Beruflich Dokumente
Kultur Dokumente
CLEANING & SANITIZATION OF MAIN TANK AND INSTALLATION OF CHLORINE DOSING SYTEM FOR
GM PECH IZMIR
LAHORE
Page 1
Dealing in: FILTRATION PURIFICATION ULTRA FILTRATION MEMBRANE ULTRA VIOLET STERILIZATION
Products: Anti scaling Agent Flocon 260 (USA,UK,TAIWAN) Biocides (Food/Non food graded) Membrane Cleaners (Acid/Alkaline) Community Water Purification Plants. R.O Systems. Waste Water Treatment Plants. Mix Beds. Deionizer. Water Softeners. Swimming Pool Equipments (Algaecides for summer and winter shield) Filtration System for Whole Office Building. Overhead Tank Filtration System. Filtration System for Whole House. Kitchen Filtration System.
Consultancy Services: We provide: A) B) C) Consultancy on designing, selection of equipments, accessories and maintenance guidelines for the Quality control Laboratory. Consultancy on Bottle Selection, Quality Assurance Manual preparation and advanced training of man power related to Mineral Water Bottling Plants. Consultancy to industrial clients for selection of filtration cartridges and softener resins.
Page 2
1 2 3 4
Alkaline solution Washing Acids Solution Cleaning/Service Iron Remover Rust removing Active Chlorine Bacteria removing/ Sanitizing
1 2 3 4
01 01 As required
Chlorination Tank P.E 200 Gallons TOYO Fittings as required UPVC Service charges
Items Required:
Empty Drums Plastic Garden Pipe Rubber gloves Scrubbers Wiper large Masks Helper/Sweeper 200liter 1 inch 6 Nos. 50 feet 12 Pairs 20 5 20 5
Page 3
QUOTATION
Description: Cleaning and Sanitization of Main water tank with
installation of chlorination system.
Price
Buyers Responsibility
Rs. 89,900/=
water Point, Electricity point, Parts
TERMS OF PAYMENT
After job completion within one week.
Taxes: Offered price does not include sales tax, which shall be paid by client where applicable. Any additional duty/Tax levied upon during the course of subsequent legislation shall be payable by Client at per actual.
Page 4
Warranty: The system shall be warranted in workmanship for 12-months from the date of commissioning or 18-months from the date of delivery, whichever comes earlier.
Delivery: The delivery period shall be 30 days. Depending upon items remaining unsold at the time of ordering of equipment.
Inclusions: The design, fabrication, assembling, supply, installation & commissioning of the plant. The delivery of equipment & materials as per specifications & bill of quantities mentioned in the proposal. Any additional item or changes in specifications shall lead to the revision of price. Training of your operational staff during installation & commissioning of the plant. One-year after sales technical backup services for equipment & material supplied.
Page 5
Any service or item not specified in our scope of work in the offer.
ABDUL SAMAD
Page 6