7.0 TESTING
7.1 TESTING PLAN
In general, in a project, testing commences with a test plan and terminates with
successful execution of acceptance testing. A test plan is a general document for the entire
project that defines the scope, approach to be taken, and the schedule of testing, as well as
identifies the test items for testing and the personnel responsible for the different activities of
testing.
The test planning can be done well before the actual testing commences and can be
done in parallel with the coding and design activities. The inputs for forming the test plan are:
(1) project plan, (2) requirements document, and (3) architecture or design document. The
project plan is needed to make sure that the test plan is consistent with the overall quality plan
for the project and the testing schedule matches that of the project plan. The requirements
document and the design document are the basic documents used for selecting the test units
and deciding the approaches to be used during testing.
A test plan should contain the following:
Test unit specification
Features to be tested
Approach for testing
Test deliverables
Schedule and task allocation
As seen earlier, different levels of testing have to be performed in a project. The levels
are specified in the test plan by identifying the test units for the project. A test unit is a set of
one or more modules that form a software under test (SUT). The identification of test units
establishes the different levels of testing that will be performed in the project.
Generally, a number of test units are formed during the testing, starting from the
lower-level modules, which have to be unit-tested. That is, first the modules that have to be
tested individually are specified as test units. Then the higher-level units are specified, which
may be a combination of already tested units or may combine some already tested units with
some untested modules. The basic idea behind forming test units is to make sure that testing

080380107013&080380107019 Testing


RKCET(CE) Page 97


is being performed incrementally, with each increment including only a few aspects that need
to be tested.

An important factor while forming a unit is the testability of a unit. A unit should be
such that it can be easily tested. In other words, it should be possible to form meaningful test
cases and execute the unit without much effort with these test cases.
For example, a module that manipulates the complex data structure formed from a file
input by an input module might not be a suitable unit from the point of view of testability, as
forming meaningful test cases for the unit will be hard, and driver routines will have to be
written to convert inputs from files or terminals that are given by the tester into data
structures suitable for the module. In this case, it might be better to form the unit by including
the input module as well. Then the file input expected by the input module can contain the
test cases.
Features to be tested include all software features and combinations of features that
should be tested. A software feature is a software characteristic specified or implied by the
requirements or design documents. These may include functionality, performance, design
constraints, and attributes.
The approach for testing specifies the overall approach to be followed in the current
project. The techniques that will be used to judge the testing effort should also be specified.
This is sometimes called the testing criterion or the criterion for evaluating the set of test
cases used in testing. In the previous sections we discussed many criteria for evaluating and
selecting test cases. Testing deliverables should be specified in the test plan before the actual
testing begins.
Deliverables could be a list of test cases that were used, detailed results of testing
including the list of defects found, test summary report, and data about the code coverage.
The test plan typically also specifies the schedule and effort to be spent on
different activities of testing, and the tools to be used. This schedule should be consistent with
the overall project schedule. The detailed plan may list all the testing tasks and allocate them
to test resources who are responsible for performing them. Many large products have separate

080380107013&080380107019 Testing


RKCET(CE) Page 98


testing teams and therefore a separate test plan. A smaller project may include the test plan as
part of its quality plan in the project management plan.
7.2 TESTING STRATEGY
Developers are under great pressure to deliver more complex software on increasingly
aggressive schedules and with limited resources. Testers are expected to verify the quality of
such software in less time and with even fewer resources. In such an environment, solid,
repeatable, and practical testing methods and automation are a must.
In a software development life cycle, bug can be injected at any stage. Earlier the bugs
are identified, more cost saving it has. There are different techniques for detecting and
eliminating bugs that originate in respective phase.
Software testing strategy integrates software test case design techniques into a
wellplanned series of steps that result in the successful construction of software. Any test
strategy incorporate test planning, test case design, test execution, and the resultant data
collection and evaluation.
Testing is a set of activities. These activities so planned and conducted systematically
that it leaves no scope for rework or bugs.
Various software-testing strategies have been proposed so far. All provide a template for
testing. Things that are common and important in these strategies are
Testing begins at the module level and works outward : tests which are carried out,
are done at the module level where major functionality is tested and then it works toward the
integration of the entire system.
Different testing techniques are appropriate at different points in time: Under different
circumstances, different testing methodologies are to be used which will be the decisive
factor for software robustness and scalability. Circumstance essentially means the level at
which the testing is being done (Unit testing, system testing, Integration testing etc.) and the
purpose of testing.
The developer of the software conducts testing and if the project is big then there is a
testing team: All programmers should test and verify that their results are according to the
specification given to them while coding. In cases where programs are big enough or

