Sie sind auf Seite 1von 10

INTERNATIONAL CONSTRUCTION & INVESTMENT CONSULTANCY CO.

,LTD
Address : 2nd floor , 140 Nguyen Van Thu Street.
Dakao Ward , District 1 , HCM City VietNam
Tel: (84-8) 9111915 - 9111916 ; Fax : (84-8) 9111914
Email : m_e@icic.com.vn ; Website : www.icic.com.vn
F06-DME
Cng trnh/Project : Khu nh Estella II Ngy/Date : 12/5/2014
Hng mc/Service : Pressurization - Calculation sheet Reason for issue :
Concept; Tender; Approval; Construction; Boq; Information; Action; Comment; Revision
Danh sch pht hnh/Distribution List : S lng pht hnh/Number of copies Issued
- Khch hng/Client : Keppel land - a CD/Disk :
- Kin trc/Architect : - Bn in/Print paper :
- T vn C-in/M&E Consultant : ICIC - Bn photo/Photo paper :
- Nh thu chnh/Main Contractor : - Khc/Others :
- Khc/Others :
1./ Standard refer :
- Singapore CP-13 Mechanical ventilation and air conditioning in building
Standard Singapore CP 13 : 1999
*Floor Area (A) : 15225 m
2
*Efficient Area : 10420 m
2
*Height Level(Efficient): 2.5 m
*Air changes per hour (ACH)
Normal operating : 6.0 ACH
Emergency operating : 9.0 ACH
*Exhaust air flow :
Normal operating : 43417 L/s Adopt 43000 L/s
Emergency operating : 65125 L/s Adopt 65000 L/s
*Fresh air flow :
Normal operating : 34733 L/s Adopt 35000 L/s
Emergency operating : 52100 L/s Adopt 52000 L/s
Block 5:
*Pump room area : 58 m
2
Height : 3 m
Air Changes per Hour : 8 ACH
Exhaust air flow : 322 L/s Adopt 320 L/s
*LV switch room : 38 m
2
Height : 3 m
Air Changes per Hour : 6 ACH
Exhaust air flow : 158 L/s Adopt 160 L/s
Block 6:
*Pump room area : 48 m
2
Height : 3 m
Air Changes per Hour : 8 ACH
Exhaust air flow : 267 L/s Adopt 270 L/s
*LV switch room : 26 m
2
Height : 3 m
Air Changes per Hour : 6 ACH
Exhaust air flow : 108 L/s Adopt 110 L/s
Block 7:
*Pump room area : 68 m
2
Height : 3 m
Air Changes per Hour : 8 ACH
Exhaust air flow : 378 L/s Adopt 380 L/s
*Swimming pool Pump room area : 105 m
2
Height : 3 m
Air Changes per Hour : 8 ACH
CALCULATION SHEET OF VENTILATION OF BASEMENT
Page 1 of 10
Exhaust air flow : 583 L/s Adopt 580 L/s
*LV switch room : 52 m
2
Height : 3 m
Air Changes per Hour : 6 ACH
Exhaust air flow : 217 L/s Adopt 220 L/s
Prepared Checking 01 Checking 02&03
Name : Thi Phong Name : Thi Phong Name : L Vn Xun
Signature : Signature : Signature :
Page 2 of 10
INTERNATIONAL CONSTRUCTION & INVESTMENT CONSULTANCY CO.,LTD
Address : 2nd floor , 140 Nguyen Van Thu Street.
