Originated from RCC32.xls on CD

LOCATION Supports from grid


MATERIALS
fcu
35
fy
460
fyv
460
Density
23.6

N/mm
N/mm
N/mm
kN/m

SPANS
SPAN 1
SPAN 2
SPAN 3
SPAN 4
SPAN 5
SPAN 6

L (m)

H (mm)

6.500
7.000
7.500

275
275
275

chg

to grid

43

Revision

Job No

R68

5a

h agg
20
mm
gm
1.05
steel
gm
1.50
concrete
(Normal weight concrete)
Solid (mm)
Left
Right

450
1100
1100

Page

1-May-14

1100
1100
450

COVERS (to links, or if no links, to reinf)


Top cover
20
mm
Btm cover
20
mm
Side cover
20
mm
RIBS
slab depth, hf
100
mm
Rib width
150
mm
Centres
900
mm
1 in
10
taper
SUPPORTS
Support No

Type

1
4

K
E

K(nife), C(antilever) or E(ncastre)

LOADINGUDLs (kN/m)
Span 1
UDL
PL 1
PL 2
Span 2
UDL
PL 1
PL 2
Span 3
UDL
PL 1
PL 2

Checked

1999 BCA for RCC

Date

PLs (kN/m)

Position (m)

Self
Weight

Add Dead
Load

Imposed
Load

Position
from left

3.93
~~~~
~~~~
~
4.19
~~~~
~~~~
~
3.82
~~~~
~~~~

2.50
8.50

4.00
1.00

~~~~
0.450

~
2.50
8.50

~
4.00
1.00

~~~~
1.450

~
2.50

~
4.00

~~~~

Self

Span 4
Weight
UDL
PL 1
~~~
PL 2
~~~
Span 5
~
UDL
PL 1
~~~
PL 2
~~~
Span 6
~
UDL
PL 1 ~~~~
PL 2 ~~~~

LOADING PATTERN
DEAD
IMPOSED

Add Dead
Load

Imposed
Load

Position
from left

