Sie sind auf Seite 1von 16

Physical seperation between power cable and data cable

Standard followed ANSI/TIA-569 Sl.no 1 2 3 1 2 3 4 5 Generic Collect Design Drawings & specification Which Standard has been adopted for the design Check for Logs Physical Verification area wise Service entrance & exits Inter building Cable raisers & runways Cabinets LTE

between power cable and data cable

lowed ANSI/TIA-569 remarks

Distance between power cables and data cables(m)

Lightning Protective System


Standards followed : IEC 62305-1,IEC 62305-2,IEC 62305-3,IEC 62305-4 , IEEE 1100 and ANSI/TIA 962 Sl.no 1 2 3 4 5 6 7 8 Generic informaiton Collect Design Drawings & specification Which Standard has been adopted for the design Check for Logs What is the lightning density value of that area Area of the Building What is the area of building (l*b*h)? Any taller building around ? Required no of Air termination according to IEEE1100 Inspect for any metallic structures above air termination rod Air Termination What is the type of Air Termination rod used? How many Air Termination rod used? Check for the Position of air termination rod Check whether it is interconnected What is the Length of air termination rod? What is the Diameter of the rod? Check for Damaged or unfixed conductors and components Down Conductor 16 17 18 19 20 21 How many downconductor is used in case of interconnetced and not interconnected)? What is the Dimension of down conductor? Which Material has been used? Check for the Shortest distance between downconductor and earth termination rod Check for Damaged or unfixed conductors and components Check for Continuity of bonds and joints Earthing How many earth pits are used in case of interconnetced and not interconnected earth pit system)? What is the Dimension of earth rod? What is the Type of earthing rod has been used(pipe or plate)? Which Material has been used in earthing rod? General practices (Physical Inspection) Earthpit resistance date and value & methodology Check whether earth pits are Interconnected What is the dimension of earth connecting strips if it is interconnected ? Which Material has been used for interconnecting earth pits?

9 10 11 12 13 14 15

22 23 24 25 26 27 28 29 30

EE 1100 and ANSI/TIA 962 remarks

Earthing System
Standard followed : ANSI/TIA 607 Sl.no 1 2 3 Generic informaiton Collect Design Drawaings & specification Which Standard has been adopted for the design Check for Logs Configuration Check whether TGB(telecommunications grounding busbar ) is present Check whether TMGB( telecommunications main grounding busbar ) is present Check whether TBB(telecommunications bonding backbone ) is present Check for the Segregation of cabinet earthing to TGB Check whether TGB is close to PDB What is the Distance between TGB & TMGB? Check If all TGBs are connetced to main TMGB What is the Dimensions of TGB? What is the Dimensions of TMGB? What is the Dimensions of TBB? Check for the type of material used in TGB, TMGB and TBB Check whether metallic cable shield not been used as a TBB(copper recommended) Check whether connections from TBB to TGB and TBB to TMGB are exothermically welded Interconnection Check whether TGB is connected to Nearest TGB Check whether TMGB is connected to earthing system Check whether Earth pits are interconnected Verify the Size of TBB based on distance Earth Pit How many earth pits are used in case of interconnetced and not interconnected earth pit system)? What is the Dimension of earth rod? What is the Type of earthing rod has been used(pipe or plate)? What is the type of Material used in earthing rod? General practices (Physical Inspection) Earthpit resistance date and value & methodology Check whether earth pits are Interconnected What is the dimension of earth connecting strips if it is interconnected ? Which Material has been used for interconnecting earth pits?

4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

21 22 23 24 25 26 27 28 29

remarks

Surge Protective Device selection


Standards followed : IEC 62305-1,IEC 62305-2,IEC 62305-3,IEC 62305-4 and IEEE 1100 Sl.no 1 2 3 Generic informaiton Collect Design Drawaings & specification Which Standard has been adopted for the design Check for Logs Configuraiton Check whether SPD's are provided stagewise Check whether Proper type of SPD's are selected Check for the Type of SPD used Check for the Brand used Check for its Specification Check for the Life of SPD Check for the Specs of Conductor used Check whether Fuse or CBs used and their rating rating Stage 1 SPD Check whether Proper type of SPD's are selected Check for the Type of SPD used Check for the Brand used Check for its Specification Check for the Life of SPD Check for the Specs of Conductor used Check whether Fuse or CBs used and their rating rating What is the Current ,Voltage,kVA rating of that line? Stage 2 SPD Check whether Proper type of SPD's are selected Check for the Type of SPD used Check for the Brand used Check for its Specification Check for the Life of SPD Check for the Specs of Conductor used Check whether Fuse or CBs used and their rating rating What is the Current ,Voltage,kVA rating of that line?

