Civil Package AZSB / Station AZSB (Taman Suntex)

System Package S6 ( Building Management System )


1 Installation of Lift System
PS, Annex F2.1, Section C Pg
6 of 8 Add.1,item 7(d)
P P
2
Installation of Escalator and
Travelator System
PS, Annex F2.2, Section C Pg
6 of 8 Add.1,item 7(d)
P P
3 Step Down Transformer
PS, Annex F2.3, Section C Pg
4 of 6 Add.1,item 7(d)
P P
4
Uninterruptible Power
Supply
PS, Annex F2.4,Section C Pg 4
of 6 Add.1,item 7(d)
P P
5 LED Lighting Equipment
PS, Annex F2.5,Section C Pg 4
of 6 Add.1, item 7(d)
P P
6
Environmental Control
System(ECS)
PS, Annex F2.6, Section C Pg
8 of 10 Add.1,item 7(d)
P P
7
Fire Dectection and
Protection System
P ,Annex F2.7,Section C Pg 7
of 8 Add.1, item 7(d)
P P
EMC MANAGEMENT PLAN CHECKLIST
Item
Particular Specification,
Remark
WPC
SYSTEM
WPC CIVIL Description SYSTEM DS DC
The EMC Management Plan to be submitted by the following Contractor:-
8
Installation of Station
Signage
PS Annex F2.9 none
9
Installation of IT equipment PS Annex F2.11
none
10
Track works
PS Appendix H3, Interface
Spec., item 10 none
11
Signalling and Train Control
System
PS Appendix H4, Interface
Spec., item 9, pg 14 0f 20
P P
Both WPC Civil and System shall
exchange all necessary information
concerning EMC/EMI in the respective
system to encure compatibility in the
design of their systems.The Contractors
shall jointly investigate interference
problem and provide necessary
corrective actions throughout the
contract period. Both contractor shall
jointly develop a test plan how the EMC
of WPC Civil and System shall be
verified
12 Telecommunication System
PS Appendix H5, Interface
Spec., item 9, pg 22 of 30
P P
Both WPC Civil and System shall
exchange all necessary information
concerning EMC/EMI in the respective
system to encure compatibility in the
design of their systems.The Contractors
shall jointly investigate interference
problem and provide necessary
corrective actions throughout the
contract period. Both contractor shall
jointly develop a test plan how the EMC
of WPC Civil and System shall be
verified
13
Power supply and
distribution System
PS Appendix H6, Interface
Spec., item 9, pg 16 of34
P P
Both WPC Civil and System shall
exchange all necessary information
concerning EMC/EMI in the respective
system to encure compatibility in the
design of their systems.The Contractors
shall jointly investigate interference
problem and provide necessary
corrective actions throughout the
contract period. Both contractor shall
jointly develop a test plan how the EMC
of WPC Civil and System shall be
verified
14 Electric Train
PS Appendix H7, Interface
Spec., item7
none
15 Automatic Fare Collection
PS Appendix H8, Interface
Spec., item 9, pg 13 of 22
P P
Both WPC Civil and System shall
exchange all necessary information
concerning EMC/EMI in the respective
system to encure compatibility in the
design of their systems.The Contractors
shall jointly investigate interference
problem and provide necessary
corrective actions throughout the
contract period. Both contractor shall
jointly develop a test plan how the EMC
of WPC Civil and System shall be
verified
16
Electronic Access Control
System
PS Appendix H9, Interface
Spec., item 9, pg 15 of 22
P P
Both WPC Civil and System shall
exchange all necessary information
concerning EMC/EMI in the respective
system to encure compatibility in the
design of their systems.The Contractors
shall jointly investigate interference
problem and provide necessary
corrective actions throughout the
contract period. Both contractor shall
jointly develop a test plan how the EMC
of WPC Civil and System shall be
verified
17 Facility SCADA
PS Appendix H10, Interface
Spec., item9, pg 11 of 16
P P
Both WPC Civil and System shall
exchange all necessary information
concerning EMC/EMI in the respective
system to encure compatibility in the
design of their systems.The Contractors
shall jointly investigate interference
problem and provide necessary
corrective actions throughout the
contract period. Both contractor shall
jointly develop a test plan how the EMC
of WPC Civil and System shall be
verified
18
Building Management
System
PS Appendix H11, Interface
Spec., item 9, pg 14 of 24
P P
Both WPC Civil and System shall
exchange all necessary information
concerning EMC/EMI in the respective
system to encure compatibility in the
design of their systems.The Contractors
shall jointly investigate interference
problem and provide necessary
corrective actions throughout the
contract period. Both contractor shall
jointly develop a test plan how the EMC
of WPC Civil and System shall be
verified