Abstract
RAJUK (the capital Development Authority), former DIT, has been established in 1956
and entrusted with giving the responsibilities of improving physical and urban
condition of the Dhaka City. It is the supreme authority for 3 specific areas;
preparing plan for Dhaka city, execution of plan and control its development within
its jurisdiction. Presently, Dhaka became one of the fasted growing cities in the world
and its population more than 12 millions. Around 350 thousands new people are
adding to the existing city population in every year which creates huge pressure on
traffic and transportation, housing, power, gas and other utility services. It became
almost impossible to the city development agencies to deliver housing, transport and
other services to the city dwellers accordingly. So that every year scenario of city’s
built environment is getting worse than the previous year. RAJUK miserably failed in
the plan execution especially control its development as per the plan and the norms
and planning laws of the city. RAJUK provides ‘Planning Permission’ and ‘Land use
Clearance’ to the private land owner to construct any structure on his/her land in the
urban area in accordance to the compatibility of the master plan. It is the only
technique to implement the master plan and maintain the desired land use of an
urban area. But due to serious shortage of skilled manpower, corruption in the
planning permission process, lack of visionaries and weak monitoring capacity of
RAJUK Dhaka city grew haphazard way and turned into an unmanageable mega city.
As a result, the living conditions have deteriorated very rapidly and the social as well
as physical infrastructure are on the verge of collapse. This paper mainly focuses on
the process of planning permission of RAJUK for a new building and evaluates its
capacity of monitoring the development of Dhaka City. It also criticizes the
shortcomings, bribing and malpractices in this process which resulted an unplanned
city.
Introduction
It is the responsibility of urban local government to prepare physical development plan
of a city and develop and control its growth accordingly. Ratecliff (1993) explained that,
for this purpose ‘certain planning standards are followed to control the physical setting of
the urban area and to ensure safety, health, amenity welfare, convenience, efficiency and
public interest.’ A system of development control introduced in UK under the provisions
of the 1947 Town and Country Planning Act which required for the first time that all
future building development and any material change in the use of the building would,
henceforth, be subject to the need for planning permission from a local authority
(Ratecliff, 1993). In Dhaka city a government nominated a special agency RAJUK (the
Capital Development Authority) prepares city plan and sets the broad goals and
objectives of the development plan. All the strategies of development plan are translated
into specific land use and space requirements in such a way that it could ensures the
optimum utilization of resources as various uses of land competes to each other.
RAJUK is the legitimate agency entrusted with the job of preparing plan for Dhaka city,
ensuring development as per the prepared plan and controlling the future development.
It exerts its power of development control as per the development plan through planning
permission1 (Mahmud 2006). Planning Permission is consisting of 2 phase approval
namely; land use clearance and building permission. ‘Land use clearance’ certificate is
1
It is the certification that proposed land use of a land is compatible with the development plan and its
design followed the planning laws and standard of RAJUK.
1
given after examining the compatibility with master plan and ‘Building Permission’ is for
proper designing a building as per the Building Construction Rules of RAJUK.
Presently, RAJUK exercise 5 legal instruments for the development control of Dhaka
City’s land use. They are Town Improvement Act 1953, EBBC (East Bengal Building
Construction) Act 1952, Private Residential Land Development Rules 2004, Wet Land
Conservation Act 2002 and Development Metropolitan Development Plan (DMDP).
Every construction/erection/excavation with in the jurisdiction of RAJUK requires
permission/approval from the Authorized Officer or Building Construction Committee
appointed under the provision of the Town Improvement Act, 1953. Any type of building
construction, housing, commercial, industrial and whatsoever need planning permission
and they must be in conformity with the land use provision of Master Plan/Urban Area
Plan/Detailed Area Plans of different SPZ’s.
Mahmud (2006) thinks, due to RAJUK’s weak institutional capacity, development control
of Dhaka City can be characterize in these ways; Firstly, whole the process of planning
permission is criticized with lot of allegations like; unnecessary delay of file processing
and harassment coupled with bribery and corruption. Secondly, overlooking or ignoring
the provisions of planning laws intentionally from RAJUK and client both end. Third one
is more technical that is incompetencies of RAJUK for skill man power and insufficient
urban planners in the planning department. Fourthly, which happens in the
implementation stage, is violation of plan by the people, construction without planning
permission etc for the lack of effective monitoring by the RAJUK.
