Job Plan No.: Lead Discipline: Approved By: Effective Date: Hours Duration: Frequency:
Note: The 12 monthly review of this Maintenance Job Plan shall be recorded on the PROCEDURE HISTORY Sheet within this Document.
1
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1.2
THIS JOB PLAN LISTS THE STEPS FOR 1 YEARLY INTERVAL CALIBRATION TESTS ON A PRESSURE SAFETY VALVE (PSV).
Preamble: Pressure Safety Valves are removed from site to the maintenance workshop for calibration. For the duration of the calibration test the vessel is without normal PSV protection.
File Location: \\C:\Users\admin\Desktop\Masoud\Valve Safety\2008-I Valve, Pressure Safety (PSV) Test 1 yearly.doc of 4 Page 1
Company Name
Job Plan No.: Lead Discipline: Approved By: Effective Date: Hours Duration: Frequency:
Specialist tools: - Workshop facilities, crane and/or scaffolding (where necessary). Procedure steps
STEP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 OPEN permit to work VERIFY the PSV tag number matches that on the PM document INSPECT the PSV in situ for leaks and corrosion ISOLATE , LOCK, TAG AND TRY the upstream hand isolation valve ISOLATE, LOCK, TAG AND TRY the downstream hand isolation valve OPEN the downstream vent valve where applicable OPEN the upstream vent valve REMOVE the PSV to the workshop PROTECT the open ends of the PSV pipe connections from debris CALIBRATE the PSV in accordance with the relief pressure CLEAN the pipe connections for the PSV RE-INSTAL the PSV CLOSE the downstream vent valve where applicable CLOSE the upstream vent valve UNLOCK, OPEN and REMOVE the TAG from the downstream hand isolation valve where applicable UNLOCK, OPEN and REMOVE the TAG from the upstream hand isolation valve INSPECT the PSV for leaks CLOSE permit to work RECORD all data & sign off PSV Inspection Report PSV Inspection Report is attached as page 2 of 2 De-isolations may be carried out by Production staff A piece of rag tied over the open end suffices The relief pressure depends upon the installation Isolations may be carried out by Production staff Some PSVs vent to atmosphere without D/S isolation This relieves trapped pressure in the downstream pipe This relieves trapped pressure in the upstream pipe ACTION COMMENT
File Location: \\C:\Users\admin\Desktop\Masoud\Valve Safety\2008-I Valve, Pressure Safety (PSV) Test 1 yearly.doc of 4
Page 2
Company Name
Job Plan No.: Lead Discipline: Approved By: Effective Date: Hours Duration: Frequency:
Page 3 of 4
Company Name
Job Plan No.: Lead Discipline: Approved By: Effective Date: Hours Duration: Frequency:
The following Procedure History Sheet shall be used to record the Current Status of the Job Plan. Subsequent sheets shall be added as required to maintain a History of the Official review carried out.
Review/Revision No 1
Date 20/11/07
Description of Key Changes Replaced the words CLOSE, LOCK & TAG with ISOLATE, LOCK, TAG AND TRY on sequence numbers 4and 5. No Change Safety Plan Included
2 3
20/11/07 27/01/08
20/11/08 27/01/09
Don J
Page 3 of 4