Drawing Ref:
Calculations By:
Ken Geelan
Checked By:
Date: Output:
Reference:
Q= 371.25 l/day
Calculations:
Calculation of Flowrate and Pipe Size Plant operates from 7am to 6pm (11 hours) Maximum daily flow = = Qredq = OR Continuity Equation = Q = A.V V = Q/A Assuming a 300mm pipe V = .083/((.15 ) V= 0.000668672
2
= 297916.7/(60x60)
This value must be less than 3m/s to avoid scouring of the pipeline but greater than .75m/s to avoid settlement Velocity is ok System Characteristics
H = Hstat + Hf
Hstat = Hf = Where: = V= g= D= 0.025 (assumed) 1.17 m/s 2 9.81 m/s 300 mm
2
7 m LV /2gD
Subbing Values into equation above: Hreqd = 10.22 m Determining the System Characteristics Equation Continuity Equation = Q = A.V V V
2
Hreqd =
10.22m
= =
Q/A Q2/A2
Subbing this into the previous equation for required head: H = Hstat + LQ2/2gDA2
Calculations By:
Ken Geelan
Date:
Reference:
Calculations:
Using this system characteristic equation and the pump data supplied in the handout, values for Q were subbed in, tabulated and graphed. The resulting pump curves are shown below:
40 20 0
0
Qopt Hopt
20
40
Q 60 (l/s)
80
100
120
37 l/s 7.5 m
This is far below the required levels. Therefore two of these pumps were tested in paralled to see if this would be adequate. Again, the operating point here was not sufficient. Therefore two pumps were used in series and in conjunction with two more in parallel.
60 40 20 0
0
Qopt Hopt Two pumps used in
50
114 l/s 13 m
150
200
250
Qopt Hopt 114.00l/s 13.00m