1. PRELIMINARIES 1.1. Contract Terms & Conditions 1.1.1. Draw out contract 1.1.2.

Draw out lot sale & building agreement 1.1.3. Supply Construction Agreement 1.1.4. Supply Contract Plans 1.1.5. Secure Financing 1.1.6. Agreement to construction loan & mortgages 1.2. Document Review & Revision 1.2.1. Review & finalize plans 1.2.2. Review & finalize Specifications 1.2.3. Review drawings & drawing notes 1.2.4. Approve revised plans 1.2.5. Approve specifications & drawings 1.3. Advertise Bid & Bidding process 1.4. Bid Review Process 1.5. Notice to Proceed 1.5.1. Send out formal Notice to Proceed Letter 1.5.2. Confirmation of Receipt 2. SITE INVESTIGATION 2.1. Site Layout & Surveying 2.1.1. Locate property boundaries 2.1.2. Perform topographic survey 2.1.3. Sample area soil properties 2.1.4. Layout drainage measures 2.1.5. Layout excavation boundaries 2.1.6. Locate utility connections (plumbing, electrical, mechanical/HVAC) 3. FOUNDATION 3.1. Excavation 3.1.1. Clear vegetation/debris 3.1.2. Layout building footprint 3.1.3. Excavate basement area 3.1.4. Excavate for service connection rough-ins 3.1.5. Level/compact substrate 3.2. Piles 3.2.1. Mark pile locations 3.2.2. Drive piles 3.2.3. Cut piles to length 3.2.4. Install Pile Caps 3.3. Foundation Wall 3.3.1. Layout foundation walls 3.3.2. Install forms 3.3.3. Layout reinforcing steel 3.3.4. Pour concrete 3.3.5. Strip forms 3.3.6. Install drainage gravel

4.

5.

6.

7.

8.

3.3.7. Backfill 3.4. Basement Slab 3.4.1. Lay gravel base 3.4.2. Install vapour barrier 3.4.3. Layout reinforcing steel 3.4.4. Pour concrete 3.4.5. Cure concrete STRUCTURE 4.1. Framing 4.2. Flooring 4.3. Roofing INTERIOR 5.1. Insulation 5.2. Drywall 5.3. Painting 5.4. Flooring 5.4.1. Install hard wood, vinyl, carpet flooring 5.5. Cabinetry 5.5.1. Kitchen 5.5.1.1. Install cabinet frames 5.5.1.2. Install hardware 5.5.1.3. Install drawers/ doors 5.5.1.4. Install granite countertop EXTERIOR 6.1. Stucco 6.2. Cultured Stone 6.3. Garage Door 6.4. Windows/Doors SERVICES 7.1. Plumbing 7.2. Electrical 7.3. HVAC YARD & ACCESS 8.1. Landscaping 8.1.1. Lawn work 8.1.1.1. Clean up site 8.1.1.2. Prepare soil 8.1.1.3. Plant trees, shrubs & any other requested vegetation 8.1.1.4. Plant grass seed or lay sod 8.2. Garbage Disposal 8.2.1. Install collection bin 8.2.2. Collect site garbage 8.2.3. Deposit garbage in appropriate bins 8.3. Driveway 8.3.1. Level /compact substrate 8.3.2. Install forms

8.3.3. Layout reinforcing steel 8.3.4. Pour concrete 8.3.5. Cure Concrete 8.3.6. Strip Forms 8.4. Fencing & Decking 8.4.1. Construct & install fence/gate 8.4.2. Construct & install deck 9. COMPLETION OF THE MILESTONE 9.1.

Das könnte Ihnen auch gefallen