Government of Nepa Ministry of Urban Develop Department of Urban Development and B Division office kathman Bill of Quantity(BOQ Project

Name:- Const. Sn 1 1

1.1 2 3 4 5 6 7 8 8

9 10 10.1 11

11, a 11, b 11, c 12 13 14 15 15.1 15.2

16 16.1 16.2 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39

Government of Nepal Ministry of Urban Development Department of Urban Development and Building Con Division office kathmandu Bill of Quantity(BOQ) Project Name:- Const. Description Civil Works: Earth work in excavation in trenches, foundations etc. in various type of soil including timbering & shoring, pumping out water from trenches if necessary, dressing of sides , lifting and Stacking of excavated material by machine Earth work in excavation in trenches, foundations etc. in various type of soil including timbering & shoring, pumping out water from trenches if necessary, dressing of sides , lifting and Stacking of excavated material mannually Disposing of excavated soil at approprate location as per instruction of site engineer Dismentalling of Brick work in cement sand mortar including stacking of usable material at approprate location Dismentalling of CGI sheet roof and wooden rafter ,purline or Steel tube work complete including stacking of usable materials at approprate location Gravel packing With compaction as per Instruction of site Engineer. Supplying of Sand Gravel Mix Materials for piling work as per Instruction of Site Engineer Dry stone soling in foundation and floor including sand filling in joints, leveling, watering etc. all complete. For Pile work Construction of cast in situ concrete pile of Dia.500 mm by excavating pile foundation by Mechanical Drill or Mannual Drill By Rigs, Up to 10 m depth,lifting up with shoring the hole,Stacking the soil 1.0 m minimium from the edge of hole ,Dewatering. Construction of Gravel Pile Of Diameter 400 mm by Excavating Pile Foundation by Mechanical Drill or Mannual drill by rigs,up to 2.5 meter depth,Lifting Up with shoring the hole, stacking the soil 1.0 m minimum from the edge of hole, Dewatering within cons Plain cement Concrete RCC (PCC) in1:2:4 ratio for foundations, flooring and walls. Plain cement Concrete (PCC) in1:2:4 ratio for foundations, flooring and walls. Form work Formwork, shuttering, centering with waterproof ply board and steel post for all works necessary propping, scaffolding, staging, supporting inclusive of wedging and cutting holes for utilization till the support if fully unyielding nett. For Column For slab For Beam Plain cement Concrete (PCC) for RCC works (1:1:2 ) for column Plain cement Concrete (PCC) for RCC works (1:1 :3 ) for column,Beam and slab/lintels steel reinforcement bar of fe 500 grade including straightening, cleaning, cutting, binding & fixing in position with an nealed tying binding wire as per drawing, design & instruction all complete. Good qualityChimney made Brickwork in 1:4 C/S mortar Upto Ground floor Above ground floor

Machine made brick work in cement sand mortar 1:4 Upto Ground floor Above ground floor 75 mmx75 mm size sal wood frame in 1.71x1.86 mtr room size with 50 x75 mm sal wood cross partitation,12 mm commercial ply wood laminated on both side with 4mm teak wood ,joints are completed by Aluminium Partition with 5 mm thick glass and 9 mm thick laminated board of section (64x38x1.1) Aluminium casement windows of section (54x33x1.5) Aluminium Sliding Windows with fly mesh shutter of section (101x45x1.5) Aluminium Casement Doors of section (101x45x1.5) Aluminium Swing Doors of section (101x45x1.5) at entry porch Chapra polish 3 coat in plywood partition . Design Gypsam Board false ceiling work in GI frame with all necessary materials. 3/4" thick cement sand plaster in (1:4) ratio on wall . 12.5 mm thick cement sand plaster work in 1:4 Cement sand plaster work in 1:3 work in Ceiling Plaster of paris paint Double coat work inside of the wall Weather proof cement paint washable Double coat outside Ms Grill work 4/20 as per instruction of site engineer Stainless steel 50 mm pipe railing work 4 layer pipe Iron spiral staircase up to 4" to 6" dia medium pipe Sand Packing at Basement pocket Elastromeric cementious Elastromeric water proofing coating 2 Pressure on Rcc walls and others Grouting Silica Cement as per instruction of site engineer Expansion Joint works (water stopper Type) 38 mm cement concrete flooring work 1:2:4 16 mm thick marble flooring work in 20 mm thick cement sand mortar

ent of Nepal ban Development pment and Building Construction ice kathmandu antity(BOQ)

Quantity

Unit

In Figure

Rate(Without VAT) In Word

Amount

Remarks

4,725.00

Cum

133.840 3,570.61 114.89 279.44 354.06 83.08 177.03

Cum Cum Cum Sqm Cum Cum Cum

2,387.00

Rm

661.50 632.57 25.73

Rm Cum Cum

1,543.77 2,808.22 2,940.74 215.22 1,681.55 306,354.47 190.22 176.04

Sqm Sqm Sqm Cum Cum Kg Cum Cum

36.94 63.89 301.01 266.76 20.04 363.51 114.44 2.52 602.01 498.12 3,688.40 2,261.60 1,731.14 5,419.53 615.36 383.55 71.00 3.60 285.94 383.62 383.62 1,069.06 7.20 927.55 623.66

Cum Cum sqm sqm sqm sqm sqm Sqm Sqm sqm sqm sqm sqm Sqm Sqm Sqm sqm Rm Cum Sqm Sqm kg Rm Sqm Sqm