Chevron Bangladesh Drilling Morning Report

Date: 11/2/2012

Well Name: BY-16 Slot: Rig: WDI 801 End Date:

Total Time: 60.00 Time from Spud: 53.02 Days Since Last DAFW / RI Case :
TVD End (mKB): 3,465.19
Original Spud Date Country Water Depth (m) Target Depth (MD) (mKB)

Rpt No: 60 Hours: 24.00 689 / 36

SBU Drilling Well Category : Drlg Well Category 3


Depth End (MD) (mKB): 4,183
Field Name

Original KB to Mud Line (m) Target Depth (TVD) (mKB)

Bibiyana
Actual Start Date

9/10/2012
Actual End Date

Bangladesh 4,450
Total AFE Amount (Cost)

9/4/2012 00:00
AFE/WBS Number

100630 Safety/Inspections
Date Safety Check Tour Des

19,433,001

11/2/2012 00:00 11/2/2012 00:00 11/2/2012 00:00 11/2/2012 00:00 11/2/2012 01:30 11/2/2012 06:00 11/2/2012 06:00 11/2/2012 06:30 11/2/2012 06:30 11/2/2012 06:30 11/2/2012 07:00 11/2/2012 07:00 11/2/2012 08:00 11/2/2012 08:00 11/2/2012 08:00 11/2/2012 08:28 11/2/2012 09:30 11/2/2012 10:45 11/2/2012 11:30 11/2/2012 12:00 11/2/2012 12:00 11/2/2012 13:30 11/2/2012 14:00 11/2/2012 14:10

Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Safety Procedures Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Safety Meeting Pre-Tour Safety Meeting Pre-Tour Safety Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Trip Drill PTW Audit Pre-Job Meeting Pre-Tour Safety Meeting Pre-Job Meeting Pre-Job Meeting Safety Procedures Pre-Job Meeting PTW Audit

Night Night Night Night Night Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Night Night Night Night

Gen. Crane lifting Gen Hot work (PTW) Clean Mud Tank (PTW) Gen. Forklift ops T-card Audit Hot Work - Rain Shed (PTW) Gen. Forklift ops Service TD (PTW) Permit Meeting- BBS, Tnt# 2 w/Akota, BBS, Tnt# 2 w/Drivers, BBS, Tnt# 2 General maintenance (BJ) Slip & Cut Drill Line (PTW) Refueling equipments (PTW) Painting with brush Trip Drill/40sec General hotwork, TRA audited Collecting waste materials from Location RADAR Cards, Ops, Tnt#2 Gen Hot work (PTW) Gen. Crane lifting T-card Audit Service Geberator (PTW) Fixing sunshade on roof, TRA audited Transfer & refueling diesel, TRA audited Permit Meeting- BBS, Tnt#2 Gen. Forklift ops Refueling equipments (PTW) w/Akota, BBS, Tnt# 2 Working at Height (PTW)
Incident Desc

11/2/2012 16:00 PTW Audit 11/2/2012 17:00 Safety Meeting 11/2/2012 18:00 Pre-Job Meeting 11/2/2012 18:30 Pre-Job Meeting 11/2/2012 18:30 Pre-Tour Safety Meeting 11/2/2012 22:00 Pre-Job Meeting Safety / Environmental Incidents
Incident Cat.

No safety or environmental incident.

Page 1/5

Report Printed : 11/3/2012

Chevron Bangladesh Drilling Morning Report

Date: 11/2/2012

Well Name: BY-16 Slot: Rig: WDI 801 End Date:

Total Time: 60.00 Time from Spud: 53.02 Days Since Last DAFW / RI Case :

Rpt No: 60 Hours: 24.00 689 / 36

SBU Drilling Well Category : Drlg Well Category 3


Daily Operations
Report Start Date

Report End Date

11/2/2012 00:00
Daily Field Est Total (Cost) Cum Field Est To Date (Cost) Daily Mud Field Est (Cost) Cum Mud Cost to Date (Cost)

11/3/2012 00:00
Drilling Hours (hr) Cum Rotating Hrs on Casing

198,330
Operations Summary

13,253,170

7,394

438,545

4.50

185.5

Ops for past 24 hrs: Trouble shoot LWD. TIH to 3022m. Slip & cut drill line. Cont TIH to 3840m. Ream & wash to 4137m. Drill 8-1/2" hole f/ 4137m to 4183m. Projected ops for next 24 hrs: Work on pipe handler & C/O saver sub. Cont drilling 8-1/2" hole section.
Comments