4 5 6 7 8 9 10 11

12 13 14 15 16 17 18 19

20 21 22 23 24 25 26 27

28 29 30 31

Stage 3 Check whether Proper type of SPD's are selected Check for the Type of SPD used Check for the Brand used Check for its Specification

32 33 34 35

Check for the Life of SPD Check for the Specs of Conductor used Check whether Fuse or CBs used and their rating rating What is the Current ,Voltage,kVA rating of that line?

vice selection

EC 62305-3,IEC 62305-4 and IEEE 1100 remarks

(Service entrance)

(Service entrance to Data Center Panel)

(UPS o/p to Cabinets)

Earthing System: 1 2 3 4 5 6 7 Date of Construction of Earth Pit Earth pit Checked OK for mechanical wear out and Any bolts / conductors degraded due to rusting Earth Pits marked in permanent markings Earth resistance checked periodically Earth Recharging done periodically Earth Electrodes exposed to physical damage Earthing System: 1 2 3 4 5 6 7 Date of Construction of Earth Pit Earth pit Checked OK for mechanical wear out and Any bolts / conductors degraded due to rusting Earth Pits marked in permanent markings Earth resistance checked periodically Earth Recharging done periodically Earth Electrodes exposed to physical damage Earthing System: 1 2 3 4 5 6 7 Date of Construction of Earth Pit Earth pit Checked OK for mechanical wear out and Any bolts / conductors degraded due to rusting Earth Pits marked in permanent markings Earth resistance checked periodically Earth Recharging done periodically Earth Electrodes exposed to physical damage Earthing System: 1 2 3 4 5 6 7 Date of Construction of Earth Pit Earth pit Checked OK for mechanical wear out and Any bolts / conductors degraded due to rusting Earth Pits marked in permanent markings Earth resistance checked periodically Earth Recharging done periodically Earth Electrodes exposed to physical damage

Remarks

Remarks

Remarks

Remarks

Power Quality Parameters


Sl.no 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Parameters Phase Voltage Current Power factor frequency Power factor Voltage THD Current THD Flickers Real power (kW) Reactive Power(kVAr) Apparent power (kVA) Real power Consumption(kWh) Reactive power Consumption(kVArh) Apparent power Consumption(kVAH)

er Quality Parameters
Remarks

Generic
Sl.no Does the data center have access to more than one utility grid or separate feeders from different substations? How are they used (i.e. for capacity or redundancy?) What is the electrical and cooling density in watts per square foot and/or BTUs per square foot in the raised floor or IT equipment areas? What is the height of raised floors? What is the designed or desired cubic feet per minute (CFM) of air flow in the delivery aisle per tile? In other IT equipment area? How is this monitored? What are the temperature and relative rumidity (RH) availability in the equipment spaces? How is the scheduling for preventive and/or predictive maintenance managed? For example, is it automatically generated by a software program or hard-copy scheduling or used an outside vendor to manage it? Check for maintenance history for all critical equipment? Are maintenance schedules and equipment history records available for review? What kind of documented preventive and predictive maintenance procedures do are made in place? What types of maintenance activities are performed during the maintenance windows? Please provide a list of all the scheduled preventive and predective Electrical systems (infrared testing) Electrical systems (all other maintenance and testing) Generators UPS devices Switchgear and transformers Automatic transfer switches Static transfer switches Power distribution units (PDUs) Remote power panels or circuit breaker panels Other electrical distribution equipment HVAC system equipment Fire and life safety equipment Has any of critical equipment (UPS devices, generators, chillers, etc) exceeded its useful life? How is redundant critical equipment configured? How many utility feeds does the facility receive? How are they used? (i.e. redundancy, or capacity)

2 3

4 5

6 7

8 9

10 11 12

13

13 14 15 16 17 18 19 20 21 22 23 24

25 26 27 28 29 30 31

Is there an ATO switch between feeders? If so who owns and maintains it? Is there reserved capacity for the facility? What is the voltage received from the utility service? What are the feeder sizes? At what points is Surge Protective Devices (SPD) equipment used in the electrical distribution system? What are the capacities and ratings of the generators? How are the generators configured in terms of redundancy? Are the generators tied to a common bus? How long does it take for the generators to be online and supply the facility with power in the event of a utility outage? How many UPS devices service the data center? What are the capacities and ratings of the UPS devices in kW of output? If flywheels are used in UPS devices, what are the ratings and time limits? Please provide a detailed description of the operation of these units. If batteries are used in UPS devices What types of batteries are used? What is the expected range of life of the batteries? What is the battery discharge time at full load? When was the last time the batteries were replaced? What are the UPS redundancies? How many UPS devices can fail without impacting critical load to the data center floor? How are multiple UPS devices configured? (Single module or common bus?) Can we review a one-line drawing of electrical distribution system? provide a drawing of the data centers grounding system? Is the grounding system designed for a data center? Are there redundancies in the grounding system? describe and provide a drawing of the data centers grounding system Is the grounding system designed for a data center? Are there redundancies in the grounding system? What was the grounding system tested to? Are cabinets and racks individually grounded? Describe in detail the facilitys cooling systems for the data center and IT equipment areas. What is the total designed cooling capacity of the cooling system? What are the redundancies? How is humidity controlled in the raised-floor areas? What types of smoke detection and fire suppression systems are in use? What is the lighting level of the room (Limit: >500LUX in horizontal plan >200 Lux in vertical plane , measured 1 m above the finished floor)ref TIA 942Page 33 What is the height of the door(Limit: >1m wide >2.13m high) Does Door have door sill (It should not have door sill)

32

33 34 35 36 37 38 39 40 41 42 43

Das könnte Ihnen auch gefallen