080380107013&080380107019 Testing


RKCET(CE) Page 99


collective effort is involved for coding, responsibilities for testing lies with the team as a
whole.
Debugging and testing are altogether different processes. Testing aims to finds the
errors whereas debugging is the process of fixing those errors. But debugging should be
incorporated in testing strategies.
A software strategy must have low-level tests to test the source code and high-level tests that
validate system functions against customer requirements.
Once it is decided who'll do testing then the main issue is how to go about testing.
That is in which manner testing should be performed. As shown in fig. first unit testing is
performed. Unit testing focuses on the individual modules of the product. After that
integration testing is performed. When modules are integrated into bigger program structure
then new errors arise often. Integration testing uncovers those errors. After integration testing,
other high order tests like system tests are performed. These tests focus on the overall system.
Here system is treated as one entity and tested as a whole. Now we'll take up these different
types of tests and try to understand their basic concepts.

Fig7.2.1 Sequence of Tests

7.2.1 Unit Testing
We know that smallest unit of software design is a module. Unit testing is performed to check
the functionality of these units. it is done before these modules are integrated together to
build the overall system. Since the modules are small in size, individual programmers can do
unit testing on their respective modules. So unit testing is basically white box oriented.
Procedural design descriptions are used and control paths are tested to uncover errors within
individual modules. Unit testing can be done for more than one module at a time.

080380107013&080380107019 Testing


RKCET(CE) Page 100


The following are the tests that are performed during the unit testing:
Module interface test: here it is checked if the information is properly flowing into the
program unit and properly coming out of it.
Local data structures: these are tested to see if the local data within unit(module) is
stored properly by them.
Boundary conditions: It is observed that much software often fails at boundary
conditions. That's why boundary conditions are tested to ensure that the program is
properly working at its boundary conditions.
Independent paths: All independent paths are tested to see that they are properly
executing their task and terminating at the end of the program.
Error handling paths: These are tested to check if errors are handled properly by them.
See fig. for overview of unit testing

080380107013&080380107019 Testing


RKCET(CE) Page 101



Figure: Unit Testing

Fig7.2.1.1: Unit Test Procedure
Unit testing begins after the source code is developed, reviewed and verified for the
correct syntax. Here design documents help in making test cases. Though each module
performs a specific task yet it is not a standalone program. It may need data from some other
module or it may need to send some data or control information to some other module. Since
in unit testing each module is tested individually, so the need to obtain data from other
module or passing data to other module is achieved by the use of stubs and drivers. Stubs and
drivers are used to simulate those modules. A driver is basically a program that accepts test
case data and passes that data to the module that is being tested. It also prints the relevant
results. Similarly stubs are also programs that are used to replace modules that are
subordinate to the module to be tested. It does minimal data manipulation, prints verification
of entry, and returns. Fig. illustrates this unit test procedure.
Drivers and stubs are overhead because they are developed but are not a part of the product.
This overhead can be reduced if these are kept very simple.
Once the individual modules are tested then these modules are integrated to form the bigger
program structures. So next stage of testing deals with the errors that occur while integrating
modules. That's why next testing done is called integration testing, which is discussed next.