00:00-05:00 Ops: 00:00-00:30 Rig Service 00:30-02:00 Change Grabber dies on pipe handler. Monitor on the trip Tank 02:00-02:30 Circulate Gas 15% 02:30-04:30 Pull one stand and Change out Saver Sub. Monitor on the trip Tank 04:30-05:00 Continue drilling 8 1/2" hole section F/4183 T/4189m
Max Drill Gas Avg Background Gas Head Count

6.10
Required Matls next day

4.16

129.0

Hawk jaw: WDI 100-10 torque wrench on site. Lamprell performed engineering survey for installation. Awaiting installation. Hydraulic torque wrench waiting on parts. Leaking main seal on ODS hydraulic cathead. Recieved spare seals. Will install while performing open hole logging. Multiple leaking or inoperable 6" valves in mud tanks. Spares on location. Will repair during rig move. 93 joints of Chevron 5" drillpipe being utilized by WDI. #15 Seal leaking & shaft misaligned causing vibration on Reserve pit #1, no spare parts. Diesel centrifuge not working waiting on seals. Safety Observation Cards
Observation Typ # Rpts Com

CVX-9, WDI-15, Other-40

64 During lifting gear oil barrel by crane I observed a person on the rig floor came in between the air winch and the load when they were putting it down. I immediately stopped the crane operator and moved the person to safety and explained the hazard that he could have been caught in between. Tenet # 2 - OMAR FARUQUE - FLOORMAN - WDI
Contact

Daily Contacts Tracy Love Stephen Joubert Jay Darder Musharref Hossain Latifur Rahman Peter Jennings Time Log
Start Time End Time Phase Activity Dur (hr) Unsched Event? UE Time (hr) UE Ref No. Com

00:00 01:30 08:30 10:30 11:00 14:00

01:30 08:30 10:30 11:00 14:00 15:00

PRODCSG, DRILL PRODCSG, DRILL PRODCSG, DRILL PRODCSG, DRILL PRODCSG, DRILL PRODCSG, DRILL

BHATST TIH DRLLNSC UNITMAIN TIH REAM

1.50 Yes 7.00 2.00 0.50 3.00 1.00 Yes

1.00 38

Trouble shooting LWD. Suspected problem with Radio Active Source. TIH to 3022m. HPJSM. Slip & cut 88' of drill line. Rig service - Change out TDS gear lube. Cont TIH f/ 3022m. Set down @ 3840m w/ up to 30K and unable to work through.

1.00 39

MU TDS. Ream & wash down f/ 3840m to 3855m and stall out TDS. Work string. Unable to rotate. Cont circ & work string. Gas increase to 40%. Flowcheck (static). Cont work pipe & circ until gas decreased. Set down 70K & cock jars. PU 70K overpull, hold, & fire jars. Pipe free. Cont PU & start rotation. Back ream to 3834m & ream down to 3863m. Backream & ream down stand. Ream & wash f/ 3863m to 3900m.

15:00

15:30

PRODCSG, DRILL

REAM

0.50 Page 2/5

Report Printed : 11/3/2012

Chevron Bangladesh Drilling Morning Report

Date: 11/2/2012

Well Name: BY-16 Slot: Rig: WDI 801 End Date:

Total Time: 60.00 Time from Spud: 53.02 Days Since Last DAFW / RI Case :

Rpt No: 60 Hours: 24.00 689 / 36

SBU Drilling Well Category : Drlg Well Category 3


Time Log
Start Time End Time Phase Activity Dur (hr) Unsched Event?

UE Time (hr)

UE Ref No.

Com

15:30

19:30

PRODCSG, DRILL

REAM

4.00

Log down @ 100 m/hr while ream & wash f/ 3900 m to 4137m. Note: LWD neutron porosity not working.