~~~~

~~~~

min

max

1
0

1.4
1.6

LOADING DIAGRAM

5a

REACTIONS (kN/m)
SUPPORT
Characteristic Dead
Max Imposed
Min Imposed
MAX ULTIMATE

23.4
12.8
-8.8
53.3

57.9
29.6
7.5
128.5

48.0
29.3
5.3
114.0

23.8
17.5
-9.0
61.3

~
~
~
~

~
~
~
~

~
~
~
~

REINFORCED CONCRETE
COUNCIL

Project

Spreadsheets to BS 8110

Client
Location

Advisory Group
3rd Floor slab, from 1 to 5a

Made by

RIBBED SLABS to BS 8110:1997 (Analysis & Design)

Checked

Originated from RCC32.xls on CD

Date

rmw

May-2014
Revision

chg

1999 BCA for RCC

Page

44
Job No

R68

BENDING MOMENT DIAGRAMS (kNm/m)


100

100

80

80

60

60

40

40

20

20

-20

-20

-40

-40

-60

-60
-80

-80
0

10

15

20

5a

Elastic Moments

SUPPORT No

Elastic M
Redistributed M
b
Redistribution
SPAN No

Elastic M
Redistributed M
b

25

10

15

80.1
72.1
0.900
10.0%

68.4
68.4
1.000
0.0%

85.9
73.0
0.850
15.0%

~
~
~

~
~
~

~
~
#VALUE!

~
~
#VALUE!

~
~
#VALUE!

48.75
45.65
0.936

44.13
50.02
1.133

25

5a

Redistributed Envelope

0.0
0.0
1.000

59.62
57.40
0.963

20

kNm/m
kNm/m
~

SHEAR FORCE DIAGRAMS (kN/m)


80

80

60

60

40

40

20

20

-20

-20

-40

-40

-60

-60

-80
0

10

15

20

Elastic V
Redistributed V

5a

Elastic Shears
SPAN No

-80

25

10

15

Redistributed Shears

54.1
53.3

63.3
62.1

67.5
67.4

57.2
57.4

56.6
56.6

63.0
61.3

~
~

~
~

~
~

~
~

~
~

~
~

SPAN No

Elastic V
Redistributed V

20

25

5a

Project

Spreadsheets to BS 8110

REINFORCED CONCRETE COUNCIL

Client
Location

Advisory Group
3rd Floor slab, from 1 to 5a

Made by

RIBBED SLABS to BS 8110:1997 (Analysis & Design)

Checked

Originated from RCC32.xls on CD

SPAN 3
ACTIONS
DESIGN

M kNm/m
b
d
mm
As mm
As' mm

TOP STEEL

As prov

mm

BTM STEEL
SHEAR

LINKS
DEFLECTION
& CHECKS

As' prov mm
V kN/m
v N/mm
vc N/mm

Date

rmw

LEFT
CENTRE
68.4 @col face
50.0
1.00
1.13
239.0
236.5
618
457
0
As T 118
2T
20
/rib
2T
12
/rib
+ 4 T8 between
829
As T prov 226
2T
12
/rib
1T
25
/rib
226
As prov 491
56.58
0.889
0.935
Link
6
.
2T6 @ 1,200
L/d 31.712
Allowed 38.473 ok

May-2014
Revision

chg

1999 BCA for RCC

Page

/46
Job No

R68

RIGHT
73.0
0.85
239.0
661
As'
4
2T
20
/rib
+ 4 T8 between
As prov
829
1T
16
/rib
As' prov
201
V
61.26
v
1.221
vc
0.935
2T6 @ 175 for 875

% As
Bar & cover
Bar spacing

ok
ok
ok

ok
ok
ok

ok
ok
ok

Dist to link

ok

ok

ok

Project

Spreadsheets to BS 8110

Client
Location

Advisory Group
3rd Floor slab, from 1 to 5a

Made by

RIBBED SLABS to BS 8110:1997 (Analysis & Design)

Checked

Originated from RCC32.xls on CD

REINFORCED CONCRETE COUNCIL


rmw

1999 BCA for RCC

Date

Page

May-2014
Revision

/47
Job No

chg

R68

APPROXIMATE WEIGHT of REINFORCEMENT


TOP STEEL

No

Type

Dia

Length

Unit Wt

Weight

2
4
2
2
4
2
2
4
2
2
4

T
T
T
T
T
T
T
T
T
T
T

12
8
16
20
8
12
20
8
12
20
8

2150
2150
4475
3375
3375
4425
3625
3625
4675
2400
2400

0.888
0.395
1.578
2.466
0.395
0.888
2.466
0.395
0.888
2.466
0.395

3.8
3.4
14.1
16.6
5.3
7.9
17.9
5.7
8.3
11.8
3.8

Support 1
Span 1
Support 2
Span 2
Support 3
Span 3
Support 4

2
2
2
2
2
1
1

T
T
T
T
T
T
T

16
20
12
20
12
25
16

1150
4900
3175
4750
3175
5900
1725

1.578
2.466
0.888
2.466
0.888
3.853
1.578

3.6
24.2
5.6
23.4
5.6
22.7
2.7

Span 1
Span 2
Span 3

6
7
10

T
T
T

6
6
6

800
800
800

0.222
0.222
0.222

1.1
1.2
1.8

Support 1
Span 1
Support 2
Span 2
Support 3
Span 3
Support 4

BOTTOM STEEL

LINKS

SUMMARY

All figures approximate - see User Guide.

Reinforcement density (kg/m) 9.68

Total rebar per rib, excluding mesh (kg)

190.7

Project
Location

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

ANALYSIS I

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

SELF WEIGHT
ave bw
rib area
net self wt
E/O solid
cross rib
addn. solid
total SW

Made by rmw Job No R68


Date
1-May-14

1999 BCA for RCC

167.5
0.119
3.129
3.361
0
0.801555
3.930

167.5
0.119
3.129
3.361
0
1.056428
4.185

167.5
0.119
3.129
3.361
0
0.69468
3.823

140.0
0.076
1.993
-1.993
0
#DIV/0!
0.000

140.0
0.076
1.993
-1.993
0
#DIV/0!
0.000

140.0
0.076
1.993
-1.993
0
#DIV/0!
0.000

mm
mm
kN/m
kN/m
kN/m
kN/m
kN/m

ANALYSIS
1.0
0.4

Min load
Max load

x dead load
x dead load +

1.6

x imposed load

(Table 2.1)

Distribution Factors
SUPT 1
R

Af
h -hf
Aw1
Aw2
A sum
sum Ax
x bar
sum Ad
Ix
Stiffness
Sum
Factor

SUPT 2
L

SUPT 3

R
90000

L
90000

SUPT 5

90000

SUPT 6

90000

SUPT 7

90000

L
90000

175

175

175

-100

-100

-100

26250

26250

26250

-15000

-15000

-15000

6125

6125

6125

2000

2000

2000

122375

122375

122375

77000

77000

77000

10391666.7 10391666.7

10391666.7

3883333.33

3883333.33

3883333.33

84.9165815 84.9165815

84.9165815

50.4329004

50.4329004

50.4329004

539513578

539513578

539513578

8902944.1

8902944.1

8902944.1

686716269
105648657

686716269
98102324.1

686716269
91562169.2 91562169.2

0
#DIV/0!

0
#DIV/0!

203750981
0.518519 0.481481

SUPT 4

98102324

189664493
0.51724 0.482759

#DIV/0!

#DIV/0!
0

#DIV/0!
0

0
#DIV/0!

#DIV/0!

#DIV/0!
0

Fixed End Moments


Min load
Cant
UDL
PL 1
PL 2
FEM
Live load
Cant
UDL
PL 1
PL 2
FEM

SPAN 1
R

SPAN 2
R

SPAN 3
R

SPAN 4
R

SPAN 5
R

SPAN 6
R

22.64
3.3137
0
25.95

187.2629
22.63964
0.246475
0
22.89

176.1091
27.29736
7.747772
0
35.05

27.2974
2.02419
0
29.32

177.8434
29.64056
0
0
29.64

29.64056
0
0
29.64

0
0
#DIV/0!
#DIV/0!
0.00

0
#DIV/0!
#DIV/0!
0.00

0
0
#DIV/0!
#DIV/0!
0.00

0
#DIV/0!
#DIV/0!
0.00

0
0
#DIV/0!
#DIV/0!
0.00

0
#DIV/0!
#DIV/0!
0.00

31.589
1.9492
0
33.54

219.7851
31.58919
0.144985
0
31.73

229.5637
37.05228
4.557513
0
41.61

37.0523
1.1907
0
38.24

251.1374
41.85623
0
0
41.86

41.85623
0
0
41.86

0
0
#DIV/0!
#DIV/0!
0.00

0
#DIV/0!
#DIV/0!
0.00

0
0
#DIV/0!
#DIV/0!
0.00

0
#DIV/0!
#DIV/0!
0.00

0
0
#DIV/0!
#DIV/0!
0.00

0
#DIV/0!
#DIV/0!
0.00

Moment Distribution
SUPT 1
Min load

Sum

-25.953
25.953
3.1523
-3.1523
-3.3857
3.3857
0.6049
-0.6049
-0.6497
0.6497
0.1161
-0.1161
-0.1247
0.1247
0.00

SUPT 2

22.88612
6.304672
12.97668
-6.771429
-1.576168
1.209805
1.692857
-1.299371
-0.302451
0.23215
0.324843
-0.249336
-0.058037
0.044547
35.41

-35.04513
5.854338
0.082504
-6.287755
-0.757026
