YEAR % HEADING TOPIC DETAIL Sl.

No
04 30 Bridge Regirdering A 0.61m span arch bridge is required to be replaced with an RCC slab. This
work is required to be carried out by the provision of service girder . The
height of the bank is 3m. It is a single line track. Narrate the steps required
to be carried out including the imposition of temporary speed restriction.
Cross section of the temporary arrangement should be drawn.
1
04 30 Civil Concrete water - cement ratio 2
04 30 Civil Hydraulics Draw a sketch of venturimeter and establish the formula of total discharge
through different diameters
3
04 30 Civil Hydraulics a 20 mm diameter pipe is required to be connected with a 25 mm diametetr
pipeline for distribution of water . The flow will be from 25mm dia . Pipe
towards 20mm dia. Pipe. The velocity of water in the 25mm dia pipeline is 1
m/s. Calculate the velocity of water in the 20mm dia. pipe
4
04 30 Civil RCC design an RCC footing supporting 20t vertical load. The load includes the
self weight of the column. The self weight of the footing is required to be
added to find out the total load on the soil . The bearing capacityof the soil is
1t/m3 . The size of the column will be 300x300mm. Calculate the size of the
footing , thickness of the footing as well as the distribution of the
reinforcement bars. The allowable tensile stress of the reinforcement bars
can be taken as 2100kg/cm2. Grade of concrete may be taken as M-20. The
cover may be taken as 50 mm
5
04 30 Civil RCC the following sketch shows a cantilever slab and a cotinuous RCC beam.
Make out the layout of the main reinforcement bars as well as distribution
bars for beams, stirrups also to be shown. Development length to be
assumed. The bars should be shown in the cross section as given below
6
04 30 Civil RCC
figure
7
04 30 Civil RCC define the one way and two way slabs in the RCC structure . Draw a layout (
both in plan and cross section) of the main reinforcement bars and
distribution bars in a typical one way slab and two way slab
8
04 30 Civil SM Hooks law
9
04 30 Civil SM Draw the shear force and bending moment diagram indicating the values for
the following loading arrangements.
10
04 30 Civil SM
figure
11
04 30 Civil SM calculate the size of the weld required for the welded bracket loaded as
shown in the figure given below. Assume allowable shear stress in the weld
as 1025kg/cm2
12
04 30 Civil SM
figure
13
04 30 Civil Soil optimum moisture content 14
04 30 Civil Soil Active and passive earth pressure 15
04 30 Civil Soil standard penetration test 16
04 30 Civil Steel What will be the diameter of a rivet hole for a 20mm dia. Rivet 17
04 30
Contract
list of approved contractors 18
04 30
Contract
security deposit 19
04 30
Contract
earnest money 20
THIS QUESTION BANK CONSISITS OF LDCE 30% AND 70% FOR THE SELECTION OF ADEN/AXEN FROM
Group 'C' CIVIL ENGINEERS. FOR THE YEAR 1991 to 2005.
04 30
Contract
standing earnest money 21
04 30
Contract
delayed and late tenders 22
04 30
Contract
measurement book 23
04 30
Contract
Define works contract . How many types of works contract are entered into
by engineering department. Narrate briefly each type of works contract 24
04 30
Contract
Define open tenders , limited tenders and single tenders 25
04 30 Establish write short notes on IR in the context of industrial relations and disputes. 26
04 30 Establish What is hours of employment. Give two examples of each category of staff
in the engineering department under HOER.
27
04 30 Establish Explain briefly the procedure to be followed in case of death ( on duty)of a
Gr. 'D' staff of engineering department . What benefits his nominee is
entitled.
28
04 30 Establish write down the eligibility criteria for privilege pass as per their salary. Give
the details of dependents of railway employees who can be included in the
priviege passes
29
04 30 Establish PREM 30
04 30 Establish Assumed period 31
04 30 Establish service record 32
04 30 Establish LAP
33
04 30 Establish LHAP 34
04 30 Establish Important features of workmen's compensation act . Also indicate the time
limit for entertaining any claim
35
04 30 Establish indicate the percentage of reservation applicable for SC & ST candidates 36
04 30 Finance primary unit -32 37
04 30 Finance SRSF 38
04 30 General List out the works requiring the sanction of commissioner of railway safety
39
04 30 General How many types of estimates are prepared in engineering department .
narrate briefly the function of each type of estimate
40
04 30 General Narrate the different steps involved in preperation of preliminary works
programme and final works programme
41
04 30 General Illustrate atleast five plan heads which are generally included in the works
programme.
42
04 30 GK at present how many railway zones are available also specify the name of
the zones as well as their headquarters
43
04 30 GRS A 30kmph temporary speed restriction has been imposed on track due to
some repair. Draw a sketch showing the position of the engineering
indicators and their inter distances
60
04 30 GRS Size of a caution indicator .Dimension to be given in mm. 61
04 30 OLIC which part of the constitution cotains the provision regarding official
language
62
04 30 OLIC when hindi day is celebrated 63
04 30 OLIC there are three regions as per the provisions made in the official language
rule. Name the regions
64
04 30 OLIC in which region tamilnadu is situated 65
04 30 OLIC what are the places where hindi and english should be used. 66
04 30 OLIC write the following phrases in hindi 67
04 30 OLIC approved 68
04 30 OLIC sanctioned 69
04 30 OLIC what is the position 70
04 30 OLIC seen. Thanks 71
04 30 OLIC please speak 72
04 30 P.Way Ballast Impact value (max.) as an accepted criteria of track ballast. 73
04 30 P.Way Bridge Centre to centre distance of channel sleepers in a girder bridge 74
04 30 P.Way Curve Criteria for realignment of curve 75
04 30 P.Way Curve calculate the super-elevation , maximum permissible speed and transition
length for a 2" curve on a BG section having MPS of 130kmph . Assume the
equilibrium speed as 90 kmph and the booked speed of goods train as
60kmph
76
04 30 P.Way Curve Transition curve 77
04 30 P.Way Curve Establish the relationship between radius at curvature , chord and versine .
