with rigid safety fencing. (iii) 11KV SWGR room and basement as well as all access points are shall be locked. 2.1. IR value measurement: Measure insulation resistance at 5000V DC before and after HV test.
R YBE in G Before HV Test After HV Test Y-RBE in G B-RYE in G

2.2. HVAC test. This test is to be carried out on each of the phases with respect to earth. AC voltage at 50Hz equal to 80% FAT value i.e 22.4kV since this test was carried out at Factory 2.5 times of the line voltage i.e 28 kV for 1 minute was applied to the conductor with respect to ground. The leakage current is recorded and noted as mentioned in the below table. (Note: Since this test is carried out in factory. 80% of the 28kV i.e. 22.4 kV shall be applied in site test.) Test Result: HV Test @ 22.4 kV AC for 1 Minutes
Leakage current in mA 0 Sec RYBE Y-RBE B-RYE 30 Sec 1 min

Criteria: Shall be withstood.


HYOSUNG Signature: Name: Date: LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date: KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 8 OF 105 DATE:

2.2. PARTIAL DISCHARGE TEST DURING HV TEST (i) All secondary circuit of CTs must be shorted. (ii) Ground the other two phases through the bus bar at cable chamber and also at the CVD display on the chamber. (iii) For the selected phases apply 1.1 x E/1.732 Voltage (7.6KV) (iv) Note down the PD value for each panel at the applied voltage. (v) Repeat same procedure for all phases and all the feeders.
S.NO 1 2 3 4 BAY NO Test voltage (kV) 6.9KV Measured values Y-PH B-PH Result

R-PH

A190 A170 A150 A130

6.9KV 6.9KV 6.9KV

Criteria: Should be less than 15 db 2.3. VT RATIO TEST AT RATED VOLTAGE: For Incomer: Test Results
VT Designation Phase Terminal 1r - 1nr R 2r - 2nr 3r - 3nr 1y - 1ny Y 2y - 2ny 3y - 3ny 1b - 1nb B 2b - 2nb 3b - 3nb Applied Primary Voltage in (V) Calc Sec. Voltage in (V) Measured Sec. Voltage in (V) % Error

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 9 OF 105 DATE:

For Bus VT & Outgoing Feeders:


VT Designation Phase R Y B Terminal 1r - 1nr 1y - 1ny 1b - 1nb Applied Primary Voltage in (V) Calc Sec. Voltage in (V) Measured Sec.Voltage in (V) % Error

2.4.CVD INDICATOR TEST: CVD Indicator test have been tested with 6 kv single phase, check the all condition with individual Phases. CVD indications tested at 6KV AC VOLTAGE Remarks: : OK/NOT OK

3. MEASUREMENT OF INSULATION RESISTANCE FOR AUXILIARY CIRCUIT Insulation Resistance Measurement The insulation resistance between Auxiliary circuit and earth shall be measured with 1kV Megger.
Contents Between the Auxiliary Circuit and Earth Measured value of Insulation Resistance Result Remarks

Criteria: >2M Remarks:

4. VACUUM CIRCUIT BREAKER TEST Name Plate Details


HYOSUNG Signature: Name: Date: LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date: KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 10 OF 105 DATE:

Description Make

INCOMER

BUS SECTION SCHNEIDER

OUT GOING

HVX 12-40-31-E Type Installation Serial no Rated current Rated frequency Rated voltage Breaking rating Control voltage Auxiliary voltage Breaker operating sequence Year of manufacture 2500 A 50 Hz 12 kV 40 kA 110 VDC 240 VAC O0.3S-CO3M-CO

HVX 12-40-31-E INDOOR

HVX 12-40-31-E

3150 A 50 Hz 12 kV 40 kA 110 VDC 240 VAC O0.3S-CO3M-CO

800A 50 Hz 12 kV 40 kA 110 VDC 240 VAC O0.3S-CO3M-CO

4.1. Insulation Resistance Measurement:


Applied Voltage 5KV Pole Earth(Close) Pole Pole(Open) R-PH(G) Y-PH(G) B-PH(G)

Criteria: 500M

4.2. Coil Resistance Measurement:


Coil Trip Coil Close Coil Resistance in

Criteria: 1.Closing Coil : 35.3 to 39.0 2. Opening Coil : 35.3 to 39.0

4.3. CB Closing & Opening check at reduced control voltage:


CB Close Open C .Voltage (110V) (85%) (70%) A .Volt [Vdc] 93.5V 77V Time (ms) Result

Temperature :

4.4. Breaker Timing Test:


HYOSUNG Signature: Name: Date: LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date: KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 11 OF 105 DATE:

Operation Open Close Close Open

R-PH (msec)

Y-PH (msec)

B-PH( (msec)

Criteria: 1. Closing time : 20 to 50ms 2. Opening time: 15 to 35 ms

4.5. Contact Resistance Measurement:


Phase R-Phase Y-Phase B-Phase Measured Value (in )

Criteria: 1. For Incomer & Bus Section


2. For Outgoing feeder

: < 20 : <55

Check List for Print out 1.Breaker timing test report 4.6. Electrical & Mechanical Operational checks for Circuit Breaker 4.6.1 Electrical checks Sl.No 4.6.1.1 4.6.1.2 4.6.1.3 Description Rack In / Rack Out Spring charge indication Spring Charge Mechanism 1.Electrical Operation 2.Mechanical operation Current drawn by spring charge motor CB Spring Charge Time in Seconds Anti-pumping checked Open / Close Indication Auxiliary Contacts Operation of Counter Tripping & Closing Operation
Operation Trip Close Electrical Mechanical

Remarks

4.6.1.4 4.6.1.5 4.6.1.6 4.6.1.7 4.6.1.8 4.6.1.9 4.6.1.10

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 12 OF 105 DATE:

4.6.2 Mechanical Operational Checks Sl.No Description Check the correct closing/opening of the doors a. Make to VCB at TEST position 4.6.2.1 b. Un-latch or latch the door latch c. Lift up the door handle to opening the door d. Push down the handle to closing the door 4.6.2.2 Circuit breaker in test and closed condition should not be possible to rack IN. 4.6.2.3 Circuit breaker in service and closed condition should not be possible to rack OUT. Circuit breaker in between service and test position should not be possible to 4.6.2.4 Close. 4.6.2.5 Circuit breaker in test position should be possible to close or trip. 4.6.2.6 Circuit breaker in service position should be possible to close or trip. 4.6.2.7 All safety interlocks. 4.6.2.8 Smooth rack in and rack out for the circuit breaker. 4.6.2.9 Mechanical Interlock with Earth Switch 4.6.2.10 Earthing switch cannot be closed when the circuit breaker is in service position. 4.6.2.11 Circuit breaker cannot be Rack IN when the Earthing switch is Closed 4.6.2.12 Circuit breaker interchangeability test 4.6.2.13 Check the CB racking IN/OUT handle inserted properly The positions of the Withdraw able part are described as, State Operations possible Withdraw able truck in service 1. Switching device shall be switched position, switching device ON OFF from Local/Remote. 2. Switching device shall be switched OFF from emergency Push button. Withdraw able truck in service 1. Removal of the withdraw able truck. position, switching device 2. Switching device shall be switched OFF OFF from Local/Remote. Withdraw able truck located Transfer of the Withdraw able truck between the service and test to service or Test position positions Withdraw able truck in test 1. Switching device shall be switched position, switching device ON OFF from Local/Remote. Withdraw able truck in disconnected position LV plug pulled off, switching device OFF, door open
HYOSUNG Signature: Name: Date:

Remarks

Operations not possible 1.Removal of the Withdraw able truck 2.Opening of the door 3.Pulling of the LV plug 1. Opening of the door 2. Pulling of the LV plug 1. Closing of the switching device 2. Opening of the door 3. Pulling of the LV plug Transfer of the Withdraw able truck to service position Closing of the door transfer of the Withdraw able truck to service position

--

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 13 OF 105 DATE:

5. CONTACT RESISTANCE MEASUREMENT TEST 5.1. Bus Bar Contact Resistance Make : SCHNEIDER DC Current Injected : 100 A DC Pre-conditions for the measurement of BUSBAR contact resistance: 1. All the breakers are to be kept in service position. 2. Close the breakers in the bays through which current injected. And all other should be in open. 3. Ensure all the earth switches are in open position. 11KV SWITCHGEAR
SL.NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Bay -1 Identification A210 A190 A170 A150 A130 A110 A18- I/C -1 A90 A70 A50 A30 A10 A20 A40 A60 A80 A100 A28 I/C -2 A120 A140 A160 A180 A200 A220 A290 A310 A330 A350 A38 A370 A390 A410 A430 A450 Bay -2 Identification A190 A170 A150 A130 A110 A18- I/C -1 A90 A70 A50 A30 A10 A12 Bus section A40 A60 A80 A100 A28 I/C -2 A120 A140 A160 A180 A200 A220 A32 Bus Section A310 A330 A350 A38 A370 A390 A410 A430 A450 A470 Bay -3 Identification ----------------------A20 ----------------------A290

Ambt Temperature :
R-Ph in Y-Ph in

C
B-Ph in

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 14 OF 105 DATE:

Note: For the all other test the value is for two breakers & bus. For the test Sl.No 12 the value is for three breakers & bus. Remarks:

5.2. Earth Switch Contact Resistance Measurement Make : SCHNEIDER DC Current Injected : 100 A DC Pre-conditions for the measurement of EARTH SWITCH contact resistance: 1. All the breakers are to be kept in test position. 2. Close the earth switches in the bay through which current injected, and all other should be in open. Earth Switch
SL.NO Bay Identification

Ambt Temperature :
R-Ph in Y-Ph in

C
B-Ph in

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
HYOSUNG Signature: Name: Date:

A210 A190 A170 A150 A130 A110 A18 A90 A70 A50 A30 A10 A12 A20 A40 A60 A80 A100 A28 A120 A140
LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date: KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 15 OF 105 DATE:

22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

A160 A180 A200 A220 A32 A290 A310 A330 A350 A38 A370 A390 A410 A430 A450 A470

Remarks:

6. CURRENT TRANSFORMER TEST 6.1. Incomer Feeder Name Plate Details


HYOSUNG Signature: Name: Date: LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date: KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 16 OF 105 DATE:

Description Make Type Installation Highest system voltage Short time rating Ratio Class Rated burden(VA) CT sec. resistance (Rct) at 75c in Knee point voltage (Vk) in V I mag at VK/2 in mA R ph Mfg.Year/Sl.No Y ph B ph CT Sec Terminals R ph Y ph B ph Function

CT1 (CORE-1)

CT1 (CORE-2) SCHNEIDER RING INDOOR 12 kV 40 kA for 3Sec

CT2 (CORE-1)

2500/1A PX 8.75 230 30

2500/1A 5P20/1.0 15VA 8.75 -

3200/1A PX 18 563 18

1S1-1S2 1S1-1S2 1S1-1S2 MAIN TRF DIFF(87T) + REF

2S1-2S2 2S1-2S2 2S1-2S2 DIR OC+BF +BCU+METERING

S1-S2 S1-S2 S1-S2 BUS BAR PROTN (87B/50BF)

6.1.1. General Checks 1.General visual inspection 2.Name plate details 3.HV Terminal Marking 4.LV Terminal Marking
HYOSUNG Signature: Name: Date: LAHMEYER INTERNATIONAL Signature: Name: Date:

: : : :
KAHRAMAA Signature: Name: Date:

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 17 OF 105 DATE:

5.Check for tightness of all CT terminals 6.Neutral earthing / Single point earthing 7.Position of P1-towards BUS/FEEDER 8.Check CT Connection with ring type Lugs 9.Check CT wire as per the Schematic diagrams and tightness 6.1.2 Insulation Resistance Measurement: Minimum Value: 1M/KV

: : : : :

Ambt Temperature

Test Procedure Check the Core to be measured Say Typical X Y(X is value to be checked, Y is against which value to be checked). Connect X to - Ve Terminal of Megger Connect Y to + Ve Terminal of Megger Select the Voltage Rating of Megger Operate the Megger and record Values Test Results
Description Primary Earth Primary- Secondary 1 Primary- Secondary 2 Secondary 1-Earth Secondary 2-Earth Secondary 1- Secondary 2 Applied Voltage (DC) in V 5000 V 5000 V 5000 V 500 V 500 V 500 V R-PH(G) Y-PH(G) B-PH(G)

6.1.3. Polarity Test

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 18 OF 105 DATE:

(P1 towards (+) ve & P2 towards (-) ve

Test Results
CT Designation CT1 CT2 Core No CORE-1 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 R-PH Y-PH B-PH

6.1.4. CT Winding Resistance

Test Procedure Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page As per instructions given by manual enter the test current(0.1A to 1.0A) and Pressing the start button, the test card displays The deviation of the measurement over time during the period of charging the winding The Kit will automatically performers a discharging of winding after saving the measurement Measures the DC Voltage Measures the Resistance
Test Results CT Core No Terminal Measured Resistance ( in ohms)

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 19 OF 105 DATE:

Designation CORE-1 CORE-2 CORE-1 1S1-1S2 2S1-2S2 1S1-1S2

R-Ph At ambT At 75 C

Y-Ph At ambT At 75 C

B-Ph At ambT At 75 C

CT1 CT2

Ambt Temperature

Temperature at 75 C = Rt (1+0.00393(75-t)
Where, 75 : Resistance at 75C () Rt : Resistance at ambient temperature () t : Ambient temperature (C)

Criteria: Resistance shall be less than specified CT specification.

6.1.5. Knee Point Voltage measurement

Test Procedure Do the connection as shown fig. Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page The necessary wiring is only two leads from the voltage output to the open secondary wiring of the CT. After entering the current and voltage limits and pressing the start button, the test card displays. Carry out the test. The knee point will be automatically calculated by the kit. After test an automatic sequence of demagnetization is performed. The test is done using a regulated voltage source. Do the same for all other cores.

Ambt Temperature
HYOSUNG Signature: Name: Date: LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date: KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 20 OF 105 DATE:

Test Results CT Designation CT1 CT2 R-Ph Core No CORE-1 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 Vk (V) Imag (mA) Vk (V) Y-Ph Imag (mA) Vk (V) B-Ph Imag ( mA)

Criteria: Accordance with CT specification.

6.1.6. Ratio Test

Test Procedure Do the connection as shown fig. Isolate primary/secondary/neutral earth. Switch on the kit. Select the current transformer page. As per the instruction given by the manual do the activities. After entering primary and the secondary Current values and pressing the start button, the test cord displays. The Ratio will be calculated automatically by the kit. Do the same procedure for the other phases. Test Results: R-Phase
CT Designation CT1 CT2 Core No CORE-1 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 Injected Primary Current (A) Expected Sec. Current (A) Measured Sec. Current (A) % Error

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 21 OF 105 DATE:

Y-Phase
CT Designation CT1 CT2 Core No CORE-1 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 Injected Primary Current (A) Expected Sec. Current (A) Measured Sec. Current (A) % Error

B-Phase
CT Designation CT1 CT2 Core No CORE-1 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 Injected Primary Current (A) Expected Sec. Current (A) Measured Sec. Current (A) % Error

Criteria: Accordance with CT specification.

Check List for Print out 1.CT Ratio and Polarity Test (For all Cores and Taps) 2.Knee point test ( for all cores and taps) 3.Winding resistance test (for all core & taps) Remark :

: : :

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 22 OF 105 DATE:

6.2. BUS SECTION 6.2.1. Name Plate Details


Description Make Type Installation Highest System Voltage Short Time Rating R ph Mfg.Year/S l.No: Ratio Class Rated burden(VA) CT sec.resistance (Rct) at 75c in Knee point voltage (Vk) in V I mag at VK/2 in mA R ph Mfg.Year/ Sl.No Y ph B ph CT Sec Terminals Function R ph Y ph B ph 1S1-1S2 1S1-1S2 1S1-1S2 B/B PROT (87B) 1S1-1S2 1S1-1S2 1S1-1S2 OC/EF+BCU+MET 2S1-2S2 2S1-2S2 2S1-2S2 B/B PROT (87B) Y ph B ph 3200/1A PX 18 563V 8.8mA 3200/1A 5P20/1.0 15 VA 18 3200/1A PX 18 563V 8.8mA CT 1 CORE-1 SCHNEIDER RING INDOOR 12 kV 40 kA for 3Sec CT 2 CORE-1 CT 2 CORE-2

SCHNEIDER RING INDOOR 12 kV 40 kA for 3Sec

6.2.1. General Checks


HYOSUNG Signature: Name: Date: LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date: KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 23 OF 105 DATE:

1. 2. 3. 4. 5. 6. 7. 8. 9.

