Sie sind auf Seite 1von 12

CHAPTER 79

PAGE 1
EXTRA - FLUGZEUGBAU GmbH
SERVICE MANUAL EXTRA 300
PAGE DATE: 31. January 1995
Chapter 79
Oil System
CHAPTER 79
PAGE 2
EXTRA - FLUGZEUGBAU GmbH
SERVICE MANUAL EXTRA 300
PAGE DATE: 31. January 1995
TABLE OF CONTENTS
79-00-00 GENERAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
79-10-00 INVERTED OIL SYSTEM. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
79-10-01 Principles oI Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
79-20-00 OIL COOLER. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
79-20-01 Principles oI Operation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
79-30-00 INSTALLATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
79-30-01 Fittings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
79-30-02 Flexible Hoses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
79-40-00 MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
79-40-01 Reseating Valve Balls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
79-40-02 Cleaning Inverted Oil System. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
CHAPTER 79
PAGE 3
EXTRA - FLUGZEUGBAU GmbH
SERVICE MANUAL EXTRA 300
PAGE DATE: 31. January 1995
79-00-00 GENERAL
The EA 300 is equipped with a modiIication oI a Christen
Inverted Oil System (CHRISTEN 801 series). Maintenance
work or overhaul oI the this system requires consultation
to the manuIacturer. (ReIer to Christen Product Manual (P/
N: Christen 70047-001) and Lycoming Operator`s Manual
(P/N:60297-21). Additionally the lubrication system oI the
EA 300 has two oil cooler which are connected to the
engine by Ilexible tubing.
79-10-00 INVERTED OIL SYSTEM
The standard Christen 801 Inverted Oil System is a kit-Iorm
accessory Ior Lycoming aircraIt engines which permits
normal engine lubrication, with minimal oil loss, during
aerobatic Ilight. When installed, it becomes a selI-con-
tained extension oI the normal aircraIt engine oil and
breather systems. As the system control valves are gravity-
operated, no connection to aircraIt power sources is re-
quired (ReIer to Figure 1 and 2).
The system works in all inverted and negative-g Ilight
conditions and is particular suited to high-perIormance
aircraIt used Ior unlimited-class aerobatic competitions.
The need Ior modiIication oI the standard Christen 801
Inverted Oil System results Irom installation requirements
Ior diIIerent system components oI the Lycoming AEIO
540 engine.
CHAPTER 79
PAGE 4
EXTRA - FLUGZEUGBAU GmbH
SERVICE MANUAL EXTRA 300
PAGE DATE: 31. January 1995
79-10-01 Principles of Operation
Normal flight
During normal Ilight, the weighted ball valve at the top oI
the oil separator is open, allowing blow-by gases Irom the
engine crankcase to be vented Irom the breather port to the
top oI the oil separator and out through the overboard
breather line. The top ball valve oI the oil valve is closed
and the bottom ball valve is open, allowing oil to Ilow Irom
the sump Iitting to the oil pump and out to the engine
lubrication points.
INVERTED OIL SYSTEM
Inverted Oil System, Normal Flight
Figure 1
CHAPTER 79
PAGE 5
EXTRA - FLUGZEUGBAU GmbH
SERVICE MANUAL EXTRA 300
PAGE DATE: 31. January 1995
Inverted flight
When the aircraIt is inverted, engine oil Ialls to the top oI
the crankcase. the weighted ball valve in the oil seperator
closes, preventing overboard loss oI oil though the top oI
the oil separator. Blow-by gasses Irom the engine crankcase
are vented Irom the sump to the bottom oI the oil separator
and out through the overboard breather line. The top ball
valve oI the oil valve is open, and the bottom valve is closed,
allowing oil to Ilow out Irom the breather port to the oil
valve, through the sump Iitting and the sump screen, to the
oil pump and out to the engine lubrication points.
Any oil in the lines which Iails to return to the sump during
the transition between normal and inverted Ilight drains
into the oil separator. This oil then returns to the sump Irom
the bottom oI the oil separator during periods oI normal
Ilight.
Principles oI Operation
INVERTED OIL SYSTEM
Inverted Oil System, Inverted Flight
Figure 2
CHAPTER 79
PAGE 6
EXTRA - FLUGZEUGBAU GmbH
SERVICE MANUAL EXTRA 300
PAGE DATE: 31. January 1995
79-20-00 OIL COOLER
The lubrication system oI the EA 300 has two oil cooler
which are mounted on the leIt Iront and leIt rear engine
baIIles and connected to the engine by Ilexible hose. The
two oil coolers (SW 8406 R) are produced by the STEWART
WARNER SOUTH WIND Corporation.
79-20-01 Principles of Operation
In operation the hot lubricating oil leaving the engine is
pumped by an engine-driven pump to a hose connector on
the engine mount which directs the oil to the oil coolers.
The oil is cooled in passing through the oil cooler and
returned to the engine lubricating circuit through the return
hose tubing connecting the engine mount connector.
Flexible Hose
Oil cooler
(SW 8406 R)
Oil cooler
(SW 8406 R)
Oil Cooling System
Figure 3
Engine
CHAPTER 79
PAGE 7
EXTRA - FLUGZEUGBAU GmbH
SERVICE MANUAL EXTRA 300
PAGE DATE: 31. January 1995
79-30-00 INSTALLATION
BeIore making installations and repairs to the aircraIt
plumping, it is important to make accurate identiIication oI
plumping materials.
79-30-01 Fittings
General inIormation concerning Iittings used in the Extra
300 you Iind in Chapter 20-10-08.
Inverted Oil System
The hose and Iitting installation is modiIied to the standard
Christen Inverted Oil System. The connections oI the
Inverted Oil System still consist oI AN (Army/Navy)
Standard Iittings. The position oI this AN-Iittings at the
engine is shown in the Iigure 4 on Iollowing page 8.
Oil Cooling System
The Ilexible tubing oI the oil cooling system are connected
by AN Standard Iittings with equal size (8D), but diIIerent
connection angle. The position oI this AN-Iittings at the
engine is shown in the Iigure 5 on page 9.
CHAPTER 79
PAGE 8
EXTRA - FLUGZEUGBAU GmbH
SERVICE MANUAL EXTRA 300
PAGE DATE: 31. January 1995
INSTALLATION
Fittings
N
i
p
p
l
e
A
N