1.12339
0.813072
-1.206558
-0.145266
0.215567
0.15602
-0.231527
-0.027875
0.041365
-35.41

SUPT 3

29.3215
0.16501
2.92717
-1.51405
-3.14388
1.62614
0.56169
-0.29053
-0.60328
0.31204
0.10778
-0.05575
-0.11576
0.05988
29.36

-29.64056
0.154007
0
-1.413116
0
1.517734
0
-0.271163
0
0.291238
0
-0.052034
0
0.055886
-29.36

SUPT 4

29.64056
0
0.077004
0
-0.706558
0
0.758867
0
-0.135582
0
0.145619
0
-0.026017
0
29.75

SUPT 5

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

SUPT 6

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

SUPT 7

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

ANALYSIS II

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Live on
Odd Spans

Sum
Live on
Even Spans

Sum

Made by rmw Job No R68


Date
1-May-14

1999 BCA for RCC

-33.538
33.538
-8.2274
8.2274
-7.154
7.154
-1.5788
1.5788
-1.3728
1.3728
-0.3029
0.3029
-0.2634
0.2634
0.00

31.73418
-16.45476
16.76922
-14.30805
4.113689
-3.157506
3.577013
-2.745575
0.789377
-0.605894
0.686394
-0.526849
0.151474
-0.116265
19.91

0
10.788
-10.788
2.5642
-2.5642
2.0701
-2.0701
0.492
-0.492
0.3972
-0.3972
0.0944
-0.0944
0.00

21.57545
0
5.128369
-5.393861
4.140116
-1.282092
0.984083
-1.035029
0.794448
-0.246021
0.188836
-0.198612
0.152447
24.81

-15.27942
10.82489
-13.28605
1.975787
-2.93197
1.718024
-2.549462
0.379134
-0.562616
0.329672
-0.489217
0.072752
-0.107961
-19.91
-41.60979
20.03434
-9.890425
4.762057
-2.590648
3.844393
-0.615783
0.913792
-0.49712
0.737701
-0.118163
0.175348
-0.095392
0.141558
-24.81

Elastic Support Moments

21.6498
-7.63971
3.95157
-6.64302
3.43605
-1.46599
0.75827
-1.27473
0.65934
-0.28131
0.1455
-0.24461
0.12652
13.18
38.243
-19.7809
10.0172
-5.1813
2.38103
-1.23157
1.9222
-0.99424
0.4569
-0.23633
0.36885
-0.19078
0.08767
-0.04535
25.82

-41.85623
20.20645
0
3.688135
0
3.206978
0
0.707717
0
0.615387
0
0.135804
0
0.118087
-13.18

41.85623
0
10.10323
0
1.844068
0
1.603489
0
0.353858
0
0.307694
0
0.067902
0
56.14

-18.46213
0
-4.835876
0
-1.149462
0
-0.927957
0
-0.22057
0
-0.178066
0
-0.042325
-25.82

0
-9.231063
0
-2.417938
0
-0.574731
0
-0.463979
0
-0.110285
0
-0.089033
0
-12.89

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

(3.2.1.2.2)

Support

All spans
Odd Spans
Even Spans

0
0
0

80.12945
55.32132
60.22301

68.35206
42.53567
55.17439

73.0033
85.8904
16.8669

0
0
0

0
0
0

0
0
0

Redistribution
b b +
Max M
Dead only
All spans
Odd Spans
Even Spans

1
1
0
0
0
0
0

(3.2.2.1)
0.9
1.1
72.1165
35.41488
72.1165
60.85345
66.24531

1
1
68.35206
29.35801
68.35206
42.53567
55.17439

method 1
0.85
1.15
73.0068
29.7539
73.0068
73.0068
19.3969

1
1
0
0
0
0
0

1
1
0
0
0
0
0

1
1
0
0
0
0
0

UDL

1
PL1

PL2

UDL

2
PL1

PL2

UDL

3
PL1

PL2

41.796
100.11
100.11
41.796

8.5
13.5
13.5
8.5

0
0
0
0

46.7955
110.314
46.7955
110.314

8.5
13.5
8.5
13.5

0
0
0
0

47.4249
114.3949
114.3949
47.4249

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

63.31961
59.50297
30.75167

67.5429
31.9635
66.5816

56.27077
23.33193
57.23202

56.57726
51.41681
28.82012

0
0
0

0
0
0

0
0
0

0
0
0

Total Ultimate Loads


Span

Dead only
All spans
Odd Spans
Even Spans
Span

Dead only
All spans
Odd Spans
Even Spans

0
0
0
0

Elastic Shears
Span

All spans 50.295


Odd Spans 54.112
Even Spans 19.545
Span

All spans
Odd Spans
Even Spans

0
0
0

57.8176
62.97806
18.60478
6

0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

ANALYSIS III

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Made by rmw Job No R68


Date
1-May-14

1999 BCA for RCC

Redistributed Shears
Span

Dead only
All spans
Odd Spans
Even Spans

23.361
51.528
53.261
18.618

Span

Dead only
All spans
Odd Spans
Even Spans

26.93504
62.08685
60.35407
31.67818

31.0023
66.3982
32.7538
67.442

0
0
0
0

0
0
0
0

0
0
0
0

24.29318
57.41548
22.54162
56.3717

23.65967
56.5768
53.13461
28.48278

0
0
0
0

0
0
0
0

23.76524
57.81806
61.26025
18.94212
6

0
0
0
0

Imposed Reactions
Support

All spans 11.764 29.60798


Odd Spans 12.847 7.497289
Even Spans -8.8048 11.25493

29.28643 15.3417 #VALUE!


5.338907 17.4931 #VALUE!
11.07531 -8.95576 #VALUE!

#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!

PL2

< >

SPAN MOMENTS
SPAN 1
Elastic V All
Odd
Even
Redist V All
Odd
Even
Elastic X- All
Odd
Even
Redist X- All
Odd
Even
Elastic M All
Odd
Even
Redist M All
Odd
Even
SPAN 2
Elastic V All
Odd
Even
Redist V All
Odd
Even
Elastic X- All
Odd
Even
Redist X- All
Odd
Even
Elastic M All
Odd
Even
Redist M All
Odd
Even

Left

< >

50.29516
54.1118
19.54459
51.52792
53.2607
18.61808

PL1

< >

Loadings

0
0
0
0
0
0

3.265438
3.513235
3.039503
3.345475
3.457977
2.895415
0
0
0
0
0
0

15.4023
15.4023
6.43019
0.45
0.45
0.45
0.45
0.45
0.45
21.0733
22.7908
8.14401
21.6281
22.4078
7.72708

13.5
13.5
8.5
2.388944
2.636741
1.717614
2.468981
2.581483
1.573527
50.02579
59.61639
13.31017
53.02012
57.39578
11.78554

0
0
0
0
0
0
0
0
0
6.075
6.075
3.825
6.075
6.075
3.825

2.388944
2.636741
1.717614
2.468981
2.581483
1.573527
50.02579
59.61639
13.31017
53.02012
57.39578
11.78554

Left

< >

PL1

< >

PL2

< >

67.54288
31.96354
66.58163
66.39818
32.75384
67.44196

80.12945
55.32132
60.22301
72.1165
60.85345
66.24531

4.285962
4.781334
4.224966
4.213325
4.899554
4.279558
0
0
0
0
0
0

13.5
8.5
13.5
3.429314
3.509844
3.368317
3.356676
3.628063
3.42291
32.11057
-1.819639
48.74988
36.23953
-4.53121
45.64892

0
0
0
0
0
0
0
0
0
-60.55445
-42.99632
-40.64801
-52.5415
-48.52845
-46.67031

(3.2.2.1b)
Max

80.12945
55.32132
60.22301
72.1165
60.85345
66.24531

50.02579
59.61639
13.31017
53.02012
57.39578
11.78554

1.059856
0.962752
0.885453

Right

56.27077
23.33193
57.23202
57.41548
22.54162
56.3717

Loadings

15.7591
6.68507
15.7591
1.45
1.45
1.45
1.45
1.45
1.45
1.24099
-16.0019
19.7536
7.59411
-20.3881
14.9788

Right

63.31961
59.50297
30.75167
62.08685
60.35407
31.67818

3.429314
3.509844
3.368317
3.356676
3.628063
3.42291
32.11057
-1.819639
48.74988
36.23953
-4.53121
45.64892

(3.2.2.1b)
Max

68.35206
42.53567
55.17439
68.35206
42.53567
55.17439

32.11057
0
48.74988
36.23953
0
45.64892

1.128586
0
0.93639

Project
Location