General visual inspection Name plate details HV Terminal Marking LV Terminal Marking Check for tightness of all CT terminals Neutral earthing / Single point earthing Position of P1-Towards BUS/FEEDER Check CT Connection with ring type Lugs Check CT wire as per the Schematic diagrams and tightness

: : : : : : : : :

6.2.2. Insulation Resistance Measurement: Minimum Value: 1M/kV

Test Procedure Check the Core to be measured Say Typical X Y(X is value to be checked, Y is against which value to be checked). Connect X to - ve Terminal of Megger Connect Y to + ve Terminal of Megger Select the Voltage Rating of Megger Operate the Megger and record Values Test Results- CT 1
CT Designation CT 1 Description Primary Earth Primary-Secondary(Core.1) Secondary (Core.1)- Earth Applied Voltage (DC) in V 5000 V 5000 V 500 V R-PH(G) Y-PH(G) B-PH(G)

Test Results -CT 2


HYOSUNG Signature: Name: Date: LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date: KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 24 OF 105 DATE:

CT Designation

Description Primary Earth Primary- Secondary (Core.1) Primary- Secondary (Core.2)

Applied Voltage (DC) in V 5000 V 5000 V 5000 V 500 V 500 V 500 V

R-PH(G)

Y-PH(G)

B-PH(G)

CT 2

Secondary (Core.1) -Earth Secondary (Core.2)-Earth Secondary(Core.1) & Secondary(Core.2)

6.2.3. Polarity Test (P1 towards (+) ve & P2 towards (-) ve

Test Procedure Isolate primary/ secondary / Neutral earth. Connect S1 to +ve and S2 to ve in the meter. Apply 1.5VDC instantaneously to Primary as shown in fig. Monitor the +ve Deflection in the meter. Test Results
CT Designation CT1-1 CT2-1 CT2-2 Core No CORE-1 CORE-1 CORE-2 Terminal 1S1-1S2 1S1-1S2 2S1-2S2 R-PH Y-PH B-PH

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 25 OF 105 DATE:

6.2.4. CT Winding Resistance

Test Procedure Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page As per instructions given by manual enter the test current(0.1A to 1.0A) and Pressing the start button, the test card displays The deviation of the measurement over time during the period of charging the winding The Kit will automatically performers a discharging of winding after saving the measurement Measures the DC Voltage Measures the Resistance Test Results
Measured Resistance ( in ohms) CT Designation CT1-1 CT2-1 CT2-2 Core No CORE-1 CORE-1 CORE-2 Terminal 1S1-1S2 1S1-1S2 2S1-2S2 R-Ph At ambT At 75 C Y-Ph At ambT At 75 C B-Ph At ambT At 75 C

Ambt Temperature :

Temperature at 75 C = Rt (1+0.00393(75-t))
Where, 75: Resistance at 75C () Rt : Resistance at ambient temperature () t : Ambient temperature (C)

Criteria: Resistance shall be less than specified CT specification.

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 26 OF 105 DATE:

6.2.5. Knee Point Voltage measurement Ambt Temperature : C

Test Procedure Do the connection as shown fig. Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page The necessary wiring is only two leads from the voltage output to the open secondary wiring of the CT. After entering the current and voltage limits and pressing the start button, the test card displays. Carry out the test. The knee point will be automatically calculated by the kit. After test an automatic sequence of demagnetization is performed. The test is done using a regulated voltage source. Do the same for all other cores. Test Results
CT Designation CT1-1 CT2-1 CT2-2 R-Ph Core No CORE-1 CORE-1 CORE-2 Terminal 1S1-1S2 1S1-1S2 2S1-2S2 Vk (V) Imag (mA) Vk (V) Y-Ph Imag (mA) Vk (V) B-Ph Imag ( mA)

Criteria: Accordance with CT specification.

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 27 OF 105 DATE:

6.2.6. Ratio Test

Test Procedure Do the connection as shown fig. Isolate primary/secondary/neutral earth. Switch on the kit. Select the current transformer page. As per the instruction given by the manual do the activities. After entering primary and the secondary Current and pressing the start button, the test cord displays. The Ratio will be calculated automatically by the kit. Do the same procedure for the other phases. Test Results R-Phase
CT Designation CT1-1 CT2-1 CT2-2 Core No CORE-1 CORE-1 CORE-2 Terminal 1S1-1S2 1S1-1S2 2S1-2S2 Injected Primary Current (A) Expected Sec. Current (A) Measured Sec. Current (A) % Error

Y-Phase
CT Designation CT1-1 CT2-1 CT2-2 Core No CORE-1 CORE-1 CORE-2 Terminal 1S1-1S2 1S1-1S2 2S1-2S2 Injected Primary Current (A) Expected Sec. Current (A) Measured Sec. Current (A) % Error

B-Phase
CT Designation CT1-1 CT2-1 CT2-2 Core No CORE-1 CORE-1 CORE-2 Terminal 1S1-1S2 1S1-1S2 2S1-2S2 Injected Primary Current (A) Expected Sec. Current (A) Measured Sec. Current (A) % Error

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 28 OF 105 DATE:

Criteria: Accordance with CT specification.

Check List for Print out 1. CT Ratio and Polarity Test ( For all Cores and Taps ) 2. Knee point test ( for all cores and taps) 3. Winding resistance test (for all core & taps)

: : :

Remark

6.3. Outgoing Feeders Name Plate Details


Description Make Type Installation Highest System Voltage Short Time Rating Ratio Class Rated burden(VA) CT sec. resistance (Rct) at 75c in Knee point voltage (Vk) in V I mag at VK/2 in mA R ph Mfg.Year/ Sl.No: Y ph B ph CT Sec Terminals Function R ph Y ph B ph 1S1-1S3 1S1-1S3 1S1-1S3 OC/EF+BCU 2S1-2S3 2S1-2S3 2S1-2S3 PILOT WIRE PRTN 1S1-1S2 1S1-1S2 1S1-1S2 B/B PROTN (87B) 400 300 /1A 5P20/1.0 15 - 11.5 VA 2 - 1.5 (CT1) Core 1 (CT1) Core 2 SCHNEIDER RING INDOOR 12 kV 40 kA for 3Sec 400 300 /1A PX 1.4 1.05 425 - 320 50-70mA 3200/1A PX 18 563V 8.8mA (CT2) Core 1

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 29 OF 105 DATE:

6.3.1. General Checks 1. General visual inspection 2. Name plate details 3. HV Terminal Marking 4. LV Terminal Marking 5. Check for tightness of all CT terminals 6. Neutral earthing / Single point earthing 7. Position of P1-Towards BUS/FEEDER 8. Check CT Connection with ring type Lugs 9. Check CT wire as per the Schematic diagrams and tightness 6.3.2. Insulation Resistance Measurement: Minimum Value: 1M/KV

: : : : : : : : :

Test Procedure Check the Core to be measured Say Typical X Y(X is value to be checked, Y is against which value to be checked). Connect X to - ve Terminal of Megger Connect Y to + ve Terminal of Megger Select the Voltage Rating of Megger Operate the Megger and record Values

Test Results
Description Primary Earth Primary- Secondary 1 Primary- Secondary 2 Secondary 1-Earth Secondary 2-Earth Secondary 1- Secondary 2 Applied Voltage (DC) in V 5000 V 5000 V 5000 V 500 V 500 V 500 V R-PH(G) Y-PH(G) B-PH(G)

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 30 OF 105 DATE:

6.3.3. Polarity Test (P1 towards (+) ve & P2 towards (-) ve

Test Procedure Isolate primary/ secondary / Neutral earth. Connect S1 to +ve and S2 to ve in the meter. Apply 1.5VDC instantaneously to Primary as shown in fig. Monitor the +ve Deflection in the meter. Test Results
CT Designation Core No CORE-1 CT1 CORE-2 CT2 CORE-1 Terminal 1S1-1S2 1S1-1S3 2S1-2S2 2S1-2S3 S1-S2 R-PH Y-PH B-PH

6.3.4. CT Winding Resistance

Test Procedure

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 31 OF 105 DATE:

Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page As per instructions given by manual enter the test current(0.1A to 1.0A) and Pressing the start button, the test card displays The deviation of the measurement over time during the period of charging the winding The Kit will automatically performers a discharging of winding after saving the measurement Measures the DC Voltage Measures the Resistance

Test Results
Measured Resistance ( in ohms) CT Designation Core No Terminal R-Ph At ambT 1S1-1S2 CORE-1 CT1 CORE-2 CT2 CORE-1 1S1-1S3 2S1-2S2 2S1-2S3 1S1-1S2 At 75 C Y-Ph At ambT At 75 C B-Ph At ambT At 75 C

Ambt Temperature

Temperature at 75 C = Rt (1+0.00393(75-t))
Where, 75: Resistance at 75C () Rt : Resistance at ambient temperature () t : Ambient temperature (C)

Criteria: Resistance shall be less than specified CT specification. 6.3.5. Knee Point Voltage measurement Ambt Temperature : C

Test Procedure

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 32 OF 105 DATE:

Do the connection as shown fig. Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page The necessary wiring is only two leads from the voltage output to the open secondary wiring of the CT. After entering the current and voltage limits and pressing the start button, the test card displays. Carry out the test. The knee point will be automatically calculated by the kit. After test an automatic sequence of demagnetization is performed. The test is done using a regulated voltage source. Do the same for all other cores. Test Results
R-Ph CT Designation Core No Terminal 1S1-1S2 1S1-1S3 2S1-2S2 CORE-2 CT2 CORE-1 2S1-2S3 1S1-1S2 Vk (V) Imag (mA) Vk (V) Y-Ph Imag (mA) Vk (V) B-Ph Imag ( mA)

CORE-1 CT1

Criteria: Accordance with CT specification. 6.3.6. Ratio Test

Test Procedure Do the connection as shown fig. Isolate primary/secondary/neutral earth. Switch on the kit. Select the current transformer page. As per the instruction given by the manual do the activities. After entering primary and the secondary Current and pressing the start button, the test cord displays. The Ratio will be calculated automatically by the kit. Do the same procedure for the other phases.
HYOSUNG Signature: Name: Date: LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date: KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 33 OF 105 DATE:

Test Results R-Phase


CT Designation Core Terminal 1S1-1S2 1S1-1S3 2S1-2S2 2S1-2S3 1S1-1S2 Injected Primary Current in (A) Expected Sec.Current in (A) Measured Sec.Current in (A) % Error

CORE-1 CT1 CORE-2 CT2 CORE-1

Y-Phase
CT Designation Core Terminal 1S1-1S2 1S1-1S3 2S1-2S2 2S1-2S3 1S1-1S2 Injected Primary Current in (A) Expected Sec. Current in (A) Measured Sec. Current in (A) % Error

CORE-1 CT1 CORE-2 CT2 CORE-1

B-Phase
CT Designation Core Terminal 1S1-1S2 1S1-1S3 2S1-2S2 2S1-2S3 1S1-1S2 Injected Primary Current in (A) Expected Sec. Current in (A) Measured Sec. Current in (A) % Error

CORE-1 CT1 CORE-2 CT2 CORE-1

Criteria: Accordance with CT specification. Check List for Print out 1. CT Ratio and Polarity Test(For All Cores and Taps) 2. Knee point test ( for all cores and taps) 3. Winding resistance test (for all core & taps) Remarks

: : :

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 34 OF 105 DATE:

6.4. Station Transformer Feeders Name Plate Details


Description Make Type Installation Highest System Voltage Short Time Rating Ratio Class Rated burden(VA) CT sec. resistance (Rct) at 75c in Knee point voltage (Vk) in V I mag at VK/2 in mA R ph Mfg.Year/S l.No: Y ph B ph CT Sec Terminals Function R ph Y ph B ph 1S1-1S2 1S1-1S2 1S1-1S2 OC+E/F 2S1-2S2 2S1-2S2 2S1-2S2 BCU+ METERING S1-S2 S1-S2 S1-S2 B/B PROT (87B) 150/1A 5P20/1.0 15VA 3 (CT1) CORE-1 (CT1) CORE-2 SCHNEIDER RING INDOOR 12 kV 40kA for 3Sec 150/1A 5P20/1.0 15VA 3 3200/1A PX 18 563 8.8mA (CT2) CORE-1

6.4.1. General Checks 1. General visual inspection 2. Name plate details 3. HV Terminal Marking 4. LV Terminal Marking 5. Check for tightness of all CT terminals 6. Neutral earthing / Single point earthing 7. Position of P1-Towards BUS/FEEDER 8. Check CT Connection with ring type Lugs 9. Check CT wire as per the Schematic diagrams and tightness

: : : : : : : : :

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 35 OF 105 DATE:

6.4.2. Insulation Resistance Measurement: Minimum Value: 1M/KV

Ambt Temperature

Test Procedure Check the Core to be measured Say Typical X Y(X is value to be checked, Y is against which value to be checked). Connect X to - ve Terminal of Megger Connect Y to + ve Terminal of Megger Select the Voltage Rating of Megger Operate the Megger and record Values Test Results
Description Primary Earth Primary- Secondary 1 Primary- Secondary 2 Secondary 1-Earth Secondary 2-Earth Secondary 1- Secondary 2 Applied Voltage (DC) in V 5000 V 5000 V 5000 V 500 V 500 V 500 V R-PH(G) Y-PH(G) B-PH(G)

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 36 OF 105 DATE:

6.4.3. Polarity Test (P1 towards (+) ve & P2 towards (-) ve

Test Procedure Isolate primary/ secondary / Neutral earth. Connect S1 to +ve and S2 to ve in the meter. Apply 1.5VDC instantaneously to Primary as shown in fig. Monitor the +ve Deflection in the meter. Test Results
CT Designation CT1 CT2 Core No CORE-1 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 R-PH Y-PH B-PH

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 37 OF 105 DATE:

6.4.4. CT Winding Resistance

Test Procedure Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page As per instructions given by manual enter the test current(0.1A to 1.0A) and Pressing the start button, the test card displays The deviation of the measurement over time during the period of charging the winding The Kit will automatically performers a discharging of winding after saving the measurement Measures the DC Voltage Measures the Resistance Test Results
Measured Resistance ( in ohms) CT Designation Core No Terminal R-Ph At ambT CORE-1 CT1 CT2 CORE-2 CORE-1 1S1-1S2 2S1-2S2 1S1-1S2 At 75 C Y-Ph At ambT At 75 C B-Ph At ambT At 75 C

Ambt Temperature

Temperature at 75 C = Rt (1+0.00393(75-t))
Where,

75: Resistance at 75C () Rt : Resistance at ambient temperature () t : Ambient temperature (C) Criteria: Resistance shall be less than specified CT specification.

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 38 OF 105 DATE:

6.4.5. Knee Point Voltage measurement Ambt Temperature : C

Test Procedure Do the connection as shown fig. Isolate primary/ secondary / Neutral earth. Switch on the kit Select the current transformer page The necessary wiring is only two leads from the voltage output to the open secondary wiring of the CT. After entering the current and voltage limits and pressing the start button, the test card displays. Carry out the test. The knee point will be automatically calculated by the kit. After test an automatic sequence of demagnetization is performed. The test is done using a regulated voltage source. Do the same for all other cores. Test Results
R-Ph CT Designation Core No CORE-1 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 Vk (V) Imag (mA) Vk (V) Y-Ph Imag (mA) Vk (V) B-Ph Imag ( mA)

CT1 CT2

Criteria: Accordance with CT specification.