8
1
6
-
1
0
D

H
o
s
e

E
l
b
o
w
A
N

8
4
4
-
1
2
D
H
o
s
e

E
l
b
o
w
A
N

8
4
2
-
1
2
D
2
1
5
4
4
4
4
1
2
5
1
L
y
c
o
m
i
n
g

E
l
b
o
w
-
F
i
t
t
i
n
g
P
a
r
t

N
u
m
b
e
r

7
7
1
5
5
3
L
y
c
o
m
i
n
g

A
d
a
p
t
e
r
,

G
a
s
k
e
t
,
S
c
r
e
e
n
P
a
r
t

N
u
m
b
e
r

s

L
W
-
1
6
3
3
9
,
S
T
D
-
1
2
7
2
,

7
7
6
4
4
E
l
b
o
w

A
N
-
1
0
D
(
7
/
8
-
1
4

U
N
F
-
3
A
)
O
i
l

S
u
m
p

r
e
t
u
r
n

I
i
t
t
i
n
g
3
4
E
l
b
o
w
A
N

8
2
3
-
1
0
D
Positions of AN-Fittings in the Inverted Oil System
Figure 4
CHAPTER 79
PAGE 9
EXTRA - FLUGZEUGBAU GmbH
SERVICE MANUAL EXTRA 300
PAGE DATE: 31. January 1995
1
1
2
3
N
i
p
p
l
e
A
N