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

ANALYSIS IV

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

SPAN 3
Elastic V All
Odd
Even
Redist V All
Odd
Even
Elastic X- All
Odd
Even
Redist X- All
Odd
Even
Elastic M All
Odd
Even
Redist M All
Odd
Even
SPAN 4
Elastic V All
Odd
Even
Redist V All
Odd
Even
Elastic X- All
Odd
Even
Redist X- All
Odd
Even
Elastic M All
Odd
Even
Redist M All
Odd
Even
SPAN 5
Elastic V All
Odd
Even
Redist V All
Odd
Even
Elastic X- All
Odd
Even
Redist X- All
Odd
Even
Elastic M All
Odd
Even
Redist M All
Odd
Even

Left

Made by rmw Job No R68


Date
1-May-14

1999 BCA for RCC

< >

56.57726
51.41681
28.82012
56.5768
53.13461
28.48278

PL1

< >

PL2

< >

Right

57.8176
62.97806
18.60478
57.81806
61.26025
18.94212

Loadings

68.35206
42.53567
55.17439
68.35206
42.53567
55.17439

3.70934
3.371008
4.557751
3.70931
3.483632
4.504403
0
0
0
0
0
0

15.2526
15.2526
6.32332
0
0
0
0
0
0
-68.3521
-42.5357
-55.1744
-68.3521
-42.5357
-55.1744

0
0
0
3.70934
3.371008
4.557751
3.70931
3.483632
4.504403
36.5801
44.12757
10.50308
36.57838
50.01505
8.974576

0
0
0
0
0
0
0
0
0
-68.35206
-42.53567
-55.17439
-68.35206
-42.53567
-55.17439

3.70934
3.371008
4.557751
3.70931
3.483632
4.504403
36.5801
44.12757
10.50308
36.57838
50.01505
8.974576

73.00333
85.89036
16.86687
73.00681
73.00681
19.3969

Left

< >

PL1

< >

PL2

< >

Right

0
0
0
0
0
0

(3.2.2.1b)
Max

Loadings

73.00333
85.89036
16.86687
73.00681
73.00681
19.3969

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0
0
0
0
-73.00333
-85.89036
-16.86687
-73.00681
-73.00681
-19.3969

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0

Left

< >

PL1

< >

PL2

< >

Right

0
0
0
0
0
0

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

(3.2.2.1b)
Max

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0

Loadings

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.999953
1.133419
0.854471

0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
-73.0033
-85.8904
-16.8669
-73.0068
-73.0068
-19.3969

0
0
0
0
0
0

36.5801
44.12757
10.50308
36.57838
50.01505
8.974576

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

(3.2.2.1b)
Max

0
0
0
0
0
0

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!

Project
Location

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

ANALYSIS V

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

SPAN 6
Elastic V All
Odd
Even
Redist V All
Odd
Even
Elastic X- All
Odd
Even
Redist X- All
Odd
Even
Elastic M All
Odd
Even
Redist M All
Odd
Even
UDLs at solid (for shear)
UDL
PL left
PL right

Left

< >

0
0
0
0
0
0

0
0
0
0
0
0

Made by rmw Job No R68


Date
1-May-14

1999 BCA for RCC

PL1

< >

PL2

< >

0
0
0
0
0
0

Loadings

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Right

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

15.486
13.5
0

15.486
0
0

15.486
0
0

0
0
0

0
0
0

0
0
0

(3.2.2.1b)
Max

0
0
0
0
0
0

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS I
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

REINFORCEMENT DESIGN

Date

1999 BCA for RCC

SPAN 1

L = 6.500

h = 275
bw = 167.5

MAIN STEEL
b
M/m
M/rib
d
bf
K'
Web Mres
Flange Mres
K
z
x
d'
net fsc
Excess M
As' req
fst
As req
bw/b
Min %
Min As

LEFT
1.000
0.00
0.00
243.0
900
0.1558
48.29
289.75
0.0000
230.85
27.00
34.0
0.0
0.00
0
438.1
0

kNm/m
kNm
mm
mm
kNm
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
%
mm

At Edge of Solid

M/m
M/rib
bf
K
z
x
net fsc
Excess M
As' req
fst
As req
TENSION STEEL
As deflection
As to provide
in rib
No
As prov
=%
Clear dist
Min S
Max S
Residual
Min
As resid
extra
No
As prov
COMPRESSION STEEL
Required

No
As' prov
=%
Clear dist
Min S

kNm/m
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
mm
mm
mm

ok

mm
%

ok

mm
mm
mm

ok
ok

0
120
12
2
226
0.556
122.6
25.0
152.2

519
519
20
2
628
1.570
65.2
25.0
178.5

ok
ok
ok

mm
mm
mm

ok

mm
%

ok

mm
mm

ok

314
16
2
402
0.988
72.8
25.0

BS8110

RIGHT
0.900
72.12
64.90
239.0
900
0.1558
46.71
280.29
0.0361
227.05
26.56
32.0
0.0
0.00
0
438.1
653
0.13%
322
35.29
31.76
150
0.1059
206.44
72.36
374.8
0.00
0
438.1
350

ok

ok
ok
ok

0.26%
96
8
4
201

%
mm

mm

0.13%
322
dmid = 239.0
0.00
0.00
150
0.0000
230.85
27.00
0.0
0.00
0
438.1
0

SPAN
0.963
57.40
51.66
239.0
900
0.1558
46.71
265.92
0.0287
227.05
26.56
34.0
0.0
0.00
0
438.1
519
0.19
0.18%
83
d'mid = 36.0
23.26
20.93
150
0.0698
218.75
45.00
124.4
0.00
0
438.1
218

ok

Job No R68
1-May-14

653
350
20
2
628
1.570
105.8
25.0
152.2

Ref

-=-

3.4.4.4
Fig 3.3
-=3.4.4.4
-=-=Fig 3.3

Fig 3.3

Table 3.25

3.4.4.4
-=-=Fig 3.3

Fig 3.3

between bars
3.12.11.1
3.12.11.2.4

0.26%
24
8
4
201

ok

ok
ok

218
16
2
402
1.004
114.2
25.0

ok

ok
ok

188
12
2
226
0.565
80.4
25.0

Table 3.25

between bars
3.12.11.1

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS II
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Date

1999 BCA for RCC

Job No R68
1-May-14

SPAN 1 cont
DEFLECTION
fs
Base ratio
Tens Mod
Comp Mod
Perm L/d
Actual L/d
As req increased by

0.0

N/mm

263.3
20.80
1.49
1.25
38.64
27.20
0.00

ok
%

ok

268.1
7.00
1.36
1.00
0.00
0.00
0.00

Eqn 8
3.4.6.3/4
Table 3.10
Table 3.11
3.4.6.3
3.4.5.1

RIB SHEAR
V cl
distance from cl
V rib
v
vc
(v-vc)bv
Link
@
for
As Dist
As' Dist

53.26
0.450
29.51
0.7251
0.7976
67.0
6
175
0

kN/m
m
kN
N/mm
N/mm
N/mm
mm
mm
mm
mm

ok

mm

REINFORCEMENT DESIGN

0.0

SPAN 2

ok
ok

NOMINAL
0.0
6
1200
2400
0
0.0

L = 7.000

b
M/m
M/rib
d
bf
K'
Web Mres
Flange Mres
K
z
x
d'
net fsc
Excess M
As' req
fst
As req
bw/b
Min %
Min As

kNm/m
kNm
mm
mm
kNm
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
%
mm

At Edge of Solid

M/m
M/rib
bf
K
z
x
net fsc
Excess M
As' req
fst
As req

kNm/m
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm

3.4.5.10
Eqn 3
Table 3.8
Table 3.7
3.12.7.1
Spacing
from solid
3.4.5.5

ok

0.0

3.12.7.2

h = 275

MAIN STEEL

62.09
1.100
40.55
1.0129
0.9345
67.0
6
175
350

bw = 167.5
LEFT
0.900
72.12
64.90
239.0
900
0.1558
46.71
280.29
0.0361
227.05
26.56
32.0
0.0
0.00
0
438.1
653
0.13%
322
dmid = 239.0
28.87
25.98
150
0.0866
213.21
57.31
293.5
0.00
0
438.1
278

SPAN
0.936
45.65
41.08
