Terga A.FRIDI
5 4 3 2 1 1 Minor 10 8 6 4 2 2 Serious Severity 15 12 9 6 3 3 Major
25-01-2010
Assessment No:
047
Immediate
INTRODUCTION The table below provides a simplified representation of the methodology used and the processes involved in this Hazard Identification & Risk Analysis Procedure (Risk Management) to be undertaken by OCIA and all Subcontractors in order to initiate, act on, review and effectively manage project-related related risks throughout the Construction Phase.
IDENTIFICATION - Pre planning, Method ASSESSMENT Impact, Risk factor, statement , Job safety analysis. Mitigation measure, Residual risk
Page 2 sur 5
Hazards Identified (include the exposed groups)
Probability 1-5 Severity 1-4
Risk 1 - 20
Probability 1-5
Severity 1-4
Risk 1 - 20
Residual Risk
General precautions
Training of personnel to activity risks Stabilization of the crane Delimitation of the perimeter Limit the number of workers Certified controlled and well maintained machines. Licensed competent machines operator. Complete the machine checklist inspection. Re inspect the machine after each shift Control braking system warning light and sound machines
Removal of scrap (Crane) collision with person collision between the crane and equipments drop in scrap Poor visibility for the driver
16
mark the area of operations of the crane 2 officer commanding the ship maneuver through regulatory actions to avoid accidents Control of the safety catch hook the slings Ensure the crane on his dashboard that the load weight does not exceed the maximum allowed Ban the person be under a suspended load defining the radius of the rotary crane prohibit the movement of people around the handling
Page 3 sur 5
Hazards Identified (include the exposed groups)
Probability 1-5 Severity 1-4
Risk 1 - 20
Probability 1-5
Severity 1-4
Risk 1 - 20
Residual Risk
Evacuation material (Trucks) Drop in scrap crush the Person Removal of scrap with raft (torch) Burn Sting Glare Gas and smock
12
Certified trucks Certified and experienced driver The limited speed in the site The circulation signs The circulation plan (updated)
16 Port PPE: Face shield or goggles, gloves, aprons and leggings Respiratory protection Aeration of the workspace
Demolition the raft (Excavator breakers) Tilting of the shovel Clash of person Flaying particles Burst the flexible of the breakers
12
Prepare a flattened surface and stable Limitation the work area Prohibit the circulation in the work area Checking the condition of equipments before beginning the work Relay operator Compulsory wearing of PPE in particular hearing protection and breathing masque
Page 4 sur 5
Cleaning excavation (compressor) Screening in gun (case of leakage) Injury generated by pipe rupture Electrocution 4 4
Probability 1-5
Severity 1-4
Risk 1 - 20
Probability 1-5
Severity 1-4
Risk 1 - 20
Residual Risk
12
2 Check the cleanness of the workplace Leak detection cylinder gas and hoses Install extinguisher in prominent place visible and accessible No smoking
Environment High noise levels Pollution the air: Exhaust gas The dust Leaking oil or diesel machines on soil
9 Compulsory wearing of PPE Checking the condition of equipments before beginning the work
Assessor
Print :
Sign:
Date:
Page 5 sur 5