Name : TOTO ARIFIYANTO 08888572033 / 081310708844 Aonly one 1Whats the function of the CC module ( ).

A. Provide GPS system clock and RF reference clock B. Provide E1/T1 for Abis communication C. Shelf management function D. Baseband modulation and demodulation function 2Which The frequency expansion input interface ( A. RX out B. TX1/RX1 C. RX in D. TX2/RX2 ).

3. what decide the microwave antenna height. 1) link LOS 2) BTS antenna height. 3) tower height 4) bracket height 4. which one we can check the antenna pointing correctly or not. 1) Modulation mode 2) Frequency correct or not 3) Receiving level of receiver 4) polarization 5. how many RJ-45 GE port MW S340 have. 1) 1 2) 2 3) 3 4) 4 6. Affected by many factors in transmission, receive level fluctuates much. technology can make the receive level relatively stable.

1ATPC 2XPIC 3MTPC 4XPD B(not only one) 1. there are many factors impact antenna installed in the right position. 1) height 2) azimuth 3) vertical angle 4) antenna type 2. If the receive level of a microwave link fluctuates in a month, possible causes include 1) The link is blocked by trees 2) There is a lot of big rain in this month 3) The link is blocked by building 4) It is a cross-sea link 3. When designing link, which methods can be adopted to decrease over-reach interferrence? 1Increase inclosed angle of communication link 2Increase transmission power 3Increase antenna height 4Increase frequency space of communication link 4. which traffic type MW S340 provide for BTS. 1) E1 2) IP 3) STM-1 4) STM-4 C answer 1. At BTS ATP items, which is included in the installation test ? Answer : VSWR (Visual Standing Wave Ratio), DTF (Distance to Fault) & RL (Return Lost).
2. If length of feeder cable is 40 meter, how VSWR value should be gotten ?

Answer : 1,0 dbm 1,2 dbm.

3. What is meaning of VSWR?

Answer : VSWR (Visual Standing Wave Ratio).

D. Fillout 1___Fabric Switch___ is the interface between BBU and RRU. 2The function of ___ Fabric Switch ___ board of BBU are baseband modulation and demodulation 3Single RTRB (or wide band RRU) can support ___2___carriers ___1___ sector.

4Perform pre-cutover of BTS , we need disconnect the _____________ antenna of existing BTS and use it as the main antenna of ZTE BTS E. Essay : 1. How to create VLAN in MW S340 product Answer : Have never created VLAN on S340 yet. 2. How to do the ping test----from site ping BSC. Answer : Have never ping test before. 3. Point out the board name of B8200.(10 points)

Answer : 1. PM 2. FS 3. CHV 4. FA 5. CHD 6. CC 7. SA 4. How many grounding cables from ZTEs equipment that connected to IGB? Then mention one by one! Answer : BTS 8800 : Grounding Cabinet to IGB, Grounding Kits to IGB, MW : Grounding Rack 19 to IGB, Grounding MW to Rack 19, Grounding ODU to IGB, Grounding Arrester to IGB. POWER : Grounding Cabinet Power to IGB & Grounding Netral Bar to IGB. 5. What is the reason that convinced you to work on PT. ZTE? Answer : 1. Having skills & experienced on BTS, MW & RECTI (previous on Huawei & Ericcson). 2. Family needs.