Sie sind auf Seite 1von 5

Request Date : CI No.

S.No. Site Name NE Code Qty Hardware Type Shelf/Slot/Port Serial # Pool # Remarks
1 RT07 RT7D1a 2 DUPLEX FC/PC-LC/PC SNFN FPP & TRUNK
2 RT07 RT7D1a 1 DUPLEX FC/PC-SC/PC CLIENT
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
2-Dec-12 M2771
21
22
23
24
25
26
27
28
29
30
31
32
33
34
Thales Integration : Date :
Athorized by
TXM O&M Integration : Date :
Approved by
TXM O&M Integration Manager : Date :
Pool Hardware Usage Form, vesion 1.0, dated 24-Apr-2011
MOHAMMED FAROOQI
WALID MERDAH
Additional Information & Remarks
Authorization & Approval
M. TAHER
Prepared by
No. Ring # Site Name NE Code Qty Hardware Type
Shelf/Slot#
Module/Port
Length Qty
1
2
3
4
5
6
7
No. Ring # Site Name NE Code Qty Hardware Type
Shelf/Slot#
Module/Port
Ring # Site Name NE Code
1 1 RT07 RT7D1a 1 TXP
SH2 SL4
1 MAJZ MAJD1a
2 1 RT07 RT7D1a 1 ONS-10G-S1
SH2 SL4 P1
1 MAJZ MAJD1a
3
4
5
6
7
8
9
CRO Issue Date 2-Dec-12 SRO Status For Circuit Design
Originator's Name Priority
CRO Ref.# 021212/M2771 SRO Ref.#
Change Request Order Details
MB12120002
NORML
Install additional 1 pc of TXP card with XFP module. CRO Purpose
Abdul Khaliq
SRO Issue Date 2-Dec-12
New Hardware
Type
New Patchcord
Assigned To Mobily Completion Depend on Availability
Proposed/Required changes Description
Site Hardware Required
Shelf/Slot#
Module/Port
SH2 SL6
SH2 SL6 P1
Request Description
Request to provide new circuit for M2770 which will drop at RT07 & UNAZ point to point using any Lambda's available on DWDM RING 1.
REMARKS
In able to provide and implement this request it is required
to install new 1 pc of TXP card with XFP module at RT07.
All new hardware's and new wirings will be installed.
TO BE FILLED BY SNFN TEAM
There will be relocation of hardwares from
equipment to equipment and reconfiguration of
lambda assignments. The relocation price for
the card from MAJZ to RT07 will be charged
under the circuit M2770.
Proposed Hardware to be Relocated
Remarks
9
10
Note: After approval, please scan and send back to Thales for Implementation. Whereas original signed copy can be received later.
Work Description
Effort/Resources
Authorized and Approved by: DATE
Total new TXP card (1 pc) and XFP module (1 pc) shall be provided/installed at RT07.
SEE ATTACHED BOQ
Important Note:
This Change Request Order Form will be filled by both (SNFN/Thales) in the event that there will be a service request which has something to do with additional materials and changes which has an impact on the design either minor or major
changes. Please be informed that all Service Request which are not according on the previous SED will not be threated as normal service request, implementation will take more time than the regular SRO.
290709 FormRev 2.4
To be filled by SNFN
To be filled by Thales
Legend:
Activity Schedule
Financial Impact
AUTHORIZATION
JUSTIFICATION
Actual Impact Assessment
To provide request for new circuit using any available Lambda's between RT07-UNAZ via DWDM RING 1., installation of all required hardwares and wirings to be done by Thales as per request from SNFN
The request path is not assign for Mobily according to previous Traffic matrix design, Thales is therefore instructed to install new hardware' s and use additional Lambda between RT07-UNAZ.
Schedule will be provided later as soon the CRO is approve, howvever the implementation will not comply on agreed 5 working days due to new design requirements.
M. TAHER
Ahmed Al Ghamdi: SNFN O & M Manager
Approved by Thales
Mohd. Khayreddin (Telecom Prog. Manager) ABDUL KHALIQ
RECEIVED BY Implemented By
New Request Modification Deletion
Request Date Request Date
SRO Reference No. SRO Reference No.
CI Number CI Number
Requester Name Company
Title Phone Number
E-Mail Fax
Partner Name Partner Name
End User Name End User Name
Service Type Service Type
Termination Eqpt. Termination Eqpt.
CRQ Number Contact Details
Source Source Source Source Destination Destination Destination Destination
CRQ000000123165
UNAZ
STM-64
Transmission
RT07
STM-64
Transmission
Abdullah
Mobily
Service Request Order Details Service Request Order Details Service Request Order Details Service Request Order Details
2-Dec-12
MB12120002
Request Details Request Details Request Details Request Details
s.alamoudi@mobily.com.sa
Mobily
569141147
M2771
Request By (Contact Details) Request By (Contact Details) Request By (Contact Details) Request By (Contact Details)
End User (Client) Details End User (Client) Details End User (Client) Details End User (Client) Details
Salah Al Amoudi
Vice President / Transmission Networks
Mobily
x
DCC Required
x
x
Encapsulation Working Mode Flow Control MTU Concat.
(Single Mode-SM)
Source : Destination :

