BID BREAKDOWN
MC ANGEL GABRIEL HALL (PHASE Project: 2) Location: Miriam College Child Study Center, Katipunan Ave., Quezon City Owner: Miriam College Foundation, Inc. Subject: Bid Breakdown for General Construction and Interior Works ITEM NO. DIV 1.0 DESCRIPTION GENERAL REQUIREMENTS a. Mobilization & Demobilization b. Building & Occupancy Permits c. Insurance & Bonds d. Temporary Utilities (site office, sheds, enclosures, toilets,etc.) e. Security Services f. As-built Drawings TOTAL DIV 1.0 SITEWORK a. Demolition 1. Demolition / Relocation of Existing Fence 2. Demolition / Relocation of existing Wall for TR, Loft, etc. b. Excavation c. Backfilling d. Dewatering e. Soil Treatment f. Drainage System up to MH2 only g. Covered Walk h. Catch Basin i.Concrete Pipes j. 12.5' PVC pipes storm drain k. Landscaping TOTAL DIV 2.0 UNIT lot lot lot lot lot QTY. MATERIAL UNIT COST AMOUNT
AMOUNT
DIV 2.0
sq.m. sq.m. cu.m. cu.m. cu.m. sq.m. lot sq. m. cu. m. l.m. l.m. sq. m.
LAST UPDATE:4/10/2014
Page 1of 10
BID BREAKDOWN
ITEM NO. DIV 3.0 TBV TBV TBV TBV TBV TBV
DESCRIPTION CONCRETING WORKS (including formwork & reinforcements) a. Wall Footings b. Column Footing c. Column d. Lintel Beams ( drs. & wdo. openings) e. Beams f. Slab on Fill g. Laundry Area Counter TOTAL DIV 3.0 MASONRY WORKS (incl. reinf., mortar & plastering) CONCRETE HOLLOW BLOCKS b. 150mm thk CHB TOTAL DIV 4.0 METALS a. Structural Metal Framing (includes truss, purlins, sag rods, rivets, etc.) b. Structural Metal Floor Framing for Loft (15% of roof area) c. Disappearing Stairs d. Fences and Gates e. Grille Works f Aluflex Aluminum Panels g. Stainless Steel Dish Racks TOTAL DIV 5.0 WOOD & PLASTICS a. Rough Carpentry (include rough hardwares) b. Cabinetry 1. Counter at Toddler Restroom 2. Covelight and band at hallway
UNIT
QTY.
AMOUNT
DIV 4.0
TBV
sq.m
LAST UPDATE:4/10/2014
Page 2of 10
BID BREAKDOWN
DESCRIPTION
UNIT
QTY.
AMOUNT
c. Loft Balustrade / Railing (option to recu.m use materials from LRC gate) d. Loft Flooring cu.m. e. Baseboard for Toddler Room bd.ft. TOTAL DIV 6.0 THERMAL & MOISTURE PROTECTION a. Waterproofing b. Roofing Insulation c. Preformed Galvalum Roofing Tiles d. Gutter e. Chains f. Sealant and Caulking g. Vapor barrier TOTAL DIV 7.0 DOORS & WINDOWS FLUSH HOLLOW CORE WOOD DOORS b. WD-1: 1.6m Hollow Core Double door with square vision panels c. WD-2: .9m Hollow Core Single door with square vision panels d. WD-3: .9m Hollow Core Single door with marine plywood f. WD-4: .7m Hollow Core Single door with square vision panels 2x6 TDK Door Jambs ALUMINUM WINDOWS a. AW-1: 6 mm thk. clear glass on Powder-coated Aluminum Casement Window (verify color) 2.70 x 1.65m b. AW-2: 6 mm thk. clear glass on Powder-coated Aluminum Casement Window (verify color) 1.80 x 1.65m
DIV 7.0
DIV 8.0
TBV
set
set
LAST UPDATE:4/10/2014
Page 3of 10
BID BREAKDOWN
ITEM NO.
DESCRIPTION c. AW-3: 6 mm thk. clear glass on Powder-coated Aluminum Awning Window (verify color .60x 1.05m d. AW-4: 6 mm thk. Tempered glass one-way mirror (verify color )and size 1.20 x .90m e. AW-5: 6 mm thk. Powder-coated Aluminum Louvers (verify color) and size 2.80 x 1.80m f. AW-6: 6 mm thk. Powder-coated Aluminum Louvers (verify color) and size .75 x 1.30m g. AW-7: 6 mm thk. Powder-coated Aluminum Louvers (verify color) and size .60 x .60m Finish Hardwares a. Hinges 1. 106mm x 306mm x 40mm Selfclosing Hinge 2. 100mm x 100mm x 2.5mm thk. Butt Hinges b. Sliding Door Track c. Locks 1. Deadbolt 2. Entrance lock 3. Flushbolt d. Others 1. Stainless Steel Door pulls 2. Retractable Sliding door pull 3. Magnetic door holder 4. Push plate
UNIT set
QTY.
AMOUNT
set
set
set
set
8.04
pcs pcs sets sets sets sets sets sets sets sets
LAST UPDATE:4/10/2014
Page 4of 10
BID BREAKDOWN
ITEM NO.