080380107013&080380107019 Testing


RKCET(CE) Page 102


7.2.2 Integration Testing
Unit testing ensures that all modules have been tested and each of them works properly
individually. Unit testing does not guarantee if these modules will work fine if these are
integrated together as a whole system. It is observed that many errors crop up when the
modules are joined together. Integration testing uncovers errors that arises when modules are
integrated to build the overall system.
Following types of errors may arise:
Data can be lost across an interface. That is data coming out of a module is not going
into the desired module.
Sub-functions, when combined, may not produce the desired major function.
Individually acceptable imprecision may be magnified to unacceptable levels. For
example, in a module there is error-precision taken as +- 10 units. In other module
same error-precision is used. Now these modules are combined. Suppose the
errorprecision from both modules needs to be multiplied then the error precision
would be +-100 which would not be acceptable to the system.
Global data structures can present problems: For example, in a system there is a
global memory. Now these modules are combined. All are accessing the same global
memory. Because so many functions are accessing that memory, low memory
problem can arise.
Integration testing is a systematic technique for constructing the program structure
while conducting tests to uncover errors associated with interfacing. The objective is to take
unit tested modules, integrate them, find errors, remove them and build the overall program
structure as specified by design.
There are two approaches in integration testing. One is top down integration and the other is
bottom up integration.
Top-down integration is an incremental approach to construction of program structure.
In top down integration, first control hierarchy is identified. That is which module is driving
or controlling which module. Main control module, modules sub-ordinate to and ultimately
sub-ordinate to the main control block are integrated to some bigger structure. For integrating
depth-first or breadth-first approach is used.

080380107013&080380107019 Testing


RKCET(CE) Page 103



Fig.7.2.2.1 Top down integration
In depth first approach all modules on a control path are integrated first. See fig. 9.6.
Here sequence of integration would be (M1, M2, M3), M4, M5, M6, M7, and M8. In breadth
first all modules directly subordinate at each level are integrated together.
Using breadth first for fig. 9.6 the sequence of integration would be (M1, M2, M8), (M3,
M6), M4, M7, andM5.
Bottom-up integration testing starts at the atomic modules level. Atomic modules are the
lowest levels in the program structure. Since modules are integrated from the bottom up,
processing required for modules that are subordinate to a given level is always available, so
stubs are not required in this approach.
A bottom-up integration implemented with the following steps:
Low-level modules are combined into clusters that perform a specific software
subfunction. These clusters are sometimes called builds.
A driver (a control program for testing) is written to coordinate test case input and
output.
The build is tested.
Drivers are removed and clusters are combined moving upward in the program
structure.

080380107013&080380107019 Testing


RKCET(CE) Page 104



Fig7.2.2.2 (a) Program Modules (b)Bottom-up integration applied to program modules in (a)
Fig shows the how the bottom up integration is done. Whenever a new module is
added to as a part of integration testing, the program structure changes. There may be new
data flow paths, some new I/O or some new control logic. These changes may cause problems
with functions in the tested modules, which were working fine previously.
To detect these errors regression testing is done. Regression testing is the re-execution of
some subset of tests that have already been conducted to ensure that changes have not



080380107013&080380107019 Testing


RKCET(CE) Page 105


propagated unintended side effects in the programs. Regression testing is the activity that
helps to ensure that changes (due to testing or for other reason) do not introduce undesirable
behavior or additional errors.
As integration testing proceeds, the number of regression tests can grow quite large.
Therefore, regression test suite should be designed to include only those tests that address one
or more classes of errors in each of the major program functions. It is impractical and
inefficient to re-execute every test for every program functions once a change has occurred.
7.2.3 Validation Testing
After the integration testing we have an assembled package that is free from modules
and interfacing errors. At this stage a final series of software tests, validation testing begin.
Validation succeeds when software functions in a manner that can be expected by the
customer.
Major question here is what are expectations of customers. Expectations are defined in
the software requirement specification identified during the analysis of the system. The
specification contains a section titled Validation Criteria Information contained in that
section forms the basis for a validation testing.
Software validation is achieved through a series of black-box tests that demonstrate
conformity with requirements. There is a test plan that describes the classes of tests to be
conducted, and a test procedure defines specific test cases that will be used in an attempt to
uncover errors in the conformity with requirements.
After each validation test case has been conducted, one of two possible conditions
exists:
The function or performance characteristics conform to specification and are accepted,
or
A deviation from specification is uncovered and a deficiency list is created. Deviation or error
discovered at this stage in a project can rarely be corrected prior to scheduled completion. It
is often necessary to negotiate with the customer to establish a method for resolving
deficiencies.

