Beruflich Dokumente
Kultur Dokumente
Zirku
Zirku
Upper Zakum
Planned Award : Q1 2012 Planned Finish : Q1 2013 Planned Award : Q2 2013 Planned Finish : Q1 2015
EPC
Installation of RO type desalination plants with total capacity of ~ 4450m3/day, new centralised STP, decentralied STUs and associated P-8362 :Potable Water & Sewage Treatment infrastructure/ piping upgrade to meet acute shortage of potable water and Plant at Zirku sewage treatment plant at Zirku. EPC works to be carried for this project.
Zirku
Upper Zakum
EPC
P-8341 Water Injection Plant Upgrade & P-8361 Cooling Water System Upgrade Installation of additional power generation facilities at Zirku Island since the existing power generation facilities enhancement due to the operational constraints for maintenance of aging turbines, increase in demand for the future projects and improve flexibility of operations Construct an air conditioned hanger (23m X 23m) complet with offices, electrical/water/drainage utilities, communication facilities, standby generator, fire detection and fighting system, ..etc. Installation of jet fuel facility including but not necessary limited to civil foundations, associated piping system, electrical, instrumentation, fire detection and protection system (Pumps & tanks will be free issued by ZADCO ). To build a seventh Crude oil storage tank on Zirku island with a capacity of Barrels 1 million. Engineer, procure and construct the offshore facilities for the UZ750 Project Engineer, procure and construct the onshore (on island) facilities for the UZ750 Project Level island surface and construct the early civil work structures, trenches, roads and other requirements on the islands Design and construct camp facilities for each island
Upper Zakum
FEED Planned Award : Q1 2012 Planned Finish : Q1 2013 EPC Planned Award : Q4 2013 Planned Finish : Q1 2018 EPC Planned Award : Q1 2013 Planned Finish : Q4 2014 EPC Planned Award : Q2 2013 Planned Finish : Q2 2015
Project
Zirku
Project
Zirku
9 10 11 12
(P8382) - 7th Crude Oil Storage Tank at Zirku UZ750 Sub-sea Pipelines, Cables, Offshore Structures & Brownfied Work (EPC-1) UZ750 Island Surface Facilities Early Civil Works
Planned Award : Q1 2013 Planned Finish : Q2 2015 Planned Award : Q2 2012 Planned Finish : Q2 2015 Planned Award : Q3 2012 Planned Finish : Q1 2016 Planned Award : Q1 2012 Planned Finish : Q22015 Planned Award : Q2 2012 Planned Finish : Q2 2015
13
EPC
Upper Zakum