8
1
6
-
8
D
3
E
l
b
o
w
A
N

8
2
2
-
8
D
1
E
l
b
o
w
A
N

8
2
3
-
8
D
2
Positions of AN-Fittings in the Oil Cooling System
Figure 5
E
n
g
i
n
e
INSTALLATION
Fittings
CHAPTER 79
PAGE 10
EXTRA - FLUGZEUGBAU GmbH
SERVICE MANUAL EXTRA 300
PAGE DATE: 31. January 1995
INSTALLATION
79-30-02 Flexible Hoses
General inIormation concerning Ilexible hoses you Iind in
Chapter 20-10-07.
I M P O R T A N T If replacement of oil lines is necessary, cover the oil lines
of the engine department with AEROQUIP AE102 fire
sleeves as per Chapter 20-10-07 except the AEROQUIP
637/MIL-H 6000 hoses.
Oil Cooling System
The position and identiIication oI the Ilexible hose at the
engine and the oil cooling system is shown in Figure 6:
1 AEROQUIP 303-8 Hose Fittings 491-8D
PN: PC-63601A21 hose lenght: 1210 mm
2 AEROQUIP 303-8 Hose Fittings 491-8D
PN: PC-63601A22 hose lenght: 1030 mm
3 AEROQUIP 303-8 Hose Fittings 491-8D
PN: PC-63601A23 hose lenght: 600 mm
2
3
1
Engine
Positions of AEROQUIP-Hose in the Oil Cooling System
Figure 6
CHAPTER 79
PAGE 11
EXTRA - FLUGZEUGBAU GmbH
SERVICE MANUAL EXTRA 300
PAGE DATE: 31. January 1995
Inverted Oil System
The position and identiIication oI the Ilexible hose at the
engine and the inverted oil system is shown in Figure 7:
1 AEROQUIP 637/ MIL-H 6000 Hose clips
PN: PC-63601A27 hose lenght: 580mm
2 AEROQUIP 637/ MIL-H 6000 Hose clips
PN: PC-63601A28 hose lenght: 350mm
3 AEROQUIP 303-10 Hose Fittings 491-10D
PN: PC-63601A29 hose lenght: 830mm
4 AEROQUIP 303-10 Hose Fittings 491-10D
PN: PC-63601A25 hose lenght: 400mm
5 AEROQUIP 303-10 Hose Fittings 491-10D
PN: PC-63601A24 hose lenght: 220mm
6 AEROQUIP 303-10 Hose Fittings 491-10D
PN: PC-63601A26 hose lenght: 200mm
1
2
INSTALLATION
Flexible Hose
4
Positions of AEROQUIP-Hose in the Inverted Oil System
Figure 7
6
3
5
CHAPTER 79
PAGE 12
EXTRA - FLUGZEUGBAU GmbH
SERVICE MANUAL EXTRA 300
PAGE DATE: 31. January 1995
79-40-00 MAINTENANCE
The inverted oil system normally requires no maintenance.
During major overhauls or when repairs require sump
removal, inspect sump Ior excessive deposits oI sludge,
varnish, or Ioreign material. II sump is dirty, remove and
thoroughly clean all hoses and components; then use com-
pressed air blast Ior drying and cleanout beIore reassembly.
79-40-01 Reseating Valve Balls
Marginal oil loss oI valve may result Irom nicks in the valve
seats which cause leakage when the valve should be closed.
Such nicks can be caused by mishandling or by small chips
oI metal being caught between the ball and the seat as the
valve operates during initial run-in oI a new or overhauled
engine. For more inIormation oI the valve leakage test reIer
to Lycoming Operator`s Manual.
79-40-02 Cleaning Inverted Oil System
The inverted oil system must be Ilushed with a suitable
petroleum solvent, such as varsol, every 300 (three hun-
dred) hours oI engine operation or when there is evidence
oI the loss oI oil through the breather line aIter normal
Ilight.

Das könnte Ihnen auch gefallen