Calculate the versine in centimetres of 1degree curve measured on a 20m
chord. If the degree of curvature is not known then the same can be found
out by measuring the versine by a specific chord length
78
04 30 P.Way Curve A 1 IN 12 cross over is required to be laid between two parallel track of 5m
track centre. Calculate the distance between TNV to TNC along with the
cross over as well as along the straight . Show these distances after drawing
a sketch.
79
04 30 P.Way Diversion for construction of a new bridge in replacement of a distressed bridge a
semi permanent diversion is required to be laid at site. Draw the layout of
the said diversion. The distance between the running track and the
proposed diversion may be taken as 'D'. There should be a straight portion
('C') between the two reverse curves. Also furnish the formula for calculation
of the total length of the diversion as per the dimensions mentioned above.
80
04 30 P.Way Duties Illustrate the duties of AEN in open line organization as enumerated in
IRPWM
81
04 30 P.Way LC draw a protection diagram of track on a double line section when one of the
double line track is infringed at a level crossing . Also narrate the actions to
be taken by the gatekeeper for protection of track.
82
04 30 P.Way LC List out the essential equipments in a 'B' class level crossing. 83
04 30 P.Way LC minimum distance of level crossing gate lodge from central line of nearest
track
84
04 30 P.Way LWR Switch expansion joint 85
04 30 P.Way LWR Illustrate the steps and procedures for destressing a LWR track in BG .The
duration of the traffic block is 2 1/2 hours. Please furnish the break-up of
each activity vis--vis the time required.
86
04 30 P.Way Rail Glued joint 87
04 30 P.Way Rail percentage of loss in section in a 52 kg rail due for replacement 88
04 30 P.Way Rail Frequency of ultrasonic testing for a route less than 15 GMT 89
04 30 P.Way Renewal Criteria for rail renewal on BG 90
04 30 P.Way Renewal Number od sleepers per KM in Gr. 'A' route having traffic density more than
20 GMT
91
04 30 P.Way TM Design mode of tamping 92
04 30 P.Way TM Number of tamping types in a CSM track machine 93
04 30 P.Way TRC Track geometry index 94
04 30 SOD Minimum and maximum clearances (in mm) of check rail at level crossing
95
04 30 SOD Minimum horizontal distances (in mm) from centre of track to any structure
96
04 30 SOD Horizontal distances(max & min in mm) from centre of track to face of
passenger platform coping
97
04 30 SOD Height (max & min in mm) above rail level for high level passenger platform
98
04 30 SOD Minimum horizontal distance (in mm) from centre line of track to any
isolated structure or any building at platform level
99
04 30 SOD Clearance of wing rail ( max & min in mm) at nose of crossing 100
04 30 SOD value of a throw a switch at the toe of switch 101
04 30 Stores materials at site account 102
94 70 Bridge Girder work PSC girder cast in yd and transport - M450 - post tensioning - precautions &
quality control measures
103
94 70 Bridge Grouting cement grouting f crack in masonry abutment of br. - alternate remedial
measure?
104
94 70 Bridge Painting steel girder painting - stages involved, quality control to execute under tfc.?
105
94 70 Bridge Regirdering change cracked bed block, regirdering 4x12.2m plate girder br. How to
organise, carry out. Sketch stage arrangement
106
93 70 Bridge Regirdering 3 m span arch br- rain fall 325mm - rebuilt by 1x 6m PSC slab br. -
procedure under tfc.
107
93 70 Bridge Regirdering new rob in water stagnation area, deposit terms, soil alluvial & rock at 20m
depth below ground, type of foundation? , ketch sub structure & decking
arrangement. Clearances in ohe area? , temp. arrangements?
108
92 70 Bridge Regirdering temp arrangement for rebuilding a br 109
93 70 Bridge how waterway determined for rebuilding br damaged in unprecedented flow.
110
93 70 Bridge how waterway determined for rebuilding br damaged in unprecedented flow.-
catchment area 80 sq km - 50 yr 24 hr rainfall intensity is 200 mm
111
93 70 Bridge procedure - epoxy grouting in crack of abutment in arch br. 112
93 70 Bridge psc girder br inspn- records to be maintained 113
93 70 Bridge bearings 114
91 70 Bridge metalising of plate girders 115
91 70 Bridge Discribe in detailsa the procedure for fabricating and erecting pre stressed
concrete girders
116
05 70 Bridge What is the speed restriction required for RCC Jacketing below bed level for
a bridge
117
05 70 Bridge jacketting of acrh bridge 118
05 70 Bridge MBG loading 119
05 70 Bridge Draw a sketch of a centralised bearing in girder bridges ? What is the
advantage over the normal PB plate bearings
120
05 70 Bridge Define major and minor bridge 121
92 70 Civil Concrete controlled concrete 122
92 70 Civil Concrete limit state design 123
91 70 Civil Concrete 1 Limit state design 124
91 70 Civil Concrete 4 Specification for cement 125
91 70 Civil Concrete 7Controlled concrete 126
05 70 Civil Concrete after how many days of casting the concrete cubes are tested 127
05 70 Civil Concrete wateer cement ratio of concrete 128
93 70 Civil Concrete limit state design 129
94 70 Civil Materails functions of retarder, superplastisizer, curing compound, water proofing
compound
130
92 70 Civil Materails quick setting cement 131
93 70 Civil RCC column 60 x 60 cm, overall load 60000kg, bm 300000kg cm, bearing
capacity of soil 20 t/sq m, sketch footing and rcc details
132
93 70 Civil RCC design beam - 1500 kg/m udl-span 10m-width 50cm-depth 75cm-m200
concrete
133
92 70 Civil RCC design slab of room 5 m x 3 m - m150 - draw reinforcement detail - m150 -
lods as residential bldgs
134
91 70 Civil RCC Design a lab for a room of 5mx3m and draw the reinforcement shedule .Use
concrete M15 Assume load for the residential building.?