239.0
900
0.1558
46.71
265.92
0.0228
227.05
26.56
32.0
0.0
0.00
0
438.1
413
0.19
0.18%
83
d'mid = 36.0
16.32
14.69
150
0.0490
225.20
30.68
0.0
0.00
0
438.1
149

RIGHT
1.000
68.35
61.52
239.0
900
0.1558
46.71
280.29
0.0342
227.05
26.56
32.0
0.0
0.00
0
438.1
618
0.13%
322
21.78
19.61
150
0.0654
220.15
41.88
149.6
0.00
0
438.1
203

-=-

3.4.4.4
Fig 3.3
-=3.4.4.4
-=-=Fig 3.3

Fig 3.3

Table 3.25

3.4.4.4
-=-=Fig 3.3

Fig 3.3

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS III
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Date

1999 BCA for RCC

Job No R68
1-May-14

SPAN 2 cont
TENSION STEEL
As deflection
As to provide
in rib
No
As prov
=%
Clear dist
Min S
Max S
Residual
Min
As resid
extra
No
As prov
COMPRESSION STEEL
Required

No
As' prov
=%
Clear dist
Min S
DEFLECTION
fs
Base ratio
Tens Mod
Comp Mod
Perm L/d
Actual L/d
As req increased by

mm
mm

ok

mm
mm

ok

%
mm

ok
ok

mm
mm

653
278
20
2
628
1.570
105.8
25.0
137.0

ok

ok
ok
ok

413
413
20
2
628
1.570
65.2
25.0
218.3

ok

ok
ok
ok

0.26%
24
8
4
201

%
mm
mm
mm
mm

ok

mm
mm

ok

%
mm

ok

mm

188
12
2
226
0.565
80.4
25.0
268.1
7.00
1.36
1.00
0.00
0.00
0.00

N/mm

ok
%

618
203
20
2
628
1.570
105.8
25.0
137.0

between bars
3.12.11.1
3.12.11.2.4

0.26%
0
8
4
201

ok

ok
ok

ok

149
12
2
226
0.565
122.6
25.0

ok

ok
ok

215.3
20.80
1.83
1.16
44.18
29.29
0.00

188
12
2
226
0.565
80.4
25.0
228.7

Table 3.25

between bars
3.12.11.1
Eqn 8
3.4.6.3/4
Table 3.10
Table 3.11
3.4.6.3
3.4.5.1

RIB SHEAR
V cl
distance from c/L
V rib
v
vc
(v-vc)bv
Link
@
for
As Dist
As' Dist

67.44
1.100
45.37
1.1332
0.9345
67.0
6
175
525

kN/m
m
kN
N/mm
N/mm
N/mm
mm
mm
mm
mm
mm

ok

0.0

ok
ok

NOMINAL
0.0
6
1200
2400
0
0.0

57.42
1.100
36.34
0.9078
0.9345
67.0
6
175
0

3.4.5.10
Eqn 3
Table 3.8
Table 3.7
3.12.7.1
Spacing
from solid
3.4.5.5

ok

0.0

3.12.7.2

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS IV
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

REINFORCEMENT DESIGN

Date

1999 BCA for RCC

SPAN 3

L = 7.500

h = 275

bw = 167.5

MAIN STEEL
b
M/m
M/rib
d
bf
K'
Web Mres
Flange Mres
K
z
x
d'
net fsc
Excess M
As' req
fst
As req
bw/b
Min %
Min As

LEFT
1.000
68.35
61.52
239.0
900
0.1558
46.71
280.29
0.0342
227.05
26.56
32.0
0.0
0.00
0
438.1
618

kNm/m
kNm
mm
mm
kNm
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
%
mm

At Edge of Solid

M/m
M/rib
bf
K
z
x
net fsc
Excess M
As' req
fst
As req
TENSION STEEL
As deflection
As to provide
in rib
No
As prov
=%
Clear dist
Min S
Max S
Residual
Min
As resid
extra
No
As prov
COMPRESSION STEEL
Required

No
As' prov
=%
Clear dist
Min S

kNm/m
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
mm
mm
mm

ok

mm
%

ok

mm
mm
mm

ok
ok

mm
mm
mm

ok

mm
%

ok

mm
mm

618
265
20
2
628
1.570
105.8
25.0
137.0

457
457
25
1
491
1.239
25.0
25.0
186.5

ok
ok
ok

ok

147
12
2
226
0.565
80.4
25.0

BS8110

RIGHT
0.850
73.01
65.71
239.0
900
0.1445
43.32
259.91
0.0365
227.05
26.56
34.0
0.0
0.00
0
438.1
661
0.13%
322
48.53
43.68
150
0.1457
191.00
106.67
422.5
0.36
4
438.1
486

ok

ok
ok
ok

0.26%
0
8
4
201

%
mm

mm

0.13%
322
dmid = 236.5
27.67
24.90
150
0.0830
214.42
54.62
274.3
0.00
0
438.1
265

SPAN
1.133
50.02
45.01
236.5
900
0.1558
42.42
262.41
0.0255
224.68
26.28
32.0
0.0
0.00
0
438.1
457
0.19
0.18%
83
d'mid = 38.5
12.88
11.60
150
0.0395
224.68
26.28
0.0
0.00
0
438.1
118

ok

Job No R68
1-May-14

661
486
20
2
628
1.570
105.8
25.0
137.0

Ref

-=-

3.4.4.4
Fig 3.3
-=3.4.4.4
-=-=Fig 3.3

Fig 3.3

Table 3.25

3.4.4.4
-=-=Fig 3.3

Fig 3.3

!!!
between bars
3.12.11.1
3.12.11.2.4

0.26%
32
8
4
201

ok

ok
ok

118
12
2
226
0.571
122.6
25.0

ok

ok
ok

147
16
1
201
0.502
0.0
0.0

Table 3.25

between bars
3.12.11.1

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS V
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Date

1999 BCA for RCC

Job No R68
1-May-14

SPAN 3 cont
DEFLECTION
fs
Base ratio
Tens Mod
Comp Mod
Perm L/d
Actual L/d
As req increased by

228.7
7.00
1.54
1.00
0.00
0.00
0.00

N/mm

ok
%

252.1
20.80
1.59
1.16
38.47
31.71
0.00

ok

287.3

Eqn 8
3.4.6.3/4
Table 3.10
Table 3.11
3.4.6.3
3.4.5.1

RIB SHEAR
V cl
distance from c/L
V rib
v
vc
(v-vc)bv
Link
@
for
As Dist
As' Dist

m
kN
N/mm
N/mm
N/mm
mm
mm
mm
mm
mm

REINFORCEMENT DESIGN
MAIN STEEL
b
M/m
M/rib
d
bf
K'
Web Mres
Flange Mres
K
z
x
d'
net fsc
Excess M
As' req
fst
As req
bw/b
Min %
Min As

kNm/m
kNm
mm
mm
kNm
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
%
mm

At Edge of Solid

M/m
M/rib
bf
K
z
x
net fsc
Excess M
As' req
fst
As req

56.58
1.100
35.59
0.8890
0.9345
67.0
6
175
0

kN/m

kNm/m
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm

0.0

ok

SPAN 4
- No Span 4 LEFT
0.850
73.01
65.71
-36.0
900
0.1445
0.98
5.90
1.6095
-28.77
-16.07
34.0
438.1
59.81
-1950
438.1
-2418
0.13%
0
dmid = -36.0
73.01
65.71
150
9.6570
-28.77
-16.07
438.1
64.72
-2143
438.1
-2142591112

ok
ok

NOMINAL
0.0
6
1200
3600
0
0.0

L = 0.000

61.26
0.450
48.86
1.2206
0.9345
67.0
6
175
875

3.4.5.10
Eqn 3
Table 3.8
Table 3.7
3.12.7.1
Spacing
from solid
3.4.5.5

0.0

ok

3.12.7.2

h= 0
bw = 140

SPAN
#VALUE!
~
#VALUE!
-36.0
900
#VALUE!
0.98
-121.00
#VALUE!
#VALUE!
#VALUE!
34.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.16
0.18%
0
d'mid = 36.0
73.01
65.71
150
9.6570
#VALUE!
#VALUE!
#VALUE!
64.72
#VALUE!
#VALUE!
#VALUE!

RIGHT
~
~
#VALUE!
-36.0
900
0.1558
1.06
6.36
#VALUE!
#VALUE!
#VALUE!
34.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.13%
0
73.01
65.71
150
9.6570
-27.98
-17.81
438.1
64.65
-2143
438.1
-2142591120

-=-

3.4.4.4
Fig 3.3
-=3.4.4.4
-=-=Fig 3.3

Fig 3.3

Table 3.25

3.4.4.4
-=-=Fig 3.3

Fig 3.3

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS VI
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Date

1999 BCA for RCC

Job No R68
1-May-14

SPAN 4 cont
TENSION STEEL
As deflection
As to provide
in rib
No
As prov
=%
Clear dist
Min S
Max S
Residual
Min
As resid
extra
No
As prov
COMPRESSION STEEL
Required

No
As' prov
=%
Clear dist
Min S
DEFLECTION
fs
Base ratio
Tens Mod
Comp Mod
Perm L/d
Actual L/d
As req increased by

mm
mm

ok

mm
mm

ok

%
mm

ok
ok

mm
mm

mm
mm
mm

ok

mm
mm

