Sie sind auf Seite 1von 1

Number of

Panels
Hardware
2 4
1 1 Track
1 2 Top Pivot Brackets
1 2 Top Pivots
1 2 Roller Guides
3 6 Non-Mortise Hinges
1 2 Bottom Pivots
1 2 Bottom Pivot Brackets
1 1 Spring Snugger
- 2 Door Aligners
1 2 Door Knobs
All All Necessary Fasteners
PRIME-LINE
BI -FOLDI NG DOOR
I nst al l at i on I nst r uc t i ons
STEP 3
Mount track using 1" flat head screws so face of
door is flush with or slightly recessed from
opening face. If needed, cut track to
1
/8" less
than finished opening.
STEP 4
Install jamb bracket so center line of bracket is
aligned with center line of track. Bracket must
rest firmly on the floor, or on wood block if
additional clearance is required for carpeting.
STEP 6
Guide top pivot into top pivot bracket hole of
track assembly. Lift door and place bottom pivot
into jamb bracket. Depress guide roller and
insert into track
.
STEP 5
VERTICAL ADJUSTMENT- Lift door and adjust
bottom pivot until top clearance with track is
minimal. Adjust pivot hole to provide proper
clearance on jamb.
HORIZONTAL ADJUSTMENT- To move top
pivot, remove panel(s), loosen screw and adjust
as needed.
STEP 7
4-PANEL ONLY- Install aligners on rear of door
using pan head screws. Adjust in or out until
doors are aligned with each other. Tighten
screws.
STEP 2
Install top pivot(s), guide roller(s) and bottom
pivot(s) by drilling
7
/16" diameter holes, 2" deep,
as shown. Install hinges on edge of panels,
centering third hinge.
FOR DOORS WEIGHING UP TO 30 LBS. PER PANEL
TOOLS NEEDED
STEP 1
Prepare finished door opening per chart.
Finished
Opening
Width
36" 48" 60" 72" 96"
Panel
Width*
17
3
/4" 11
3
/4" 14
3
/4" 17
3
/4" 23
3
/4"
Panel
Hight
Door opening minus 1
5
/8", minus
carpet thickness.
* Divide net opening width by the number of door
panels (2 or 4) and subtract 1/4".
STEP 8
Locate knobs approximately 36" from floor
centered in leading door panel(s). Drill
7
/64"
hole(s) and attach knob(s).
DOOR
THICKNESS
1" To 1
3
/8"
2-PANEL 4-PANEL
GUIDE ROLLER
Top Pivot Bracket Spring Snugger
Top Pivot Bracket Spring Snugger Top Pivot Bracket
2-PANEL TRACK ASSEMBLY
4-PANEL TRACK ASSEMBLY
TOP PIVOT(S) - Centered 1-1
1
/4" from edge,
spring loaded (depress to install).
TOP GUIDE ROLLER(S)
Centered
7
/8" from edge,
spring loaded (depress
to install).
7
/16" DIA.
recess
2" deep
BOTTOM PIVOT(S)
Centered 1-1
1
/4" from edge.
HINGES
TRACK
PIVOT
HOLE
GUIDE ROLLER
SPRING
BOTTOM PIVOT WITH
ADJUSTMENT SCREW
TRACK
Drill
3
/32"
pilot holes
for
3
/4" flat
head screws.
5
/16" gap
between panels
TOP PIVOT SPRING
SNUGGER
CASING
TRIM
MOULDING
JAMB JAMB BRACKET
LEADING DOORS
Drill
3
/32" pilot
holes for
1
1
/4" flat
head screws.
Drill
3
/32" Pilot
holes for
3
/4"
pan head
screws.
Drill
3
/32" pilot
holes for
3
/4" flat head
screws.
TRACK
SNUGGER SPRING
HOUSING
Press bumper spring into
nylon spring housing and
push into track.
DOOR
BOTTOM
PIVOT
BOTTOM
PIVOT BRACKET
10"
10"
36"
Approx.
Center of Panel
P
A
N
E
L
H
E
I
G
H
T

F
I
N
I
S
H
E
D

O
P
E
N
I
N
G

H
E
I
G
H
T
PANEL
WIDTH
2003 PRIME-LINE San Bernardino, CA 92407
Drill with
3
/32",
7
/16",
7
/64" bits
Hammer Phillips
Screwdriver
Tape
Measure
TRACK ASSEMBLY
Track
Door Knob
Hinges
Round Head Screw
Flat Head Screw
Door Aligners
Spring
Snugger
Bottom Pivot
Bracket
Top
Pivot
Bottom
Pivot
Roller
Guide
KIT CONTAINS:
Top Pivot
Bracket
bi-fold door installation-english.qxp 8/18/2003 11:23 AM Page 1

Das könnte Ihnen auch gefallen