135
05 70 Civil RCC Design a slab supported on all the 4 sides size 3.5m x 4m.Give a sketch
both cross sectiopn and in plan Showing the reinforcement details 136
94 70 Civil RCC design reaining wall ht of fill 6m, surcharge load for two lane road to class A
loading. Sketch c/s.
137
94 70 Civil RCC bcentral beam of roof slab 3m x 10m with cross beam at 2.5 m c/c. sketch
reinforcement and drainage arrangement at slab
138
94 70 Civil RCC limit state design 139
94 70 Civil RCC col. 50 cm square, load 200t- fs 1000 kg/cm2 fc 60kg/cm2- c/s area of
longi. Reinforcement? 1/m = 18 sketch longi & latreal reinforcement
140
93 70 Civil RCC first flor slab, of size 24m x 3.6m, dimensions of structural members using
m200 concrete. Assume loads, prepare bar bending schedule
141
93 70 Civil Sewage colony 2000 houses - no under ground sewr availble - design & sketch
sewage arrangement of colony
142
91 70 Civil SM 2 Modulus of resilience 143
05 70 Civil SM What will be the bending moment at the centr of 4m span beam carrying udl
of 4t/m.Beam is a simoply supported beam
144
93 70 Civil Soil sketch founds of double storey bldg to be constructed on black cotton soil
145
92 70 Civil Soil sketch hollow br pier resting on single circular well founds-dia 15m-depth
32m- mark important parts
146
91 70 Civil Soil write briefly on the various foundations adopted for bridges 147
91 70 Civil Soil caisson foundation 148
91 70 Civil Soil Draw a sketch of a hollow bridge pier resting on a single circular well
foundation Dia 15m, depth 32m.Indicate brief diamensions for the important
parts?
149
91 70 Civil Soil liquid limit, plastic limit, plasticity index 150
05 70 Civil Soil plate load test of soil 151
94 70 Civil Soil pile large bored pile 1000mm dia drilled usung dentonite-precautions for
sound pile free from intrusions,disontinuitie in under ground structures -soil
sulphur high, water table 6' below G.L.
152
94 70 Civil Soil types of founds for bldgs. Sketch found for 6mtall pier on oile found to carry
sinle line bg & second line also.
153
05 70 Civil Steel what will the rivet hole dia for 20mm dia rivet 154
05 70 Civil Steel what ISMC section used for channel sleeper 155
05 70 Civil Steel Butt weld and fillet weld 156
93 70 Civil Survey fundamental axes of levelling inst? Relation bet them during per
adjustment?
157
93 70 Civil Survey Inst. Bet A &B-reading at A & B 4.9 & 4.72, Inst. At B-reading at A & B 4.8 &
4.56, what is reading at A in second case to make line of sight horizontal 158
92 70 Civil Survey list theper. Adjustment of theodolite & why reqd 159
92 70 Civil Survey fundamental axes of levelling inst? Relation bet them during per
adjustment?
160
92 70 Civil Survey Inst. Bet A &B-reading at A & B 4.9 & 4.72, Inst. At B-reading at A & B 4.8 &
4.56, what is reading at A in second case to make line of sight horizontal 161
91 70 Civil Survey What are the permanent adjustment of transit theodolite? Explain why
adjustments are
required to be made ?
162
91 70 Civil Survey 5 contours 163
94 70 Civil Survey back ray method of resection in plane table survey 164
93 70 Civil Survey What are the permanent adj of a transit theodolite,explain the object & need
for each adjustment
165
93 70 Civil Survey In order to ascertain the elevation of the top of the signal on a hill the
following observation s were made from 2 instrument station s A & B at a
horizontal distance of 100Mapart the stns A & B being in line with the top of
the sig. The angles of elevation of the top of the sig at A & B were 32deg 40`
and 22deg 30` . The staff readings upon the BM of elevation 45.15 were
respectively 1.517 &3.35 when the instrument was at A & B the telescope
being horiz. Det. the elevation of the top of the signal
166
93 70 Civil
Water Supply
hardness of water? Any one method of removing hardness 167
92 70 Civil
Water Supply
hardness of water? How it is measured, Any one method of removing
hardness
168
91 70 Civil
Water Supply
3 Impurities in water 169
94 70 Civil
Water Supply
stages of treatment from river to drinking. Sketch the above arrangement for
a colony of 500 rly qrs.
170
93 70 Civil
Water Supply
diff bet slow sand & rapid sand filters 171
93 70 Civil
Water Supply
design rapid garvity filteration plant for colony 5000 rly qrs.sketch sailient
equipments& lyout of plant.source is pernnial river, & surface water drawn
for treatment
172
93 70 Civil
Water Supply
responsibility for cholroination - staffcolony in iow hqrs, hospitals, way ide
stns.
