Beruflich Dokumente
Kultur Dokumente
Candidates are required to give their answers in their own words as far as practicable. The figures in the margin indicate full marks. Attempt all the questions. 1) a) *n &hat principle the continuit$ e+uation is ,ase% on- State an% %erive the continuit$ e+uation .or a pipe .lo&) ,) / pipeline /B" 100 m long is lai% on a up&ar% slope o. 1 in 20) 'he length o. the portion /B is 30m an% its %iameter is 1!0mm) /t B the pipe section su%%enl$ enlarges to (00 mm %iameter an% remains so .or the remain%er o. its length B"4 30 m) / .lo& o. 0)0! m(5s is pumpe% into the pipe at its lo&er en% / an% is %ischarge% at the upper en% " into a close% tank) 'he pressure at the suppl$ en% / is 1 0 675m 2 than .in% the pressure at the %ischarge en% ") a) 9hat are the %i..erences ,et&een .riction .actor an% .anning .riction .actor- :escri,e it) /n% also %erive .riction .actor in hea% loss in pipe) ,) ;sing (0 $ears %ata an% <um,el=s metho% the .loo% magnitu%es .or return perio%s o. 100 an% !0 $ears .or a river .oun% to ,e 1200 an% 1020 cusec respectivel$) Estimate the magnitu%e o. a .loo% &ith a return perio% o. !00 $ears) a) 9hat are the selection criteria o. tur,ine- :escri,e it) ,) :escri,e construction o. 6aplan tur,ine &ith the help o. sketch) a) :escri,e &orking principle o. centri.ugal pump &ith neat sketch) ,) 9ater is supplie% to a to&n o. 004000 inha,itants) 'he reservoir is 2) 6m a&a$ .rom the to&n an% loss o. hea% %ue to .riction in pipe line is measure% as 1! m) "alculate si>e o. suppl$ main i. each inha,itants consumes100 lit o. &ater per %a$ an% hal. o. the %ail$ suppl$ is pump in 0 hr)?. @ 0)0(0A a) 9h$ it is necessar$ to %issipate energ$ &hen &ater is spille% out
1
8 0
2)
() )
8 0 8 0
!)
through the over.lo& %am- EBplain %i..erent t$pes o. spill&a$s &ith neat sketch) ,) 9hat is meant ,$ h$%raulic Cumps- :escri,e %i..erent t$pes o. surge tanks &ith necessar$ sketches) 2) a) :escri,e the metho%s use% to estimate the missing rain.all %ata at a station) #o& &oul% $ou %etermine optimum num,er o. rain gauges to ,e installe% in a given catchments,) / storm &ith 20 cm o. precipitation pro%uce% a sur.ace runo.. o. 11)2 cm) Estimate the DEin%eB o. the storm i. the temporal %istri,ution o. rain.all is as .ollo&s: 1 rain.all per 0)0 2 1)0 ( ()0 )2 ! ()2 2 ()2 8 2)0 0
0 8
1)0 2F!
9rite short notes on any two: c) "ontinuit$ e+uation %) ;E'u,e manometer e) '$pes o. concrete an% .ill %ams