#VALUE!

mm
mm

ok

#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
20
#VALUE!
#VALUE!
#VALUE!
#VALUE!
25.0
#VALUE!

ok

ok
ok
ok

0.26%
0
8
5
0

%
mm

-2418
0
20
2
628
-12.467
50.8
25.0
137.0

#VALUE!

N/mm

ok
%

#VALUE!
16
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.0
7.00
0.62
1.00
0.00
0.00
0.00

#VALUE!
0
20
2
628
-12.467
50.8
25.0
137.0

#DIV/0!
between bars
3.12.11.1
3.12.11.2.4

0.26%
#VALUE!
#VALUE!
#VALUE!
#VALUE!

ok

#VALUE!
#VALUE!

#VALUE!

#VALUE!
16
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

ok

#VALUE!
#VALUE!

#VALUE!
20.80
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!

#VALUE!
16
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Table 3.25

between bars
3.12.11.1
Eqn 8
3.4.6.3/4
Table 3.10
Table 3.11
3.4.6.3
3.4.5.1

RIB SHEAR
V cl
distance from c/L
V rib
v
vc
(v-vc)bv
Link
@
for
As Dist
As' Dist

0.00
-0.036
0.00
0.0000
#VALUE!
#VALUE!
6
#VALUE!
#VALUE!

kN/m
m
kN
N/mm
N/mm
N/mm
mm
mm
mm
mm
mm

#VALUE!

#VALUE!

#VALUE!
#VALUE!

NOMINAL
0.0
6
1200
#VALUE!
#VALUE!
#VALUE!

0.00
-0.036
0.00
0.0000
#VALUE!
#VALUE!
6
#VALUE!
#VALUE!

from solid

#VALUE!

3.12.7.2

3.4.5.10
Eqn 3
Table 3.8
Table 3.7
3.12.7.1
Spacing
3.4.5.5

#VALUE!

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS VII
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

REINFORCEMENT DESIGN

SPAN 5
- No Span 5 -

MAIN STEEL
b
M/m
M/rib
d
bf
K'
Web Mres
Flange Mres
K
z
x
d'
net fsc
Excess M
As' req
fst
As req
bw/b
Min %
Min As

kNm/m
kNm
mm
mm
kNm
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm

kNm/m
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
mm
mm

ok

mm
%

ok

mm
mm
mm

ok
ok

mm
mm
mm

ok

mm
%

#VALUE!

mm
mm

ok

#VALUE!
#VALUE!
#VALUE!

#VALUE!

#VALUE!
16
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

BS8110

SPAN
#VALUE!
~
#VALUE!
-38.5
900
#VALUE!
1.21
-124.52
#VALUE!
#VALUE!
#VALUE!
32.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.16
0.18%
0
d'mid = 38.5
0.00
0.00
150
0.0000
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!

RIGHT
~
~
#VALUE!
-34.0
900
0.1558
0.95
5.67
#VALUE!
#VALUE!
#VALUE!
36.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
25
#VALUE!
#VALUE!
#VALUE!
#VALUE!
25.0
#VALUE!

#VALUE!
0
16
2
402
-8.448
59.2
25.0
137.0

0.13%
0
0.00
0.00
150
0.0000
-32.30
-3.78
438.1
0.00
0
438.1
0

ok

ok
ok
ok

0.26%
#VALUE!
#VALUE!
#VALUE!
0

%
mm

mm

#VALUE!
0
20
2
628
-12.467
50.8
25.0
137.0

Job No R68
1-May-14

h= 0
bw = 140

0.13%
0
dmid = -38.5
0.00
0.00
150
0.0000
-34.20
-4.00
438.1
0.00
0
438.1
0

%
mm

mm

L = 0.000

LEFT
~
~
#VALUE!
-36.0
900
0.1558
1.06
6.36
#VALUE!
#VALUE!
#VALUE!
34.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

At Edge of Solid

M/m
M/rib
bf
K
z
x
net fsc
Excess M
As' req
fst
As req
TENSION STEEL
As deflection
As to provide
in rib
No
As prov
=%
Clear dist
Min S
Max S
Residual
Min
As resid
extra
No
As prov
COMPRESSION STEEL
Required

No
As' prov
=%
Clear dist
Min S

Date

1999 BCA for RCC

Ref

-=-

3.4.4.4
Fig 3.3
-=3.4.4.4
-=-=Fig 3.3

Fig 3.3

Table 3.25

3.4.4.4
-=-=Fig 3.3

Fig 3.3

between bars
3.12.11.1
3.12.11.2.4

0.26%
#VALUE!
#VALUE!
#VALUE!
#VALUE!

ok

#VALUE!
#VALUE!

#VALUE!
12
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

ok

#VALUE!
#VALUE!

#VALUE!
20
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Table 3.25

between bars
3.12.11.1

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS VII
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Date

1999 BCA for RCC

Job No R68
1-May-14

SPAN 5 cont
DEFLECTION
fs
Base ratio
Tens Mod
Comp Mod
Perm L/d
Actual L/d
As req increased by

N/mm

ok
%

#VALUE!
7.00
#VALUE!
1.00
0.00
0.00
0.00

#VALUE!

#VALUE!
20.80
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!

#VALUE!

Eqn 8
3.4.6.3/4
Table 3.10
Table 3.11
3.4.6.3
3.4.5.1

RIB SHEAR
V cl
distance from c/L
V rib
v
vc
(v-vc)bv
Link
@
for
As Dist
As' Dist

m
kN
N/mm
N/mm
N/mm
mm
mm
mm
mm
mm

REINFORCEMENT DESIGN
MAIN STEEL
b
M/m
M/rib
d
bf
K'
Web Mres
Flange Mres
K
z
x
d'
net fsc
Excess M
As' req
fst
As req
bw/b
Min %
Min As

kNm/m
kNm
mm
mm
kNm
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
%
mm

At Edge of Solid

M/m
M/rib
bf
K
z
x
net fsc
Excess M
As' req
fst
As req

0.00
-0.036
0.00
0.0000
#VALUE!
#VALUE!
6
#VALUE!
#VALUE!

kN/m

kNm/m
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm

#VALUE!

#VALUE!

#VALUE!
#VALUE!

SPAN 6
- No Span 6 LEFT
~
~
#VALUE!
-34.0
900
0.1558
0.95
5.67
#VALUE!
#VALUE!
#VALUE!
36.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.13%
0
dmid = -34.0
0.00
0.00
150
0.0000
-32.30
-3.78
438.1
0.00
0
438.1
0

NOMINAL
0.0
6
1200
#VALUE!
#VALUE!
#VALUE!

0.00
-0.034
0.00
0.0000
#VALUE!
#VALUE!
6
#VALUE!
#VALUE!

from solid

#VALUE!

3.12.7.2

3.4.5.10
Eqn 3
Table 3.8
Table 3.7
3.12.7.1
Spacing
3.4.5.5

#VALUE!

L = 0.000

h= 0
bw = 140

SPAN
#VALUE!
~
#VALUE!
-34.0
900
#VALUE!
0.95
-118.19
#VALUE!
#VALUE!
#VALUE!
32.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.16
0.18%
0
d'mid = 34.0
0.00
0.00
150
0.0000
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!

BS8110

RIGHT
~
kNm/m
#VALUE!
-32.0
900
0.1558
0.84
5.02
#VALUE!
#VALUE!
#VALUE!
34.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.13%
0
0.00
0.00
150
0.0000
-30.40
-3.56
438.1
0.00
0
438.1
0

Ref

-=-

3.4.4.4
Fig 3.3
-=3.4.4.4
-=-=Fig 3.3

Fig 3.3

Table 3.25

3.4.4.4
-=-=Fig 3.3

Fig 3.3

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS IX
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Date

1999 BCA for RCC

Job No R68
1-May-14

SPAN 6 cont
TENSION STEEL
As deflection
As to provide
in rib
No
As prov
=%
Clear dist
Min S
Max S
Residual
Min
As resid
extra
No
As prov
COMPRESSION STEEL
Required

No
As' prov
=%
Clear dist
Min S
DEFLECTION
fs
Base ratio
Tens Mod
Comp Mod
Perm L/d
Actual L/d
As req increased by

mm
mm

ok

mm
mm

ok

%
mm

ok
ok

mm
mm

mm
mm
mm

ok

mm
mm

#VALUE!

mm
mm

ok

#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
16
#VALUE!
#VALUE!
#VALUE!
#VALUE!
25.0
#VALUE!

ok

ok
ok
ok

0.26%
#VALUE!
#VALUE!
#VALUE!
0

%
mm

#VALUE!
0
16
2
402
-8.448
59.2
25.0
