The technology
Guide wheel
Guide arm
Weak point
The technology
Guide wheel
Guide Kerb
A14 Congestion
CHUMMS Multi-modal study
Growth Agenda
Structure Plan Northstowe New town Cambridge Fringes
Delivery
Business Case July 2002 Provisional funding approved 2003 Public Inquiry Sept to Dec 2004 Transport and Works Order Dec 2005 Funding approved - June 2006 Opened August 2011
Funding
Budget - 116.27 million DfT - 92.5 million Developer Funding 23.7 million
Section 106
Town and Country Planning Act
New Developments
Transport and Works Order Transport and Works Act 1992 Railways, Tramways, Trolley buses and guided transport systems Authorises works Defines Limits of Deviation Includes: Compulsory Purchase Powers Deemed Planning Permission
Transport and Works Order Process: Environmental Assessment 2003 Consultations 2003 Draft Orders Feb 2004 Public Inquiry Sept Dec 2004 CGB Order made Dec 2005
Drainage
Structures Junctions Landscaping etc.
Ride Quality?
Ride Quality
Leeds insitu Essen pre-cast
Guideway Tolerances Cambridgeshire Specification Gauge 2600 mm +0mm 5mm Kerb alignment +/- 2mm (horizontal) Running surface alignment +/-2mm (vertical) Joints +/-2mm Joint spacing 10m minimum
Guideway construction
Construction
Construction Park and Rides Bus stops Bridleway/cycleway Flares Car Traps Ecology
Bus Operations All operating risks and costs to be taken by Operators Open access Multiple operators Access Charges Multi-operator ticketing Quality Partnership High quality vehicles
Operating
Services - Peak hour from St Ives to Cambridge Pre-busway 5 per hour Busway 8 per hour at opening 10 per hour from 4th Sept