Dakao Ward , District 1 , HCM City VietNam
Tel: (84-8) 9111915 - 9111916 ; Fax : (84-8) 9111914
Email : m_e@icic.com.vn ; Website : www.icic.com.vn
F06-DME
Cng trnh/Project : Khu nh Estella II Ngy/Date : 12/5/2014
Hng mc/Service : Pressurization - Calculation sheet Reason for issue :
Concept; Tender; Approval; Construction; Boq; Information; Action; Comment; Revision
Danh sch pht hnh/Distribution List : S lng pht hnh/Number of copies Issued
- Khch hng/Client : Keppel land - a CD/Disk :
- Kin trc/Architect : - Bn in/Print paper :
- T vn C-in/M&E Consultant : ICIC - Bn photo/Photo paper :
- Nh thu chnh/Main Contractor : - Khc/Others :
- Khc/Others :
1./ Standard refer :
- Singapore CP-13 Mechanical ventilation and air conditioning in building
- BS EN 12101-6 : 2005 Smoke and heat control system
- TCVN 2622: 1995 Fire prevention and protection for buildings and structures - Design requirements
- TCVN 6160: 1996 Fire protection - High rise building - Design requirements
2./ System Calculation :
- Different pressure between staircase and Lobby : 5010 Pa when all doors shall be closed.
- Different pressure between staircase and Lobby : 10 Pa when final exit door & two adjoining doors at any storeys shall be opened
and all others shall be closed.
- Air velocity through by the opened doors : 0.75 m/s.
- In normal condition, ventilation for staircase : 4 Air changes per hour.
Standard: BS EN 12101-6 : 2005
System classification:
Using class E for this design.
I. Input data:
* Velocity through the opened door (V - m/s) : 0.75
* Door area (A - m2) 1.6
* Number of opened door (n) : 3
II. Equation :
Qsdo (m
3
/s) = 0.83 x A
le
x OR
Qsdo (m
3
/s) = A x V x n
Q
L
(m
3
/s) = 0.83 x A
le
x
Q
S
(m
3
/s) = Q
L
x 1.5
Qsdo : Leakage air (Different pressure shall be 10 Pa) when three doors are opened (two doors at fire floor, adjacent floor and final exit)
Q : Require flow (select the value is larger between Qs and Qsdo)
Q
L
: Leakage air when all doors are closed (Different pressure shall be 50 Pa)
A
le
: Gap of closed doors, Estimate follow the table A.3, Standard BS EN 12101-6 : 2005, A
le
= 0.02
III. Calculation :
Data: Number of floors (N) = 20 Floors
Calculate the value of Qs :
Q
L
= 4.70
(m
3
/s )
Qs= 7.04 (m
3
/s )
Calculate the value of Qsdo :
- Air flow criterion :
Qs= 3.60 (m
3
/s )
- Pressure criterion :
Qs= 13.49 (m
3
/s )
Select Q
SDO
= 13.5
(m
3
/s )
IV. Result :
The air supply for pressurization via the duct system so the required air flow shall be increased 15 %
Q = Q
SDO
x 1.15 = 15.5
(m
3
/s )
V. Estimation of size of Air release area at fire floor:
The air leak into the fire floor : 3 (m
3
/s )
Air release area = 1.6 (m
2
)
VII. Door opening forces :
The permissible pressure to limit the door opening forces : 100N
VIII. Calculation size of Air relief damper :
When all doors are closed :
Q' = Q - Q
L
= 10.82
(m
3
/s )
STAIRCASE PRESSURIZATION CALCULATION SHEET
10
50
Page 3 of 10
Air relief area = 1.68 (m
2
)
Standard: Singapore CP 13 : 1999
I. Input data :
* Staircase area (m
2
) - A 20
* Hight (m) - H 70
* Air changes per hour - n 4
* Number of floor - N 20
II. Equation :
Q
tg
= AxHxn
Q
tg
: Require flow (m
3
/hr)
III. Result :
Q
tg
= 5600
(m
3
/h )
Q
tg
= 1,600 (l/s)
Prepared Checking 01 Checking 02&03
Name : Thi Phong Name : Thi Phong Name : L Vn Xun
Signature : Signature : Signature :
STAIRCASE VENTILATION CALCULATION SHEET
Page 4 of 10
INTERNATIONAL CONSTRUCTION & INVESTMENT CONSULTANCY CO.,LTD
Address : 2nd floor , 140 Nguyen Van Thu Street.