This paper will demonstrate the process of getting a planning approval, critically review
the whole process, how it affects the development control and last not the list, how it
helps to implement the plan of a city.
Methodology of the study describes the research strategy adopted and step
followed to achieve the objectives of the study as showed in the following.
i) Conceptualization: collected text and document related to development
control, growth management and planning permission helped to
develop theoretical background of the research.
ii) Secondary Information Collection: Ordinance, rules etc of government in
physical planning were collected from RAJUK and other related
organization and studied to know the functions, roles and responsibility
of concern authority. An in-depth investigation into the recorded
documents helped to understand the process of issuing land use
clearance and building plan-permission and their nature.
iii) Field Investigation and Justification: A sample survey was conducted in
the year 2008 to know the implementation of ‘approved plan’ from
Md. Akter Mahmud
Page 2 of 17
RAJUK. Samples were rationally distributed in the different areas of the
Dhaka City. Economic classes, income, planned areas and unplanned
areas were considered during sample distribution. Field investigation
was necessary for this research to know the types of violation of
building rules, how they were deviated from the plan that issued from
RAJUK and how they manage to do that. A comprehensive field
investigation will help to identify and quantify the level of corruption
done by the RAJUK and its officials.
a. Multi-Sampling: Firstly whole city was divided into two major
types e.g.; planned and spontaneously developed area. Then few
areas were selected from both categories as sample. 50 samples
were randomly collected from 3 planned residential areas, Uttara,
Gulshan and Banani, of Dhaka city. Other 125 samples were
randomly collected the spontaneously developed areas like;
Khilgaon, Taltala, Lalmatia, Shamoli, Mirpur, Kallanpur, Bangshal,
Tantibazar and Mugdhapara etc. During sample collection and area
selection socio-economic consideration was taken into account
Sample distribution is shown in the following:
b. Information from RAJUK: the process of “land use clearance” and
building permission process were reviewed. RAJUK officials and the
applicants of building permission and the brokers were interviewed
for preparing the paper.
iv) Interviews: Interviews were conducted with the researchers, experts
and concern officials of RAJUK which will help to enrich the report.
v) Data Analysis: All the information collected from both primary and
secondary sources were analyzed and explored for a suitable solution
Urbanization Pattern of Dhaka City
The creation of the independent state of Bangladesh in 1971, it gave Dhaka the glory and
prestige of the capital of a sovereign country. This led to Dhaka's phenomenal growth. A
recent study by World Bank has estimated that about 40% of the total population in
Bangladesh will be living in urban area in Bangladesh by 2025 (ADB, 2000). Urban
population density in Bangladesh was 2179 persons/sq.km in 1991 and the present
density is estimated at approximately 3008 persons/sq.km. Population density of Dhaka
mega city was found to be 4795 persons/sq.km in 1991 and the present density is
estimated at approximately 8573 persons/sq.km. However, the population density of
DCC area is more than three times of the megacity area, as in 1991 it was 15333
persons/sq.km against estimated present density of 18055 persons/sq.km (BBS, 2001).
With limited availability of floodfree land, further densification of population along with
haphazard encroachment of peripheral land of Dhaka as well as in urban areas of
Bangladesh seems inevitable. Dhaka has the lion’s share of urban population. The
following table shows the level of urbanization in Dhaka region.
13
12
Figure 1 shows the population has increased from 7.3 million in 1991 to 12.2
11is expected that the population of Dhaka city will be 13.6
million in 2005. It
Population (million)
million and 24.25 million by the year 2010 and 2025 respectively (Azam,
2006). The primary reason of this fast growing trend of urbanization of Dhaka
are largely attributed to the establishment of capital city, locations of various
government and non-government offices, industrial and commercial
10
organizations, educational institution etc. (Jahan, et al, 2007).This rapid pace
of urbanization creates extreme pressure on basic utility services such as
Md. Akter Mahmud
Page 4 of 17
9
shelter, water, electricity etc. For instance, presently, the water demand of
Dhaka is 210 crore litres per day and the supply is 170 to 180 crore litres per
day. Thus Dhaka is facing shortage of water of 30 to 40 crore litres every day
(Daily Prothom Alo, 2008,). Lion’s share of water supply of Dhaka (86.26%)
comes from groundwater. Groundwater extraction puts heavy pressure on the
city’s water table, especially when most of the city’s supply of water depends
on what the tube wells extract from the ground. As a result ground water table
lowering 2-3 meters every year which became an environmental threat for the
city dwellers.
