Lesson Handout Notes 25241 METER PROVING

A69.1858-LHN-PRO-25241-01
Effective Date: September 11th , 2007

Training Program Discipline System Sub-System Training Focus Training Elements

: TECHNICIAN: LEVEL 2 CERTIFICATION : PROCESS : METERING & GAUGING : METER PROVING : PRACTICAL KNOWLEDGE : This lesson targets training on the following training elements: Meter Proving Meter Proving Systems

Training Objectives

: At the end of the Lesson the participants will be able to: Describe how a meter proving system works Extract relevant information from a meter proving run

0 Rev

2007-09-11 Date

V. Vladut Prepared by

VV Initials

T. Hedison Checked by

TJH Initials

R.G. Hollamby Approved by

RGH Initials

Initial Document Modifications Page 1 of 9

Form: A62.1858-ADM-FRM-0303

Cegelec 2006

This document is the property of Cegelec (The Company). Distribution and use of this document are strictl y governed by the Companys Document Management Policy and Procedures. The contents and form of the document are the sole property of The Company and may not be reproduced, distributed or used without the express written permission of The Company.

Lesson Handout Notes 25241: Meter Proving


A62.1858-LHN-PRO-25241-01 September 11th 2007

DOCUMENT INFORMATION

TABLE OF CONTENTS Technician: Level 2 Certification ................................................................................................................................... 1 Process ......................................................................................................................................................................... 1 Metering & Gauging ...................................................................................................................................................... 1 METER PROVING ........................................................................................................................................................ 1 Practical Knowledge ..................................................................................................................................................... 1 Metering definitions ....................................................................................................................................................... 3 Proving system ............................................................................................................................................................. 3 Pipe prover ................................................................................................................................................................... 4 Types of prover pipes ................................................................................................................................................... 5 Bidirectional pipe prover ............................................................................................................................................... 6 Metering Facilities.....7

Purpose The purpose of this document is to provide the participant study information.

OWNER The owner of this document is the Discipline Team of Ogere Training Facility, Ogere Remo, Ogun State, Nigeria.

CUSTODIAN The custodian of this document is the Data Administrator and Document Controller of the Ogere Training Facility, Nigeria

25231: Meter Proving

Cegelec 2007

Page 2 of 9

Lesson Handout Notes 25241: Meter Proving


A62.1858-LHN-PRO-25241-01 September 11th 2007

Metering definitions
Custody and fiscal transfer involve royalties; so the main characteristic of a metering system is to reduce inaccuracies to a minimum. For flow, accuracy depends on the type of measurement - Operational measurement: # 5 % - Control measurement: # 2 % - Custody and fiscal transfer: < 1 % for gases and < 0.5 % for liquids Example: For 1 million of barrels of oil per day the calculation is based on $50 per barrel. A 0.1 % error represents $50 000 per day. Design, installation, maintenance and operation of a station should be covered by standards agreed by the Buyer and the Seller and based upon: - governmental requirements - industry practices - company guidelines The station shall be certified by a third party certifying agency. Custody transfer involves export metering and fiscal transfer involves domestic metering.

Proving system
Proving system is necessary for the accurate determination of the meter calibration factor MF (number of pulses per unit volume). Proving shall be in accordance with ISO or API standards. Different systems: 1. Master meter - uses an accurate meter in series with the meter to be calibrated; 2. Volumetric prover - uses a vessel of an accurate certified volume; - considerable time is required for filling, draining and return of the test fluid; - normal operation of the meter must be interrupted. 3. Prover pipe - uses of an accurate certified volume of pipe; - time is relatively short. - normal operation of the meter will not be interrupted.
25231: Meter Proving Cegelec 2007 Page 3 of 9

Lesson Handout Notes 25241: Meter Proving


A62.1858-LHN-PRO-25241-01 September 11th 2007

The Prover pipe Consist mainly of: - A pipe section with an exact determined volume limited by two detectors; - A sphere or a piston (neoprene); - A high resolution prover counter; The sphere or piston actuates the two detectors which in turn will start and stop the counting of electrical pulses.

