Sie sind auf Seite 1von 6

SR NO.

1 2 3 4 5

GS Engineering & Construction India Pvt. Ltd.


BASIS FOR WORK VOLUME CALCULATION
DESCRIPTION
PIPING AND INSTRUMENTATION DIAGRAMS - QTY. 186 Nos. OVERALL PLOT PLAN - QTY. 1 NO. UNIT PLOT PLAN - QTY. 14 Nos. UG COMPOSITE DRAWINGS - QTY. 16 Nos. PIPING MAN-HOUR ESTIMATION - GS DESIGN PROCEDURE DOC NO .43-WI-011 REV 0

DATE 11 March 2014 PREPARED BY PIPING CHECKED BY SVP / PJK APPROVED BY YNK REV 0

LINE LIST SUMMARY FOR BLOCK A - D

WORK VOLUME SUMMARY


SR. NO. 1 2 3 BLOCK NO. A C D UNIT NO. 01-AA 01APR 01EFF LS 03-DA 03DPR 03- A 01-E 01-E PR 01-E A HOT HOT PR HOT UG FUEL A 63 63A 63PR 63UG AIR A AIR UG CHE A CHE UG MET A MET UG DIE A DIE 11 A 11 PR 11 UG 03-I A 03-I PR 03-I UG 03-I 05A 05PR 05UG FF A DESCRIPTION INLET FACILITIES AREA EFFLUENT PLANT LIQUID STABILISING MOLECULAR SIEVE DEHYDRATION & MERCURY REMOVAL NO.OF LINES 254 603 1606 NO.OF EQUIPMENT 9 34 52

Project - PDVSA GAS Mega Project

REV DATE PREPARED BY CHECKED BY APPROVED BY

0 11 March 2014 PIPING SVP / PJK YNK

NO. OF EQUIPMENT. GAD 7 19 28

NO.OF PIPING GAD 117 116 159

RAW GAS COMPRESSION

73

12

103

HOT OIL SYTEM

251

26

10

203

POWER GENERATION & UTILITY AREA

1197

70

25

140

RESIDUE GAS COMPRESSION AREA

271

33

24

144

NGL EXTRACTION & ETHANE RECOVERY UNIT

732

74

17

129

FF UG WWT A FIRE FIGHTING SYSTEM & FLARE K.O. DRUM WWT UG DRAIN 1A FL A FL PR FLARE SYSTEM FL UG TOTAL
1) No. of Piping GAD quantity includes Unit piping GA + Rack piping GA + Interconnecting GA 2) 1 NOS. QUANTITY SHALL BE CONSIDERED FOR OVERALL PLOT PLAN AND KEY PLAN

244

41

84

0 5231

6 357

3 151

32 1227

Note :

Page 4 of 6

GS Engineering & Constructi


TITLE

ASSUMPTIONS FOR WORK VO

For Drawing 1) For preparation of Equipment layout 1:50, 1:100 and 1:150 scale considered for A0 sheet size. 2) Where ever empty area shown on plot plan, we have considered one equipment and piping layout each. 3) For piping layout where ever needed we have considered 2 nos of plan. 4) For piperack 4 tier have been considered. (2 Plan layout, 1 Ground layout & additional 1 section for psv platform n 5) Utility station located on 15m radius as marked in plot plan. 6) Information Drawing sketches for hydraulic calculation considered with quantity of PSV, PUMP & Blow down va

For Equipment 1) All package equipments are individually counted as a part of scope though these are shown as a package part in P& 2) Package equipments those are not shown on plot plan but shown in P&ID also considered. 3) For Regeneration Gas Compressor Package D4.140201/02/03, Knock out drum, Lube oil tank, Lube oil cooler and 4) For Regeneration Gas Heater D1.140201/02/03 , Main and pilot burner and combustion air blower also counted as 5) Rack is also consider as one equipment for initial Modelling of Pipe Rack. For Piping 1) Inlet feed gas receiver pig trap P&ID not available, hence 13 no. of lines considered with vessel trim in major line 2) Instrument air lines have been considered in major line quantity with 30% extra as marked on plot plan. 3) Lines inside vendor package item have been considered in major line quantity. 4) Utility station with three services have been considered in auxiliary line quantity. 5) Assumed 1 analyser shelter for block-A & 2 analyser shelter for block-D. 6) For vessel trim quantity difference other than 4 have been added in major lines. 7) Close drain header consider only for package item. 8) Manhole quantity considered as per mark-up received from civil. 9) The quantity of lines has been counted by branch quantity except air cooler. 10) PSV inlet-outlet and bypass lines counted separately. 11) Control valve upstream-downstream lines counted separatly. 12) Metering skid also considered as a control building.

g & Construction India Pvt. Ltd.

DATE 11 March 2014 PREPARED BY PIPING CHECKED BY SVP / PJK APPROVED BY YNK REV 0

IONS FOR WORK VOLUME CALCULATION

eet size. ping layout each. 1 section for psv platform near equipment)

SV, PUMP & Blow down valve.

own as a package part in P&ID. red. oil tank, Lube oil cooler and Lube oil pump and spare are additionally counted as a part of scope though n air blower also counted as a scope.

ith vessel trim in major line quantity of block-A. ked on plot plan.