DESCRIPTION GLASS AND GLAZING Mirrors a. .6mm thk.x 600mm x 1200mm mirror One-Way Mirror Glass TOTAL DIV 8.0 FINISHES Floor Finishes a. 0.20 x 0.20 Ceramic Floor Tiles (labor only) b. Vinyl Flooring c. Rubber flooring at LRC Wall Finish a. 0.20 x 0.20 Ceramic Wall Tiles (labor only) b. 1/2" thk Fiber cement double wall partition Ceiling Finishes a.1/4" thk. Fiber Cement Board with hangers (re-use TRC ceiling)
UNIT
QTY.
AMOUNT
TBV TBV
pcs sf
sq.m.
owner
TBV
Counter top - 6mm marble slab sq.m. T-runners and acoustic gypsum board sq.m. Painting Works a. Concrete Surfaces 1. Exterior - Smooth Painted Finish sq.m. 2. Interior - Smooth Painted Finish sq.m b. Varnish finish for Wooden Surfaces sq.m b. Fiber-cement surfaces - Latex Semisq.m gloss c. Gypsum Surfaces - Latex Semisq.m gloss d. Metal Surfaces - Enamel Painted sq.m Finish e. LRC Flooring - Anti Skid Paint sq.m TOTAL DIV. 9.0
LAST UPDATE:4/10/2014
Page 5of 10
BID BREAKDOWN
DESCRIPTION
QTY.
AMOUNT
SPECIALTIES a. Blackboard b. .6mm thk. X 1200mm x 2100mm. Mirror incl. Frame c. Laminated Restroom Partition TBV System TOTAL DIV. 10.0 DIV 15.0 MECHANICAL Plumbing System a. Water Supply system b. Soil & Waste Piping System c. Septic Tank Plumbing Fixtures a. Watercloset b.Lavatory 1. Wall-hung lavatory 2. Stainless Steel Sink 3. Towel Bar c. Faucet 1. Self-closing faucet 2. Hose bibb d. Urinal e. Other toilet accessories Air Distribution a. exhaust fan b. ceiling mounted electric fan c. 1hp wall-mounted AC - installed d. Wall-mounted box-type electric fan Storm Drainage System a. Catch Basin b. Floor Drain c. 100mm PVC Downspout d. 100mm dia. Roof Drain e. Excavation/Breaking f. Backfilling g. Gravel Bedding
l.m. l.m. cu.m. sets sets sets sets sets pcs sets lot sets sets sets sets pcs. pcs. l.m. l.m. lot lot cu.m.
owner
owner TBV
LAST UPDATE:4/10/2014
Page 6of 10
BID BREAKDOWN
ITEM NO.
UNIT lot
QTY.
AMOUNT
LAST UPDATE:4/10/2014
Page 7of 10
BID BREAKDOWN
ITEM NO.
DESCRIPTION
UNIT
QTY.
AMOUNT
DIV 16.0 ELECTRICAL 1. Electrical Works a. Circuit breakers, panel elements, boxes & enclosures b. Wiring Devices 1. Rough-ins - 15mm dia. Conduit - 20mm dia. Conduit - 50mm dia. Conduit - 80mm dia. Conduit - Fittings and Accssories - Junction Box - Utility Box - Square Box - Miscellaneous 2. Wires and Cables - 2mm2 THHN Wire - 3.5mm2 THHN Wire - 5.5mm2 THHN Wire - 8mm2 THHN Wire - 22mm2 THHN Wire - 30mm2 THHN Wire - 100mm2 THHN Wire - Miscellaneous 3. Wiring Devices - Two Gang Switch - Three Way Switch - Three Way Weatherproof Switch - Single Convenience Outlet - Duplex Convenience Outlet - Duplex Weatherproof Convenience Outlet - Pop-up Single Convenience Outlet - Miscellaneous
sets
l.m. l.m. l.m. l.m. sets pcs. pcs. pcs. lot l.m. l.m. l.m. l.m. l.m. l.m. l.m. lot sets sets sets sets sets sets sets sets
LAST UPDATE:4/10/2014
Page 8of 10
BID BREAKDOWN
ITEM NO. owner owner owner owner owner owner owner TBV owner
TBV
DESCRIPTION c. Lighting fixtures, housings & diffusers 2-36 watt recess mounted 1-13watt PL lamp 4-36watt recess mounted 2-150watt infrared motion det. Emergency light Exit light 1-36watt fluorescent w/ wire guard d. Electric Meter e. Inter-com cable Intercom for viewing Room f. TV Cable cable g. Telephone cable Tapping to MIC Hall TOTAL DIV. 16.0 OTHER ITEMS TO COMPLETE WORK (Please Specify) FURNITURE Kid's Chairs Kid's Table Kid's Center Table Shelf Units Cubbies Lockers Bookstand, Rotating Comp.Table + Chair TV Stand Teacher's Cabinet Pillows, Foam blocks Shelves for Faculty Storage Teacher's Carrel Teacher's Chair with casters
UNIT sets sets sets sets sets sets sets sets sets sets l.m. l.m. l.m.
QTY.
AMOUNT
sets sets sets sets sets sets sets sets sets sets sets sets sets sets
LAST UPDATE:4/10/2014
Page 9of 10
BID BREAKDOWN
ITEM NO.
DESCRIPTION Square Table for 4 Furniture for Activity Rooms ACCESSORIES: Clock, Crucifix, etc
QTY.
AMOUNT
GRAND TOTAL NOTE: Materials and/or work not specified in the bid breakdown and technical specifications but is implied and deemed necessary to complete the work shall be supplied by the contractor, except for owner-supplied materials as stated in the technical specifications.