173
93 70 Civil
Water Supply
Specification for inverted filter while moorum blanketing 174
94 70
Contract
emd&sd, works register, 175
93 70
Contract
Works register 176
93 70
Contract
Work order cum agreements 177
93 70
Contract
stn approach road with wbm 1km long to be black topped - prepare work
order for zonal contractor-assume rates of anydivision
178
92 70
Contract
what action to be taken when contractor does not bring enough labor to
progress with the work
179
92 70
Contract
who can record the measurements of ballast supply in open line 180
92 70
Contract
what is the procedure for test chec for measurement of earth work 181
91 70
Contract
6 Shedule of rates 182
91 70
Contract
(1) Zonal works Contract 183
91 70
Contract
(2) Works Register 184
91 70
Contract
(4) General Conditon of contract 185
91 70
Contract
(5) Arbitration 186
94 70 Establish sailient features of wca, decasualisation, pnm 187
94 70 Establish engaging Clabour - drm,cpo,phod,gm 188
94 70 Establish pme <45yrs gk once in - a, 2,3 ,4 yrs 189
94 70 Establish reviewunder dar 25a by gm,phod,president of india, drm 190
94 70 Establish substitute engaged against leave vacancy, regular vac, temp. vacancy of
lonf duration. Vacancy of sporadic nature,
191
94 70 Establish min service for promotion within gr.C is - 3yrs,2yrs, no limit, 5 yrs 192
94 70 Establish retiring on superannuation - drcg -15 months pay of last salary, 16.5 months
pay of last 10 months pay subject to 1 lakh max., lumsum 45000/- 193
94 70 Establish % reservation for SC&ST&OBC - 15,9 1/2,27%, 15,4,18%,11,7 1/2,13% 194
94 70 Establish 2 employee mutual transfer - seniority - bottom most, date of entry in new
place, each man take seniority of the other subject to least of two.
195
94 70 Establish no. of office bearers to attend pnm meeting - 15,35,30,20 196
94 70 Establish b4 imposing major penalty to serve is - show cause notice, enquiry report,
charge sheet, notice for imposing the penalty
197
93 70 Establish ___ can call for paper and no time limit & revise orders for gr C & D
employees - gm, phod, agm, rly bd
198
93 70 Establish A CPC emp. Is a CL/Substitute/Temp. emp./none 199
93 70 Establish The rates of OT admissible if the Hrs of employment exceeds the rostered
hrs but below/exceeds statutory limits 1&2 times/1.5&2/1&1.5 /2&3 times of
normal rate of pay
200
93 70 Establish The duration of Job analusis tobe gone under HOER to revise the roster Hr
of LC is 72/48/96/144 hours\
201
93 70 Establish Salient feature of industrial dispute act 202
93 70 Establish What are the channel available to a rly emp who has been served with a
notice imposing one of the major penalities
203
93 70 Establish What do you know about decasualisation 204
93 70 Establish What is live register and supplementary live register Describe the
instruction for maintaing such registers
205
93 70 Establish define - appointng authority,discoplinary authority, applette authority under
dar cases
206
93 70 Establish what r benefits of employee on superannuation under pension scheme 207
93 70 Establish various relaxation & concessions applicablt to SC/ST employees in dept
selection for promotions
208
93 70 Establish sailient features of hoer 209
93 70 Establish an emploee to avail releif under wca, the duration of disablement shall be
min of ---, 4,7,3days, 1 month
210
93 70 Establish suspension imposed on employee can be reviewed within ___ days,
90,45,180, none of these
211
93 70 Establish min age to engage as casual labor ___, 25,18,21,33 212
93 70 Establish pme for employee <45 yrsin train passing duty is once in __- 6 months,a
year,2years,3 years
213
93 70 Establish engaging fresh casual labor require approval of cpo,agm,gm,rly. Bd. 214
93 70 Establish min period of servicein lower grade reqd for promotion ti next higher grade is
5,3,2,1 yrs
215
93 70 Establish If employee dies on duty he is elgble for compansation under wca when - he
did not violateany safety rule, when he was not under influence of alhocol,
irrespective of cause that lead to death
216
92 70 Establish what is the responsibility of principal employer under contract labor
regulation act
217
92 70 Establish describe procedure followed for empanelment of casual labor 218
92 70 Establish what are the classifications under hoer 219
92 70 Establish how a lc gk with 2 man is rostered 220
92 70 Establish what is the entitlement of a retired person for PTO 221
92 70 Establish who are eligible to be treated in rly hospital 222
92 70 Establish what are the major penalties under D&A rules 223
92 70 Establish what is a revision petition 224
92 70 Establish what are the permissible deductions under the payment of wages act 225
92 70 Establish what is the procedure for retrenching the surplus casual labor 226
92 70 Establish bank of surplus posts 227
91 70 Establish Give a list of major and minor penalties 228
91 70 Establish What is the disinction in the procedure for imposition of major and minor
penalties
229
91 70 Establish What is the difference between (a) compulsory retairment and Voluntary
retairment
230
91 70 Establish Temporary withdrawals and final withdrawals 231
91 70 Establish Censor and Warnings 232
91 70 Establish Removal and Dismissal from service 233
91 70 Establish An employee who retairs on account of medical decastogarisation gets .
Pension
234
91 70 Establish Arailway servant who has not been permitted to avail joining time for
transpoting kit and personnal effects is entitle to ..