137.0

#VALUE!

N/mm

ok
%

#VALUE!
20
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
7.00
#VALUE!
1.00
0.00
0.00
0.00

#VALUE!
0
12
2
226
-5.049
67.6
25.0
137.0

between bars
3.12.11.1
3.12.11.2.4

0.26%
#VALUE!
#VALUE!
#VALUE!
#VALUE!

ok

#VALUE!
#VALUE!

#VALUE!

#VALUE!
12
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

ok

#VALUE!
#VALUE!

#VALUE!
20.80
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!

#VALUE!
16
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Table 3.25

between bars
3.12.11.1
Eqn 8
3.4.6.3/4
Table 3.10
Table 3.11
3.4.6.3
3.4.5.1

RIB SHEAR
V cl
distance from c/L
V rib
v
vc
(v-vc)bv
Link
@
for
As Dist
As' Dist

0.00
-0.034
0.00
0.0000
#VALUE!
#VALUE!
6
#VALUE!
#VALUE!

kN/m
m
kN
N/mm
N/mm
N/mm
mm
mm
mm
mm
mm

#VALUE!

#VALUE!

#VALUE!
#VALUE!

NOMINAL
0.0
6
1200
#VALUE!
#VALUE!
#VALUE!

0.00
-0.032
0.00
0.0000
#VALUE!
#VALUE!
6
#VALUE!
#VALUE!

from solid

#VALUE!

3.12.7.2

3.4.5.10
Eqn 3
Table 3.8
Table 3.7
3.12.7.1
Spacing
3.4.5.5

#VALUE!

Project
Location

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

GRAPH DATA I

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Made by rmw Job No R68


Date
1-May-14

1999 BCA for RCC

LOADING DIAGRAM
Beam
Supports
UDL's
Dead
Imposed
PL's
Dead
Imposed

0
0
0
-5.0463
0
0
6.4302
0.45
10.43
18.93

21
0
0
0
0
6.43
10.43
0.45
18.93
19.93

-5.0463

6.5
6.4302
10.43

6.5
-5.0463
6.5
0
6.4302
0
10.43
10.43

6.5
0
6.5
6.69
10.69
0
10.43
10.43

0.975
-34.629
-38.351
-11.537
0
-35.831
-37.521
-10.634
-8.076
-26.845
-37.521
0
0

1.3
-40.894
-45.855
-12.749
0
-42.496
-44.749
-11.545
-8.9246
-32.099
-44.749
0
0

13.5
6.6851
10.685

13.5
-5.0463
13.5
0
6.6851
7.95
10.685
19.185

13.5
0
13.5
6.32
10.32
7.95
19.19
20.19

21
6.3233
10.323

21
-5.0463
21
0
6.3233
6.5
10.685
10.685

21
0
21
0.00
0.00
6.5
10.69
10.69

21
0
0

21
-5.0463
21
0
0
13.5
10.323
10.323

21
0
21
0.00
0.00
13.5
10.32
10.32

21
0
0

21
-5.0463
21
0
0
13.5
10.323
10.323

21
0
21
0.00
0.00
13.5
10.32
10.32

21
0
0

21
-5.0463
21
0
0
21
0
0

21
0

21
0.00
0.00

21
0
0

21
0.00
0.00

MOMENT DIAGRAMS
SPAN 1
X
M(e) all
M(e) odd
M(e) even
Beam
M(r) all
M(r) odd
M(r) even
70% max
70% min
Lower bound
Upper bound
Beam

Edge of solid

0
0
0
0
0
0
0
0
0
0
0
0
0

0.325
-15.532
-16.773
-6.0124
0
-15.933
-16.496
-5.7113
-4.2087
-11.741
-16.496
0
0

0.65
-26.738
-29.219
-9.6456
0
-27.539
-28.666
-9.0434
-6.7519
-20.453
-28.666
0
0

1.625
-45.531
-51.733
-13.283
0
-47.535
-50.35
-11.777
-9.2978
-36.213
-50.35
0
0

1.95
-48.542
-55.984
-13.137
0
-50.946
-54.325
-11.33
-9.1956
-39.189
-54.325
0
0

2.275
-49.926
-58.609
-12.311
0
-52.73
-56.672
-10.204
-8.6179
-41.026
-56.672
0
0

2.6
-49.683
-59.606
-10.807
0
-52.888
-57.393
-8.398
-7.5648
-41.724
-57.393
0
0

2.925
-47.813
-58.976
-8.6233
0
-51.419
-56.487
-5.9132
-6.0363
-41.284
-56.487
0
0

3.25
-44.316
-56.72
-5.7605
0
-48.322
-53.954
-2.7493
-4.0323
-39.704
-53.954
0
0

3.575
-39.192
-52.837
-2.2185
0
-43.599
-49.794
1.0938
-1.5529
-36.986
-49.794
1.0938
0

3.9
-32.442
-47.327
2.0027
0
-37.25
-44.007
5.6161
1.4019
-33.129
-44.007
5.6161
0

4.225
-24.064
-40.19
6.9031
0
-29.273
-36.594
10.818
4.8322
-28.133
-36.594
10.818
0

4.55
-14.06
-31.426
12.483
0
-19.669
-27.553
16.698
8.7379
-21.998
-27.553
16.698
0

4.875
-2.4291
-21.035
18.741
0
-8.4388
-16.886
23.258
13.119
-14.725
-16.886
23.258
0

5.2
10.829
-9.0176
25.679
0
4.4185
-4.5919
30.497
17.976
-6.3123
-6.3123
30.497
0

5.525
25.714
4.6268
33.296
0
18.903
9.3291
38.415
23.308
3.2388
0
38.415
0

5.85
42.225
19.898
41.593
0
35.014
24.877
47.013
29.558
13.929
0
47.013
0

6.175
60.364
36.796
50.568
0
52.752
42.052
56.289
42.255
25.757
0
56.289
0

6.5
80.129
55.321
60.223
0
72.117
60.853
66.245
56.091
38.725
0
72.117
0

0.45
5.4
-21.073 19.796
-22.791 -0.8136
-8.144 30.286

0
6.5
80.129
55.321
60.223
0
72.117
60.853
66.245
56.091
38.725
0
72.117
0

0.35
6.85
57.455
44.544
37.885
0
49.842
49.799
43.606
40.218
26.519
0
49.842
0

0.7
1.05
1.4
1.75
2.1
7.2
7.55
7.9
8.25
8.6
36.71 17.897 1.0133 -9.8895 -18.187
34.585 25.445 17.124 12.172 8.4635
17.477 -1.0005 -17.547 -28.114 -36.075
0
0
0
0
0
29.499 11.086 -5.397 -15.899 -23.796
39.564 30.147 21.549 16.321 12.336
22.897 4.1185 -12.73 -23.597 -31.859
25.697 17.811 11.987 8.5201 5.9244
12.234 -0.7004 -12.283 -19.68 -25.252
0
-0.7004 -12.73 -23.597 -31.859
39.564 30.147 21.549 16.321 12.336
0
0
0
0
0

2.45
8.95
-24.554
5.5742
-42.105
0
-29.762
9.1701
-38.191
3.9019
-29.474
-38.191
9.1701
0

2.8
9.3
-28.99
3.5039
-46.205
0
-33.798
6.8231
-42.592
2.4527
-32.343
-42.592
6.8231
0

3.15
9.65
-31.496
2.2525
-48.374
0
-35.903
5.2951
-45.062
1.5767
-33.862
-45.062
5.2951
0

3.5
10
-32.071
1.82
-48.613
0
-36.078
4.586
-45.602
1.274
-34.029
-45.602
4.586
0

3.85
10.35
-30.716
2.2064
-46.922
0
-34.322
4.6958
-44.212
1.5445
-32.845
-44.212
4.6958
0

4.2
10.7
-27.43
3.4117
-43.3
0
-30.636
5.6246
-40.891
2.3882
-30.31
-40.891
5.6246
0

4.55
11.05
-22.214
5.436
-37.747
0
-25.019
7.3723
-35.639
3.8052
-26.423
-35.639
7.3723
0

4.9
11.4
-15.068
8.2792
-30.264
0
-17.472
9.9388
-28.457
5.7954
-21.185
-28.457
9.9388
0

5.25
11.75
-5.9907
11.941
-20.851
0
-7.9939
13.324
-19.345
8.3589
-14.595
-19.345
13.324
0

5.6
12.1
5.0169
16.422
-9.5065
0
3.4143
17.529
-8.3021
11.496
-6.6546
-8.3021
17.529
0

5.95
12.45
17.955
21.722
3.768
0
16.753
22.552
4.6713
15.206
2.6376
0
22.552
0

6.3
12.8
32.823
27.841
18.973
0
32.022
28.394
19.575
22.976
13.281
0
32.022
0

6.65
13.15
49.623
34.779
36.108
0
49.222
35.056
36.41
34.736
24.345
0
49.222
0

7
1.1
5.9
13.5
68.352 15.367 15.988
42.536 24.206 20.915
55.174 -3.4825 1.7534
0
68.352 8.6128 14.729
42.536 28.869 21.784
55.174 1.5934 2.6998
47.846 16.944 14.641
29.775 -2.4378 1.2274
0
68.352 28.869 21.784
0

0
13.5
68.352
42.536
55.174
0
68.352
42.536
55.174
47.846
29.775
0
68.352
0

0.375
13.875
48.208
24.327
44.811
0
48.208
23.683
44.938
33.746
17.029
0
48.208
0

0.75
14.25
30.209
8.2629
35.338
0
30.209
6.9745
35.591
24.736
5.784
0
35.591
0

1.125
1.5
1.875
2.25
2.625
14.625
15
15.375 15.75 16.125
14.355 0.6454 -10.919 -20.339 -27.613
-5.6562 -17.43 -27.06 -34.544 -39.883
