NO.
DATE
1 03-08-2010
OFFICERS PRESENT
1.CETD,CCED, Mr.Kumar,
S.Ramamurthy, Ananda,
N.Sridhar,
POINTS DISCUSSED
1. Reviwed lay out of YTPS. 2. Railway yard proposed to be on
embankment with the RC ducts for crossing as there is difference in
elevation at teh beginning & end to a tune of 20m.. 2. FOPH to be
located on the Right side of the yard.3. The service line can be
dispensed with as most of TG parts are expected on road. 4. It is
proposed have a gantry at the begining of the yard to unload the
materials received by railways. 5. Aquisition of land to be made at the
tail end of the yard. 6. Fly ash from ash pond of RTPS is proposed for
embnakment. a) Approximate quantity of embankment will be 5.0
M.cum. Cost at 120/cum will be 600 Million INR.b)the cost if concrete
platform is proposed quantity will be about 8 lakh cum cost at
9000/cum will be 7200Million INR 6. Raods and drains to be reviewed.
REMARK
S
POLLUTION NORMS
SOURCE OF WATER:
KRISHNA
BOILER & CW BLOW DOWN TO BE LED TO CMB
COC=5
MAX BOTTOM ASH SHOULD BE <
950.4
FLY ASH <
3801.6
SLUDGE FROM ETP
<
63
STP SLUDGE
<
0.04
TPD
TPD
TPD
TPD
Rail formation el
side slope
Chainage
(units)
675.000 shoulder
1.50 H:1V
ROAD WIDTH
Chainage
m
0.00
1.85
4.75
5.35
7.75
9.40
10.00
10.55
11.60
13.70
15.30
17.70
19.20
19.90
20.30
21.05
22.60
23.40
24.85
25.40
26.65
27.25
27.90
28.30
28.65
29.20
29.95
30.35
0.00
84.08
215.89
243.16
352.24
427.23
454.50
479.50
527.22
622.67
695.39
804.47
872.64
904.46
922.64
956.72
1027.17
1063.53
1129.43
1154.43
1211.24
1238.51
1268.06
1286.24
1302.14
1327.14
1361.23
1379.41
Contour
level
m
675.000
674.500
674.000
673.500
673.000
672.500
672.000
671.500
671.000
671.000
671.000
671.000
670.500
670.000
669.500
669.000
668.500
668.000
667.500
667.000
666.500
666.000
665.500
665.000
664.500
664.000
663.500
663.000
Track
width
units
m
0.10
0.25
1.10
1.45
2.00
2.35
2.00
2.20
2.40
3.10
3.50
4.20
4.50
4.60
4.75
4.90
5.10
5.20
5.30
5.30
5.30
5.40
5.40
5.40
5.40
5.40
5.45
5.45
1.5 M
7.50 M
TRACK
WIDTH
m
4.55
11.36
50.00
65.90
90.90
106.81
90.90
99.99
109.08
140.90
159.08
190.89
204.53
209.07
215.89
222.71
231.80
236.34
240.89
240.89
240.89
245.43
245.43
245.43
245.43
245.43
247.70
247.70
TOP
WIDTH
m
15.05
21.86
60.50
76.40
101.40
117.31
101.40
110.49
119.58
151.40
169.58
201.39
215.03
219.57
226.39
233.21
242.30
246.84
251.39
251.39
251.39
255.93
255.93
255.93
255.93
255.93
258.20
258.20
berm
depth
embk
m
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.00
4.00
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50
9.00
9.50
10.00
10.50
11.00
11.50
12.00
1.5 m
bed
width
average
width9m0
m
15.05
23.36
63.50
80.90
107.40
124.81
110.40
120.99
131.58
163.40
181.58
213.39
228.53
234.57
242.89
251.21
263.30
269.34
275.39
276.89
278.39
284.43
285.93
287.43
288.93
290.43
294.20
295.70
m
15.045
22.6125
61.995
78.6525
104.4
121.0575
105.9
115.74
125.58
157.395
175.575
207.39
221.775
227.07
234.6375
242.205
252.795
258.09
263.385
264.135
264.885
270.18
270.93
271.68
272.43
273.18
276.2025
276.9525
area
m
0.00
11.31
62.00
117.98
208.80
302.64
317.70
405.09
502.32
629.58
702.30
829.56
997.99
1135.35
1290.51
1453.23
1643.17
1806.63
1975.39
2113.08
2251.52
2431.62
2573.84
2716.80
2860.52
3004.98
3176.33
3323.43
qty
cuml qty
0
475.3289
4830.736
2453.942
17822.51
19177.22
8458.387
9033.972
21651.94
54017.1
48427.16
83547.64
62296.53
33936.07
22051.03
46763.55
109066.7
62717.32
124622.2
51100.73
123982
63854.65
73936.83
48091.87
44360.57