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 39 OF 105 DATE:

6.4.6. Ratio Test

Test Procedure Do the connection as shown fig. Isolate primary/secondary/neutral earth. Switch on the kit. Select the current transformer page. As per the instruction given by the manual do the activities. After entering primary and the secondary Current and pressing the start button, the test cord displays. The Ratio will be calculated automatically by the kit. Do the same procedure for the other phases. Test Results R-Phase
CT Designation Core CORE-1 CT1 CT2 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 Injected Primary Current in (A) Expected Sec. Current in (A) Measured Sec. Current in (A) % Error

Y-Phase
CT Designation Core CORE-1 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 Injected Primary Current in (A) Expected Sec. Current in (A) Measured Sec. Current in (A) % Error

CT1 CT2

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 40 OF 105 DATE:

B-Phase
CT Designation Core CORE-1 CORE-2 CORE-1 Terminal 1S1-1S2 2S1-2S2 1S1-1S2 Injected Primary Current in (A) Expected Sec. Current in (A) Measured Sec. Current in (A) % Error

CT1 CT2

Criteria: Accordance with CT specification. Check List for Print out 1. CT Ratio and Polarity Test(For All Cores and Taps) 2. Knee point test ( for all cores and taps) 3. Winding resistance test (for all core & taps) Remarks :

: : :

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 41 OF 105 DATE:

7. VOLTAGE TRANSFORMER TEST 7.1. Incomer Feeder Name Plate Details


Description Make Type Installation Highest System Voltage Insulation Level Ratio Class Burden(VA) R ph Mfg.Year/Sl.No: Y ph B ph Function BCU + AVR + MET. + SYNC 11kV/3 :110V/3 3P/1.0 50 VA CORE 1 SCHNEIDER VBF12 INDOOR 12 kV

7.1.1. General Checks 1. General visual inspection 2. Name plate details 3. HV Terminal Marking 4. LV Terminal Marking 5. Check for tightness of all VT terminals 6. VT Primary and Secondary neutral earth check 7. Fuse rating 8. MCB rating 9. Equipment Grounding System

: : : : : : : : :

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 42 OF 105 DATE:

7.1.2. Insulation Resistance Measurement: Minimum Value: 1M/kV

Ambt Temperature

Test Procedure Check the Core to be measured Say Typical X Y(X is value to be checked, Y is against which value to be checked). Connect X to - ve Terminal of Megger Connect Y to + ve Terminal of Megger Select the Voltage Rating of Megger Operate the Megger and record Values Test Results
Description Primary Earth Primary- Secondary 1 Secondary 1-Earth Applied Voltage (DC)in V 5000 V 5000 V 500 V R-PH(G) Y-PH(G) B-PH(G)

7.1.3. Polarity Test

Test Procedure Isolate primary/ secondary / Neutral earth. Connect a to +ve and n to ve in the meter. Apply 1.5VDC instantaneously to Primary as shown in fig. Monitor the +ve Deflection in the meter. If the deflection is not enough to confirm, reverse the connection (meter shall be connected to Primary side and DC voltage shall be applied on secondary side) and try again. Test Results
VT Designation VT Core No CORE-1 Terminal 1r* - 1nr* R-Ph Y-Ph B-Ph

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 43 OF 105 DATE:

*Denotes respective phase .i.e (1r-1nr), (1y-1ny), (1b-1nb) 7.1.4. VT Winding Resistance

Test Procedure Isolate primary/ secondary / Neutral earth. Switch on the kit Select the voltage transformer page As per instructions given by manual enter the test current and Pressing the start button, the test card displays The deviation of the measurement over time during the period of charging the winding The Kit will automatically performers a discharging of winding after saving the measurement Measures the DC Voltage Measures the Resistance Test Results
Measured Resistance ( in ohms) VT Designation Core Terminal R-PH At ambT HV R* - N* 1r* - 1nr* LV 2r* - 2nr* 3r* - 3nr* At 75 C Y-PH At ambT At 75 C B-PH At ambT At 75 C

*Denotes respective phase.i.e (R-N), (Y-N), (B-N), (1r-1nr), (1y-1ny),(1b-1nb) (2r-2nr), (2y-2ny),(2b-2nb) & (3r-3nr),(3y-3ny),(3b-3nb) Ambt Temperature: C Temperature at 75 C = Rt (1+0.00393(75-t))
Where, 75: Resistance at 75C () Rt: Resistance at ambient temperature () t: Ambient temperature (C)

Criteria: Resistance shall be less than specified CT specification.

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 44 OF 105 DATE:

7.1.5. Ratio Test

Test Procedure Do the connection as shown fig. Switch on the kit. Select the voltage transformer page. As per the instruction given by the manual do the activities. After entering primary and the secondary voltage and pressing the start button, the test cord displays. The Ratio will be calculated automatically by the kit. Do the same procedure for the other phases. Test Results
VT Designation Phase R VT Y B Terminal 1r - 1nr 1y - 1ny 1b - 1nb Applied Primary Voltage in (V) Calc Sec. Voltage in (V) Measured Sec. Voltage in (V) % Error

Criteria: Accordance with VT specification. Check List for Print out 1.VT ratio and polarity test 2. VT secondary winding resistance

: :

Remarks:

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 45 OF 105 DATE:

7.2. Capacitor, Station Transformer, Outgoing Feeders Name Plate Details


Description Make Type Installation Highest System Voltage Insulation Level R ph Mfg. Year/Sl.No: Y ph B ph Ratio Class Burden(VA) Function 11kV/3 : 110V/3 3P/1.0 50 VA BCU + MET. + SYNC. Core 1 SCHNEIDER VBF12 INDOOR 12 kV

7.3. Bus VT
Description Make Type Installation Highest System Voltage Insulation Level R ph Mfg.Year/Sl.No: Y ph B ph Ratio Class Burden(VA) Function 11kV/3 : 110V/3 3P/1.0 50 VA BCU + MET. + SYNC. Core 1 SCHNEITER VBF12 INDOOR 12 kV

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 46 OF 105 DATE:

7.2.1. General Checks 1.General visual inspection 2.Name plate details 3.HV Terminal Marking 4.LV Terminal Marking 5.Check for tightness of all VT terminals 6.Fuse rating 7.MCB rating 8.Equipment Grounding System 9. VT Primary and Secondary neutral earth check 10. VT truck rack IN/OUT check 7.2.2. Insulation Resistance Measurement: Minimum Value: 1M/kV

: : : : : : : : : :

Ambt Temperature

Test Procedure Check the Core to be measured Say Typical X Y(X is value to be checked, Y is against which value to be checked). Connect X to - ve Terminal of Megger Connect Y to + ve Terminal of Megger Select the Voltage Rating of Megger Operate the Megger and record Values Test Results Applied Voltage Description R-PH(G) Y-PH(G) B-PH(G) (DC) in V Primary Earth 5000 V Primary- Secondary 5000 V Secondary -Earth 500 V

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 47 OF 105 DATE:

7.2.3. Polarity Test

Test Procedure Isolate primary/ secondary / Neutral earth. Connect a to +ve and n to ve in the meter. Apply 1.5VDC instantaneously to Primary as shown in fig. Monitor the +ve Deflection in the meter. If the deflection is not enough to confirm, reverse the connection (meter shall be connected to Primary side and DC voltage shall be applied on secondary side) and try again. Test Results VT Designation Core No Terminal R-Ph 1r* - 1nr* VT CORE -1 *Denotes respective phase .i.e (1r-1nr),(1y-1ny),(1b-1nb)

Y-Ph

B-Ph

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 48 OF 105 DATE:

7.2.4. VT Winding Resistance

Test Procedure Isolate primary/ secondary / Neutral earth. Switch on the kit Select the voltage transformer page As per instructions given by manual enter the test current and Pressing the start button, the test card displays The deviation of the measurement over time during the period of charging the winding The Kit will automatically performers a discharging of winding after saving the measurement Measures the DC Voltage Measures the Resistance Test Results
Measured Resistance ( in ohms) VT Designation Core Terminal R-PH At ambT VT 1 1r* - 1nr* At 75 C Y-PH At ambT At 75 C B-PH At ambT At 75 C

*Denotes respective phase .i.e (1r-1nr),(1y-1ny),(1b-1nb)


Ambient Temperature: C

Temperature at 75 C = Rt (1+0.00393(75-t))
Where,

75 : Resistance at 75C () Rt : Resistance at ambient temperature () t : Ambient temperature (C) Criteria: Resistance shall be less than specified CT specification.

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 49 OF 105 DATE:

7.2.5. Ratio Test

Test Procedure Do the connection as shown fig. Switch on the kit. Select the voltage transformer page. As per the instruction given by the manual do the activities. After entering primary and the secondary voltage and pressing the start button, the test cord displays. The Ratio will be calculated automatically by the kit. Do the same procedure for the other phases. Test Results
VT Designation Phase R Y B Terminal 1r - 1nr 1y - 1ny 1b - 1nb Applied Primary Voltage in (V) Calculated Sec. Voltage in (V) Measured Sec. Voltage in (V) % Error

Criteria: Accordance with VT specification. Check List for Print out 1. VT ratio and polarity test 2. VT secondary winding resistance

: :

Remarks

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 50 OF 105 DATE:

8. METER CALIBRATION TEST 8.1. Ammeter with Selector Switch 8.1.1. Name Plate Details Device Ref : Make : Sl. No. : Full Scale Reading : CT Ratio : Accuracy Class : 8.1.2. Secondary Injection Test
Injected Secondary Current in (A) Measured Current in (A) Expected Current in (A) % Error

Allowable Error Range: As per the Ammeter Class Ammeter Found Healthy Selector switch function checked : : YES / NO YES / NO

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 51 OF 105 DATE:

8.2. Volt Meter with Selector Switch: 8.2.1. Name Plate Details Device Ref : Make : Sl. No. : Full Scale Reading : CT Ratio : Accuracy Class : 8.2.2. Secondary Injection Test
Injected Secondary voltage in V Measured Voltmeter Reading in (kV) Expected Voltmeter Reading in (kV) % Error

Allowable Error Range: As per the Voltmeter Class Volt meter Found Healthy Selector switch function checked : : YES / NO YES / NO

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 52 OF 105 DATE:

9.11kV CT SECONDARY INJECTION TEST 9.1. Incomer Feeder 9.1.1 Name Plate Details:
Description Make Type Installation Highest system voltage Short time rating Ratio Class Rated burden(VA) CT sec. resistance (Rct) at 75c in Knee point voltage (Vk) in V I mag at VK/2 in mA R ph Mfg. Year/Sl.No Y ph B ph CT Sec Terminals R ph Y ph B ph Function 1S1-1S2 1S1-1S2 1S1-1S2 MAIN TRF DIFF(87T) + REF 2S1-2S2 2S1-2S2 2S1-2S2 Directional O/C Protection +BCU+AVR+ Ammeter S1-S2 S1-S2 S1-S2 Bus Bar Protection 2500/1A PX <8.75 230 30 (CT1) CORE-1 (CT1) CORE-2 SCHNEIDER RING INDOOR 12 kV 40 kA for 3Sec 2500/1A 5P20/1.0 15VA <14 3200/1A PX <18 563 8.8mA (CT2) CORE-1

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 53 OF 105 DATE:

9.1.2. A18

CT1- Core-1, Diff Protection (87T) + REF (87NI). Ratio : 2500/1A SWGR Terminals X11-612, 615, 618 & 613 and

Inject R- PH 0.6 A, Y- PH 0. 8A, B- PH 1.0A at A, measure the Current in the following terminals.

Secondary Current In mA measured at SWGR Panel A18 TB Terminal X11 R 612 Y 615 B 618 N 613 R 1 Relay Panel +B11 RP CT Terminal X650 Y 3 B 5 N 7 Relay Panel +B11 .RP Test Block S871.B Test Position R 21 Y 23 B 25 N 27

Relay Panel +B11 .RP Test Block S871.B Test Position R 22 Y 24 B 26 N 28

Relay Panel +B11 .RP Test Block S871.B Service Position R 22 Y 24 B 26 N 28

Relay Panel +B11 RP Relay 87T Main - 7UT613 R R1 Y R3 B R5 N -

Relay Panel +B11 RP Display Pri. Current at Relay87T Main7UT613 R IL1 Y IL2 B IL3 N -

Relay Panel +B11 RP Display Sec. Current at Relay87T Main7UT613 R IL1 Y IL2 B IL3 N -

Relay Panel +B11 .RP Test Block S871.B Test Position R 2 Y 4 B 6 N 8

Relay Panel +B11 .RP Test Block S871.B Test Position R 1 Y 3 B 5 N 7

Relay Panel +B11 .RP Test Block S871.B Service Position R 1 Y 3 B 5 N 7 R 10

Relay Panel +B11 .RP TB Terminal X650 Y 11 B 12 N 13

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 54 OF 105 DATE:

Relay Panel +A18 .RP TB Terminal X610 R 5 Y 6 B 7 N 8

Relay Panel +A18 .RP Test Block S871 Test Position R 21 Y 23 B 25 N 27

Relay Panel +A18 .RP Test Block S871 Test Position R 22 Y 24 B 26 N 28

Relay Panel+A18 .RP Test Block S871 Service Position R 22 Y 24 B 26 N 28 R Q1/Q2

Relay Panel+A18 .RPRelay (87NL/51) P141 Y Q3/Q4 B Q5/Q6 N Q7/Q8

Relay Panel +A18 .RP- Display Pri. Current at Relay (87NL/51) P141 R IL1 Y IL2 B IL3 N 3I0

Relay Panel+A18 .RPDisplay Sec. Current At Relay (87NL/51) P141 R IL1 Y IL2 B IL3 N 3I0

Relay Panel +A18 .RPB1 Metrosil N 1 N 2

Relay Panel +A18 .RPR102 Resistor N 1 N 2

Relay Panel +A18 .RP S871 Test Position N 1 N 3

Relay Panel +A18 .RP S871 Test Position N 2 N 4

Relay Panel+A18 .RP Test Block S871 Service Position N 2 N 4

Relay Panel +A18 .RP-Relay 87NL P141 N

Relay Panel +A18 .RPDisplay Pri. at RELAY 87NL P141 3I0

Relay Panel+18A .RP- Display Sec. at Relay 87NL P141

3I0

Q7/Q8

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 55 OF 105 DATE:

9.1.3. A18

CT1- CORE-2, AVR+DIR OC+BCU+AMMETER Ratio : 2500/1A SWGR Terminals X11 622, 625, 628 & 623

Inject R- PH 0.6 A, Y- PH 0.8A, B- PH 1.0A at A and measure the current in the following terminals.

Secondary current in mA measured at SWGR Panel +A18 TB Terminal -X11 R 622 Y 625 B 628 N 623 Relay Panel+A18 .RP TB Terminal X620 R 1 Y 3 B 5 N 7 Relay Panel+A18 .RP TB TerminalX620 B B 10 13 AVR Panel TB Terminal X620 B 1 B 4

AVR Panel -A1 TAPCON 260 Relay TerminalM1 B B 5 9

AVR Panel -A1 TAPCON 260 Relay Display Pri B I B

AVR Panel -A1 TAPCON 260 Relay Display Sec B I B -

Relay Panel+A18 .RP Test Block S671.A Test Position R 21 Y 23 B 25 N 27

Relay Panel+A18 .RP Test Block S671.A Test Position R 22 Y 24 B 26 N 28

Relay Panel+A18 .RP Test Block S671.A Service Position R 22 Y 24 B 26 N 28

Relay panel +A18 .RP Relay (67/67N/51/50BF) P141 R Q1/Q2 Y Q3/Q4 B Q5/Q6 N Q7/Q8

Relay panel +A18 .RP Relay Display Pri at (67/67N/51/50BF) P141 R Y B N IL1 IL2 IL3 IE

Relay panel +A18 .RP Relay Display Sec at (67/67N/51/50BF) P141 R Y B N IL1 IL2 IL3 IE

Relay Panel+A18 .RP Test Block S671.A Test Position R 2 Y 4 B 6 N 8

Relay Panel+A18 .RP Test Block S671.A Test Position R Y B N 1 3 5 7

Relay Panel+A18 .RP Test Block S671.A Service Position R Y B N 1 3 5 7

Relay Panel+A18 .RP Test Block S201 Test Position R Y B N 21 23 25 27

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 56 OF 105 DATE:

Relay Panel+A18 .RP Test Block S201 Test Position R Y B N 22 24 26 28

Relay Panel+A18 .RP Test Block S201 Service Position R Y B N 22 24 26 28

Relay Panel+A18 .RP A201 BCU 7SJ647 R Y B N Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8

Relay Panel+A18 .RP - Display Pri. at BCU 7SJ647 IL1 IL2 IL3 IE

Relay Panel+A18 .RP - Display Sec. at BCU 7SJ647 IL1 IL2 IL3 IE

Relay Panel +A18 .RP TB Terminal X620 R Y B N 10 11 12 13

R 661

SWGR Panel+A18 TB Terminal- X11 Y B 663 665

N 667

R 2

SWGR Panel+A18 Selector Switch (-S401) Y B 6 10

N 1

R-ph

SWGR Panel +A18 Ammeter (-P401) Y-ph B-ph

9.1.4. A

CT2- CORE-1, BB PROTN. Ratio: 3200/1A SWGR Terminals X11 634, 637, 640 &

Inject R- PH 0.6 A, Y- PH 0.8A, B- PH 1.0A at A 633 and measure the current in the following terminals.
SWGR Panel A18 TB Terminal X11 Y B 637 640

R 634

N 633

Secondary current in mA measured at Bb Relay Panel +BB .RP1 TB Terminal-X610 R Y B N 52 53 54 2

BB Relay Panel +BB .RP1 R103,R104,R105(Resistor) R Y B N 1,2 1,2 1,2 --

BB Relay Panel +BB .RP1 Test Block S87Z1 Test Position R Y B N 21 23 25 27

BB Relay Panel +BB .RP1 Test Block S87Z1 Test Position R Y B N 22 24 26 28

-BB Relay Panel +BB .RP1 Test Block S87Z1 Service Position R Y B N 22 24 26 28

BB Relay Panel +BB .RPRelay F87Z1 BBP 7SJ611 R Y B N Q7/Q8 Q7/Q8 Q7/Q8 ---

BB Relay Panel +BB .RPRelay Display Pri.F87Z1 BBP 7SJ611 R Y B N 3I0 3I0 3I0 -

BB Relay Panel +BB .RP-Relay Display Sec.F87Z1 BBP 7SJ611 R Y B N 3I0 3I0 3I0 -

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 57 OF 105 DATE:

9.1.5.