Figure 1. Typical prover pipe The prover counter determines: P and T corrected prover volume Vp from original volume Vo (established by a certifying authority) Vp = Vo x Cts x Cps x Ctl x Cpl Where: Cts: correction factor for effect of temp. on prover material (API 2531 table I) Cps: correction factor for effect of pres. on prover material (API 2531 table II) Ctl: correction factor for effect of temp. on liquid (ASTM D1250 table VI) Cpl: correction factor for effect of pres. on liquid (API 1101 table II)

Actual meter calibration factor MF1 = n1/Vp Where n1 = number of pulses.


25231: Meter Proving Cegelec 2007 Page 4 of 9

Lesson Handout Notes 25241: Meter Proving


A62.1858-LHN-PRO-25241-01 September 11th 2007

Types of prover pipe - Unidirectional: The sphere passes through the section always in the same direction and is returned to the upstream end through an interchange. - Bidirectional: The sphere passes through the section back and forth. The change of direction is accomplished by means of a 4-way-diverter-valve or a combination of valves. Prover can be stationary or mobile depending on the size of the station. Requirements: For every loading the meter has to be proved and shall require participation of both Parties. Periodic testing shall be as often as weekly. Proving should start after flow parameters (P, T, , and F) are stabilized. To obtain accuracy and repeatability <= 0.02 %: - Vp shall be at least 0.5 % of the maximum volume per hour; - A minimum of 10 000 pulses has to be generated; - The sphere velocity shall not exceed 3 m/s; - Possible change in the volume shall never exceed 0.1 %; - Usually if 3 to 5 successive runs agree within 0.02 % of each other, MF is considered accurate; - Assure that there is no leakage around the sphere in its passage; - A test shall be carried-out if there are large variations of pressure, temperature, viscosity and flow during normal operation. Prover loop calibration system It is used to calibrate prover loop volume at periodically period and to determine official prover loop volume. It consists of several calibrated tanks and transfer pump connected to prover loop.

25231: Meter Proving

Cegelec 2007

Page 5 of 9

Lesson Handout Notes 25241: Meter Proving


A62.1858-LHN-PRO-25241-01 September 11th 2007

Figure 2. Bidirectional pipe prover


25231: Meter Proving Cegelec 2007 Page 6 of 9

Lesson Handout Notes 25241: Meter Proving


A62.1858-LHN-PRO-25241-01 September 11th 2007

Metering Facilities This example of a metering system for cargo products and bunkering products consists of ten metering banks. The metering banks accurately measure the volume of products delivered to tankers. The banks also control and monitor the flow of products as they are delivered. The following products are transferred from the refinery through dedicated pipelines to tankers, passing the metering system: FOC FOB PG RG MDB MDC MDO KE NA JP - 4 LPG : : : : : : : : : : : Fuel Oil Cargo Fuel Oil Bunker Premium Gasoline Regular Gasoline Marine Diesel Bunker Marine Diesel Cargo Motor Diesel Oil Kerosene Naphtha Jet Fuel Liquefied Petroleum Gas

The number of meter runs to be used for each loading is based on a maximum required flow rate. For each metering bank, a unidirectional prover loop verifies the accuracy of the meters. This occurs while loading operation is at normal flow rate. The metering and pipe prover functions are operated from the control room at the terminal administration building. Manual proving can also be done at the metering stations.

25231: Meter Proving

Cegelec 2007

Page 7 of 9

Lesson Handout Notes 25241: Meter Proving


A62.1858-LHN-PRO-25241-01 September 11th 2007

Figure 3. Product flow through a meter proving system for the FOC and FOB Skids

Figure 4. Typical configuration of a metering skid.


25231: Meter Proving Cegelec 2007 Page 8 of 9

Lesson Handout Notes 25241: Meter Proving


A62.1858-LHN-PRO-25241-01 September 11th 2007

The product metering systems have a common inlet header and multiple meters. These are dedicated to loading berths as follows:
Product Meters to Berth 1&2 Meters to Berth 3&4 Meter Type

Number Fuel Oil Cargo (FOC) Regular Gasoline (RG) Premium Gasoline (PG) Marine Diesel Cargo (MDC) Motor Diesel Oil (MDO) Kerosene (KE) Naphtha (NA) Jet Fuel (JP-4) Fuel Oil Bunker (FOB) Marine Diesel Bunker (MDB) 4 3 3 3 3 3 2 2 3 2

Size 12 10 10 10 10 10 6 4 8 6

Number 4 3 3 3 3 3 2 2 3 2

Size 12 10 10 10 10 8 6 4 8 4 PDM TM TM TM TM TM TM TM PDM TM