Civil Engineering Specification for the Water Industry (CESWI) th 7 Edition

WRc plc 2010

Introduction to CESWI

1st edition was published in 1978, the last edition (6th) was in 2004 Performance specification, not method Guidance developed alongside specification clauses Used with British Standards

WRc plc 2010

Introduction to CESWI

Specification to covers:
water supply, wastewater, river engineering

Can be used with a variety of contract


conditions (previously ICE)

WRc plc 2010

Sections in CESWI

General Materials Excavation, Backfilling and Restoration Concreting and Formwork Construction of Pipelines and Ancillary Works Building Works Testing and Disinfection Roadworks Sewer Renovation Water Mains Rehabilitation Tunnelling and Shaft Sinking Works
WRc plc 2010

Scope of CESWI

Includes civil engineering works clean water and wastewater minor building works are included ( e.g. superstructure to a pumping station) Excludes major building works not a design guide

WRc plc 2010

Relation to other documents

One of a number of contract documents

Conditions of Contract The priced Bill of Quantities Method of Measurement Specification Drawings

DAME Rule For use with a variety of forms of contract Referenced by:

Self-Laying of Water Mains and Services Sewers for Adoption

WRc plc 2010

Drafting process

Companies invited to join a drafting group via Water UK 15 water companies involved Comments on CESWI 6 were invited via Water UK Sub groups looked at sections in CESWI Whole document reviewed together A draft sent out via Water UK for comments Comments received and incorporated Dec 2010 Other Companies contacted if not in drafting group

WRc plc 2010

Changes to CESWI

Lots of small changes were made All 11 section titles stayed the same Alphabetical order within the sections Tried to keep the same subjects in the same places Clauses updated with current practice New clauses/sub clauses have been added to every section Standards and document references updated

WRc plc 2010

Key Changes

Aligned with all forms of contract (used to be just ICE) Removal of Contract Administrator Updated clauses subsequent to new guidelines published (e.g. 1.16 Water Supply Hygiene Guidance) Single statement about legislation, direct references removed Deleted clauses not relevant anymore (e.g. waterproof paper) New clauses added e.g. abandonment of water mains (Section 5)

WRc plc 2010

Timetable
Approval Water UK members via website Sign off by Standards Board for Water UK 27/01/11 Printing Proof read Feb 2011. Printing Feb/March 2011 Implementation date ? To allow for familiarisation.

WRc plc 2010

Questions?