Outline

Pore Pressure and Fracture Gradient

Drilling Fluid
Casing Design Cement Design Drilling Bit Economic Analysis

Area of Interest

Area of Interest

Area of Interest

Area of Interest

OGIP Surface Map

Porosity Surface Map

Porosity 3D View

Net Pay 3D View

Vertical Well Placement

Horizontal Well Placement

Future Production Estimate

Fracturing Well #1

Pore Pressure and Fracture Gradient


Equation used
Pff = 0.33 x [(OB / d) + 2 x (pore / d)]

Pore Pressure Gradient Approximately 0.42 psi/ft

Fracture Gradient
Approximately 0.73 psi/ft

Casing Design
API GRADE Yield Strength Min Ultimate Strength 60K psi Min Elongation 29.5%

J-55

40K (min) 80K (max) [psi]

[Table 7.1 from text] 50

Based off of the calculated yield strength: around 42,000 psi No need for larger ultimate strength Water Table between 500 2000 foot (From NE) 2200

Conductor Casing:

50 feet

6000

Surface Casing:
Intermediate Casing: Production Casing:

2200 feet
6000 feet 12000 feet 12000

Casing Design contd


Casing Diameter Casing Pressure

Conductor
Surface Intermediate Production

23.125 in
19.2 in 13.5 in 9.4 in

20 in
14 in 1100 psi 11.25 in 8.4 in 4850 psi

35 psi

2460 psi

SF = 1.7

Casing Design contd


Casing Collapse Res.

Conductor
Surface Intermediate Production

480 psi
1875 psi 5500 psi 10200 psi

MW = Pressure x (0.052 x TVD)

Drilling Fluid
Casing Mud Weight

Conductor
Surface Intermediate Production

13.4 ppg
8.76 ppg 7.58 ppg 6.16 ppg

MW = Pressure x (0.052 x TVD)

Cement Design
Type: Class C
High early strength properties which allows cement to be used at high water levels.
Regularly used for shallow well cementing operations through salt beds.

Density of the cement = 11.53 ppg

Cement Design contd


Ac = ( dout2 din2) / 1029.4 (bbl/ft)

Volume = Ac (bbl/ft) * Depth (ft)


Casing
Conductor Surface Intermediate Production Total cement Volume

Cement Volume
6.5 bbl 368.9 bbl 324.58 bbl 207.49 bbl 907.47 bbl 36.498 ft3 2071.37 ft3 1822.52 ft3 1165.07 ft3 5095.44 ft3

Drilling Bit
Drilling through shale and sandstone

We will use Poly diamond crystal bit (because they are


faster and tend not to break as often as other bits)

Use multi pad drilling (Will use 75% less land)

Drilling
How many days to reach depth?

It will take about 14 and half days to drill to the pay


zone with an average rate of penetration of 34.3 ft/hr

Economical Analysis
How much will it cost per day?
rule-of-thumb for trip-time estimations is 1 hr/1,000 ft of
a well.

C= [(R=$1125)( (t=12 hrs) +(td=350hrs)+Cb


$25,000]/(F=12,000ft) = $36.02/ft

$29,652.35

How much will it cost total to drill?


$432,331.27

Thank You!

Any Questions?