235
91 70 Establish When an employeee is injure in duty ,during the time iof treatment he gets
. Leave
236
91 70 Establish Maximum amount of LAP that can be accumilated is ..days 237
91 70 Establish What are the classification of various catagories of staff in the engineering
department under HOER? Give two examples for each catogories 238
91 70 Establish (1) PNM (4)Conact Rules 239
91 70 Establish (2)Decasualisation (5) Staff benefit fund 240
91 70 Establish (3)Public primesses Eviction Act 241
05 70 Establish what is the minimum medical category required for a gate keeper 242
05 70 Establish How many days of casual leave is admissible in a year 243
05 70 Establish What is the weekly rouster duty hour fpr essential intermittent staff 244
05 70 Establish Whate is the medical fitness of a tack machine operator 245
05 70 Establish wheathe cadre restructring and upgradation are the same? Give reply as
yes or no?
246
94 70 Finance estimate- types, ned, purpose 247
94 70 Finance voted & charged exp., revenue& capital allocation, exchequer control, genl
& departmental charges
248
93 70 Finance Exchequer control 249
93 70 Finance General charges 250
93 70 Finance Primary unit of expenditure 251
92 70 Finance what are checks reqd to be made in the final bill 252
92 70 Finance what is voted exp. 253
92 70 Finance what is rly safety works fund 254
91 70 Finance Explain the various steps followed in the preparation of Budjet of Revenue
Maintainance expendeture of the Engineerin department ? In What ways
this is different from Budgeting for the Capital expenditure
255
91 70 Finance How estmates are prepaired and sanctioned in Respect of CTR works ?
How is the account of least materiels made, the materials disposed and
credits realised
256
91 70 Finance (3)Primary units iof expenditure 257
05 70 Finance Under which demand numbeer the expenditure on trasck maintainance is to
be booked
258
05 70 Finance What is the primary unit of contractual payment 259
05 70 Finance Special repair due to breaches is booked under what demand and
upgradation are the same? Give reply as yes or no?
260
92 70 General Estimate stn approach road with wbm 1km long to be black topped - prepare estimate
and mention specification
261
05 70 General Land what is the rate of annnual licence fee as a percentage of land value in case
of shops /retails depots,if the same is set up after 1.4.2004
262
94 70 General urgency certificate 263
94 70 General std m book 264
93 70 General Completion report 265
93 70 General Deposit works 266
93 70 General work require crs sanction? 267
93 70 General assisted sdg 268
92 70 General works require crs sanction 269
92 70 General coe. Of dynamic augment 270
92 70 General what is urgency certificate 271
92 70 General what is material modification 272
92 70 General when is revised estimate to be made for a work 273
91 70 General What is a PERT chart Prepare a chart for monitoring a PSC girder bridge 18.3m span? 274
05 70 General List of estimates being done in engineering department 275
05 70 General What is the value of works to which detailed estimate to be made 276
05 70 General List the requiring the sanction of commissioner of railway saftey 277
05 70 General List out the document to accompany the application for sanction of works
from CRS
278
93 70 GRS b class crossing stn sketch - dole line ohe, common loop, interlocking, fob,
island pf, show -dimensions, signals, clearances
279
93 70 GRS motor trly wkg - procedure, equipments, action in caseof breakge of trly.
Duties of gk in case of motor trly pasing lc protected by signals
280
93 70 GRS A crossing stn. Is to ne constructed in the middle of a block stn 15 Km long .
At this loc. There is a grade of 1 in 280 with an U/M LC . Draw a sketch of
the corssing Stn with two loops, island pf and fob indicate the dimensions ,
loc of sig. for std. III interlocking andmin. facilities to be provided
281
92 70 GRS halt stn in 1 in 100 grade to be converted as crossing stn with 2 loop lines
with interlocking - draw the proposed stn
282
05 70 GRS What is the dimension of the triangular portion of the speed indicator 283
05 70 GRS What is the dimension of the circular T/P board 284
05 70 GRS Use testingand life of detonators 285
05 70 GRS Equipments ofor push and motor trolley 286
05 70 GRS what is the normal life of a detonators 287
05 70 GRS Speed indicator and caution board along with sketch 288
94 70 GRS catch sdg 289
94 70 GRS when trolley as lorry, carrying ral from one mid section to other mid section -
rules?