19:30

00:00

PRODCSG, DRILL

DRLROT

4.50

Drill 8-1/2" hole F/4137m T/4183m Today: Drilled 46m. AROP w/ connection 10.2 m/hr. 4.80 bbls/hr losses, .31 bbls/hr downhole losses. Lithology (4237.0-4183.0m) - sandstone (15-30%), claystone(Tr-10%) silt stone (60-80%). Recovered 36 grams metal filings off ditch magnet. Total recovery 516 grams.

Personnel
Company Total Headcount SSE

Chevron Weatherford Weatherford Weatherford Aker-Kvaerner Weatherford BJ Services Weatherford MI Swaco Weatherford Weatherford Brandt NOV Weatherford Weatherford Weatherford Chevron Smith International Schlumberger Weatherford Weatherford Chevron Weatherford Weatherford Mud Checks
Date Depth (MD) (mKB) Depth (TVD) (mKB) Gel 10 sec (lbf/100ft)

12 11 Rig Expat 43 Rig National 23 Shamolima Catering 1 Wellhead Eng 2 3 2 3 LWD/MWD Cementing DD Solids control

0 Gyrodata 5 TRS 11 7 5 0 1 0 0 0 0 0 0 Solids Wireline SLS Ayun ent PetroBangla Inspection Slickline Completion hands Shafiq Brothers WWT BanglaCat

0 Bangla Industrial
Mud/Brine Type Sample Source Checked By YP Calc (lbf/100ft)

11/2/2012 22:00
Flow Line Temperature (C) Vis 3rpm Fluid Density (lb/gal)

NAF
Gel 10 min (lbf/100ft)

Active Pit
Gel 30 min (lbf/100ft)

11.00
Vis 6rpm Vis 300rpm

16.0
Vis 600rpm

32.0
Funnel Viscosity (s/qt)

36.0
PV Calc (Pas)

16 0
ROC (Wet) (% by wt) (lb/lb) Retort NAF by Volume (%)

7
pH Filtration Sz (m) NAF/Water Ratio Chlorides (mg/L)

8
CaCl2 (mg/L)

42
Electric Stability (V)

68
Water Phase Salinity (mg/L)

61 283,786
Retort Water by Volume (%)

51,500
High Gravity Solids (lb/bbl) Corrected Solids (%)

335,000.00 16.80
API Filtrate (cc/30min) API Filter Cake (1/32")

780.0
Retort Solids (% by Volume) (%)

170.80
NaCl (mg/L)

19.00
HTHP Filtrate (cc/30min)

16.00
HTHP Filter Cake (1/32")

65.00 1
Visibility (km)

80.2/19.8 Weather Conditions


Wave Ht (m) Swell Ht (m) Wave Dir () Wind Spd (knots) Wind Dir P Bar (mmHg) T High (C)

3.4
T Low (C)

Page 3/5

Report Printed : 11/3/2012

Chevron Bangladesh Drilling Morning Report

Date: 11/2/2012

Well Name: BY-16 Slot: Rig: WDI 801 End Date:

Total Time: 60.00 Time from Spud: 53.02 Days Since Last DAFW / RI Case :

Rpt No: 60 Hours: 24.00 689 / 36

SBU Drilling Well Category : Drlg Well Category 3


Support Vessels
Vessel Name Vessel Type Arrival Date

Depart Date

Note

Unscheduled Events
Referen ce No. Start Date End Date Event Type Unsch Maj Cat Unsch Detail Description Accountable Party Contractor

38

11/2/2012

11/2/2012

NPT

EQP

LWD

LWD tool problems.

Operator's Other Contractors Operator

Weatherford, Directional Drlg-MWD Chevron, Asset Team


On Loc

39

11/2/2012

11/2/2012

NPT

WP

TIGHT HOLE

Hang up @ 3855m. Work & jar free. Back ream & ream down stand.
Rec

Mud Additive Amounts


Des Date Consumed

Barite Cacl2 / Nacl Lime Nova Plus Nova Plus Versatrol M VG Plus VG-69 Job Supply Amounts
Supply Item Des

11/2/2012 11/2/2012 11/2/2012 11/2/2012 11/2/2012 11/2/2012 11/2/2012 11/2/2012


Date Received Consumed

6.0 40.0 13.0 1.0 2.0 17.0 6.0 4.0


Cum On Loc

148.0 200.0 127.0 18.0 34.0 113.0 162.0 146.0

Diesel Drill String/BHA BHA #9, Adjustable Gauge Stabilizer


Bit Run Drill Bit Length (m)