73311.36
105352.7
59082.81
475
5306
7760
25583
44760
53218
62252
83904
137921
186348
269896
332192
366129
388180
434943
544010
606727
731349
782450
906432
970287
1044224
1092315
1136676
1209987
1315340
1374423
30.80
31.85
32.75
33.45
35.15
35.45
36.15
36.95
37.55
38.20
38.95
39.40
40.30
41.05
41.65
43.10
43.75
44.15
44.45
45.65
45.95
46.95
47.55
48.55
1399.86
1447.58
1488.49
1520.30
1597.57
1611.20
1643.02
1679.38
1706.65
1736.19
1770.28
1790.73
1831.64
1865.72
1892.99
1958.90
1988.44
2006.62
2020.25
2074.79
2088.43
2133.88
2161.15
2206.60
662.500
662.000
661.500
661.000
660.500
660.000
659.500
659.000
658.500
658.000
657.500
657.000
656.500
656.000
655.500
655.000
654.500
654.000
653.500
653.000
652.500
652.500
652.500
652.500
5.40
5.40
5.40
5.40
5.40
5.35
5.30
5.30
5.30
5.30
5.20
5.10
5.00
5.00
4.90
4.70
4.65
4.60
4.50
4.50
4.35
4.20
4.00
3.80
245.43
245.43
245.43
245.43
245.43
243.16
240.89
240.89
240.89
240.89
236.34
231.80
227.25
227.25
222.71
213.62
211.34
209.07
204.53
204.53
197.71
190.89
181.80
172.71
255.93
255.93
255.93
255.93
255.93
253.66
251.39
251.39
251.39
251.39
246.84
242.30
237.75
237.75
233.21
224.12
221.84
219.57
215.03
215.03
208.21
201.39
192.30
183.21
CHAINAGE VS QUANTITY
600E+04
12.50
13.00
13.50
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
20.50
21.00
21.50
22.00
22.50
22.50
22.50
22.50
294.93
275.43
296.43
276.18
297.93
276.93
299.43
277.68
300.93
278.43
300.16 276.9075
299.39 275.385
300.89 276.135
302.39 276.885
303.89 277.635
300.84
273.84
297.80 270.045
294.75
266.25
296.25
267
293.21 263.205
285.62 254.865
284.84 253.3425
284.07
251.82
281.03 248.025
282.53 248.775
277.21 242.7075
270.39
235.89
261.30
226.8
217.71
252.21
3442.88
3590.34
3738.56
3887.52
4037.24
4153.61
4268.47
4418.16
4568.60
4719.80
4792.20
4860.81
4925.63
5073.00
5132.50
5097.30
5193.52
5288.22
5332.54
5473.05
5460.92
5307.53
5103.00
4898.48
69193.93
167821.3
149894.2
121311.8
306153.1
55841.1
133974.2
157922.9
122534.5
137201.2
162120.1
98714.09
200157.1
170414.1
139152
337084.6
152008.3
95279.03
72407.01
294668.4
74542.33
244712.9
141947.5
227283.5
1443617
1611438
1761332
1882644
2188797
2244638
2378613
2536535
2659070
2796271
2958391
3057105
3257262
3427676
3566828
3903913
4055921
4151200
4223607
4518276
4592818
4837531
4979478
5206762
600E+04
QUANTITY CUM
500E+04
400E+04
300E+04
Series1
Series2
200E+04
100E+04
0,000E+00
0.00
10.00
20.00
30.00
CHAINAGE METER
40.00
50.00
60.00
7.50
1.5
1.50
CHAINAGE VS AREA
CHAINAGE VS AREA
6,000E+00
AREA SQ.M
5,000E+00
4,000E+00
3,000E+00
Series2
2,000E+00
1,000E+00
0,000E+00
0.00
10.00
20.00
30.00
CHAINAGE METER
40.00
50.00
60.00
Conveyor capacity
1800 TPH
Crusher Capacity
900 TPH
Stacker Reclaimer
1800 TPH
10 m
8.5 m
Boom length
Wagon capacity
45 m
110 MT for WT
Crusher In put
Out put
-300 mm
-20 mm
Vibrating screen
IS 3823
Crusher
WEATHERING COURSE
0.1404 kn/SQ.M
Indicate Ubits for imposed loads
Seismic load as required by owner
Include digonal wind under wind load case
PP256
PP257
pp258
pp258
pp257
pp257
pp262
For all earth retaining structure & ground level slab for tanks, minimum
surcharge load of 2t/sq.m shall be considered
No review of SBC even if settlement is less than the allowable limit.
Therefore remove the paragraph.
para xvii)One geade higher than the base concrete shall be used for grout.
However for eqipment foundation.
pp271
pp275
pp276
pp276
Minimum grade of concrete : In table for water retaining struct. Use M25
pp278