080380107013&080380107019 Testing


RKCET(CE) Page 106


7.2.3.1 Alpha-Beta Testing
For a software developer, it is difficult to foresee how the customer will really use a
program. Instructions for use may be misinterpreted; strange combination of data may be
regularly used; and the output that seemed clear to the tester may be unintelligible to a user in
the field.
When custom software is built for one customer, a series of acceptance tests are
conducted to enable the customer to validate all requirements. Acceptance test is conducted
by customer rather than by developer. It can range from an informal test drive to a planned
and systematically executed series of tests. In fact, acceptance testing can be conducted over a
period of weeks or months, thereby uncovering cumulative errors that might degrade the
system over time.
If software is developed as a product to be used by many customers, it is impractical
to perform formal acceptance tests with each one. Most software product builders use a
process called alpha and beta testing to uncover errors that only the end user seems able to
find.
Customer conducts the alpha testing at the developers site. The software is used in a
natural setting with the developer. The developer records errors and usage problem. Alpha
tests are conducted in a controlled environment.
The beta test is conducted at one or more customer sites by the end user(s) of the
software. Here, developer is not present. Therefore, the beta test is a live application of the
software in an environment that cannot be controlled by the developer. The customer records
all problems that are encountered during beta testing and reports these to the developer at
regular intervals. Because of problems reported during beta test, the software developer
makes modifications and then prepares for release of the software product to the entire
customer base.
7.2.4 System Testing
Software is only one element of a larger computer-based system. Ultimately, software
is incorporated with other system elements and a series of system integration and validation
tests are conducted. These tests fall outside the scope of software engineering process and are
not conducted solely by the software developer.

080380107013&080380107019 Testing


RKCET(CE) Page 107


System testing is actually a series of different tests whose primary purpose is to fully
exercise the computer-based system. Although each test has a different purpose, all work to
verify that all system elements have been properly integrated and perform allocated functions.
In the following section, different system tests are discussed.
7.2.4.1 Recovery Testing
Many computer-based systems must recover from faults and resume operation within
a pre-specified time. In some cases, a system may be fault tolerant; that is, processing faults
must not cause overall system function to cease. In other cases, a system failure must be
corrected within a specified period or severe economic damage will occur.
Recovery testing is a system test that forces the software to fail in a variety of ways and
verifies that recovery is properly performed. It the recovery is automated (performed by
system itself), re-initialization mechanisms, data recovery, and restart are each evaluated for
correctness. If the recovery requires human intervention, the mean time to repair is evaluated
to determine whether it is within acceptable limits.
7.2.4.2 Stress Testing
Stress tests are designed to confront program functions with abnormal situations.
Stress testing executes a system in a manner that demands resources in abnormal quantity,
frequency, or volume. For example, (1) special tests may be designed that generate 10
interrupts are seconds, when one or two is the average rate; (2) input data rates may be
increased by an order of magnitude to determine how input functions will respond; (3) test
cases that require maximum memory or other resources may be executed; (4) test cases that
may cause excessive hunting for disk resident data may be created; or (5) test cases that may
cause thrashing in a virtual operating system may be designed. The testers attempt to break
the program.
7.2.4.3 Security Testing
Any computer-based system that manages sensitive information or causes actions that
can harm or benefit individuals is a target for improper or illegal penetration.
Security testing attempts to verify that protection mechanism built into a system will protect it
from unauthorized penetration. During security testing, the tester plays the role of the
individual who desires to penetrate the system. The tester may attack the system with custom
software designed to break down any defenses that have been constructed; may overwhelm

080380107013&080380107019 Testing


RKCET(CE) Page 108


the system, thereby denying service to others; may purposely cause system errors, hoping to
find the key to system entry; and so on.
Given enough time and resources, good security testing will ultimately penetrate a system.
The role of the system designer is to make penetration cost greater than the value of the
information that will be obtained in order to deter potential threats.
7.2.5 User Acceptance Test
Once the payroll system is ready for implementation, the Payroll department will
perform User Acceptance Testing. The purpose of these tests is to confirm that the system is
developed according to the specified user requirements and is ready for operational use.