Fig 2: Typical Development Control Process
Goals and objectives of
development plan
Follow the
planning norms/
standards
Translation in to land use
and space requirement
Guided by:
Rules/ Planning Laws
Planning norms
Implementation of plan Circular
through project/ action Government order
plan/ planning permission Government decision
Gazette notification
Source: Developed by the Author
Land use Clearance
Generally planned residential areas of RAJUK like; Gulshan, Banani, Uttara, Dhanmondi
and other private housing areas that already have the approval of RAJUK for developing
as residential area are not subject to take the ‘land use clearance’ from RAJUK. For other
areas taking the land use clearance is must before submitting plans for construction.
Generally land use clearances are of two types:
• Type 1: General land use clearance
• Type 2: Land use clearance using TI act
Fig 3: A general Land use permission process
Collecting ‘Land use
clearance form’ by depositing
400Tk in Bank
Submitting complete
form with Mouza map
showing the proposed
map in the Planning
Section Surveyor will prepare a sketch
with correct field information
& sends it to ATP
ATP approves
application and send it
to Drafts man
Draftsman sign on
application and send it Applicant collect it from
to disperse disperse
Md. Akter Mahmud
Page 6 of 17
Source: Own Illustration
Type 1: Direct land use permission can be given if the proposed criteria of land use in
certain area matches to the criteria and standards set by the Master plan for that area. Fig
3 shows the process how direct land use permission reached to an applicant after he
submits his application a ‘general land use permission’ within the master plan area. As
per the section 74 (1) of TI Act,
‘…………. it shall be unlawful for any person to use any land for any purposes other
than laid down in the Master Plan, unless he has been permitted to do so under section
75, and
As per the Section 74(3) of the same Act,
‘All future developments and construction, both public and private, shall be conformity
with the Master Plan or with the amendment thereof.’
Type 2: Second type of land use clearance is more complicated and time consuming
which is shown in the fig. 4. However, for any kind of deviation or mismatch to the
Master plan the application have to be proceeding through the TI Act 75(I)/(II).
“ 75(1) If any person desires to use any land for any purpose other than that laid down
in the [Master] Plan, he may apply in writing to the Chairman for permission so to do.”
“75(2) If the Chairman refuses permission to any person, such person may, within
sixty days of the Chairman’s refusal, appeal to the [Kartripakkha] against such refusal.”
Planning clearance or land use clearance is the step to check whether the proposed use of
land confirm with the prepared plan by RAJUK. Ideally, this clearance assure planners
that land will be used as per plan of the city. RAJUK control, all the development
activities of Dhaka City under the provisions of Town Improvement Acts, Building
Construction Rules and Land Use Regulations within the area under its jurisdiction. Any
use of land or any type of construction needs approval or clearance from RAJUK and
Authorized Sections are responsible for issuing those land use clearances.
Evaluation of Land Use Permission Process
In black and white, it should take more or less 3 weeks to get a land use order by a plot
owner/ applicant. From the field survey it was found that plan permission process is so
complex, lengthy and harassing that people rarely take the normal procedure of plan
permission rather they prefer to go through a deal with the illegal agents by giving them
extra money. File processing does not processed without persuasion or deal with the
RAJUK officials. RAJUK’s official website2 says, Land use clearances have found some or
major deviations when constructing the buildings and seemed to be regular practice
almost in every cases of approved plans. These happened due to nonapplications of
powers and lack in enforcement of building constructions rules and regulations. Field
survey and interviews with planners suggest that negligence in duties, intention to forgo
some specific cases, poor inspection and reporting and political influence made
Authorized Section a fearsome part of the organization. In case of some critical issues,
clients or developers some how manage the authority for land use clearances for
particular areas where development is restricted for specific purpose. Peoples claimed
that the files/plans are not approved properly and sites are not inspected as per given
2
http://www.rajukdhaka.gov.bd/new/about_rajuk/major_activities.htm Date of visit: May 02, 2009
Md. Akter Mahmud
Page 7 of 17
parameters. The unnecessary harassment or time killing or missing of specific files or put
objections on files are most common practice dealing the Authorized Sections. The overall
performance of this section is not up to the mark as mentioned by the clients.
