The Laboratory is implementing a watershed-scale project to mitigate transport of legacy contaminated sediment within the Los Alamos and Pueblo Canyon watershed. The mitigation approach uses a variety of structures located throughout the watershed, each with a specific purpose towards either reducing the erosion potential in stormwater runoff or to trap sediment being transported in stormwater runoff. The project also includes instrumentation of 3 stream gages to enable real-time notification of floods to the Buckman Direct Diversion project for their use in operational decisions.