26.753 19.058 12.252 6.335 1.3074
0
0
0
0
0
14.355 0.6461 -10.918 -20.337 -27.612
-7.5887 -20.007 -30.28 -38.409 -44.393
27.133 19.564 12.884 7.094 2.1929
18.727 13.341 8.5763 4.4345 0.9152
-3.9593 -12.201 -18.942 -24.181 -27.918
-7.5887 -20.007 -30.28 -38.409 -44.393
27.133 19.564 12.884 7.094 2.1929
0
0
0
0
0

3
16.5
-32.743
-43.078
-2.831
0
-32.741
-48.231
-1.819
-1.9817
-30.154
-48.231
0
0

3.375
16.875
-35.728
-44.127
-6.0802
0
-35.726
-49.925
-4.9417
-4.2562
-30.889
-49.925
0
0

3.75
17.25
-36.567
-43.032
-8.4402
0
-36.566
-49.474
-7.1752
-5.9081
-30.123
-49.474
0
0

4.125
17.625
-35.262
-39.792
-9.911
0
-35.261
-46.878
-8.5195
-6.9377
-27.854
-46.878
0
0

4.5
18
-31.813
-34.407
-10.493
0
-31.81
-42.137
-8.9745
-7.3448
-24.085
-42.137
0
0

4.875
18.375
-26.218
-26.877
-10.185
0
-26.215
-35.251
-8.5403
-7.1294
-18.814
-35.251
0
0

5.25
18.75
-18.478
-17.202
-8.988
0
-18.476
-26.22
-7.217
-6.2916
-12.935
-26.22
0
0

5.625
19.125
-8.5934
-5.3822
-6.9019
0
-8.5908
-15.045
-5.0044
-3.7675
-6.0154
-15.045
0
0

6
19.5
3.4362
8.5825
-3.9266
0
3.4389
-1.7243
-1.9025
6.0078
-2.7486
-2.7486
6.0078
0

6.375
19.875
17.611
24.692
-0.062
0
17.614
13.741
2.0885
17.284
-0.0434
-0.0434
17.614
0

6.75
20.25
33.93
42.947
4.6917
0
33.933
31.351
6.9687
30.063
3.2842
0
33.933
0

7.125
20.625
52.394
63.346
10.335
0
52.397
51.107
12.738
44.342
7.2343
0
52.397
0

7.5
1.1
7.05
21
73.003 15.345 48.53
85.89
-4.795 59.095
16.867 27.298 9.135
0
73.007 15.345 48.533
73.007 -6.6845 46.984
19.397 27.669 11.513
60.123 19.109 41.366
11.807 -3.3565 6.3945
0
73.007 27.669 48.533
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

-21.628
-22.408
-7.7271
-5.7008
-15.954

13.139
3.7823
35.29
21.201
-0.5695

35.29

SPAN 2
Local X
X
M(e) all
M(e) odd
M(e) even
Beam
M(r) all
M(r) odd
M(r) even
70% max
70% min
Lower bound
Upper bound
Beam

SPAN 3
Local X
X
M(e) all
M(e) odd
M(e) even
Beam
M(r) all
M(r) odd
M(r) even
70% max
70% min
Lower bound
Upper bound
Beam

SPAN 4
Local X
X
M(e) all
M(e) odd
M(e) even
Beam
M(r) all
M(r) odd
M(r) even
70% max
70% min
Lower bound
Upper bound
Beam

225675912.xls.ms_office

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

1:41 AM

5/1/2014

0
21
0
0
0
0
0
0
0
0
0
0
0
0

73.003
85.89
16.867

73.003
85.89
16.867

73.007
73.007
19.397
60.123
11.807

73.007
73.007
19.397
60.123
11.807

73.007

73.007

21
0
0

21
0.00
0.00

21
0
0

21
0.00
0.00

21
0
0

21
0.00
0.00

21
0
0

Project
Location

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

GRAPH DATA II

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Made by rmw Job No R68


Date
1-May-14

1999 BCA for RCC

SPAN 5
Local X
X
M(e) all
M(e) odd
M(e) even
Beam
M(r) all
M(r) odd
M(r) even
70% max
70% min
Lower bound
Upper bound
Beam

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

0
0
0

0
0
0
0
0

0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

0
0
0

0
0
0
0
0

0
0
0
0
0

0.45
0.45
43.364
47.181
16.651
44.597
46.33
15.724
15.724
46.33
0

0.45
0.45
29.864
33.681
8.151
31.097
32.83
7.2245
7.2245
32.83
0

0.45
0.45
29.864
33.681
8.151
31.097
32.83
7.2245
7.2245
32.83
0

0.45
0.45
29.864
33.681
8.151
31.097
32.83
7.2245
7.2245
32.83
0

6.5
6.5
-63.32
-59.503
-30.752
-62.087
-60.354
-31.678
-62.087
-31.678
0

0
6.5
67.543
31.964
66.582
66.398
32.754
67.442
32.754
67.442
0

1.45
7.95
44.692
22.27
43.731
43.547
23.06
44.591
23.06
44.591
0

1.45
7.95
31.192
13.77
30.231
30.047
14.56
31.091
14.56
31.091
0

1.45
7.95
31.192
13.77
30.231
30.047
14.56
31.091
14.56
31.091
0

1.45
7.95
31.192
13.77
30.231
30.047
14.56
31.091
14.56
31.091
0

7
13.5
-56.271
-23.332
-57.232
-57.415
-22.542
-56.372
-57.415
-22.542
0

0
13.5
56.577
51.417
28.82
56.577
53.135
28.483
28.483
56.577
0

0
13.5
56.577
51.417
28.82
56.577
53.135
28.483
28.483
56.577
0

0
13.5
56.577
51.417
28.82
56.577
53.135
28.483
28.483
56.577
0

0
13.5
56.577
51.417
28.82
56.577
53.135
28.483
28.483
56.577
0

0
13.5
56.577
51.417
28.82
56.577
53.135
28.483
28.483
56.577
0

7.5
21
-57.818
-62.978
-18.605
-57.818
-61.26
-18.942
-61.26
-18.942
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

13.5
-59.616

13.5
85.89

21
-59.616

21
85.89

21
-59.616

21
85.89

21
-59.616

21
85.89

21
-59.616

21
85.89

SPAN 6
Local X
X
M(e) all
M(e) odd
M(e) even
Beam
M(r) all
M(r) odd
M(r) even
70% max
70% min
Lower bound
Upper bound
Beam

SHEAR FORCE DIAGRAMS


SPAN 1
Local X
X
V(e) all
V(e) odd
V(e) even
V(r) all
V(r) odd
V(r) even
Lower bound
Upper bound
Beam
GRIDS

0
0
0
0
0
0
0
0
0
0
0

0
0
50.295
54.112
19.545
51.528
53.261
18.618
18.618
53.261
0

6.5
-59.62

6.5
85.89

225675912.xls.ms_office

SPAN 2

SPAN 3

1:41 AM

SPAN 4

5/1/2014

0
21
0
0
0
0
0
0
0
0
0

SPAN 5

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

SPAN 6

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

Made by rmw

Job No R68
1-May-14

21
0.00
0.00

225675912.xls.ms_office

1:41 AM

5/1/2014

Made by rmw

Job No R68
1-May-14

SPAN 6

0
21
0
0
0
0
0
0
0
0
0

225675912.xls.ms_office

1:41 AM

5/1/2014

Disclaimer
All advice or information from the British Cement Association and/or Reinforced Concrete
Council is intended for those who will evaluate the significance and limitations of its contents
and take responsibility for its use and application. No liability (including that for negligence)
for any loss resulting from such advice or information is accepted by the BCA, RCC or their
subcontractors, suppliers or advisors. Users should note that all BCA software and
publications are subject to revision from time to time and should therefore ensure that they
are in possession of the latest version.
This spreadsheet should be used in compliance with the accompanying publication
'Spreadsheets for concrete design to BS 8110 & EC2' available from British Cement
Association, Telford Avenue, Crowthorne, Berkshire RG45 6YS.

Status of spreadsheet
Public release version.
Revision history RCC32 Ribbed Slabs (A & D)

Date

Version

04-Aug-99 RCC32 v1.0

Action

Size (kB)

First public release.


Includes b version comments

761

Das könnte Ihnen auch gefallen