Burden Measurement Test Inject 1A at each core and each phase. Measure the voltage at terminal.

LOCATION

CORE NO

PHASE

TERMINAL

VOLTAGE

BURDEN

R CT1-Core 1 Y B R CT1-Core 2 11KV SWGR CT2-Core 1 Y B R Y B

X11 612 & 613 X11 615 & 616 X11 618 & 619 X11 622 & 623 X11 625 & 626 X11 628 & 629 X11 633 & 634 X11 636 & 637 X11 639 & 640

CT Star Point Conformation:


Description CT Core (CT1) Core-1 (CT1) Core-2 (CT2) Core-1

Star Point Conformation

S1/S2

Note: 1. 2. 3. 4. 5. Confirmation of connection of CT as per drawing Confirmation of isolating links and shorting links as per drawing Confirmation of earthing of star at single point CT Terminal tightness CORE identification checks : : : : :

Remarks:

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 58 OF 105 DATE:

9.2. Bus Section 9.2.1. Name Plate Details:


Description Ratio Class Rated Output(VA) CT Sec. Resistance (Rct) @75C Knee Point Voltage (Vk) I mag At VK/2 Purpose CT1 - Core 1 3200/1A PX 18 563V 8.8mA B/B PRTN(87B/50BF) CT2 - Core 1 3200/1A 5P20/1.0 15 VA 18 O/C + E/F50/51N+BCU+METERING CT2 - Core 2 3200/1A PX 18 563V 8.8mA B/B PRTN(87B/50BF)

9.2.2. A CT1, CORE-1 (87B/50BF) Inject R-PH 0.6A, Y-PH- 0.8A, B-PH-1.0A at A measure the current in the following terminals.
SWGR Panel +A18 TB Terminal-X11 Y B 609 613

Ratio: 3200/1A SWGR Terminals X11: 605, 609, 613&603 and

R 605

N 603

Secondary current in mA measured at BB Relay Panel +BB .RP1 TB Terminal X610 R Y B N 2 4 6 5

BB Relay Panel +BB .RP1 B103,B104,B105-(Metrosil) R Y B 1,2 1,2 1,2

N --

BB Relay Panel +BB .RP1 R103,R104,R105- Resistor R Y B 1,2 1,2 1,2

N ---

BB Relay Panel +BB .RP1 Test Block S871Z1 Test Position R Y B N 21 23 25 27

-BB Relay Panel +BB .RP1 Test Block S871Z1 Test Position R Y B N 22 24 26 28

BB Relay Panel +BB .RP1 Test Block S871Z1 Service Position R Y B N 22 24 26 28

BB Relay Panel +BB .RP1Relay 87BB1 BBP 7SJ611 R Y B Q7/Q8 Q7/Q8 Q7/Q8

BB Relay Panel +BB .RP1Relay Display Pri-87BB1 BBP 7SJ611 N --3I0 3I0 3I0 ---

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 59 OF 105 DATE:

BB Relay Panel +BB .RP1Relay Display Sec-87BB1 BBP 7SJ611 3I0 3I0 3I0 --

----------------------------------

---------------

9.2.3. A CT2, CORE-1 O/C + E/F +BCU+METERING Ratio: 3200/1A Inject R-PH 0.6A, Y-PH- 0.8A, B-PH-1.0A at A SWGR Terminals X11: 612, 615, 618&613 and measure the current in the following terminals.
Relay Panel +A TB Terminal X11 Y B 615 618 Secondary current in mA measured at Relay Panel +A .RP TB Terminal X610 R Y B N 1 3 5 7 Relay Panel +A .RP Test Block S511 Test Position R Y B N 21 23 25 27

R 612

N 613

Relay Panel +A .RP Test Block S511 Test Position R Y B N 22 24 26 28

Relay Panel +A .RP Test Block S511 Service Position R Y B N 22 24 26 28

Relay Panel +A R Q1/Q2

.RP Relay (51/50BF) 7SJ621 Y B N Q5/Q6 Q7/Q8

Q3/Q4

Relay Panel +A .RP Relay Display Pri- (51/50BF) 7SJ621 R IL1 Y IL2 B IL3 N IE

Relay Panel +A .RP Relay Display Sec - (51/50BF) 7SJ621 R IL1 Y IL2 B IL3 N IE R 2

Relay Panel +A .RP Test Block S511 Test Position Y 4 B 6 N 8

Relay Panel +A .RP Test Block S511 Test Position R Y B N 1 3 5 7

Relay Panel +A .RP Test Block S511 Service Position R Y B N 1 3 5 7

Relay Panel +A .RP Test Block S201 Test Position R Y B N 21 23 25 27

Relay Panel +A .RP Test Block S201 Test Position R Y B N 22 24 26 28

Relay Panel +A .RP Test Block S201 Service Position R Y B N 22 24 26 28

Relay Panel +A .RP -A201 BCU (7SJ647) R Y B N Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8

Relay Panel +A .RP Relay Display Pri -A201 BCU (7SJ647) R Y B N IL1 IL2 IL3 IE

Relay Panel +A .RP Relay Display Sec -A201 BCU (7SJ647) R Y B N IL1 IL2 IL3 IE

R 10

Relay Panel +A .RP TB Terminal -X610 Y B 11 12

N 13

SWGR Panel BUS CT2 TB Terminal -X11

SWGR Panel +A TB Terminal -X11

SWGR Panel +A Selector Switch (S401)

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 60 OF 105 DATE:

R 651 +A R

Y 652

B 653

N 654

R 621

Y 623

B 625

N 627

R 2

Y 6

B 10

N 1

Ammeter Display R - Ph , Y - Ph ,B Ph (P401) Y B N -

9.2.4. A

CT2, CORE-2 87BB2 PROTN Ratio: 3200/1A SWGR Terminals X11:612,615,618 & 613 and

Inject R-PH 0.6A, Y-PH- 0.8A, B-PH-1.0A at +A measure the current in the following terminals.
SWGR Panel +A TB Terminal X11 R 612 Y 615 B 618 N 613

Secondary current in mA measured at BB Relay Panel +BB .RP1 TB Terminal X610 R 1 Y 17 B 33 N 49 R 1,2

BB Relay Panel +BB .RP1 B103,B104,B105 -(Metrosil) Y 1,2 B 1,2 N ---

BB Relay Panel +BB .RP1 R103,R104,R105- (Resistor) R 1,2 Y 1,2 B 1,2 N --BB Relay Panel +BB .RP1 Test Block S87Z1 Service Position R 22 Y 24 B 26 N 28

BB Relay Panel +BB .RP1 Test Block S87Z1 Test Position R 21 Y 23 B 25 N 27

BB Relay Panel +BB .RP1 Test Block S87Z1 Test Position R 22 Y 24 B 26 N 28

BB Relay Panel +BB .RP1Relay 87BB2 BBP 7SJ611 R Q7/Q8 Y Q7/Q8 B Q7/Q8 N --

BB Relay Panel +BB .RP1Relay Display Pri-87BB2 BBP 7SJ611 3I0 3I0 3I0 ----

BB Relay Panel +BB .RP1Relay Display Sec-87BB2 BBP 7SJ611 3I0 3I0 3I0 ----------

---------------------

-------------

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 61 OF 105 DATE:

9.2.5. Burden Measurement Test: Inject 1A at each core and each phase, Measure the voltage at terminal.
Location Core No CT1-Core 1 11KV SWGR CT2-Core 1 Phase R Y B R Y B R CT2-Core 2 Y B Terminal X11 612 & 613 X11 615 & 616 X11 618 & 619 X11 612 & 613 X11 615 & 616 X11 618 & 619 X11 622 & 623 X11 625 & 626 X11 628 & 629 Voltage Burden

CT Star Point Conformation: Description CT Core CT1-Core-1 Star Point Conformation Note: 1. 2. 3. 4. 5. CT2-Core-1 CT2-Core-2 S1/S2

Confirmation of connection of CT as per drawing Confirmation of isolating links and shorting links as per drawing Confirmation of earthing of star at single point CT terminal tightness CORE identification checks

: : : : :

Remarks:

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 62 OF 105 DATE:

9.3. Bay Ref: A Cable Feeder 9.3.1. Name Plate Details:

Description Ratio Class Rated Output(VA) CT Sec. Resistance (Rct) @75C Knee Point Voltage (Vk) I mag at VK/2 Purpose

(CT1) CORE 1 400 - 300/1A 5P20/1.0 15-11.5 VA <2 1.5 OC/EF+BCU+MET 50/50N/51/ 51N/49C

(CT1) CORE 2 400 - 300/1A PX <1.4 1.05 425-320V 50-70mA PILOT WIRE 87PA (7SG11+7PG211)

(CT2) CORE 1 3200/1A PX <18 563V 8.8mA BBP 87BB1(7SJ611)

9.3.2. A

CT1-CORE-1, OC/EF+BCU+MET Ratio: 400 - 300/1A SWGR Terminals X11 602, 606, 610 & 604

Inject R- PH 0.6 A, Y- PH 0.8A, B- PH 1.0 A at A and measure the current in the following terminals.
SWGR Panel TB Terminals - X11 Y B 606 610

R 602

N 604

Secondary current in mA measured at Relay Panel +A .RP- TB Terminal X610.A R Y B N 1 3 5 7

R 21

Relay Panel +A .RP S502.A Test Position Y B 23 25

N 27

R 22

Relay Panel +A .RP S502.A Test Position Y B 24 26

N 28

R 22

Relay Panel +A .RP S502.A Service Position Y B 24 26

N 28

R F1/F2

Relay Panel +A .RP- Relay (50/50N/51/51N) 7SJ802 Y B N F3/F4 F5/F6 F7/F8

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 63 OF 105 DATE:

Relay Panel +A .RP- Display Pri. Relay (50/50N/51/51N) 7SJ802 R Y B N IL1 IL2 IL3 IE

Relay Panel +A .RP- Display Sec. Relay (50/50N/51/51N) 7SJ802 R Y B N IL1 IL2 IL3 IE

R 2

Relay Panel +A .RP S502.A Test Position Y B 4 6

N 8

Relay Panel +A .RP Test Block S502.A Test Position R Y B N 1 3 5 7

Relay Panel +A .RP Test Block S502.A Service Position R Y B N 1 3 5 7

Relay Panel +A .RP Test Block S201.A Test Position R Y B N 21 23 25 27

Relay Panel +A .RP Test Block S201.A Test Position R Y B N 22 24 26 28

Relay Panel +A .RP Test Block S201.A Service Position R Y B N 22 24 26 28

Relay Panel +A R Q1/Q2

.RP A201.A BCU 7SJ632 Y B N Q5/Q6 Q7/Q8

Q3/Q4

Relay Panel +A .RP Display Pri A201.A BCU 7SJ632 R Y B N IL1 IL2 IL3 IE

Relay Panel +A .RP Display Sec A201.A BCU 7SJ632 R Y B N IL1 IL2 IL3 IE

Relay Panel +A .RP TB Terminal X610A R Y B N 10 11 12 13

SWGR Panel +A .SWGR TB Terminal X11 R Y B N 651 652 653 654

SWGR Panel +A .SWGR S401 Ammeter selector switch (AS) R Y B N 2 6 10 1

SWGR Panel +A SWGR- Ammeter Display R Y B N -

9.3.3. A

CT1- CORE-2, Pilot Wire Diff PRTN Ratio : 400 - 300/1A SWGR Terminals X11 622, 626, 630 & 624

Inject R- PH 0.6 A, Y- PH 0.8A, B- PH 1.0A at A and measure the current in the following terminals.
SWGR Panel +A TB Terminal X11 R 622 Y 626 B 630 N 624

Secondary current in mA measured at Relay Panel +A .RP- TB Terminal X620.A R 1 Y 3 B 5 N 7

Relay Panel +A .RP TEST Block S501.A Test Position R 21 Y 23 B 25 N 27

Relay Panel +A .RP Test Block S501.A Test Position R Y B N

Relay Panel +A .RP Test Block S501.A Service Position R Y B N

Relay Panel +A .RP- Relay F501.A (50GR) 7SG111 R Y B N

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 64 OF 105 DATE:

22

24

26

28

22

24

26

28

27/28

25/26

23/24

21/22

Relay Panel +A .RP- Relay Display Pri. F501.A (50GR) 7SG111 R Y B N 1AIA 1AIB 1AIC 5AIA

Relay Panel +A .RP- Relay Display Sec. F501.A (50GR) 7SG111 R Y B N 1AIA 1AIB 1AIC 5AIA

Relay Panel +A .RP Test Block S501.A Test Position 1 3 5 7

Relay Panel +A .RP Test Block S501.A Test Position R Y B N 2 4 6 8

Relay Panel +A .RP Test Block S501.A Service Position R Y B N 2 4 6 8

Relay Panel +A .RP- TB Terminal X620.A R Y B N 10 12 14 16

Relay Panel +A .RP Relay 87P (7PG211) R 23 Y 25 B 27 N 24 -

9.3.4. A

CT2-CORE-1, BUSBAR PRTN Ratio: 3200/1A SWGR Terminals X11 644, 647,650 &643

Inject R- PH 0.6 A, Y- PH 0.8A, B- PH 1.0A at A and measure the current in the following terminals.
SWGR Panel +A TB Terminal X11 Y B 647 650

R 644

N 643

Secondary current in mA measured at Relay Panel +BB .RP1 TB Terminal X610 R Y B N 3 23 39 69

Relay Panel +BB .RP1 R103,R104,R105(Resistor) R Y B N R(1,2) Y(1,2) B(1,2) ---

Relay Panel +BB .RP1 Test Block S87Z1 Test Position R 21 Y 23 B 25 N 27

Relay Panel +BB .RP1 Test Block S87Z1 Test Position R 22 Y 24 B 26 N 28

Relay Panel +BB .RP1 Test Block S87Z1 Service Position R 22 Y 24 B 26 N 28

Relay Panel +A .RP - Relay -F87Z1 BBP 7SJ611 R Y B N Q7/Q8 Q7/Q8 Q7/Q8 ---

Relay Panel +A .RP - Relay Display Pri -F87Z1 BBP 7SJ611 R Y B N 3I0 3I0 3I0 -

Relay Panel +A .RP - Relay Display Sec -F87Z1 BBP 7SJ611 R Y B N 3I0 3I0 3I0 -

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 65 OF 105 DATE:

9.3.5. Burden Measurement Test Inject 1A at each core and each phase. Measure the voltage at terminal.
Location Core No CT1-Core 1 Phase R Y B 11KV SWGR CT1-Core 2 R Y B R CT2-Core 1 Y B Terminal X11 602 & 604 X11 606 & 608 X11 610 & 612 X11 624 & 622 X11 626 & 628 X11 630 & 632 X11 644 & 643 X11 646 & 647 X11 650 & 649 Voltage Burden

CT Star Point Conformation:


Description CT Core (CT1) Core-1 (CT1) Core-2 (CT2) Core-1

Star Point Conformation

S1/S2

Note: 1. 2. 3. 4. 5.

