Sie sind auf Seite 1von 8

SRM UNIVERSITY

FORMAT FOR PREPARATION OF PROJECT REPORT FOR B. TECH.

1.

ARRANGEMENT OF CONTENTS: The sequence in which the project report material should be arranged and bound should be as follows: 1. Cover Page & Title Page 2. onafide Certificate !. "bstract #. Table of Contents $. %ist of Tables &. %ist of 'igures (. %ist of )*mbols+ "bbreviations and ,omenclature -. Chapters .. "ppendices 1/. 0eferences The table and figures shall be introduced in the appropriate places.

2.

PAGE DIMENSION AND BINDING SPECIFICATIONS: The dimension of the project report should be in "# si1e. The project report should be bound using fle2ible cover of the thic3 white art paper. The cover should be printe in !"#$% "etter& and the te2t for printing should be identical.

'. '.1 '.2

PREPARATION FORMAT: C()er P#*e + Tit"e P#*e 4 " specimen cop* of the Cover page & Title page of the project report are given in Appen i, 1. B(n#-i e Certi-i$#te . The onafide Certificate shall be in double line spacing using 'ont )t*le Times ,ew 0oman and 'ont )i1e 1#+ as per the format in Appen i, 2. The certificate shall carr* the supervisor5s signature and shall be followed b* the supervisor5s name+ academic designation 6not an* other responsibilities of administrative nature7+

department and full address of the institution where the supervisor has guided the student. The term /SUPERVISOR0 must be t*ped in capital letters between the supervisor5s name and academic designation. '.' '.1 A!&tr#$t . "bstract should be one page s*nopsis of the project report t*ped double line spacing+ 'ont )t*le Times ,ew 0oman and 'ont )i1e 1#. T#!"e (- C(ntent& . The table of contents should list all material following it as well as an* material which precedes it. The title page and onafide Certificate will not find a place among the items listed in the Table of Contents but the page numbers of which are in lower case 0oman letters. 8ne and a half spacing should be adopted for t*ping the matter under this head. " specimen cop* of the Table of Contents of the project report is given in Appen i, '. 3i&t (- T#!"e& . The list should use e2actl* the same captions as the* appear above the tables in the te2t. 8ne and a half spacing should be adopted for t*ping the matter under this head. 3i&t (- Fi*5re& . The list should use e2actl* the same captions as the* appear below the figures in the te2t. 8ne and a half spacing should be adopted for t*ping the matter under this head. 3i&t (- S78!("&9 A!!re)i#ti(n& #n N(8en$"#t5re 4 8ne and a half spacing should be adopted or t*ping the matter under this head. )tandard s*mbols+ abbreviations etc. should be used. C;#pter& 4 The chapters ma* be broadl* divided into ! parts 6i7 9ntroductor* chapter+ 6ii7 Chapters developing the main theme of the project wor3 6iii7 and Conclusion. The main te2t will be divided into several chapters and each chapter ma* be further divided into several divisions and sub:divisions. ;ach chapter should be given an appropriate title. Tables and figures in a chapter should be placed in the immediate vicinit* of the reference where the* are cited. 'ootnotes should be used sparingl*. The* should be t*ped single space and placed directl* underneath in the ver* same page+ which refers to the material the* annotate.

'.2

'.4

'.6

'.:

'.<

Appen i$e& 4 "ppendices are provided to give supplementar* information+ which is included in the main te2t ma* serve as a distraction and cloud the central theme. "ppendices should be numbered using "rabic numerals+ e.g. "ppendi2 1+ "ppendi2 2+ etc. "ppendices+ Tables and 0eferences appearing in appendices should be numbered and referred to at appropriate places just as in the case of chapters.

"ppendices shall carr* the title of the wor3 reported and the same title shall be made in the contents page also.

'.1=

3i&t (- Re-eren$e& 4The listing of references should be t*ped # spaces below the heading <0;';0;,C;)= in alphabetical order in single spacing left 4 justified. The reference material should be listed in the alphabetical order of the first author. The name of the author>authors should be immediatel* followed b* the *ear and other details. " t*pical illustrative list given below relates to the citation e2ample quoted above. REFERENCES

1. 2. !.

"riponnammal+ ). and ,atarajan+ ). 61..#7 ?Transport Phonomena of )m )el 4 @ "s25+ Pramana 4 Aournal of Ph*sics Bol.#2+ ,o.1+ pp.#21:#2$. arnard+ 0.C. and Dellogg+ C. 61.-/7 ?"pplications of Convolution 8perators to Problems in Enivalent 'unction Theor*5+ Fichigan Fach+ A.+ Bol.2(+ pp.-14.#. )hin+ D.G. and Fc3a*+ ,.H. 61.-#7 ?8pen %oop Finimum Time Control of Fechanical Fanipulations and its "pplications5+ Proc."mer.Contr.Conf.+ )an Hiego+ C"+ pp. 12!1:12!&.