290
05 70 OLIC Which part of the constitution contain provision regardin offical language
and when it was passed by the constitution
291
05 70 OLIC when is the hindi day celebrated every year 292
05 70 OLIC What is the periodicity of the following committee 293
05 70 OLIC Town official language implimentation committee 294
05 70 OLIC official laguage implimentation committee 295
05 70 OLIC What are the three regions as per the provision made in official language
rule? In which tamilnadu situated
296
05 70 OLIC In which constitution and in which article provision regarding official laguage
exists
297
05 70 OLIC As per constitution when should hindi have become the official language of
the Union of India
298
05 70 OLIC At present how many languages enlisted in the Eigth shedule of the
Constitution
299
05 70 OLIC Who was the chairman of the official language commission constitute article
344(1)
300
05 70 OLIC Which article of the costitution contains provision regarding the official
language of the union of India
301
93 70 P.Way Accident first officer to go to site 302
92 70 P.Way Accident first officer to go to site - collision of pass & goods train 303
91 70 P.Way Ballast state in brief the ballast specification in force for hand broken & machine
crushed ballast
304
05 70 P.Way Ballast what is the frequency of testing of abrassion and overall value for a ballast
supply contract 305
05 70 P.Way Ballast What is the minimum depth of ballast cushion in BG group A route 306
05 70 P.Way Ballast What is the quantity of ballast required for1 m length of track having 300mm
clear cushion
(i) for straight track (ii) for curve track
307
05 70 P.Way Ballast Size and gradation value for accepatability of track ballast for BG 308
05 70 P.Way Ballast What are the percentage payments admissible for oversize ballast 309
05 70 P.Way Ballast What are the acceptable aggregate abrasion and impact value for BG
ballast sample
310
94 70 P.Way Bridges RAW 311
93 70 P.Way Bridges RAT, vulnerable location? 312
91 70 P.Way Bridges steel channel sleeper 313
05 70 P.Way Bridges what are the maximum clear spacing of channel sleeper over bridges
(i) clear spacing other than joint (ii) clear spacing at joint
314
05 70 P.Way Bridges Draw a neat sketch of steel channel sleeper showing the fixing arrangement
with the girder including the bearing plate
315
94 70 P.Way Curve criteria for length of transition curve 316
94 70 P.Way Curve R - 500m, def angle 75 deg, mss 110kmph, eq speed 80 kmph, what eq
cant, per speed, transition length, offsets for transition curve? Max cant
165mm, max cd 100mm
317
94 70 P.Way Curve extra clearance on curve 318
93 70 P.Way Curve vc? Min R of vc? Rise 1 in 200 & fll 1 in 125.- apex - ch. 1600m & 550m RL,
rate of change of grade as 0.1% per 30 m chord
319
93 70 P.Way Curve R 500m, def angle 70 deg, eq cant for 80 kmph, mss 110 kmph, max cant
165 mm, max cd 100mm. cal - eq cant, per speed, trans length, offsets for
trans curve.
320
93 70 P.Way Curve When vertical curves provided 321
93 70 P.Way Curve a 1 in 12 T/O takes off on the O/s of a 3deg curve what is the
Max.Permissible Speed on the mainline
322
93 70 P.Way Curve for increasing the speed of a sec to 110KMPH 2deg curve 100M long
circular with 50 M transition is tobe realigned . Workout the realignemtn
indication the cant,transition length required and Cd permitted
323
93 70 P.Way Curve cumulative frequency diagram 324
92 70 P.Way Curve 3 deg curve kazipet to bza- permisissble speed & transition length?, vc
when provided and radius of vc in group a route?
325
91 70 P.Way Curve calculae max per speed over 3 deg curvefor tain running ber jtj ajj
section.assume data suitably. Wok out transition length
326
05 70 P.Way Curve What is the formula for calculation of equlibrium cant in a curve? 327
05 70 P.Way Curve What is the maximum cant deficiency permited in BG route for speed
excess of 100 kmph
328
05 70 P.Way Curve
What will be the radius of a 2.5
0
curve on BG
329
05 70 P.Way Curve Determine the relation between Versine chord and radius of curve 330
05 70 P.Way Curve What are the empirical formula for calculation of transition length 331
05 70 P.Way Curve What is the limit of statyion to staton variation of versine in a curve for speed
above 80 kmph but below 120 kpmh
332
05 70 P.Way Curve What is the maximum value of cant deficiency permitted for speed more
than 100 kmph
333
05 70 P.Way Curve What is the maximum cant permitted in BG in Group B route 334
05 70 P.Way Curve What are the extra allowance to be made in curvature for claculation of
distance of a structure ? List out the consideration to be made
335
05 70 P.Way Curve Define the degree of curvature applicable to the track 336
05 70 P.Way Curve What is the formula of Equilibrium cant 337
05 70 P.Way Curve Define the cant gradient 338
05 70 P.Way Curve Define Shift(with formula) required for the introduction of transition curve 339
05 70 P.Way Curve Define the criteria for the realignment of the curve 340
05 70 P.Way Curve Mention the steps to be followed while the realignment of the curve 341
94 70 P.Way Diversion L = 80m, ht of bank arying 2 to 3 m, show temp. diversion, signal
arrangement
342
92 70 P.Way Diversion workout & sketch diversion - br 3 x 3.6m span with 50 m track on either
side washed away
343
05 70 P.Way Diversion what is the minimum radius of curvature permitted in a temparary division
344
05 70 P.Way Duties Briefly enlist item wise the duties of key man 345
05 70 P.Way Duties What are the dutyies of an Asst. Engineer?Briefly elaborate each item 346
05 70 P.Way Duties Briefly elaborate the duties of key man 347
05 70 P.Way Fitting what is the desirable toe load of ERC mark III? 348
94 70 P.Way Formation formation problem with 5 step plan 349
93 70 P.Way Formation bad formation? 5 step plan, formation trouble in summer & winter of bc soil -
treatment procedure under tfc condition
350
93 70 P.Way Formation ew in heavy density route - soil clay - new bank to be laid - procedure -
sketch c/s - records to be maintained - equipments reqd
351
93 70 P.Way Formation 5 step action plan for formation 352
92 70 P.Way Formation new bank A route - procedure of constn? 353
91 70 P.Way Formation Bring out in brief as to what is mean by compaction of sub grade? 354
93 70 P.Way LC action to be taken by gk in case of train parting, inspn frequency of lc by
aen?, procedure for processing a work of constructing manned lc at the
request of state govt?