Confirmation of connection of CT as per drawing Confirmation of isolating links and shorting links as per drawing Confirmation of earthing of star at single point CT terminal tightness CORE identification checks

: : : : :

Remarks:

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 66 OF 105 DATE:

9.4.

Bay Ref : A

Auxiliary Transformer Feeder

9.4.1. Name Plate Details:


Description Ratio Class Rated Output(Va) CT Sec. Resistance (R ct) @75C Knee Point Voltage (Vk) I mag At VK/2 (CT1) Core 1 150/1A 5P20/1.0 15 VA <3.0 (CT1) Core 2 150/1A 5P20/1.0 15 VA <3.0 BCU+ AMMETER (CT2) Core 1 3200/1A PX <18 563V 8.8mA

Purpose

OC/EF PROTN

BUSBAR PROTN.

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 67 OF 105 DATE:

9.4.2. A

CT1- CORE-1, OC/EF PROTN Ratio : 150/1A SWGR Terminals X11 602, 605, 608 & 603

Inject R- PH 0.6 A, Y- PH 0.8A, B- PH 1.0A at A and measure the current in the following terminals.
SWGR Panel +A10 TB terminal X11 R 602 Y 605 B 608 N 603

Secondary current in mA measured at Relay Panel +A10 .RP- TB terminal X610 R 1 Y 3 B 5 N 7 R 21

Relay Panel +A10 .RP Test Block S511 Test Position Y 23 B 25 N 27

Relay Panel +A10 .RP Test Block S511 Test Position R 22 Y 24 B 26 N 28

Relay Panel +A10 .RP Test Block S511 Service Position R 22 Y 24 B 26 N 28 R

Relay Panel +A10 .RP- Relay 50/50N/51/51N (7SJ611) Y Q3/Q4 B Q5/Q6 N Q7/Q8 Q1/Q2

Relay Panel +A10 .RP- Relay Display Pri-50/50N/51/51N (7SJ611) R Y B N IL1 IL2 IL3 IE

Relay Panel +A10 .RP- Relay Display Sec -50/50N/51/51N (7SJ611) R Y B N IL1 IL2 IL3 IE

----------------------------

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 68 OF 105 DATE:

9.4.3. A

CT1- CORE-2, BCU+METERING Ratio : 150/1A, SWGR Terminals X11 622, 625, 628 & 623

Inject R- PH 0.6 A, Y- PH 0.8A, B- PH 1.0A at A and measure the current in the following terminals.
SWGR Panel +A TB terminal X11 R 622 Y 625 B 628 N 623 R 1 Relay Panel +A .RPTB terminal X620 Y 3 B 5

Secondary current in mA measured at Relay Panel +A .RPTest Block S201 Test Position N 7 R 21 Y 23 B 25 N 27

Relay Panel +A .RPTest Block S201 Test Position R Y B N 22 24 26 28

Relay Panel +A .RPTest Block S201 Service Position R Y B N 22 24 26 28

Relay Panel +A .RP - A201 BCU 7SJ647 R Y B N Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8

Relay Panel +A .RP - A201Relay Display Pri-BCU 7SJ647 R Y B N IL1 IL2 IL3 IE

Relay Panel +A .RP - A201Relay Display Sec-BCU 7SJ647 R Y B N IL1 IL2 IL3 IE

Relay Panel +A .RPTest Block S201 Test Position R Y B N 2 4 6 8

Relay Panel +A .RPTest Block S201 Test Position R Y B N 1 3 5 7

Relay Panel +A .RPTest Block S201 Service Position R Y B N 1 3 5 7

R 10

Relay Panel +A .RPTB terminal -X620 Y B 11 12

N 13

R 661

SWGR Panel +A TB terminal X11 Y B 663 665

N 667

SWGR Panel +A Ammeter Selector Switch (S401) R Y B N 2 6 10 1

SWGR Panel +A R Y

Ammeter Display B N

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 69 OF 105 DATE:

9.4.4. A

CT2-CORE-1, BUSBAR PROTN. Ratio: 3200/1A SWGR Terminals X11 644, 647, 650 & 643

Inject R- PH 0.6 A, Y- PH 0.8A, B- PH 1.0A at A and measure the current in the following terminals.
SWGR Panel A TB Terminal X11 Y B 647 650

R 644

N 643

Secondary current in mA measured at Relay Panel +A .RPTB Terminal X610 R Y B N 3 19 35 55

Relay Panel +A .RPB103,B104,B105 -Metrosil R Y B N R(1,2) Y(1,2) B(1,2) --

+ Relay Panel+A .RPR103,R104,R105 (Resistor) R Y B R(1,2) Y(1,2) B(1,2)

N --

Relay Panel+A .RPTest Block S87Z1 Test Position R Y B N 21 23 25 27

Relay Panel +A .RPTest Block S87Z1 Test Position R Y B N 22 24 26 28

Relay Panel +A .RPTest Block S87Z1 Test Position R Y B N 22 24 26 28

Relay Panel+A .RPRelay 87BB1 BBP 7SJ611 R Y B N Q7/Q8 Q7/Q8 -------------Q7/Q8 --

Relay Panel +A .RPRelay Display Pri-87BB1 BBP 7SJ611 R Y B N 3I0 3I0 3I0 --

Relay Panel +A .RPRelay Display Sec-87BB1 BBP 7SJ611 3I0 3I0 3I0 ---

---------------

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 70 OF 105 DATE:

9.4.5. Burden Measurement Test : Inject 1A at each core and each phase. Measure the voltage at terminal
Location Core No Phase R (CT1) Core 1 Y B R (CT1) Core 2 11KV SWGR (CT2) Core 1 Y B R Y B Terminal X11 602 & 603 X11 603 & 606 X11 608 & 609 X11 622 & 623 X11 625 & 626 X11 628 & 629 X11 644 & 643 X11 647 & 646 X11 650 & 649 Voltage Burden

CT Star Point Conformation:


Description CT Core (CT1) Core-1 (CT1) Core-2 (CT2) Core-1

Star Point Conformation

S1/S2

Note: 1. 2. 3. 4. 5.

Confirmation of connection of CT as per drawing Confirmation of isolating links and shorting links as per drawing Confirmation of earthing of star at single point CT terminal tightness CORE identification checks

: : : : :

Remarks:

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 71 OF 105 DATE:

10. VT SECONDARY INJECTION TEST 10.1. Bay Ref : A Incomer Feeder 10.1.1. Name Plate Details:
Core No. Class Ratio (Volt) Burden(VA) 67PROTN+SYNC. Purpose VT-WDG-1 3P/1.0 11kV/3 :110V/3 50 +BCU+VOLT METER

10.1.2. Core-1 VT secondary injection: : CORE1, 67PTN+BCU+SYNC +VOLT METER Ratio : 11kV/3 / 110V/3 Injected voltage: R-N: 60 Y-N: 50 B-N: 40 at X11- 671,672, 673 & 674 Terminals measure the voltage with respect to Earth in the following terminals
Voltage in volts measured at SWGR Panel +A MCB (F404) OFF Position R Y B N 1 3 5 7

VT core and function

SWGR Panel +A R 671 Y 672

TB Terminal X11 B 673 N 674

SWGR Panel +A MCB (F404) OFF Position R Y B N 2 4 6 8

SWGR Panel +A MCB (F404) ON Position R Y B N 2 4 6 8

SWGR Panel +A R 511 Y 512

TB Terminal X1 B 513 N 514 R 10

+ SWGR Panel +A Selector Switch (S404) Y 6 B 2 N 12

R-Y

SWGR Panel +A Volt Meter Display Y-B B-R

SWGR Panel +A --R 511.A Y 512.A

TB Terminal X1 B 513.A N 514.A

SWGR Panel +A -K101,K102, K103- U/V Relay R Y B -2,10 2,10 2,10 ---

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 72 OF 105 DATE:

SWGR Panel +A -K101.1,K102.1, K103.1- U/V Relay R Y B -2,10 2,10 2,10 --SWGR Panel +A R 511.A Y 512.A TB Terminal X4 B 513.A N 514.A

SWGR Panel +A R 511.B Y 512.B

TB Terminal X4 B 513.B N 514.B R L1

SWGR Panel +A Fuse Failure Relay (F304) Y L2 B L3 -

SWGR Panel +A R 1 Y 3

Sync Switch S25 - ON -

SWGR Panel +A Sync Switch S25 - ON R Y 2 4 -

SWGR Panel +A18 R 661 Y 663

TB Terminal X4 -

SWGR Panel +A10 R 661 Y 663

TB Terminal X4 -

SWGR Panel +A12 TB Terminal X4 R 661 Y 663 -

R 14

Relay Panel+A12 .RP TB Terminal X710 Y 15 Relay Panel+A12 .RP -A251 (7SJ640)

Relay Panel +A12 .RP Test Block S251 Test Position R Y 9 11 -

Relay Panel +A12 .RP Test Block S251 Test Position R Y 10 12 -

Relay Panel+A12 .RP Relay Display Pri -A251 (7SJ640) RY V4 Relay Panel+A18 .RP TB Terminal X710 R 1 Y 3 B 5 N 7 -

Relay Panel+A12 .RP Relay Display Sec-A251 (7SJ640) RY V4 -

R R13

Y R14

SWGR Panel +A18 R 511 Y 512

TB Terminal X4 B 513 N 514

Relay Panel +A18 .RP VT Terminal X710 R Y 14 15

RTCC1Panel. AVR. TB- X710 R 1 (R) Y 2(Y)

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 73 OF 105 DATE:

RTCC1 Panel .AVR Volt Meter Terminal R 1(R) Y 2(Y)

RTCC1 Panel .AVR Volt Meter Display R-Y R ph-Y ph

RTCC1 Panel .AVR -U/V Relay (K501) R A1(R) Y A2(Y)

RTCC1 Panel .AVR Fail Relay (K97) R 21 Y 22 R 31 Y 32

RTCC1 Panel .AVR. Raise/Lower RELAY(K502) R 13 Y 14 R 43 Y 44

RTCC1 Panel .AVR Relay-A1 TAPCON260 MI 1 MI 2

RTCC1 Panel .AVR Relay-A1 TAPCON260 R-Y U -

R 10

Relay Panel +A18 .RP TB Terminal - X710 Y 11 B 12 N 13

Relay Panel +A .RP Test Block-S671.B Test Position R 1 Y 3 B 5 N 7

Relay Panel +A .RP Test Block-S671.B Test Position R 2 Y 4 B 6 N 8

Relay Panel +A .RP Test Block-S671.B Service Position R E13 Y E33 B E53 N E73

Relay Panel +A .RP Relay F671 (67/67N/51/50BF) 7SJ621 R R14 Y R15 B R17 N R16

Relay Panel +A .RP Relay Display Pri F671 (67/67N/51/50BF) 7SJ621 R V1 Y V2 B V3 -

Relay Panel +A .RP Relay Display Sec F671 (67/67N/51/50BF) 7SJ621 R V1 Y V2 B V3 -

Relay Panel +A .RP Test Block-S201 Test Position R 1 Y 3 B 5 N 7

Relay Panel +A .RP Test Block-S201 Test Position R 2 Y 4 B 6 N 8 R 2

Relay Panel +A .RP Test Block-S201 Test Position Y 4 B 6 N 8 R

Relay Panel +A .RP Relay A201 BCU (7SJ647) Y R17 B R18 N R16

R15

Relay Panel +A .RP Relay Display Pri A201 BCU (7SJ647) R VL1 Y VL2 B VL3 N -

Relay Panel +A .RP Relay Display Sec A201 BCU (7SJ647) R VL1 Y VL2 B VL3 N -

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 74 OF 105 DATE:

10.1.3. Burden Measurement: Core-1


Phase R Y B Voltage applied in Volts 63.5 63.5 63.5 Current measured in mA Calculated Burden in VA

Note: 1. Confirmation of isolating links and shorting links as per drawing 2. Confirmation of Earthing of STAR at single point 3. Terminal tightness checked Remarks: : : :

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 75 OF 105 DATE:

10.2. Bay Ref : A12 Name Plate Details:


Core No. Class Ratio (Volt) Burden(VA) Purpose

Bus Section :

A166

VT-WDG 3P/1.0

A266

VT-WDG 3P/1.0

11kV/3 :110V/3 50 BCU + VOLTMETER + LOAD SHEDDING

11kV/3 :110V/3 50 BCU + VOLTMETER + LOAD SHEDDING

10.2.1. A166 VT secondary injection: Core and Function : A166 - BCU + Voltmeter + LOAD SHEDDING Ratio: 11kV/3:110V/3 Injected voltage: R-N: 60V Y-N: 50V B-N: 40V at X4:651, 652, 653 & 654 Terminals measure the voltage with respect to Earth in the following terminals.
Voltage in volts measured at SWGR Panel +A16 VT MCB (F404) OFF Position R Y B N 1 3 5 7

SWGR Panel +A16 R 651 Y 652 B

TB Terminal X4 N 654

SWGR Panel +A16 VT MCB (F404) OFF Position R Y B N 2 4 6 8

653

SWGR Panel +A16 VT MCB (F404) ON Position R 2 Y 4 B 6 N 8

SWGR Panel +A16 R 511 Y 512

TB Terminal X1 B 513 N 514

SWGR Panel +A16 R 511.A Y 512.A

TB Terminal X1 B 513.A N 514.A

SWGR Panel +A16 Fuse Failure Relay(F304) R Y B N L1 L2 L3 -

SWGR Panel +A16 U/V Relay K101,K102,K103 R Y B 2,10 2,10 2,10 -

SWGR Panel +A16 R 511.B Y 512.B

TB Terminal X1 B 513.B N 514.B

SWGR Panel +A16 Selector Switch (S404) R Y B N 10 6 2 12

SWGR Panel +A16 Ammeter Display (P404) RY YB BR -

SWGR Panel +A16 R 511.A Y 512.A

TB Terminal X4 B 513.A N 514.A

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 76 OF 105 DATE:

SWGR Panel +A12 R 668 Y 670

TB Terminal X4 B 672 N 674

SWGR Panel +A10 R 669 Y 671

TB Terminal X4 B 673 N 675

SWGR Panel +A10 Sync Selector Switch -25 OFF R Y B N 5 7 9 11

SWGR Panel +A10 Sync Selector Switch -25 OFF R Y B N 6 8 10 12

SWGR Panel +A10 Sync Selector Switch -25 ON R Y B N 6 8 10 12

SWGR Panel +A10 R 653 Y 655

TB Terminal X4 B 657 N 659

SWGR Panel +A12 R 653 Y 655

TB Terminal X4 B 657 N 659

Relay Panel +A12 .RP TB Terminal X710 R Y B N 10 11 12 13

Relay Panel +A12 .RP Test Block S251 Test Position R Y B N 1 3 5 7

Relay Panel +A12 .RP Test Block S251 Test Position R Y B N 2 4 6 8

Relay Panel +A12 .RP Test Block S251 Service Position R Y B N 2 4 6 8

Relay Panel +A12 .RP Relay A251 (7SJ640) R Y B N R15 R17 R18 R16

Relay Panel +A12 .RP Relay Display A251 (7SJ640) R Y B N VL1 VL2 VL3 -

SWGR Panel +A210 R 669 Y 671

TB Terminal X4 B 673 N 675

SWGR Panel +A210 Sync Selector Switch -25 OFF R Y B N 5 7 9 11

SWGR Panel +A210 Sync Selector Switch -25 OFF R Y B N 6 8 10 12

SWGR Panel +A210 Sync Selector Switch -25 ON R Y B N 6 8 10 12

SWGR Panel +A12 R 676 Y 678

TB Terminal X4 B 680 N 684

Relay Panel +A12 .RP TB Terminal X720 R Y B N 10 11 12 -

Relay Panel +A12 .RP Test Block S252 Test Position R Y B N 1 5 3 -

Relay Panel +A12 .RP Test Block S252 Test Position R Y B N 2 6 4 -

Relay Panel +A12 .RP Test Block S252 Service Position R Y B N 2 6 4 -

Relay Panel +A12 .RP Relay A252 (7SJ804) R Y B N E9 E12 E11 -

Relay Panel +A12 .RP Relay A252 (7SJ804) R Y B N VL1 VL2 VL3 -

SWGR Panel +A16

TB Terminal X4

Relay Panel +A12

TB Terminal X710

Relay Panel +A12

TB Terminal X231

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 77 OF 105 DATE:

R 511

Y 512

B 513

N 514

R 1

Y 3

B 5

N 7

R 2

Y 5

B 8

N 11

Relay Panel +A10 R 1 Y 3

TB Terminal X231.A -

Relay Panel +A10 .RP Test Block S201 Test Position R Y 11 13 -

Relay Panel +A10 .RP Test Block S201 Test Position R Y 12 14 -

Relay Panel +A10 .RP Test Block S201 Service Position R Y 12 14 Relay Panel +A18 R 1 Y 13 -

Relay Panel +A10 .RP Relay A201 (7SJ647) R Y R13 R14 -

Relay Panel +A10 .RP Relay Display A201 (7SJ647) R-Y V4 -

TB Terminal X231.A -

Relay Panel +A18 .RP Test Block S201 Test Position R Y 9 11 -

Relay Panel +A18 .RP Test Block S201 Test Position R Y 10 12 -

Relay Panel +A18 .RP Test Block S201 Service Position R Y 10 12 Relay Panel +LSP R 9 Y 10 -

Relay Panel +A18 .RP Relay A201 (7SJ647) R Y R13 R14 -

Relay Panel +A18 .RP Relay Display A201 (7SJ647) R-Y V4 Relay Panel +LSP Selector Switch S66 OFF R 2 Y 4 B 6 N 8 -

TB Terminal X231 B 11 N 12

Relay Panel +LSP Selector Switch S66 OFF R 1 Y 3 B 5 N 7

Relay Panel +LSP Selector Switch S66 ON R Y B N 2 4 6 8

Relay Panel +LSP .RP Test Block S811 Test Position R Y B N 1 3 5 7

Relay Panel +LSP .RP Test Block S811 Test Position R Y B N 1 3 5 7

Relay Panel +LSP .RP Test Block S811 Test Position R Y B N 2 4 6 8

Relay Panel +LSP .RP Relay F811 (7SJ621) R Y B N R14 R15 R17 R16

Relay Panel +LSP .RP Relay Display F811 (7SJ621) R Y B V1 V2 V3 -

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 78 OF 105 DATE:

Relay Panel +A12 .RP Test Block S201 Test Position R Y B N 3 5 7 9

Relay Panel +A12 .RP Test Block S201 Test Position R Y B N 4 6 8 10

Relay Panel +A12 .RP Test Block S201 Service Position R Y B N 4 6 8 10

Relay Panel +A12 .RP Relay A201 (7SJ647) R Y B N R15 R17 R18 R16

Relay Panel +A12 .RP Relay Display Pri A201 (7SJ647) R Y B VL1 VL2 VL3 -

Relay Panel +A12 .RP Relay Display Sec A201 (7SJ647) R Y B VL1 VL2 VL3 -

Relay Panel +A12 .RP Test Block S253 Test Position R Y B 1 3 5 -

Relay Panel +A12 .RP Test Block S253 Test Position R Y B 2 4 6 -

Relay Panel +A12 .RP Test Block S253 Service Position R Y B 2 4 6 -

Relay Panel +A12 .RP Relay A253 (7SJ804) R Y B E9 E12 E11 -

Relay Panel +A12 .RP Relay Display A253 (7SJ804) R Y B VL1 VL2 VL3 -

10.2.2. A266 VT secondary injection : VT core and function : BCU + Voltmeter + LOAD SHEDDING

Ratio: 11kV/3 / 110V/3

Injected voltage : R-N: 60V Y-N: 50V B-N: 40V at A X4: 651, 652, 653 & 654 Terminals measure the voltage with respect to Earth in the following terminals.
Voltage in volts measured at SWGR Panel +A26 VT MCB (F404) OFF Position R Y B N 1 3 5 7

SWGR Panel +A26 R 651 Y 652 B

TB Terminal X4 N 654

SWGR Panel +A26 VT MCB (F404) OFF Position R Y B N 2 4 6 8

653

SWGR Panel +A26 VT MCB (F404) ON Position R Y B N 2 4 6 8

SWGR Panel +A26 R 511 Y 512

TB Terminal X1 B 513 N 514

SWGR Panel +A26 R 511.A Y 512.A

TB Terminal X1 B 513.A N 514.A

SWGR Panel +A26 Fuse Failure Relay(F304) R Y B N L1 L2 L3 -

SWGR Panel +A26 U/V Relay K101,K102,K103 R Y B 2,10 2,10 2,10 -

SWGR Panel +A26 R 511.B Y 512.B

TB Terminal X1 B 513.B N 514.B

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 79 OF 105 DATE:

SWGR Panel +A26 Selector Switch (-S404) R 10 Y 6 B 2 N 12 SWGR Panel +A26 Ammeter Display (P404) RY YB BR SWGR Panel +A12 R 672 Y 673 TB Terminal X4 SWGR Panel +A20 R 668 Y 670 TB Terminal X4 B 672 N 674 SWGR Panel +A32 R 668 Y 669 TB Terminal X4 B 670 N 671 SWGR Panel +A26 R 511.A Y 512.A TB Terminal X4 B 513.A N 514.A

SWGR Panel +A32 Sync Selector Switch S25 OFF R Y B N 1 3 5 7

SWGR Panel +A32 Sync Selector Switch S25 OFF R Y B N 2 4 6 8

SWGR Panel +A32 Sync Selector Switch S25 ON R Y B N 2 4 6 8

SWGR Panel +A26 R 511 Y 512 B

TB Terminal X4 N 514

Relay Panel +A12 .RP TB Terminal X720 R 1 Y 3 B 5 N 7

Relay Panel +A12 .RP TB Terminal X231 R 13 Y 15 B 17 N 19

513

Relay Panel +LSP .RP TB Terminal X231 R Y B N 1 3 5 7

Relay Panel +LSP .RP Selector Switch S66 OFF R Y B N 9 11 13 15

Relay Panel +LSP .RP Selector Switch S66 OFF R Y B N 10 12 14 16

Relay Panel +LSP .RP Selector Switch S66 ON R Y B N 10 12 14 16

Relay Panel +LSP .RP Test Block S811 Test Position R Y B N 1 3 5 7

Relay Panel +LSP .RP Test Block S811 Test Position R Y B N 2 4 6 8

Relay Panel +LSP .RP Test Block S811 Service Position R Y B N 2 4 6 8

Relay Panel +LSP .RP Relay F811 (7SJ621) R Y B N R14 R15 R17 R16

Relay Panel +LSP .RP Relay Display F811 (7SJ621) R Y B V1 V2 V3 -

Relay Panel +A20 R 1 Y 3

TB Terminal X231.A -

Relay Panel +A20 .RP Test Block S201 Test Position R Y 11 13 -

Relay Panel +A20 .RP Test Block S201 Test Position R Y 12 14 -

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 80 OF 105 DATE:

Relay Panel +A20 .RP Test Block S201 Service Position R Y 12 14 Relay Panel +A28 R 1 Y 13 -

Relay Panel +A20 .RP Relay A201 (7SJ647) R Y R13 R14 -

Relay Panel +A20 .RP Relay Display A201 (7SJ647) R-Y V4 -

TB Terminal X231.A -

Relay Panel +A28 .RP Test Block S201 Test Position R Y 9 11 -

Relay Panel +A28 .RP Test Block S201 Test Position R Y 10 12 -

Relay Panel +A28 .RP Test Block S201 Service Position R Y 10 12 Relay Panel +A12 R 14 Y 16 -

Relay Panel +A28 .RP Relay A201 (7SJ647) R Y R13 R14 -

Relay Panel +A28 .RP Relay Display A201 (7SJ647) R-Y V4 -

TB Terminal X231 -

Relay Panel +A12 .RP Test Block S201 Test Position R 11 Y 13 -

Relay Panel +A12 .RP Test Block S201 Test Position R 12 Y 14 -

Relay Panel +A12 .RP Relay A201 (7SJ647) R Y R13 R14 -

Relay Panel +A12 .RP Relay Display A201 (7SJ647) R-Y V4 -

Relay Panel +A12 .RP TB Terminal -X231 R Y B N 13 15 17 19

Relay Panel +A12 .RP Test Block S511 Test Position R Y B N 9 11 13 15

Relay Panel +A12 .RP Test Block S511 Test Position R Y B N 10 12 14 16

Relay Panel +A12 .RP Test Block S511 Service Position R Y B N 10 12 14 16

Relay Panel +A12 .RP Relay A511(51/50BF) 7SJ621 R Y B N R14 R15 R17 R18

Relay Panel +A12 .RP Relay Display A511(51/50BF) 7SJ621 R Y B N V1 V2 V3 -

10.2.3. Burden Measurement: A166 VT:


LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date: KAHRAMAA

HYOSUNG Signature: Name: Date:

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 81 OF 105 DATE:

Phase

Voltage applied in Volts

Current measured in mA

Calculated Burden in VA

R Y B

63.5 63.5 63.5

A266
Phase

VT
Voltage applied in Volts Current measured in mA Calculated Burden in VA

R Y B

63.5 63.5 63.5

Note: 1. Confirmation of isolating links and shorting links as per drawing : 2. Confirmation of Earthing of STAR at single point : 3. Terminal tightness checked : Remarks:

11.0 Bay Ref : A32 Name Plate Details:


Core No. Class Ratio (Volt) Burden(VA) Purpose

Bus Section :

A566

VT-WDG 3P/1.0

11kV/3 :110V/3 50 BCU + VOLTMETER + LOAD SHEDDING

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 82 OF 105 DATE:

11.1A566 VT secondary injection : VT core and function : BCU + Voltmeter + LOAD SHEDDING

Ratio: 11kV/3 / 110V/3

Injected voltage : R-N: 60V Y-N: 50V B-N: 40V at A X4:651, 652, 653 & 654 Terminals measure the voltage with respect to Earth in the following terminals.

SWGR Panel +A56 R 651 Y 652 B

TB Terminal X4 N 654

Voltage in volts measured at SWGR Panel +A56 VT MCB (F404) OFF Position R Y B N 1 3 5 7

SWGR Panel +A56 VT MCB (F404) OFF Position R Y B N 2 4 6 8

653

SWGR Panel +A56 VT MCB (F404) ON Position R Y B N 2 4 6 8

SWGR Panel +A56 R 511 Y 512

TB Terminal X1 B 513 N 514

SWGR Panel +A56 R 511.A Y 512.A

TB Terminal X1 B 513.A N 514.A

SWGR Panel +A56 Fuse Failure Relay(F304) R Y B N L1 L2 L3 -

SWGR Panel +A56 U/V Relay K101,K102,K103 R Y B 2,10 2,10 2,10 -

SWGR Panel +A56 R 511.B Y 512.B

TB Terminal X1 B 513.B N 514.B

SWGR Panel +A56 Selector Switch (-S404) R Y B N 10 6 2 12

SWGR Panel +A56 Ammeter Display (P404) RY YB BR -

SWGR Panel +A56 R 511 Y 512

TB Terminal X4 -

SWGR Panel +A32 R 672 Y 673 -

TB Terminal X4 -

SWGR Panel +A470 X4 R 668 Y 670

TB Terminal B 672 N 674

SWGR Panel +A470 Sync Selector Switch S25 OFF R 5 Y 7 B 9 N 11

SWGR Panel +A470 Sync Selector Switch S25 OFF R 6 Y 8 B 10 N 12

SWGR Panel +A470 Sync Selector Switch S25 ON R 6 Y 8 B 10 N 12

SWGR Panel +A12 X4 R 676 Y 678

TB Terminal B 680 N 684

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 83 OF 105 DATE:

Relay Panel +A12 .RP TB Terminal X720 R Y B N 10 11 12 -

Relay Panel +A12 .RP Test Block S252 Test Position R Y B N 1 5 3 -

Relay Panel +A12 .RP Test Block S252 Test Position R Y B N 2 6 4 -

Relay Panel +A12 .RP Test Block S252 Service Position R Y B N 2 6 4 -

Relay Panel +A12 .RP Relay A252 (7SJ804) R Y B N E9 E12 E11 -

Relay Panel +A12 .RP Relay A252 (7SJ804) R Y B N VL1 VL2 VL3 -

Relay Panel +A32 .RP TB Terminal X720 R Y B N 2 5 8 11

Relay Panel +LSP .RP TB Terminal X231 R Y B N 17 18 19 20

Relay Panel +LSP .RP Selector Switch S66 OFF R Y B N 21 23 25 27

Relay Panel +LSP .RP Selector Switch S66 OFF R Y B N 22 24 26 28

Relay Panel +LSP .RP Selector Switch S66 ON R Y B N 22 24 26 28

Relay Panel +LSP .RP Test Block S811 Test Position R Y B N 1 3 5 7

Relay Panel +LSP .RP Test Block S811 Test Position R Y B N 2 4 6 8

Relay Panel +LSP .RP Test Block S811 Service Position R Y B N 2 4 6 8

Relay Panel +LSP .RP Relay F811 (7SJ621) R Y B N R14 R15 R17 R16

Relay Panel +LSP .RP Relay Display F811 (7SJ621) R Y B V1 V2 V3 -

Relay Panel +A38 R 3 Y 6

TB Terminal X720 B 9 N 12

Relay Panel +A38 TB Terminal X231.A R Y 1 13 -

Relay Panel +A38 .RP Test Block S201 Test Position R Y 9 11 -

Relay Panel +A38 .RP Test Block S201 Test Position R Y 10 12 -

Relay Panel +A38 .RP Test Block S201 Service Position R Y 10 12 Relay Panel +A32 R 1 Y 3 -

Relay Panel +A38 .RP Relay A201 (7SJ647) R Y R13 R14 -

Relay Panel +A38 .RP Relay Display A201 (7SJ647) R-Y V4 -

TB Terminal X231 B 5 N 7

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 84 OF 105 DATE:

Relay Panel +A32 .RP Test Block S201 Test Position R Y B N 3 5 7 9

Relay Panel +A32 .RP Test Block S201 Test Position R Y B N 4 6 8 10

Relay Panel +A32 .RP Test Block S201 Service Position R Y B N 4 6 8 10

Relay Panel +A32 .RP Relay A201 (7SJ647) R Y B N R15 R17 R18 R16

Relay Panel +A32 .RP Relay Display A201 (7SJ647) R Y B N VL1 VL2 VL3 -

Relay Panel +A32 .RP Test Block S255 Test Position R Y B N 1 3 5 -

Relay Panel +A32 .RP Test Block S255 Test Position R Y B N 2 4 6 -

Relay Panel +A32 .RP Test Block S255 Service Position R Y B N 2 4 6 -

Relay Panel +A32 .RP Relay A255 (7SJ804) R Y B N E9 E10 E12 -

Relay Panel +A32 .RP Relay Display A255 (7SJ804) R Y B N VL1 VL2 VL3 -

Relay Panel +A32 R 2 Y 4

TB Terminal X231 B 6 N 8

Relay Panel +A32 .RP Test Block S511 Test Position R Y B N 9 11 13 15

Relay Panel +A32 .RP Test Block S511 Test Position R Y B N 10 12 14 16

Relay Panel +A32 .RP Test Block S511 Service Position R Y B N 10 12 14 16

Relay Panel +A32 .RP Relay A511(51/5BF) (7SJ621) R Y B N R14 R15 R17 R18

Relay Panel +A32 .RP Relay Display A511(51/5BF) (7SJ621) R Y B N V1 V2 V3 -

10.3. Bay Ref : A30 Cable Feeder 10.3.1. Name Plate Details:
Core No. Class Ratio (Volt) Burden(VA) Purpose VT-WINDING 1.0/3P 11kV/3:110V/3 50 BCU + Synch Check Relay

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 85 OF 105 DATE:

10.3.2. VT core and function : BCU+SYNC Ratio : 11kV/3:110V/3 Injected voltage: R-N: 60 Y-N: 50 B-N: 40 at VT X511: 1,2,3,4 Terminals measure the voltage with respect to Earth in the following terminal
Voltage in volts measured at SWGR Panel +A30 VT MCB (F404) OFF Position R Y B N 1 3 5 7 SWGR Panel +A30 VT MCB (F404) OFF Position R Y B N 2 4 6 8

SWGR Panel +A30 R 1 Y 2

TB Terminal X511 B 3 N 4

SWGR Panel +A30 VT MCB (F404) ON Position R Y B N 2 4 6 8

SWGR Panel +A30 R 511 Y 512

TB Terminal X1 B 513 N 514

SWGR Panel +A30 R 511.A Y 512.A

TB Terminal X1 B 513.A N 514.A

SWGR Panel +A30 Fuse Failure Relay(F304) R Y B N L1 L2 L3 -

SWGR Panel +A30 U/V Relay K101,K102,K103 R Y B 2,10 2,10 2,10 -

SWGR Panel +A30 R 511.A Y 512.A

TB Terminal X4 B 513.A N 514.A

SWGR Panel +A30 Synch Selector Switch -S25 OFF R 1 Y 3 SWGR Panel +A30 R 661 Y 663 TB Terminal X4 -

SWGR Panel +A30 Synch Selector Switch -S25 OFF R 2 Y 4 SWGR Panel +A12 R 684 Y 686 -

SWGR Panel +A30 Synch Selector Switch -S25 ON R 2 Y 4 -

TB Terminal X4 -

Relay Panel +A12 X720 R Y 13 14 -

TB Terminal -

Relay Panel +A12 .RP Test Block S252 Test Position R Y 7 9 -

Relay Panel +A12 .RP Test Block S252 Test Position R Y 8 10 -

Relay Panel +A12 .RP Test Block S252 Service Position R Y 8 10 SWGR Panel +A30 R 511 Y 512 -

Relay Panel +A12 .RP Relay A252 (7SJ804) R Y E13 E14 -

Relay Panel +A12 .RP Relay Display A252 (7SJ804) R-Y VL3 -

TB Terminal X4 B 513 N 514

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 86 OF 105 DATE:

Relay Panel +A30 TB Terminal X710.A R Y B N 1 2 3 4

Relay Panel +A30 .RP Test Block S201.A Test Position R Y B N 1 3 5 7

Relay Panel +A30 .RP Test Block S201.A Test Position R Y B N 2 4 6 8

Relay Panel +A30 .RP Test Block S201.A Test Position R Y B N 2 4 6 8

Relay Panel +A30 .RP Relay A201 BCU (7SJ632) R Y B N R14 R15 R17 R18

Relay Panel +A30 .RP Relay Display A201 BCU (7SJ632) R Y B N VL1 VL2 VL3 -

Relay Panel +A30 .RP Relay A201.A O/P Contact R Y R1 R5 -

Relay Panel +A30 .RP Relay A201.A O/P Contact R Y R4 R6 -

Relay Panel +A30 TB Terminal X231 R Y 2 4 -

Relay Panel +A12 TB Terminal X231 R Y 21 22 -

Relay Panel +A12 .RP Test Block S253 Test Position R Y 7 9 -

Relay Panel +A12 .RP Test Block S253 Test Position R Y 8 10 -

Relay Panel +A12 .RP Test Block S253 Service Position R Y 8 10 -

Relay Panel +A12 .RP Relay A253 (7SJ804) R Y E13 E14 -

Relay Panel +A12 .RP Relay A253 (7SJ804) R-Y VL3 -

10.3.3. Burden Measurement:


Phase R Y B Voltage applied in Volts 63.5 63.5 63.5 Current measured in mA Calculated Burden in VA

Note: 1. Confirmation of isolating links and shorting links as per drawing 2. Confirmation of Earthing of STAR at single point 3. Terminal tightness checked Remarks:
HYOSUNG Signature: Name: Date: LAHMEYER INTERNATIONAL Signature: Name: Date:

: : :

KAHRAMAA Signature: Name: Date:

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 87 OF 105 DATE:

10.4. Bay Ref: A10 Aux.TR. Feeder 10.4.1. Name Plate Details:
Core No. Class Ratio (Volt) Burden(VA) Purpose VT-WINDING 1.0/3P 11kV/3:110V/3 50 VA BCU+SYNC.

10.4.2. VT core and function

: BCU+SYNC. Ratio : 11kV/3 / 110V/3 X511: 1, 2, 3 & 4 terminals measure the voltage with

Injected voltage : R-N: 60 Y-N: 50 B-N: 40 at VT respect to Earth in the following terminal
SWGR Panel +A10 R 1 Y 2 TB Terminal X511 B 3 N 4

Voltage in volts measured at SWGR Panel +A10 VT MCB (F404) OFF Position R 1 Y 3 B 5 N 7

SWGR Panel +A10 VT MCB (F404) OFF Position R 2 Y 4 B 6 N 8

SWGR Panel +A10 VT MCB (F404) ON Position R Y B N 2 4 6 8

SWGR Panel +A10 R 511 Y 512

TB Terminal X1 B 513 N 514

SWGR Panel +A10 R 511.A Y 512.A

TB Terminal X1 B 513.A N 514.A

SWGR Panel +A10 Fuse Failure Relay(F304) R Y B N L1 L2 L3 -

SWGR Panel +A10 U/V Relay K101,K102,K103 R Y B 2,10 2,10 2,10 -

SWGR Panel +A10 R 511.A Y 512.A

TB Terminal X4 B 513.A N 514.A

SWGR Panel +A10 Synch Selector Switch -S25 OFF R Y 1 3 SWGR Panel +A10 R 661 Y 663 TB Terminal X4 -

SWGR Panel +A10 Synch Selector Switch -S25 OFF R Y 2 4 SWGR Panel +A12 R 661 Y 663 -

SWGR Panel +A10 Synch Selector Switch -S25 ON R Y 2 4 -

TB Terminal X4 -

Relay Panel +A12 X710 R Y 14 15 -

TB Terminal -

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 88 OF 105 DATE:

Relay Panel +A12 .RP Test Block S251 Test Position R Y 9 11 -

Relay Panel +A12 .RP Test Block S251 Test Position R Y 10 12 -

Relay Panel +A12 .RP Test Block S251 Service Position R Y 10 12 SWGR Panel +A10 R 511 Y 512 -

Relay Panel +A12 .RP Relay A251 (7SJ804) R Y R13 R14 -

Relay Panel +A12 .RP Relay Display A251 (7SJ804) R-Y VL4 -

TB Terminal X4 B 513 N 514

Relay Panel +A10 TB Terminal X710 R Y B N 1 2 3 4

Relay Panel +A10 .RP Test Block S201 Test Position R Y B N 1 3 5 7

Relay Panel +A10 .RP Test Block S201 Test Position R Y B N 2 4 6 8

Relay Panel +A10 .RP Test Block S201 Service Position R Y B N 2 4 6 8

Relay Panel +A10 .RP Relay A201 BCU (7SJ647) R Y B N R15 R17 R18 R16

Relay Panel +A10 .RP Relay Display A201 BCU (7SJ647) R Y B N VL1 VL2 VL3 -

10.4.3. Burden Measurement: Phase R Y B Voltage applied in Volts 63.5 63.5 63.5 Current measured in mA Calculated Burden in VA

Note: 1. Confirmation of isolating links and shorting links as per drawing 2. Confirmation of Earthing of STAR at single point 3. Terminal tightness checked

: : :

Remarks:

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 89 OF 105 DATE:

11. CT PRIMARY INJECTION TEST 11.1. Bay Ref : A18 Incomer Feeder 11.1.1. Name Plate Details:
Description Ratio Class Rated Output(VA) CT Sec. Resistance(Rct) @75C Knee Point Voltage (VK) I mag at VK/2 Purpose (CT1) Core 1 2500/1A PX <8.75 230V 30mA MAIN PRTN 87T/REF (DIFF.) (CT1) Core 2 2500/1A 5P20/1.0 15 VA <14 Dir-OC/EF+ BCU+ AMMETER (CT2) Core 1 3200/1A PX <18 563V 30mA BB PRTN 87BBP

Note: 1. Temporary short for REF protection& Bus bar protection stabilizing resistor 11.1.2 CT Core And Function: A Ratio Injected Current
Inj. Phase SWGR Panel A18 CT Terminal -X11 R Y B N 612 R-E R-Y R-B Relay Panel +B11 .RP Test Block S871.B Service Position R 22 R-E R-Y R-B -Y 24 B 26 N 28 Relay Panel +B11 .RP Main Relay 87T (7UT613) R R1//R2 Y R3/R4 B R5/R6 N -Relay Panel +B11 .RP Display Pri. Current at Relay87T Main 7UT613 R Y B N IL1M2 IL2M2 IL3M2 615 618 613

CT CORE-1, DIFF PRTN : 2500/1A : A


Secondary Current in mA Measured at Relay Panel +B11 .RP TB Terminal Relay Panel +B11 .RP X650 Test Block S871.B Service Position R Y B N R Y B N 1 3 5 7 21 23 25 27

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 90 OF 105 DATE:

Inj. Phase

Relay Panel+B11 .RP Display Sec. Current at Relay 87T Main 7UT613 IL1M2 IL2M2 IL3M2 -

Relay Panel +B11 .RP Test Block S871.B Service Position R 2 Y 4 B 6 N 8

Relay Panel +B11 .RP Test Block S871.B Service Position R 1 Y 3 B 5 N 7

R-E R-Y R-B Relay Panel +B11 .RP TB Terminal -X650 R Y B N 10 R-E R-Y R-B Relay Panel+A18 .RP Test Block S871 Serice Position R Y B N 22 R-E R-Y R-B Relay Panel+A18 .RP- Display Sec. Current At Relay 87NL/51 (7SJ611) IL1 R-E R-Y R-B Relay Panel +A18 .RPDisplay Pri. Current at Relay 87NL/51 (7SJ611) 3I0 Relay Panel +A18 .RPDisplay Sec. Current at Relay 87NL/51 (7SJ611)P141 3I0 IL2 IL3 3I0 Relay Panel +A18 .RPB1 Metrosil N 1 N 2 Relay Panel +A18 .RPR102 Resistor N 1 N 2 Relay Panel +A18 .RP Test Block S871 Service Position N 1 N 3 Relay Panel +A18 .RP Test Block 871Service Position N N 2 4 24 26 28 Relay Panel+A18 .RPRelay 87NL/51 (7SJ611) Y B N Q3/Q4 Q5/Q6 --Relay Panel+A18 .RP- Display Pri. Current at Relay 87NL/51 (7SJ611) IL1 IL2 IL3 3I0 11 12 13 -Relay Panel+A18 .RP TB Terminal -X610 Y B N 6 7 8 -Relay Panel+A18 .RP Test Block S871 Service Position R Y B N 21 23 25 27 --

R 5

R Q1/Q2

Relay Panel +A18 .RPRelay 87NL/51 (7SJ611) N Q7/Q8 R-E

-------

---------

----------

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 91 OF 105 DATE:

R-Y R-B

11.1.3. CT Core and Function: A18 CT1-CORE-2, OC/EF+BCU+AMMETER Ratio : 2500/1A Injected Current : A
Secondary Current in mA Measured at Relay Panel +A18 Relay Panel +A18 .RP TB .RP TB Terminal Terminal -X620 -X620 R Y B N B B 1 3 5 7 10 13

Inj. Phase R 622 R-E R-Y R-B

SWGR Panel A18 Terminal -X11 Y 625 B 628

TB N 623

RTCC Panel .RP TB Terminal X620 B 1 B 4

RTCC Panel A1Relay Tapcon260 MI B B 5 R-E R-Y R-B 9

RTCC Panel A1Relay Display Tapcon260 B I R 21

Relay Panel+A18 .RP Test Block S671.A Service Position Y 23 B 25 N 27

Relay Panel+A18 .RP Test Block S671.A Service Position R 22 Y 24 B 26 N 28

Relay panel+A18 .RP Relay 67/67N/51/50BF (7SJ621) R Q1/Q2 R-E R-Y R-B Y Q3/Q4 B Q5/Q6 N Q7/Q8

Relay panel+A18 .RP Relay Display Pri -67/67N/51/50BF (7SJ621) R Y B N IL1 IL2 IL3 IE

Relay panel+A18 .RP Relay Display Sec -67/67N/51/50BF (7SJ621) R IL1 Y IL2 B IL3 N IE

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 92 OF 105 DATE:

Inj. Phase

Relay Panel+A18 .RP Test Block S671.A Service Position R Y B N 2 4 6 8

Relay Panel+A18 .RP Test Block S671.A Service Position R 1 Y 3 B 5 N 7

Relay Panel+A18 .RP Test Block S201 Service Position R 21 Y 23 B 25 N 27

R-E R-Y R-B Relay Panel+A18 .RP Test Block S201 Service Position R 22 Y 24 B 26 N 28 Relay Panel+A18 .RP A201 BCU (7SJ647) R Q1/Q2 Y Q3/Q4 B Q5/Q6 N Q7/Q8 Relay Panel+A18 .RP Relay Display PriA201BCU (7SJ647) R IL1 Y IL2 B IL3 N IE

R-E R-Y R-B Relay Panel+A18 .RP Relay Display PriA201BCU (7SJ647) R Y B N IL1 R-E R-Y R-B SWGR Panel+A18 Selector Switch S401 R 2 R-E R-Y R-B Y 6 B 10 N 1 SWGR Panel+A18 Ammeter Display P401 R 9 Y 10 B 11 N 12 IL2 IL3 IE Relay Panel+A18 TB Terminal X620 R Y B N 10 11 12 13 SWGR Panel+A18 TB Terminal- X11 Y B 663 665

R 661

N 667

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 93 OF 105 DATE:

11.1.4. CT Core and Function Ratio Injected Current


Inj. Phase R 634 R-E R-Y R-B BB Relay Panel +RP Test Block S87Z1 Service Position R 21 R-E R-Y R-B Y 23 B 25 N 27

A18 CT2-CORE-1, BB PRTN. : 2500/1A : A

SWGR Panel A18 TB Terminal X11 Y 637 B 640 N 633

Secondary Current in mA Measured at BB Relay Panel +RP1 TB Terminal-X610 R 2 Y 18 B 34 N 52 R R(1,2)

BB Relay Panel+A00 .RP R103,104,105(Resistor) Y Y(1,2 B B(1,2) N -

BB Relay Panel +RP Test Block S87Z1 Service Position R 22 Y 24 B 26 N 28 R Q7/Q8

BB Relay Panel +RP F87Z1 (7SJ611) Y Q7/Q8 B Q7/Q8 N -----

11.1.7. CT Star Point Conformation:


Description CT Core Core-1 Core-2 Core-3 Core-4 Core-5

Star Point Conformation

S1/S2

Note: 1. 2. 3. 4. 5.

Confirmation of connection of CT as per drawing Confirmation of isolating links and shorting links as per drawing Confirmation of earthing of star at single point CT terminal tightness CORE identification checks

: : : : :

Remarks:

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 94 OF 105 DATE:

11.2. Bay Ref: A12

Bus Section Feeder

11.2.1. Name Plate Details:


Description Ratio Class Rated Output (VA) CT Sec. Resistance (Rct) @75C Knee Point Voltage (VK) I mag at VK/2 Purpose CT1 - Core 1 3200/1A PX 18 563V 8.8mA B/B PRTN.-87B/50BF CT2 - Core 1 3200/1A 5P20/1.0 15 VA 18 O/C + E/F50/51N+BCU+METER CT2 - Core 2 3200/1A PX 18 563V 8.8mA B/B PRTN.-87B/50BF.