Assistant Town
Planner (ATP) of
Concern area Draftsman
Source: Own Illustration
Building approval
Building approval is the step where applicant applies by fulfilling the requirements like
detail plans, sections, elevation etc of the proposed building as per the Building
construction rules. The following documents are required to authorize a design.
1. Deed
2. Duplicate Carbon Receipt (DCR)
3. Land Rent receipt
4. Mutation
5. Draft Publication From
Md. Akter Mahmud
Page 9 of 17
6. 7 copies of the plan (for building up to 6 storied)
If the building has more than 6 floors, a structural design is required along with the prior
clearance certificates from the 7 organizations as mentioned in the previous section. For
applying a building permission of residential building/residential cum commercial
building more than 6 storey heights RAJUK demands prior clearance certificates from the
following organizations:
o Directorate of Environment
o Dhaka Electric Supply Authority (DESA)
o Water and Sewerage Supply Authority (WASA)
o TITAS Gas
o Dhaka Metropolitan Police (DMP) Traffic
o Dhaka City Corporation (DCC)
o Civil Aviation Authority Bangladesh (CAAB)
RAJUK has a Development Control Section (Authorized Section). Previously this section
was comprised with two Authorized Officers, two Assistant Authorized Officers, four
Chief Building Inspectors, 50 Building Inspectors and other staff. Now the number of
Authorized Section has been increased to four (4) instead of two (2) by increasing the staff
members and demarking the areas specified under control of each authorized
jurisdiction. These sections are supported by the four Building Construction (BC)
Committees headed by the Members (Planning and Development) for approval of the
building plans and exercising the powers of the Act for planned growth of the city.
Law of approving a rejected plan
If a plan is rejected the plot owner can make an appeal in the appealed division of the BC
committee. This committee examines the plan again. If they find it is satisfactory, the BC
committee can approve it. However, they can even reject it.
Evaluation of Building Approval Process
After a series of checks and clarifications the application is referred to the Building
Construction Committee for approval or rejection. It is done by the Authorized Section of
RAJUK. The Authorized section is bound to give the clearance within 3 weeks. However,
it varies with the frequency of their meeting. RAJUK admitted in their official webpage
that in some cases the process of plan or building construction approval or clearance
delayed due to some undefined circumstances and caused peoples to take alternative
solutions. Misuse of power as claimed by the clients; causes unnecessary harassment and
delay. The provisions of Act clearly defined that the plans should be forwarded for
clearance or approval within 45 days and if, any objection made in the plan must be
notified within 30 days after submission for approval. In fact the process sometimes take
more time as specified in the Act and in many cases it takes years to get the approval.
Without pursuing the file/case file does not go forward. As a result, to avoid the
harassment, unnecessary delay, bypassing the planning laws, bypassing the
shortcomings of the plot; people tend to take some other means for plan permission.
RAJUK’s Authorized Sections are carrying out and dealing the process of development
control and responsible for issuing land use clearance or approval for building plans
under the provision of TI Act.