'.1=.1 T#!"e #n -i*5re& > * the word Table+ is meant tabulated numerical data in the bod* of the project report as well as in the appendices. "ll other non:verbal materials used in the bod* of the project wor3 and appendices such as charts+ graphs+ maps+ photographs and diagrams ma* be designated as figures. 1. TYPING INSTRUCTIONS: The impression on the t*ped copies should be blac3 in colour. 8ne and a half spacing should be used for t*ping the general te2t. The general te2t shall be t*ped in the 'ont st*le ?Times ,ew 0oman5 and 'ont si1e 1#. ?????

APPENDI@ 1 6" t*pical )pecimen of Cover Page & Title Page7 I'ont )t*le Times ,ew 0oman 4 oldJ

TIT3E OF PROJECT REPORT


I'ont )i1e 1-JI1.$ line spacingJ

A PROJECT REPORT
I'ont )i1e 1#J

Submitted by
I'ont )i1e 1#JI9talicJ

NAME OF THE CANDIDATEASB AREG NOB


I'ont )i1e 1&J

in partial fulfillment for the award of the degree of


I'ont )i1e 1#JI1.$ line spacingJI9talicJ

NAME OF THE DEGREE


I'ont )i1e 1&J IN

0",CK 8' )TEHL


I'ont )i1e 1#J

SRM UNIVERSITY
RAMAPURAM : CHENNAI 4===:<
I'ont )i1e 1&JI1.$ line spacingJ

F8,TK & L;"0

I'ont )i1e 1#J

SPECIMEN

DISTRIBUTED CEY MANAGEMENT FOR MOBI3E AD HOC NETDORCS


A PROJECT REPORT Submitted by

SHI3PA . A ARe* N(B DINESH . R ARe* N(B

in partial fulfillment for the award of the degree of

BACHE3OR OF TECHNO3OGY
in

INFORMATION TECHNO3OGY

SRM UNIVERSITY
RAMAPURAM : CHENNAI 4== =:< MAY 2=1'

APPENDI@ 2 6" t*pical specimen of onafide Certificate7 I'ont )t*le Times ,ew 0omanJ

SRM UNIVERSITY RAMAPURAM


I'ont )t*le Times ,ew 0oman 4 si1e :1-J

BONAFIDE CERTIFICATE
I'ont )t*le Times ,ew 0oman 4 si1e :1&J I'ont )t*le Times ,ew 0oman 4 si1e :1#J

Certified that this project report EFFF.TIT3E OF THE PROJECTFFFFF..G is the bonafide wor3 of <FFFF..NAME OF THE CANDIDATEASB.FFFFG who carried out the project wor3 under m* supervision.

II)ignature of the Kead of the HepartmentJJ SIGNATURE II,ameJJ HEAD OF THE DEPARTMENT

II)ignature of the )upervisorJJ SIGNATURE II,ameJJ SUPERVISOR II"cademic HesignationJJ

IIHepartmentJJ II'ull address of the Hept & College JJ

IIHepartmentJJ II'ull address of the Hept & College JJ

APPENDI@ ' 6" t*pical specimen of table of contents7 I'ont )t*le Times ,ew 0omanJ TAB3E OF CONTENTS CHAPTER NO. ABSTRACT 3IST OF TAB3E 3IST OF FIGURES 3IST OF SYMBO3S TIT3E PAGE NO. iii ,)i ,)iii ,,)ii

1.

INTRODUCTION 1.1 1.2 G;,;0"% .... ......... 1.2.1 1.2.2 General ........... 1.2.2.1 General 1.2.2.2 . . . . . . . . . . 1.2.2.! . . . . . . . . . . 1.2.! 1.! 1.# ............ . . . . . . . . . . .. . . . . . . .................. G;,;0"% 2.2 2.2 .......... MMMMM.

1 1 2 $ 12 1. 2$ 2. !/ #$ $4< ($ .. 1//

2.

3ITERATURE REVIED 2.1

1. 2. '. 1. 2. 4. 6. :.

INTRODUCTION 3ITERATURE REVIED SYSTEM REHUIREMENTS SYSTEM ANA3YSIS SYSTEM DESIGN IMP3EMENTATION CONC3USION FUTER ENHANCEMENT APPENDI@ 1 AS#8p"e C( in*B APPENDI@ 2 AS#8p"e S$reen S;(tB REFERENCES

Das könnte Ihnen auch gefallen