Note: 1. Temporary short for Bus bar protection stabilizing resistor 11.2.2. CT Core And Function : CT1, CORE-1 87BB1 Ratio : 3200/1A Injected Current : A

Inj. Phase SWGR Panel A12 TB Terminal-X11 Y B 607 611

R 603 RE RY RB

Secondary Current in mA Measured at BB Relay Panel +RP1 TB BB Relay Panel +RP1 Terminal X610 B103,B104,B105-(Metrosil) N R Y B N R(1,2) Y(1,2) B(1,2) 605 1 17 33 49 -

BB Relay Panel +RP1 R103,R104,R105- Resistor R(1,2) RE RY RB Y(1,2) B(1,2) BB Relay Panel +RP1- Relay 87BB1 BBP (7SJ611)

BB Relay Panel +RP1 Test Block S87Z1 Service Position R Y B N 1 3 5 7

BB Relay Panel +RP1 Test Block S87Z1 Service Position R Y B N 2 4 6 8

BB Relay Panel +RP1- Relay Display Pri- 87BB1 BBP (7SJ611)

BB Relay Panel +RP1- Relay Display Sec- 87BB1 BBP (7SJ611)

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 95 OF 105 DATE:

R Q7/Q8 RE RY RB

Y Q7/Q8

B Q7/Q8

N --

R 3I0

Y 3I0

B 3I0

N --

R 3I0

Y 3I0

B 3I0

N --

11.2.3. CT Core And Function Ratio Injected Current


Inj Phase SWGR Panel BUS CT1 TB Terminal X11 R Y B N 612 R-E R-Y R-B Relay Panel+A12 .RP Test Block S511 Service Position R Y B N 22 RE RY RB Relay Panel +A12 .RP Relay Display Sec-(51/50BF ) 7SJ621 R Y B N IL1 RE RY RB Relay Panel+A12 .RP Test Block S201 Service Position R 21 RE RY RB Y 23 B 25 N 27 IL2 IL3 IE 24 26 28 615 618 613

: CT2 - CORE-1,51/51N+BCU+METERING : 3200/1A : A


Secondary Current in mA Measured at Relay Panel +A12 .RP Relay Panel+A12 .RP Test Block TB Terminal X610 S511 Service Position R Y B N R Y B N 1 3 5 7 21 23 25 27

Relay Panel +A12 .RP Relay (51/50BF ) 7SJ621 R Y B N Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8

Relay Panel +A12 .RP Relay Display Pri-(51/50BF ) 7SJ621 R Y B N IL1 IL2 IL3 IE

Relay Panel+A12 .RP Test Block S511 Service Position R 2 Y 4 B 6 N 8

Relay Panel+A12 .RP Test Block S511 Service Position R 1 Y 3 B 5 N 7

Relay Panel+A12 .RP Test Block S201 Service Position R 22 Y 24 B 26 N 28

Relay Panel+A12 .RP Relay A201 (7SJ647) R Q1/Q2 Y Q3/Q4 B Q5/Q6 N Q7/Q8

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 96 OF 105 DATE:

Relay Panel+A12 .RP Relay Display Pri A201 (7SJ647) R Y B N IL1 RE RY RB SWGR Panel+A12 TB Terminal X11 Y B 626 629 IL2 IL3 IE

Relay Panel+A12 .RP Relay Display Sec A201 (7SJ647) R Y B N IL1 IL2 IL3 IE

Relay Panel+A12 TB Terminal X610 R Y B N 10 11 12 13

R 623 RE RY RB

N 630

R 2

SWGR Panel+A12 Selector Switch S401 Y B N 6 10 1

R -

SWGR Panel+A12 Ammeter P401 Y B -

N -

11.2.4. CT Core And Function Ratio Injected Current

: CT2- CORE-2,87BB2 : 3200/1A : A

Inj Phase SWGR Panel BUS-CT1 TB Terminal -X11 R 623 R-E R-Y R-B BB Relay Panel +RP1 R103,104,105- (Resistor) R Y B R(1,2) RE RY RB BB Relay Panel + RP1Relay 87BB2 BBP 7SJ611 R Y B N Y(1,2) B(1,2) Y 626 B 629 N 622

Secondary Current in mA Measured at BB Relay Panel +RP1 TB Terminal X610 R 2 Y 19 B 36 N 55

BB Relay Panel + RP1 B103,104,105-(Metrosil) Y(1,2) B(1,2) -

R(1,2)

N -

BB Relay Panel + RP1 Test BlokS87Z2 Service Position R Y B N 21 23 25 27

BB Relay Panel + RP1 Test BlokS87Z2 Service Position R Y B N 22 24 26 28

BB Relay Panel + RP1- Display Pri. Current at Relay87BB2 BBP 7SJ611 R Y B N

BB Relay Panel + RP1- Display Sec. Current at Relay 87BB2 BBP 7SJ611 R Y B N

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 97 OF 105 DATE:

Q7/Q8 RE RY RB

Q7/Q8

Q7/Q8

--

3I0

3I0

3I0

--

3I0

3I0

3I0

--

CT Star Point Conformation:


Description CT Core CTI-Core-1 CT2-Core-1 CT2-Core-2

Note:

Star Point Conformation

S1/S2

1. 2. 3. 4. 5.

Confirmation of connection of CT as per drawing Confirmation of isolating links and shorting links as per drawing Confirmation of earthing of star at single point CT terminal tightness Core identification checks Remarks

: : : : :

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 98 OF 105 DATE:

11.3. Bay Ref : A30 Cable Feeder : 11.3.1. Name Plate Details:
Description Ratio Class Rated Output(VA) CT Sec. Resistance (Rct) @75C Knee Point Voltage (VK) I mag at VK/2 Purpose CT1-Core 1 400 - 300/1A 5P20/1.0 15-11.5 VA < 2 1.5 OC/EF+BCU+METER 50/50N/51/51N/49C CT1-Core 2 400 - 300/1A PX <1.4 1.05 425-320V 50-70mA PILOT WIRE PRTN 87P CT2-Core 1 2500/1A PX <18 563V 8.8 mA BB PRTN 87BB1

Note: 1. Temporary short for bus bar protection stabilizing resistor

11.3.3. CT Core And Function : CT-CORE-1, OC/EF+BCU+METERING Ratio : 400 - 300/1A Injected Current : A
Secondary Current in mA Measured at Relay Panel +A30 .RP- TB Relay Panel +A30 .RP Terminal -X610.A Test Block S502.A -Service Position R Y B N R Y B N 1 3 5 7 21 23 25 27

Inj phase

SWGR PanelA30 TB Terminals - X11 R Y B 602 606 610

N 604

R-E R-Y R-B Relay Panel +A30 .RP Test Block S502.A -Service Position R 22 R-E R-Y R-B Y 24 B 26 N 28 R F1/F2 Relay Panel +A30 .RP- Relay 50/50N/51/51N (7SJ802) Y F3/F4 B F5/F6 N F7/F8 Relay Panel +A30 .RP- Display Pri. Current at Relay 50/50N/51/51N (7SJ802) R Y B N IL1 IL2 IL3 IE

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 99 OF 105 DATE:

Relay Panel +A30 .RP- Display Pri. Current at Relay 50/50N/51/51N (7SJ802) R Y B N IL1 R-E R-Y R-B Relay Panel +A30 .RP Test Block S201.A Service Position R 21 R-E R-Y R-B Relay Panel +A30 .RP-201.A Display Pri. Current- BCU 7SJ632 R Y B N IL1 R-E R-Y R-B SWGR Panel A30 TB Terminal -X11 R 661 R-E R-Y R-B Y 662 B 663 N 664 IL2 IL3 IE Y 23 B 25 N 27 IL2 IL3 IE

Relay Panel +A30 .RP Test Block S502.A -Service Position R 2 Y 4 B 6 N 8

Relay Panel +A30 .RP Test Block S502.A -Service Position R 1 Y 3 B 5 N 7

Relay Panel +A30 .RP Test Block S201.A Service Position R 22 Y 24 B 26 N 28

Relay Panel +A30 .RP -201.A BCU 7SJ632 R Q1/Q2 Y Q3/Q4 B Q5/Q6 N Q7/Q8

Relay Panel +A30 .RP-201.A Display Pri. Current- BCU 7SJ632 R Y B N IL1 IL2 IL3 IE

Relay Panel +A30 .RPTB Terminal X610.A R Y B N 8 9 10 11

SWGR Panel A30 Ammeter selector switch (-S401) R 2 Y 6 B 10 N 1 R -

SWGR Panel A30 Ammeter (-P401) Y B N -

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 100 OF 105 DATE:

11.3.4. CT Core And Function : CT2-Core-2, PILOT WIRE PRTN 87P Ratio : 400 - 300/1A Injected Current : A
Secondary Current in mA Measured at Relay Panel +A30 TB Terminal Relay Panel +A30 .RP X620.A Test Block S501.A Service Position N 624 R 1 Y 3 B 5 N 7 R 21 Y 23 B 25 N 27

Inj phases R 622 R-E R-Y R-B

SWGR Panel A30 TB Terminal X11 Y 626 B 630

Relay Panel +A30 .RP Test Block S501.A Service Position R Y B N 22 R-E R-Y R-B Relay Panel +A30 .RP Test Block S501.A Service Position R 2 R-E R-Y R-B Y 4 B 6 N 8 24 26 28

Relay Panel +A30 .RP- Relay 50GR (7SG111) R Y B N 27/28 25/26 23/24 21/22

Relay Panel +A30 .RP Test Block S501.A Service Position R Y B N 1 3 5 7

Relay Panel +A30 .RP- TB Terminal -X620.A R 10 Y 12 B 14 N 16 R 23

Relay Panel +A30 .RP Relay 87P (7PG211) Y 25 B 27 N 24

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 101 OF 105 DATE:

11.3.5. CT Core And Function : CT2-Core-1, BUSBAR PRTN(87B) Ratio : 3200/1A Injected Current : A
Secondary Current in mA Measured at Relay Panel +A30 .RP TB Terminal X610 R Y B N 4 20 36 58

Inj phases R 644 R-E R-Y R-B

SWGR Panel A30 TB Terminal X11 Y B 647 650

Relay Panel +BB .RP1 R103,104,105(Resistor) R Y B N

N 643

Relay Panel +BB .RP1 Test Block S87Z1 Test Position R Y B N 21 R-E R-Y R-B Relay Panel +BB .RP - Display Pri. Current at Relay 87BB1 BBP (7SJ611) R Y B N 3I0 R-E R-Y R-B 3I0 3I0 23 25 27

Relay Panel +BB .RP1 Test Block S87Z1 Test Position R Y B N 22 24 26 28

Relay Panel +BB .RP1 - Relay 87BB1 BBP (7SJ611) R Y B N Q7/Q8 Q7/Q8 Q7/Q8 -

Relay Panel +BB .RP - Display Sec. Current at Relay 87BB1 BBP (7SJ611) R Y B N 3I0 3I0 3I0 -

------

CT Star Point Formation:


Description CT Core CT1- Core-1 CT1- Core-2 CT2- Core-1

Star Point Conformation

S1/S2

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 102 OF 105 DATE:

Note: 1. 2. 3. 4. 5.

Confirmation of connection of CT as per drawing Confirmation of isolating links and shorting links as per drawing Confirmation of earthing of star at single point CT terminal tightness CORE identification checks

: : : : :

Remarks:

11.4. Bay Ref : A10 Station Transformer Feeder 11.4.1 Name Plate Details:
Description Ratio Class Rated Output(VA) CT Sec. Resistance (Rct) @75C Knee Point Voltage (VK) I mag at VK/2 Purpose CT1- Core 1 150/1A 5P20 15 VA <3 OC/EF + METERING CT1- Core 2 150/1A 5P20/1.0 15 VA <3 BCU+AMMETER CT2- Core 1 3200/1A PX <18 563V 8.8mA BUSBAR PRTN.

Note: 1. Temporary short for REF protection & Bus bar protection stabilizing resistor 11.4.2. CT Core and Function Ratio Injected Current : CORE-1, OC/EF+METERING : 150/1A : A

Inj phases R 602 R-E R-Y R-B

SWGR Panel A10 TB Terminal X11 Y 605 B 608 N 603

Secondary Current in mA Measured at Relay Panel +A10 .RPTB Terminal X610 R 1 Y 3 B 5 N 7

Relay Panel +A .RP Test Block S511 Service Position R 21 Y 23 B 25 N 27

Relay Panel +A10

.RP

Relay Panel +A10

.RP- Relay

Relay Panel +A10

.RP- Display

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 103 OF 105 DATE:

Test Block S511 Service Position R 22 R-E R-Y R-B Relay Panel +A10 .RP- Display Pri. Current at Relay 50/51/50N (7SJ611) R Y B N IL1 R-E R-Y R-B IL2 IL3 IE Y 24 B 26 N 28 R Q1/Q2

50/51/50N (7SJ611) Y Q3/Q4 B Q5/Q6 N Q7/Q8

Pri. Current at Relay 50/51/50N (7SJ611) R Y B N IL1 IL2 IL3 IE

---------------------------------------------------------------

-----------------------

11.4.3. CT Core and Function Ratio Injected Current


Inj phases R 622 R-E R-Y R-B Relay Panel +A10 .RPTest Block S201 Service Position R Y B N 22 R-E R-Y R-B Relay Panel +A10 .RP- Relay Display Sec A201 BCU 7SJ647 R IL1 R-E Y IL2 B IL3 N IE 24 26 28

: CT1-CORE-2, BCU + Metering : 150/1A : A


Secondary Current in mA Measured at Relay Panel +A10 .RPRelay Panel +A10 .RPTB Terminal X620 Test Block S201 Service Position

SWGR Panel A10 TB Terminal X11 Y 625 B 628 N 623

R 1

Y 3

B 5

N 7

R 21

Y 23

B 25

N 27

Relay Panel +A10 .RP- Relay A201 BCU 7SJ647 R Y B N Q1/Q2 Q3/Q4 Q5/Q6 Q7/Q8

Relay Panel +A10 .RP- Relay Display Pri A201 BCU 7SJ647 R Y B N IL1 IL2 IL3 IE

Relay Panel +A10 .RPTB Terminal -X620 R 10 Y 11 B 12 N 13 R 661

SWGR Panel +A10 .RP TB Terminal X11 Y 663 B 665 N 667

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 104 OF 105 DATE:

R-Y R-B SWGR Panel+A10 Ammeter Selector Switch (-S401) R Y B N 2 R-E R-Y R-B 6 10 1 SWGR Panel +A10 Ammeter Display (-P401) R Y B N -

11.4.4. CT Core and Function Ratio Injected Current


Inj phases R 644 R-E R-Y R-B Relay Panel +BB .RP1R103,R104,R105 Resistor R(1,2) R-E R-Y R-B Relay Panel +BB .RP1Relay 87BB1 BBP 7SJ611 R Q7/Q8 R-E R-Y R-B Y Q7/Q8 B Q7/Q8 Y(1,2) B(1,2)

: CT2-CORE-1, BUSBAR PRTN : 3200/1A : A


Secondary Current in mA Measured at Relay Panel+A10 .RPRelay Panel +BB .RP1TB Terminal X610 B103,B104,B105-Metrosil N R Y B N R(1,2) Y(1,2) B(1,2) 643 3 19 35 55 Relay Panel +BB .RP1- Test Block S87Z1 Service Position R Y B N Relay Panel +BB .RP1Display Pri. Current at Relay 87BB1 BBP 7SJ611 R Y B N 3I0 3I0 3I0 -Relay Panel +BB .RP1Display Sec. Current at Relay 87BB1 BBP 7SJ611 R Y B N 3I0 3I0 3I0 -21 23 25 27 Relay Panel +BB .RP1- Test Block S87Z1 Service Position R Y B N 22 24 26 28

SWGR Panel A10 TB Terminal X11 Y B 647 650

N --

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA

PROJECT NAME: QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S5 & S8 CONTRACT NO.: GTC/371C/2010 DOC. NO.: PH10-1C-10-15-P002 REV. B TITLE:SAT PROCEDURE AND TEST FORMS FOR 11KV SWGR PAGE: 105 OF 105 DATE:

CT Star Point Conformation:

Description

CT Core

CT1-Core-1

CT1-Core-2

CT2-Core-1

Star Point Conformation

S1/S2

Note: 1. 2. 3. 4. 5. Confirmation of connection of CT as per drawing Confirmation of isolating links and shorting links as per drawing Confirmation of earthing of star at single point CT terminal tightness Core identification checks : : : : :

Remarks: Test Kit Details :


SERIAL NUMBER CALIBRATION DATE CALIBRATION DUE DATE

S.NO 1 2 3 4

EQUIPMENT

MAKE/TYPE

HYOSUNG Signature: Name: Date:

LAHMEYER INTERNATIONAL Signature: Name: Date: Signature: Name: Date:

KAHRAMAA