7.3 TESTING METHODS
There are mainly two types of the testing methods which are as follows:

7.3.1 Black-box Testing
The black-box approach is a testing method in which test data are derived from the
specified functional requirements without regard to the final program structure. It is also
termed data-driven, input/output driven, or requirements-based testing. Because only the
functionality of the software module is of concern, black-box testing also mainly refers to
functional testing -- a testing method emphasized on executing the functions and examination
of their input and output data. The tester treats the software under test as a black box -- only
the inputs, outputs and specification are visible, and the functionality is determined by
observing the outputs to corresponding inputs. In testing, various inputs are exercised and the
outputs are compared against specification to validate the correctness. All test cases are
derived from the specification. No implementation details of the code are considered.
It is obvious that the more we have covered in the input space, the more problems we
will find and therefore we will be more confident about the quality of the software. Ideally we
would be tempted to exhaustively test the input space. But as stated above, exhaustively
testing the combinations of valid inputs will be impossible for most of the programs, let alone
considering invalid inputs, timing, sequence, and resource variables. Combinatorial explosion
is the major roadblock in functional testing. To make things worse, we can never be sure

080380107013&080380107019 Testing


RKCET(CE) Page 109


whether the specification is either correct or complete. Due to limitations of the language
used in the specifications (usually natural language), ambiguity is often inevitable. Even if we
use some type of formal or restricted language, we may still fail to write down all the possible
cases in the specification. Sometimes, the specification itself becomes an intractable problem:
it is not possible to specify precisely every situation that can be encountered using limited
words. And people can seldom specify clearly what they want -- they usually can tell whether
a prototype is, or is not, what they want after they have been finished. Specification problems
contributes approximately 30 percent of all bugs in software.
The research in black-box testing mainly focuses on how to maximize the
effectiveness of testing with minimum cost, usually the number of test cases. It is not possible
to exhaust the input space, but it is possible to exhaustively test a subset of the input space.
Partitioning is one of the common techniques. If we have partitioned the input space and
assume all the input values in a partition is equivalent, then we only need to test one
representative value in each partition to sufficiently cover the whole input space. Domain
testing partitions the input domain into regions, and consider the input values in each domain
an equivalent class. Domains can be exhaustively tested and covered by selecting a
representative value(s) in each domain. Boundary values are of special interest. Experience
shows that test cases that explore boundary conditions have a higher payoff than test cases
that do not. Boundary value analysis requires one or more boundary values selected as
representative test cases. The difficulties with domain testing are that incorrect domain
definitions in the specification can not be efficiently discovered.
Good partitioning requires knowledge of the software structure. A good testing plan will not
only contain black-box testing, but also white-box approaches, and combinations of the two.

7.3.2 White-box Testing
Contrary to black-box testing, software is viewed as a white-box, or glass-box in
white-box testing, as the structure and flow of the software under test are visible to the tester.
Testing plans are made according to the details of the software implementation, such as
programming language, logic, and styles. Test cases are derived from the program structure.
White-box testing is also called glass-box testing, logic-driven testing or design-based testing

080380107013&080380107019 Testing


RKCET(CE) Page 110


There are many techniques available in white-box testing, because the problem of
intractability is eased by specific knowledge and attention on the structure of the software
under test. The intention of exhausting some aspect of the software is still strong in white-box
testing, and some degree of exhaustion can be achieved, such as executing each line of code
at least once (statement coverage), traverse every branch statements (branch coverage), or
cover all the possible combinations of true and false condition predicates (Multiple condition
coverage).
Control-flow testing, loop testing, and data-flow testing, all maps the corresponding
flow structure of the software into a directed graph. Test cases are carefully selected based on
the criterion that all the nodes or paths are covered or traversed at least once. By doing so we
may discover unnecessary "dead" code -- code that is of no use, or never get executed at all,
which can not be discovered by functional testing.
In mutation testing, the original program code is perturbed and many mutated
programs are created, each contains one fault. Each faulty version of the program is called a
mutant. Test data are selected based on the effectiveness of failing the mutants. The more
mutants a test case can kill, the better the test case is considered. The problem with mutation
testing is that it is too computationally expensive to use. The boundary between black-box
approach and white-box approach is not clear-cut. Many testing strategies mentioned above,
may not be safely classified into black-box testing or white-box testing. It is also true for
transaction-flow testing, syntax testing, finite-state testing, and many other testing strategies
not discussed in this text. One reason is that all the above techniques will need some
knowledge of the specification of the software under test. Another reason is that the idea of
specification itself is broad -- it may contain any requirement including the structure,
programming language, and programming style as part of the specification content.
We may be reluctant to consider random testing as a testing technique. The test case
selection is simple and straightforward: they are randomly chosen. Study in indicates that
random testing is more cost effective for many programs. Some very subtle errors can be
discovered with low cost. And it is also not inferior in coverage than other carefully designed
testing techniques. One can also obtain reliability estimate using random testing results based
on operational profiles. Effectively combining random testing with other testing techniques
may yield more powerful and cost-effective testing strategies.