11/2/2012

0.0

14,315.0

42,960.0

IADC Bit Dull

Bit Total Fluid Area (nozzles) (in)

BHA ROP (m/hr)

1
Nozzles (1/32")

8 1/2in, MDSi516, JG2045


String Length (m)

0.25 ------Max Nominal OD (in)

0.91

10.2

15/15/15/16/16
String Components

261.61

6.750

Smith Bits MDSi516, Stabilizer - Near Bit, Float Sub, Adjustable Gauge Stabilizer, MFR, IDS, NDT, HEL, Stabilizer, 5" HWDP, JARS, 5" HWDP
Comment

String/BHA Components
Item Des Len (m) Mass/Len (lb/ft)

5" HWDP JARS 5" HWDP Stabilizer HEL NDT IDS MFR Adjustable Gauge Stabilizer Float Sub Stabilizer - Near Bit Drilling Parameters
Wellbore Depth Start (MD) (mKB) TVD Start (mKB) Depth End (MD) (mKB) TVD End (mKB) Drill Time (hr)

160.42 9.67 56.91 1.80 5.42 8.57 3.72 8.98 3.15 0.81 1.91
On Bottom Drill Time (hr)

49.30 0.00 49.30

Interval ROP (m/hr)

Original Hole
Cum Depth Drilled (mKB)

4,137
Cum Drilling Time (hr)

3,437.60
Flow Rate (gpm)

4,183
Weight on Bit (1000lbf)

3,465.19
RPM (rpm)

4.50
Stand Pipe Pressure (psi)

2.95
Drill Str Wt (1000lbf)

10.2 270 220

46
Pick-Up String Weight (1000lbf)

4.50
Drilling Torque

500 20.0

20
Weight of String in Air (1000lbf)

180 35

3,100.0
Slack-Off String Weight (1000lbf)

365 Casing Strings


Casing Description Set Depth (MD) (mKB)

Set Depth (TVD) (mKB)

Run Date

Intermediate Casing 2
Comment

3,032

2,753.79

10/11/2012

Page 4/5

Report Printed : 11/3/2012

Chevron Bangladesh Drilling Morning Report

Date: 11/2/2012

Well Name: BY-16 Slot: Rig: WDI 801 End Date:

Total Time: 60.00 Time from Spud: 53.02 Days Since Last DAFW / RI Case :

Rpt No: 60 Hours: 24.00 689 / 36

SBU Drilling Well Category : Drlg Well Category 3


Casing Components
Top Depth (MD) (mKB) Btm Depth (MD) (mKB) Len (m) Jts

Item Des

OD (in)

ID (in)

Tubing Strings
Tubing Description Comment Set Depth (mKB) Run Date

Tubing Components
Top Depth (mKB) Bottom Depth (mKB) Length (m) Joints Item Description OD Nominal (in) ID (in)

BOP Test
Date Com

11/1/2012

Press test 13 5/8'' 10k BOPE - annular - 200/3500psi. Upr & lwr pipe rams, VBR's, BSR's, choke/ kill HCR & manual valves, check valve, TIW, kelly cock, IBOP, standpipe & manifold, kelly hose, MP manifold, choke & kill lines, choke manifold- 200/5000 psi. Perfrom koomey drawdown test - IP - 2900 psi, FP - 1800 psi, Recharge - 2min 41 sec.

Wellbores
Wellbore Name Kick Off Depth (mKB)

Original Hole Directional Surveys


Description

Planned survey BY-16 Survey Data


Date Description MD (mKB) Incl () Azm () TVD (mKB) VS (m) NS (m) EW (m) DLS (/30m)

Actual Survey BY-16 Survey Data


Date MD (mKB) Incl () Azm () TVD (mKB) VS (m) NS (m) EW (m) DLS (/30m)

11/2/2012 11/2/2012 11/2/2012

4,137.04 4,166.50 4,183.00

52.36 53.51 53.51

244.20 244.11 244.11

3,437.62 3,455.38 3,465.19

1,257.79 1,278.19 1,289.71

-1,148.38 -1,158.63 -1,164.42

-548.91 -570.06 -582.00

0.51 1.17 0.00

Page 5/5

Report Printed : 11/3/2012