Dakao Ward , District 1 , HCM City VietNam
Tel: (84-8) 9111915 - 9111916 ; Fax : (84-8) 9111914
Email : m_e@icic.com.vn ; Website : www.icic.com.vn
F06-DME
Cng trnh/Project : Khu nh Estella II Ngy/Date : 12/5/2014
Hng mc/Service : Pressurization - Calculation sheet Reason for issue :
Concept; Tender; Approval; Construction; Boq; Information; Action; Comment; Revision
Danh sch pht hnh/Distribution List : S lng pht hnh/Number of copies Issued
- Khch hng/Client : Keppel land - a CD/Disk :
- Kin trc/Architect : - Bn in/Print paper :
- T vn C-in/M&E Consultant : ICIC - Bn photo/Photo paper :
- Nh thu chnh/Main Contractor : - Khc/Others :
- Khc/Others :
1./ Standard refer :
- Singapore CP-13 Mechanical ventilation and air conditioning in building
- BS EN 12101-6 : 2005 Smoke and heat control system
- TCVN 2622: 1995 Fire prevention and protection for buildings and structures - Design requirements
- TCVN 6160: 1996 Fire protection - High rise building - Design requirements
2./ System Calculation :
- Different pressure between staircase and Lobby : 5010 Pa when all doors shall be closed.
- Different pressure between staircase and Lobby : 10 Pa when final exit door & two adjoining doors at any storeys shall be opened
and all others shall be closed.
- Air velocity through by the opened doors : 0.75 m/s.
- In normal condition, ventilation for staircase : 4 Air changes per hour.
Standard: BS EN 12101-6 : 2005
System classification:
Using class E for this design.
I. Input data:
* Velocity through the opened door (V - m/s) : 0.75
* Door area (A - m2) 1.6
* Number of opened door (n) : 3
II. Equation :
Qsdo (m
3
/s) = 0.83 x A
le
x OR
Qsdo (m
3
/s) = A x V x n
Q
L
(m
3
/s) = 0.83 x A
le
x
Q
S
(m
3
/s) = Q
L
x 1.5
Qsdo : Leakage air (Different pressure shall be 10 Pa) when three doors are opened (two doors at fire floor, adjacent floor and final exit)
Q : Require flow (select the value is larger between Qs and Qsdo)
Q
L
: Leakage air when all doors are closed (Different pressure shall be 50 Pa)
A
le
: Gap of closed doors, Estimate follow the table A.3, Standard BS EN 12101-6 : 2005, A
le
= 0.02
III. Calculation :
Data: Number of floors (N) = 25 Floors
Calculate the value of Qs :
Q
L
= 5.87
(m
3
/s )
Qs= 8.80 (m
3
/s )
Calculate the value of Qsdo :
- Air flow criterion :
Qs= 3.60 (m
3
/s )
- Pressure criterion :
Qs= 13.75 (m
3
/s )
Select Q
SDO
= 13.8
(m
3
/s )
IV. Result :
The air supply for pressurization via the duct system so the required air flow shall be increased 15 %
Q = Q
SDO
x 1.15 = 15.8
(m
3
/s )
V. Estimation of size of Air release area at fire floor:
The air leak into the fire floor : 3 (m
3
/s )
Air release area = 1.6 (m
2
)
VII. Door opening forces :
The permissible pressure to limit the door opening forces : 100N
VIII. Calculation size of Air relief damper :
When all doors are closed :
Q' = Q - Q
L
= 9.95
(m
3
/s )
STAIRCASE PRESSURIZATION CALCULATION SHEET
10
50
Page 5 of 10
Air relief area = 1.55 (m
2
)
Standard: Singapore CP 13 : 1999
I. Input data :
* Staircase area (m
2
) - A 20
* Hight (m) - H 87.5
* Air changes per hour - n 4
* Number of floor - N 25
II. Equation :
Q
tg
= AxHxn
Q
tg
: Require flow (m
3
/hr)
III. Result :
Q
tg
= 7000
(m
3
/h )
Q
tg
= 2,000 (l/s)
Prepared Checking 01 Checking 02&03
Name : Thi Phong Name : Thi Phong Name : L Vn Xun
Signature : Signature : Signature :
STAIRCASE VENTILATION CALCULATION SHEET
Page 6 of 10
INTERNATIONAL CONSTRUCTION & INVESTMENT CONSULTANCY CO.,LTD
Address : 2nd floor , 140 Nguyen Van Thu Street.