355
05 70 P.Way LC List out the equipment required at level crossing 356
05 70 P.Way LC in case of obstruction in a level crossing at what distance from the level
crossing the gate man put the banner flag across the track
357
05 70 P.Way LC For manned/unmanned level crossing having TVU lessb than 75000 what is
the perio0dicity of censusto review the classification
358
05 70 P.Way LC What is the minimum distance of the gate post form the centr lineof the track
359
05 70 P.Way LC What is the minimum width of the gate in Bclass crossing (BG) 360
05 70 P.Way LC Draw the sketches showing all the relevent dimensionsfor protection of
levelcrossing gate in case of an obsturction at the gate which could not be
removed by the gatekeeper alone (a) for double line in night time (b) for
single line in day time
361
94 70 P.Way LWR permitted locations 362
94 70 P.Way LWR conversion of swr to lwr of cst9 track - sequence of operations 363
94 70 P.Way LWR precautions - thru' pkg, attn. to rf/wf, acct. restoration 364
93 70 P.Way LWR tmax 60deg, tmin 18deg, 52kg rail+psc+M+7density, sej gap at 14.00hrs in
May is 22mm, section gdr-mas, destressing reqd or not.
365
92 70 P.Way LWR coversion of single rail to lwr on cst 9 track, hot weather patrolling 366
91 70 P.Way LWR what is meant by hot weather patrolling 367
05 70 P.Way LWR At what rail temprature hot weather patroling for LWR/CWR has to be
started ?
368
05 70 P.Way LWR Draw a sketch of LWR destressing roller with dimension for BG 369
05 70 P.Way LWR What speed restriction has to be impossed when sleeper fastingson
alternative sleeper are loosened before destressing .
370
05 70 P.Way LWR What will be the maximum sleeper dencity required for the LWR in
temperature zone III & IV
371
05 70 P.Way LWR Hysteresis l;oop of LWR along with sketch 372
05 70 P.Way LWR What is the desired gap in SEJ at td for 60 kg rail with 1660 sleeper length
373
05 70 P.Way LWR What is the rail temperature zone of Madurai 374
05 70 P.Way LWR desdtressing of LWR 375
05 70 P.Way LWR SEJ 376
93 70 P.Way Patrolling patrolling - types, equipments of monsoon patrolman, patrol chart - 8km
single line-4 up & 4 dn trains bet 17.45 to 06.45 hrs, action to be taken if
patrolman not turned up to stn in time,
377
92 70 P.Way Patrolling equipments of monsoon patrolman 378
05 70 P.Way Patrolling How many types of patrolling of track are in railway 379
05 70 P.Way Patrolling Expalin salient feature of a patrol chart 380
05 70 P.Way Patrolling List out the equipment of the patrol man 381
05 70 P.Way Patrolling Explain briefly the dutis of a patrolman 382
94 70 P.Way Rail glued jt, lubrication of jts. 383
94 70 P.Way Rail msp - dehogging , lowjt packing 384
93 70 P.Way Rail Measures tobe adopted for eleminating avoidable RF 385
93 70 P.Way Rail Gap survey 386
93 70 P.Way Rail procedure to attend rf in cwr track 387
93 70 P.Way Rail avoidable rf 388
05 70 P.Way Rail At what GMT 60 kg MM rail is due for reneval 389
05 70 P.Way Rail Now a days we are using 90 UTS rail Expand the word UTS and what is
the meaning of 90 UTS
390
05 70 P.Way Rail How many fish plate jointas are ther in glued joint 391
05 70 P.Way Rail What is the fishplate hole dia
(i) for ordinary fish plate joint (ii) for gapless fish plate joint
392
05 70 P.Way Rail Glued joint 393
05 70 P.Way Rail What degree of probe is used in Usfd machine of flange AT welds 394
05 70 P.Way Rail What is the test frqeency period of weld for first testing after inuitial testing
395
94 70 P.Way Rail defect classifiction & action to be taken 396
94 70 P.Way Renewal relaying - pqrs operations, base depot sketch, speed resteriction chart 397
91 70 P.Way Renewal What are the classification of track in BG & MG based on traffic
density,speed potential etc and the track structure specified for such track
standards
398
93 70 P.Way Renewal What are the classification of track in BG & MG based on traffic
density,speed potential etc and the track structure specified for such track
standards
399
93 70 P.Way Renewal Indicate the laying and maintenance tolerance limits for track in any one
group in MG & BG
400
92 70 P.Way Renewal classification of track based on speed, track structure for diff speed 401
05 70 P.Way Sleeper What is the length of a psc sleeper? 402
05 70 P.Way Sleeper What is the PSC sleeper spacing (c/c) in group A route 403
93 70 P.Way TM gr. B cst9 track bcm wkg 200m/day - how to organise, sr chart? Ballast
specification
404
93 70 P.Way TM intermediate tamping of machine maintained sec using chinese tamping 405
93 70 P.Way TM 10 Kms of existing track with 90 R rails on CST -9 sleeper is to be relaied
with 52 KG rail on psc sleeper with M+7 density prepare an estimate,list of
mateiralst indent for doing this, explain how to execute with PQRS
406
92 70 P.Way TM procedure for packing with chinese tamper, purpose of pqrs equipment? 407
91 70 P.Way TM what is bcm? Describe its working, what are the norms specified for its
working
408
91 70 P.Way TM wrte short notes on chinese tamping system, pqrs 409
05 70 P.Way TM Ballast cleaning machine 410
05 70 P.Way TM Give details b of machanized complete renewal of track with psc sleepers
starting from planning of work base depot workin of PQRS block working
of PQRS and steps to be followed for relaxation of speed to normal
411
05 70 P.Way TM How many tamping tools are in a CSM machine 412
05 70 P.Way TM what is the rpm of the desiel engine in CSM machine 413
05 70 P.Way TM How many round shaft chisel are ther in a cutter chain of ballast cleaning
machine
414
05 70 P.Way TM CSM tamping machine 415
05 70 P.Way TM Give details of pre tamping and post tamping operation in PSC sleeper track
416
05 70 P.Way TM Kindly tabulate the sequence of operation of BCM working along with the
approximate time required against each operation
417
92 70 P.Way TM deep screening with bcm - procedure 418
94 70 P.Way P & C 1 in 8.5, c/c of track 5.3m, st. track. Calculations & setting out 419
05 70 P.Way P & C What is the overall length of fanshaped 60 kg 1 in 12 turnout? 420
05 70 P.Way P & C What is the minimum clearance between the toe of switch and stock rail 421
92 70 P.Way TRC list different track monitoring system - periodicity of inspn, oms 2000 -
procedure & interpretation of results?