Md. Akter Mahmud
Page 10 of 17
Table 2: Reasons for taking the assistance of agents
Sl Reasons Percentage
No
1 To avoid unnecessary delay 53%
2 To avoid harassment 22%
3 Don’t have to spent for running after it 7%
4 To avoid the complex process of plan approval 13%
5 Others 5%
Total 100%
Source: Field survey 2008
From the field survey and interview with the client (land owners) and agents, it was
found that 5 basic reasons are responsible for corruption in the planning permission
process of RAJUK. They are:
o to avoid the harassment
o complex process of planning permission
o unnecessary delay
o bypassing the planning laws
o bypassing the shortcomings of the plot owner
Law for a building constructed without prior permission
If any plot owner built his building without the due approval of RAJUK there is a
provision of regularizing the plan and the building with penalties. There is a law enacted
since 1987. Under this law it is stated that if a building is constructed without RAJUK’s
approval but following all the regulations and set backs of RAJUK then it is possible to
provide permission. But the owner will have to pay a 10 times increased fees along with a
minimum Tk. 5,000 fine (it can be more).
Monitoring and Action against Unauthorized Building
The building inspectors of RAJUK are responsible to monitor the building, their
construction, their condition and continuous monitoring of all the buildings within the
RAJUK jurisdiction area. If they find any kind of deviation or, if any neighbor complains
against his neighbor regarding illegal construction, building inspectors prepares a notice
to the violators. This notice is a 2C type notice and asks to show the authorization
documents of the deviators within certain time period. Such notice is send 3 times. If the
owner fails to show the required documents in time RAJUK is empowered to demolish
his structure.
Deviation in Residential Building
Severe problems of plan violation has been found in the construction phase of residential
building in Dhaka city. Land owner take the ‘building approval’ from RAJUK by
submitting as per the requirements of the BC Rules 1996. But they start to deviate from
the approved plan from RAJUK while constructing the building. Condition would not be
Md. Akter Mahmud
Page 11 of 17
so acute if plot owners have complied the plan and rules they promised in the approved
plan. BC Rules 1996 provided rules for construction of a residential building on the issues
like width of adjacent road and distance of building from it, distance of building from the
electric line, land use policy of proposed building, boundary walls, height of the building,
parking facilities, use of basement and conditions to fulfill, light and air circulation, roof
and sunshade, emergency entrance and others facilities, special rules for residential
building (setback rules), garage and rules for highrise buildings. Among them most
serious violations were found in the deviation of following provisions;
a. Maintaining distance of building from adjacent road
b. Maintaining height of building
c. Maintaining setback rules of building
Fig 4: Land use clearance certificate
Fig 5: Lay out map of applicant’s plot
Explanations of above figures
Fig 4: RAJUK approved the land use clearance with conditions. In ground, for the lack of
monitoring, land owner does not fulfill the condition as he promised to do.
Fig 5: Space should be kept for Road extension. Plot owner promised to RAJUK on a deed to keep
2 ft X 36 ft on the north side of the plot for a 20 ft road and 2 ft X 59 ft land on the east side of the
plot for a 12 ft road. In reality plot owner do not keep space for road extension and violates the
conditions so set on the deed. Building Inspectors are bribed if they come to visit the site during or
post construction period. In the above case, roads are still less than 16 ft and 8 ft respectively.
Explanations of above figures
Fig 6: A narrow alley near Sonargaon Road. To get any planning permission it is a mandatory requirement
that adjacent roadwidth would be minimum 3.5 meter and in case of private road it may be 3.0 meter. In the
picture this road width is only 2 meter.
Fig 7: Parking space in a shopping complex. In the above photo, shopping complex buildings don’t have any
parking space which is obligatory and promised to keep in the approved plan from RAJUK. Ground floor is
used for shop instead of parking.
Performance Evaluation
Violation may occur in different ways in different respects. If a building plan does not
comply with the rules and regulations of the concerned authority as stated it is called
violation of rules. The building owners may cause violation the building designers and
the erector can also violate rules. Violations are if, building construction does not follow
construction rules of the local authority or does not follow Building Bylaws or follow
setback rules. Sometimes owners follow the building construction rules partially and
sometimes they violate rules completes. In the present study building construction rule
violation has been classified into two broader classes like Partial Violation and Full
Violation. These are described as follows:
- Total Violation: Most of the old buildings have same problem of
constructing buildings without due permission causing total violation. This kind
of buildings also does not follow the building construction rules as stated in the
books published by the Government.