Dakao Ward , District 1 , HCM City VietNam
Tel: (84-8) 9111915 - 9111916 ; Fax : (84-8) 9111914
Email : m_e@icic.com.vn ; Website : www.icic.com.vn
Cng trnh/Project : Khu nh Estella II Ngy/Date : 12/5/2014
Hng mc/Service : Estimation sheet of cooling load Reason for issue :
Concept; Tender; Approval; Construction; Boq; Information; Action; Comment; Revision
Danh sch pht hnh/Distribution List : S lng pht hnh/Number of copies Issued
- Khch hng/Client : Keppel land - a CD/Disk :
- Kin trc/Architect : - Bn in/Print paper :
- T vn C-in/M&E Consultant : ICIC - Bn photo/Photo paper :
- Nh thu chnh/Main Contractor : - Khc/Others :
- Khc/Others :
No. Room Name
Room area
m2
Unit Cooling load
kW
Cooling load
kW
Electrical
capacity
kW
Quantity
Total
kW
A Apartment
Type 2A 3.6 0.0
1 Dinning & Living room 24 0.25 6.00 2.0 1 2.0
2 Master Bed room 12 0.15 1.80 0.8 1 0.8
3 Bed room 2 7.5 0.15 1.13 0.8 1 0.8
Type 2B 3.6
1 Dinning & Living room 23 0.25 5.75 2.0 1 2.0
2 Master Bed room 8.5 0.15 1.28 0.8 1 0.8
3 Bed room 2 6.6 0.15 0.99 0.8 1 0.8
Type 2C 3.6
1 Dinning & Living room 22 0.25 5.50 2.0 1 2.0
2 Master Bed room 10 0.15 1.50 0.8 1 0.8
3 Bed room 2 7 0.15 1.05 0.8 1 0.8
Type 2D 3.6
1 Dinning & Living room 21 0.25 5.25 2.0 1 2.0
2 Master Bed room 11.5 0.15 1.73 0.8 1 0.8
3 Bed room 2 9 0.15 1.35 0.8 1 0.8
Type 2E 4.1
1 Dinning & Living room 33 0.25 8.25 2.5 1 2.5
2 Master Bed room 14 0.15 2.10 0.8 1 0.8
3 Bed room 2 14 0.15 2.10 0.8 1 0.8
Type 3A 4.9
1 Dinning & Living room 27 0.25 6.75 2.5 1 2.5
2 Master Bed room 9 0.15 1.35 0.8 1 0.8
3 Bed room 2 8.6 0.15 1.29 0.8 1 0.8
4 Bed room 3 7 0.15 1.05 0.8 1 0.8
Type 3B 4.9
1 Dinning & Living room 29 0.25 7.25 2.5 1 2.5
2 Master Bed room 14 0.15 2.10 0.8 1 0.8
3 Bed room 2 9 0.15 1.35 0.8 1 0.8
4 Bed room 3 7 0.15 1.05 0.8 1 0.8
Type 3C 4.9
1 Dinning & Living room 26 0.25 6.50 2.5 1 2.5
2 Master Bed room 9 0.15 1.35 0.8 1 0.8
3 Bed room 2 9 0.15 1.35 0.8 1 0.8
4 Bed room 3 7 0.15 1.05 0.8 1 0.8
Type 3D 4.9
1 Dinning & Living room 30 0.25 7.50 2.5 1 2.5
2 Master Bed room 11 0.15 1.65 0.8 1 0.8
3 Bed room 2 12 0.15 1.80 0.8 1 0.8
4 Bed room 3 10 0.15 1.50 0.8 1 0.8