422
91 70 P.Way TRC what are the different types of track monitoring bringing out sailient features
of such type, periodicity specified as per ules in force. State briefly as what
is meant by oms 2000 and the pocedure followed regarding interpretation of
results.
423
05 70 P.Way TRC What is the frequency of RDSO track recording
( I ) Group B route (ii) Group D route (iii)Group E route
424
05 70 P.Way TRC what are the values of standard of maintenance of track for speed above
100 kmph and 140 kmph-alighnment measured on7.5 m chord, twist
measured on a base of 3.54 m, uneveness measured on 3.5 m chord,
425
05 70 P.Way TRC Give the value of A category track - (i) Uneveness (iii) Guage (ii) Twist
(iv) alignment
426
94 70 P.Way Weld skv welding - procedure, records, tolerance 427
93 70 P.Way Weld How is alumino thermic welding done 428
93 70 P.Way Weld arc welding 429
93 70 P.Way Track management system 430
92 70 P.Way thru pkg in cst 9 sleeper 431
92 70 P.Way track modulus 432
05 70 P.Way What is the mamaximum permissible speed in MAS - SRR 433
05 70 P.Way Track structure of the excisting track may be assured as 90R rail with
CST- 9 sleeper
434
05 70 P.Way Draw a cross sectional dimentional sketch of single line BG line showing
rails,sleepers ,ballastprofile ,deth of ballast ,width fo formation both in
embankment and cutting
435
05 70 P.Way index plan 436
94 70 SOD BG & MG - min turnout R, clear spacing of br. Timber, hori. & verti clearance
for ROB in ohe area
437
93 70 SOD bg & mg - heel divergence, throw of switch, br timber spacing, min R of
curve which require check rail
438
93 70 SOD max clerance of checkrail at LC for BG & MG 439
93 70 SOD Min radius of curve below which checkrail is to be provided for BG & MG 440
93 70 SOD Height above rail level for high passenger pf for BG & MG 441
93 70 SOD Max. distance apart of trolley refuges on ballasted deck bridges for BG &
MG
442
05 70 SOD what is the maximum clearance of wing rail at the nose of crossing 443
05 70 SOD what is the minimum horizontal distance of any building on a passenger
platform from the center line of the track
444
05 70 SOD what is the minimum horizontal distance of any telegraph post measured
from the centre of the nearst track
445
05 70 SOD At what degree of curve ,in BG check rails to be provide in the track 446
05 70 SOD What isd the clearance between running rail and check rail in a level
crossing (i) minimum (ii) maximum
447
05 70 SOD What is the minimum horizontal distance of any building on a passenger
platform from centre line of the track in BG (from 305 mm above platform
level)
448
05 70 SOD What is the maximum clearance of check rail opposite to nose of crossing
449
05 70 SOD What is the maximum clearance of wing rail at nose of crossing 450
92 70 Stores how released p.way material lassified 451
91 70 Works Building 8 Building cost index 452
91 70 Works Building Discribe in brief thevarious morden building materials being used in buliding
consturction ?Comments on their relative advantages and cost benefits 453
94 70 Works Building bldg cost index 454
93 70 Works Building directed maintenance of staff colony 455
93 70 Works Building orgn chart - 4 isolated placeseach 250 units at a dist of 3 km from one
another.
456
93 70 Works Building Buliding post index 457
93 70 Works Building bldg cost index 458
92 70 Works Building bldg cost index 459
05 70 Works Building what is the value live load taken for design of an office building 460
05 70 Works Building differen method of leaky roof treatment 461
93 70 Works Concrete design mix m400 for decking arrangement of br with psc girders 462
93 70 Works Concrete Testing procedure for prestressed concrete monoblock sleepers 463
92 70 Works Concrete Testing procedure for prestressed concrete monoblock sleepers 464
93 70 Works Accommodation works 465
05 70 Works Draw a neat sketch of RDSO platform shelter ( 7.14m X 18m) located on a
high level island platform showing the salient dimension
466
05 70 Works Please show the laying and fixing arrangements of AC sheet roofing along
with purling .The overlap length between two adjacent AC sheets also to be
shown along with dimension
467
05 70 Works How many water taps to be provided in a station where the average number
of passengers at any time are 2000nos
468
05 70 Works What is the scale of minimum essential eminnities for provision of water
taps per platform in a c class station
469
05 70 Works What is the scale of minimum essential eminnities for prvision of platform
shelter per platform
470
05 70 Works Minimum essential ammenities at station what is the expansio of UIC, NHAI
471