Source : Destination :
SDH/Ethernet DWDM
Point to Point Ckts
Client Side Protection If Yes, Pls describe the Protection Scheme & attach the Plan
Date SRO Rec. Date RFS Issue
Name Date
Legend Revision # 4.2
Date : 01-Aug-2012
Note : Fill in the 'Eth Vlan Details' sheet with the mandatory information.
SRO Implementation Cycle SRO Implementation Cycle SRO Implementation Cycle SRO Implementation Cycle
2-Dec-12
STM64
Service Required
Request Details Request Details Request Details Request Details
Capacity Required
Additional Information Additional Information Additional Information Additional Information
UNAZ RT07
Circuit Connectivity Description @ Client Side Circuit Connectivity Description @ Client Side Circuit Connectivity Description @ Client Side Circuit Connectivity Description @ Client Side
GFP
1
Point to Point
SNFN Approval SNFN Approval SNFN Approval SNFN Approval
Protection Type :
To be Filled by Client To be Filled by SNFN Mandatory
Ahmed Hazza Al Ghamdi 2-Dec-12
New STM-64 link between UNAZ & RT07 passing thru Jeddah for TXM plan Ref. D02314
Protection Type :
STM-n
E1
Lambda
Structured STM
No Yes
Yes No
Optical Ethernet
UNAZ Customer Site: UNAZ UNAZ UNAZ UNAZ
UNAD1a Node Name: UNAZ.75.01 S08P01
Serv.# CI # Circuit Type FPP/DDF Location Fiber # Dir. Dir. Fiber # FPP/DDF Location
TX TX
RX RX
TX TX
RX RX
TX TX
RX RX
TX TX
RX RX
TX TX
RX RX
RT07 Customer Site: RT07 RT07 RT07 RT07
RT7D1a Node Name: RT07.35.01 S11P01
Serv.# CI # Circuit Type FPP/DDF Location Fiber # Dir. Dir. Fiber # FPP/DDF Location
TX TX
RX RX
TX TX
RX RX
TX TX
RX RX
TX TX
RX RX
TX TX
RX RX
Circuit ID
QAS-10-H10
Tie Cable Connectivity Details - Destination Tie Cable Connectivity Details - Destination Tie Cable Connectivity Details - Destination Tie Cable Connectivity Details - Destination
S08P01: CAB.OSN7500/P06/T1/1&2 FPP 12 00.E0.07-04 Conn. 35,36
Type /
Length
SNFN Drop Site Customer Termination Site
Circuit ID
QAS-10-H10 S11P01: Rack14/P05/T3/1&2 FPP 02 RK.00.01-05 Conn. 17,18
Customer Termination Site
STM64
2
Tie Cable Connectivity Details - Source Tie Cable Connectivity Details - Source Tie Cable Connectivity Details - Source Tie Cable Connectivity Details - Source
3
5
Type /
Length
SNFN Drop Site
1 STM64
M2771
5
Filled by THALES / JP
4
SNFN- Site:
Node Name:
SNFN- Site:
Node Name:
Filled by Customer
3
1
4
2
M2771
P: 5123-1-001 Dt:10-Mar-10 R2.0
02 DEC 12 OPEN
02 DEC 12
RFS DATE APPROVED DATE DESIGN SUBMITTED DATE
SRO ISSUED DATE REVISION No. STATUS 00
DATE:
1
SERVICE REQUIRED PROTECTION SCHEME
STM64
POINT TO POINT NUMBER OF CHANNELS MB12120002
QAS-10-H10
Sign & Approved by SNFN
O & M Manager
UNAZ-RT07
MOBILY CIRCUIT
DWDM RING 1
M2771
SRO REF #:
CIRCUIT ID CIRCUIT ROUTE
JP CONTRACTOR CIRCUIT OWNER
MARK CIRCUIT NAME
1 M2771_D_ST64_L_1_UNAZ-RT07_1_0
2 M2771_D_ST64_L_1_UNAZ-RT07_2_0
3 M2771_D_ST64_L_1_UNAZ-RT07_3_0
2 SEGMENT
SECTION
2
LEGEND:
REMARKS:
REV 00 - CIRCUIT PROVISION VIA MOBILY CIRCUIT RING 1
ROADM
R-1
SHELF 6
SLOT 16
PORT 1
(W)
UNAD1a
UNAZ
Client
ROADM
R-1
**SHELF 2
SLOT 4
PORT 1
(E)
58 R-1
RT7D1a
RT07
S11P01:
Rack14/P05/
T3/1&2
Client
***FPP 02
RK.00.01-05
Conn. 17,18
1
1
ROADM
R-1
TAID1a
58 R-1
PASSTHROUGH
ROADM
R-1
ECND1a
24 R-1 24 R-1
FPP 12
00.D0.07-02
Conn. 41,42
FPP 14
00.D0.07-04
Conn. 25,26
SHELF 7
SLOT 6
PORT 1
(E)
SHELF 6
SLOT 15
PORT 1
(W)
1
2
FROM MJZD1a
SH2 SL6
PREV 37
ROADM
R-1
MJZD1a
PASSTHROUGH
ROADM
R-1
RSFD1a
PASSTHROUGH
ROADM
R-1
NORD1a
PASSTHROUGH
58 R-1 58 R-1 58 R-1 24 R-1
ROADM
R-1
ITJD1a
PASSTHROUGH
ROADM
R-1
HMRD1a
PASSTHROUGH
S08P01:
CAB.OSN7500
/P06/T1/1&2
FPP 12
00.E0.07-04
Conn. 35,36
ROADM
R-1
HJRD1a
24 R-1
FPP 11
00.D1.08-03
Conn. 27,28
FPP 09
00.D1.08-01
Conn. 7,8
SHELF 3
SLOT 5
PORT 1
(E)
SHELF 1
SLOT 14
PORT 1
(W)
24 R-1
ROADM
R-1
QUBD1a
PASSTHROUGH
1
3
PREV 2 PREV 16

Das könnte Ihnen auch gefallen