Type 3A-SINGLE PENTHOUSE 6.8
1 Dinning & Living room 65 0.2 13.00 4.0 1 4.0
2 Master Bed room 25 0.15 3.75 1.2 1 1.2
3 Bed room 2 12 0.15 1.80 0.8 1 0.8
4 Bed room 3 10 0.15 1.50 0.8 1 0.8
Type 3B-SINGLE PENTHOUSE 6.8
1 Dinning & Living room 65 0.2 13.00 4.0 1 4.0
2 Master Bed room 26 0.15 3.90 1.2 1 1.2
3 Bed room 2 10 0.15 1.50 0.8 1 0.8
4 Bed room 3 10 0.15 1.50 0.8 1 0.8
Type 4-LOWER DUPLEX PENTHOUSE 11.2
Lower
1 Dinning & Living room 53 0.25 13.25 4.0 1 4
ESTIMATION OF COOLING LOAD
Page 7 of 10
2 Master Bed room 17 0.15 2.55 0.8 1 0.8
3 Bed room 3 10 0.15 1.50 0.8 1 0.8
Upper
1 Family room 25 0.25 6.25 4.0 1 4
2 Master Bed room 24 0.15 3.60 0.8 1 0.8
3 Bed room 2 14 0.15 2.10 0.8 1 0.8
Type 4-SINGLE PENTHOUSE 9.4
1 Dinning & Living room 82 0.25 20.50 7.0 1 7.0
2 Master Bed room 23 0.15 3.45 0.8 1 0.8
3 Junior master Bed room 19 0.15 2.85 0.8 1 0.8
4 Bed room 2 13 0.15 1.95 0.8 1 0.8
Type 5-LOWER DUPLEX PENTHOUSE 10.0
Lower
1 Dinning & Living room 60 0.25 15.00 4.0 1 4.0
2 Junior master Bed room 15 0.15 2.25 0.8 1 0.8
3 Bed room 3 11 0.15 1.65 0.8 1 0.8
4 Bed room 4 12 0.15 1.80 0.8 1 0.8
Upper
1 Family room 22 0.25 5.50 2.0 1 2.0
2 Master Bed room 17 0.15 2.55 0.8 1 0.8
3 Bed room 5 14 0.15 2.10 0.8 1 0.8
Type 5A-SINGLE PENTHOUSE 10.2
1 Dinning & Living room 76 0.25 19.00 7.0 1 7.0
2 Master Bed room 12 0.15 1.80 0.8 1 0.8
3 Junior master Bed room 12 0.15 1.80 0.8 1 0.8
3 Bed room 4 12 0.15 1.80 0.8 1 0.8
4 Bed room 5 12 0.15 1.80 0.8 1 0.8
Type 5B-SINGLE PENTHOUSE 13.0
1 Dinning & Living room 100 0.25 25.00 9.0 1 9.0
2 Master Bed room 15 0.15 2.25 0.8 1 0.8
3 Junior master Bed room 13 0.15 1.95 0.8 1 0.8
4 Bed room 3 10 0.15 1.50 0.8 1 0.8
5 Bed room 4 12 0.15 1.80 0.8 1 0.8
6 Bed room 5 12 0.15 1.80 0.8 1 0.8
Prepared Checking 01 Checking 02&03
Name : Thi Phong Name : Thi Phong Name : L Vn Xun
Signature : Signature : Signature :
Page 8 of 10
INTERNATIONAL CONSTRUCTION & INVESTMENT CONSULTANCY CO.,LTD
F06-DME
Concept; Tender; Approval; Construction; Boq; Information; Action; Comment; Revision
Remarks
ESTIMATION OF COOLING LOAD
Page 9 of 10
Page 10 of 10

Das könnte Ihnen auch gefallen