080380107013&080380107019 Testing


RKCET(CE) Page 111


7.4 TEST CASES:
Table 7.4 Test Cases
Test
case
id
Test
case
name
Test case desc.
Test steps
Te
st
cas
e
stat
us
Te
st
stat
us
(
P/
F)
Test
prio
rity
Defe
ct
serve
rity
Step Expected Act
ual

Logi
n 1
Valid
ate
login
To verify the
login_ Id and it
must be >4 and
no special symbol
allow.
If entered
user_id say (abc)
Error
message
user_id
must be >4

To verify the
login_ Id and it
must be >4 and
special symbol
not allowed.
if entered
user_id say
(abc$)
Error
massage
user_id
Should not
contain any
symbol.

To verify the
login_ Id and it
should not be >4
and symbol not
allowed.
If entered user
say (abcde)
Successful
login.

Logi
n 2
Valid
ate
login
To verify the
login_ Id and it
must be >4 and
If entered
user_id say (abc)
Error
message
user_id




080380107013&080380107019 Testing



RKCET(CE) Page 112


no special symbol
allow.
must be >4










To verify the
login_ Id and it
must be >4 and
special symbol not
allowed.
if entered user_id
say
(abc$)
Error
massage
user_id
Should not
contain ant
symbol.

To verify the
login_ Id and it
should not be >4
and symbol not
allowed.
If entered user say
(abcde)
Successful
login.

Logi
n 3
Valid
ate login
To verify the
login_ Id and it
must be >4 and
no special symbol
allow.
If entered
user_id say (abc)
Error
message
user_id
must be >4

To verify the
login_ Id and it
must be >4 and
special symbol not
allowed.
if entered user_id
say
(abc$)
Error
massage
user_id
Should not
contain ant
symbol.

To verify the
login_ Id and it
should not be >4
and symbol not
allowed.
If entered user say
(abcde)
Successful
login.










080380107013&080380107019 Testing



RKCET(CE) Page 113


Pass
word
1
Valid ate
Pass word
To verify the
password and it
should not be
same as user_id
and symbol are
allow.
If entered
password say(abcde)
Error
message
password
and user-id
must not be
same.

Pass
word
2
Valid
ate Pass
word
To verify the
password and it
should not be
same as user-id
and symbol are
allow.
If entered
password say(abcde)
Error
message
password
and user-id
must not be
same.

Pass Valid To verify
the
If entered Error
word
3
ate Pass
word
password and it
should not be
same as user-id
and symbol are
allow.
password say(abcde) message
password
and user-id
must not be
same.

Sto
ck
entry
Valid ate
itemname
To varify that item
name must be
accoring to its id.
If clerk 1 enter item
name as cosmetic
and click on submit
Item n ame
is incorrect





If clerk 1 enter
item_name as
jwellery and click on
submit
Item name
is incorrect





If clerk 1 enter
item_name as dress
and click on submit
Product is
correct and
stockentry
page is
opened





Valid ate
fields
To varify that
fields(Item__nam
e,price,date) are
ffully field.
If clerk enter
Item_name
,price and click on
submit
Date must
be entered

If clerk enter
item_name,date and
click on submit
Price must
be entered


080380107013&080380107019 Testing



RKCET(CE) Page 114


If clerk enter price
and date click on
submit
Item_name
must be
entered

For logou
t
To varify that user
want to logout
If clerk clik on logout
button
Window
asking
whether
you want
to logout
(yes or
No).