- Partial Violation: This kind of violation is intensively occurring by the
building owners. After taking the plan permission almost 95% building owners in
Dhaka city are someway violating the ‘Building Construction Rules 1996’. Types
of violations are:
i. Constructing floors more than it was permitted
ii. Construct buildings covering open spaces as shown in the
approved plan
iii. Internal rearrangement of approved design without permission
iv. Increase floor space from the first floor and above by extending
cantilever
v. Change its floor use without permission
From the survey it was found that more than 90% of the buildings were constructed
violating the rules of BC Rules 1996 irrespective of planned and spontaneously developed
areas of Dhaka city.
The Mohanagar Imarat Nirman Bidhimala (Building Construction Rules 2008)
The Building Construction Rule (BCR)2008 was framed through an intensive 3years
effort of professional bodies, experts and civil society members in consultation with
Government, after examination of building control tools in various countries, and with
specific consideration of land supply, population density and resource constraints of
Bangladesh.
Provisions of Building Constructions
The Mohanagar BCR 2008 was formulated considering the various aspects of urban area.
Provisions were formulated considering the type of building use, road width,
concentration of vehicular movement, population density, parking demand, utility
services and fire annihilation. There are also other rules which are needed to follow in
building construction such as, plot consolidation, building height, parking provision,
footpath, and basement. Some very significant steps were taken in the Mohanagar BCR
2008:
• Introduction of FAR which eliminates the building height limit but
permits total floor space as per the plot and its adjacent situation.
• Obligation of professionals like; Urban Planner, Architects, Structural
Engineer, Mechanical Engineer, Electrical Engineer, Geotechnical Engineer, Site
supervisor, Plumbing Engineer will definitely encourage professionalism.
• ‘One Window Service Cell3’ will ensure smoother approval of building
permission through one window service, within a fixed time, through the consent
of the stakeholders which would be a transparent mechanism to approve the
plans, thus eliminating harassment and abuse of power by authority,
• Introduction of ‘Urban Development Committee4’ will ensure the planned
development of the city.
3
A committee for considering the ‘development permit’ (it is necessary for the big projects and tall
buildings) of the applicants which is composed of members from professional institutes like; BIP, IEB,
REHAB, Stake holders like; DCC, UDD, WASA, DESA, DITS, T&T, Fire Service, DoE, Police, Civil aviation,
KPIDC, TITAS, Law ministry, Private organization working on handicap. D
Md. Akter Mahmud
Page 14 of 17
BCR 2008 in Development Control
The Mohanagar Building Construction Rule (BCR)2008 replaces the constraints of the
previous rules, which encouraged its evasion and abuse, and brings significant incentives
and benefits to all. Provisions of mandatory open space (or, maximum land utilization 50
to 65% of total plot area), setback, ground coverage, Floor Area Ratio (FAR) etc can
provide significant social and environmental benefits to the residents.
• By analyzing the BCR 2008 it was found that, Supervision and monitoring of
RAJUK in different phase of the construction and introduction of occupancy
certificate will ensure the quality of building and prevent the plan violation.
• From the findings of this paper it was found that more than 90% buildings of
Dhaka city violated the rules of BCR 1996 where there was a mandatory limitation
of buildings height. But in the BCR 2008, FAR was introduced and mandatory
height limit is eliminated. It would be great challenge if RAJUK fail to monitor
strictly the building construction gross density would increase which is against
the spirit of planning and BCR 2008
Recommendations
Legal and Technical Matters
• RAJUK has sufficient legal supports with act and by-laws. Planning
standards and planning laws should be enforced and practiced properly.
• RAJUK’s planning permission process should be more simple and
transparent. Adequate database, cross checking of data, frequent field
supervision, provision of accountability, provision of strong penalty in
case of default etc. should be regularized and compulsory. RAJUK never
used the digital data of Dhaka Metropolitan Development Plan. Instead
of manual and traditional ‘planning permission’ process RAJUK should
use that data base for planning permission. It will definitely improve the
present situation. Obviously for that RAJUK need skill and more town
planners in its organogram.
Institutional Arrangement
• RAJUK is a town planning institution and its 3 basic tasks are; Planning,
Development and Control. Organogram of RAJUK should be reviewed
and duties and responsibilities should be reexamined. Right people with
right qualification should work in the appropriate positions. Planners
should be appointed in the key positions of town planning and
development control. RAJUK, for instance, Member (Planning), Director
Town Planning, Director Plan Preparation, and Director Development
Control etc.
Institutional Strengthening
• RAJUK should recruit enough planning professionals in its regular set-up
for increasing its institutional capacity. Comparing the other cities of the
world and the Bangladesh context at least one Urban Planner should
work for serving 1 lac population of Dhaka City. For the efficient
management and development control, it is necessary to develop a
strong GIS data base of each parcel of land, its land use, use of each
floor of a building, number of people accommodating that building etc.
Therefore, information will be on the hand of Urban Planner and he will
exercise the Rules of the State as required.
• To provide planning service to the 12 million population of Dhaka at
least 120 Urban Planner should work in the whole RAJUK area. So that
they can look after the plan and manage the growth of the city. Ward
4
Composite of Government nominated Officials, President/ Vicepresident/ General Secretary of
professional bodies, representatives from civil society, University professor, etc
Md. Akter Mahmud
Page 15 of 17
Commissioners in the DCC area, chairmen of concern pourashava and
the Union Chairmen in the RAJUK area should be co-opt in the
development control process.
Concluding Remarks
Planning permission process ought to be more simple and transparent. Planning
department in RAJUK should adopt new technical support for planning permission and
development control instead of present manual system. A complete GIS database with
‘plot to plot’ record of whole RAJUK area can help a great deal in this regard. This
database will contain the information of master plan so that any applicant can know the
use of his plot proposed in the master plan which will not take more than few minutes. It
can substitute the present lengthy process of land clearance system and this service can
be provided from just one desk. Hopefully, newly introduced Building Construction
Rules 2008 will bring a better result if it is implemented properly. Previously RAJUK
failed to implement the Building Construction Rules 1996 which was easier and straight
forward rules to execute. It would be very unrealistic and optimistic to implement BCR
2008 without the rearrangement of institutional capacity of RAJUK which was the major
constraint of successful implementation of BCR 1996. Without removing that constraint it
would be a great challenge to implement BCR 2008.
Reference
Azam, A.K., 2006, “Improvement of the Water Supply System in Dhaka, Zonal
Approach ,” Dhaka WASA, Dhaka.
DMDP. 1993. Strategic Growth Options – Dhaka 2016, Rajdhani Unnayan
Kartripakkha, Dhaka
DMDP. 1995. Dhaka Metropolitan Development Plan, Vol – I, Structure Plan
(1995-2015), Rajdhani Unnayan Kartripakkha, Dhaka
DMDP. 1995. Dhaka Metropolitan Development Plan, Vol – II, Urban Area Plan
(1995-2005), Rajdhani Unnayan Kartripakkha, Dhaka
Gallion, A. & Eisner, S. 1986. The Urban Pattern: City Planning and Design, Van
Nostrand Reinhold Company, USA.
GoB. 2008. Mohanagar Imarat Nirman Bidhimala 2008, Government of
Bangladesh, Dhaka
Haque, A.M., 2004, “Hydrostratygraphy and Aquifer Piezometry of Dhaka
City”, A Post Graduate Diploma Project, Institute of Water and Flood
Management, Bangladesh University of Engineering and Technology,
Dhaka, Bangladesh.
Mahmud, A. 2008. FAR as a Development Control Tool: A New Growth
Management Technique for Dhaka City, The Jahangirnagar Planning
Review, Volume 6, June 2008, ISSN no: 1728-4198, Department of Urban
and Regional Planning, Jahangirnagar University.
Mahmud, A. 2007. Sound Planning Permission Process as Prerequisite for
Development Control in the Urban Areas: A Case Study on Dhaka City,
The Jahangirnagar Planning Review, Volume- 5, June 2007, ISSN no: 1728-
4198, Department of Urban and Regional Planning, Jahangirnagar
University.
Mahmud, A. 2006. Insufficient Enforcement of Planning Standards by RAJUK
Hindered the Growth Management, The Jahangirnagar Review, Part II:
Social Science, Vol. XXIX, 2005, pp59-74 Dhaka