If clerk clik on yes You never
been
logout

If clerk clik on
No
You cant
logout

Orde
r
Valid ate
Itemname
To varify that
ordering item
must be correct
If manager enter the
item_name
like furniture or
other item than (
dress,cosmetic,j
ewellary)
Invalid
item

If manager enter the
correct item
i.e.
dress,cosmetic,j
Entered
the
Item_name
,quality

ewellary and click on
order
,date.
Varif y
fields
To varify that
fields
(Item_name,quan
tity,date)ar fully
filled.
If manager enter
itemname,quantity
and click on order
Date must
be entered

If manager enter
item-name,date and
click on order
Quqntity
must be
entered

If manager enter
quantity date and
click on order
Item_name
must be
entered


080380107013&080380107019 Testing



RKCET(CE) Page 115


If manager enter
itemname,quantity,d
ate and click on
order
Item have
been order

Varif y
logou
t
To varify that
manager logout
If Manager entered
logout button
Window
open
asking want
to
logout.(yes
or not)

If clerk clik on yes You never
been
logout

If clerk clik on
No
You cant
logout

billin
g
Valid ate
Itemname
field must not be
empty
If manager enter the
item_name other
than three product
likedress,cosmet
ic,jewellary and click
on tab than.
Product
name is
invalid

If manager not
entered the item
name than
Field must
not be
empty

If manager enter the
correct item
i.e.
dress,cosmetic,j
ewellary and click on
tab
Entered
the
Item_name
,quality
,date.

Valid ate
no_
field must not be
empty
If manager not
entered the no_of
items
Field must
not be
empty


080380107013&080380107019 Testing



RKCET(CE) Page 116


of qualit y than
If manager enter
the correct item
i.e.
dress,cosmetic,j
ewellary and
click on tab
Entered
the
Item_name
,quality
,date.

Valid ate
prize
field must not be
empty
If manager not
entered the
prize than
Field must
not be
empty

If manager enter
the correct item
i.e.
dress,cosmetic,j
ewellary and
click on tab
Entered
the
Item_name
,quality
,date.

Valid ate
total prize
field must not be
empty
If manager not
entered the
totalprize than
Field must
not be
empty

If manager enter
the correct item
i.e.
dress,cosmetic,j
ewellary and
click on tab
Entered
the
Item_name
,quality
,date.

Sto
ck
upda
te
Valid ate
itemname
To varify that
item name must
be accoring to its
id.
If admin enter
item name as
cosmetic and
click on submit
Item n ame
is incorrect

If admin enter
item_name as
jwellery and
click on submit
Item name
is incorrect

If admin enter
item_name as
dress and click
on submit
Product is
correct and
stockentry
page is
opened


080380107013&080380107019 Testing



RKCET(CE) Page 117


Valid ate
prize
field must not be
empty
If admin not
entered the
prize than
Field must
not be
empty

If admin enter
the correct item
i.e.
dress,cosmetic,j
ewellary and
click on tab
Entered
the
Item_name
,quality
,date.

Valid field must not be If admin not Field must
ate total
prize
empty entered the
totalprize than
not be
empty

If admin enter
the correct item
i.e.
dress,cosmetic,j
ewellary and
click on tab
Entered
the
Item_name
,quality
,date.

Acco
unt
upda
te
Valid ate
itemname
To varify that
item name must
be accoring to its
id.
If admin enter
item name as
cosmetic and
click on submit
Item n ame
is incorrect

If admin enter
item_name as
jwellery and
click on submit
Item name
is incorrect

If admin enter
item_name as
dress and click
on submit
Product is
correct and
stockentry
page is
opened

Verif y
old prize
Validate the old
prize field
If admin does
not give the old
prize and clik on
submit then
Field must
not be
empty

Verif y
new
prize
Validate the new
prize field
i If admin does
not give the new
prize and clik on
submit then
Field must
not be
empty


080380107013&080380107019 Testing



RKCET(CE) Page 118


Prou
ct
ratio
Verof
y
prod uct
ratio
To varify that
item name must
be accoring to its
id.
If admin enter
item name as
cosmetic and
click on submit
Item n ame
is incorrect

If admin enter
item_name as
jwellery and
click on submit
Item name
is incorrect

If admin enter
item_name as
dress and click
on submit
Product is
correct and
stockentry
page is
opened

Verif y
no_
of
prod
uct saled
To verify
field must
not be
empty
If admin does
not enter the
no_ of product
salled
Field must
not be
empty

If admin enter Successfull
the no_ of
product salled
y logged in
mont
h
Valid ate
mont
h
To verify field
must not be
empty
If admin does
not enter the
month salled
Field must
not be
empty

Das könnte Ihnen auch gefallen