Return three copies with original signatures
as needed to:
Office of Educational Facilities
Florida Department of Education
325 West Gaines Street
1054 Turlington Building
Tallahassee, Florida 32399-0400
(850) 245-0494
Fax: (850) 245-9304
FLORIDA DEPARTMENT OF EDUCATION
Office of Educational Facilities
REQUEST TO STATE BOARD OF EDUCATION
FOR APPROVAL OF ORDER OF PRIORITY
FOR EXPENDITURE OF STATE CAPITAL OUTLAY FUNDS
(PUBLIC SCHOOLS)
School Board of _____________________________________County
District Name
In accordance with the provisions of Section (9)(d), Article XII, of the Constitution of the State of Florida, as amended (referred to as the School Capital Outlay Amendment,
the Amendment), and rules of the State Board of Education based thereon and relating to the order of priority of capital outlay projects financed from funds derived under the
Amendment, approval of the State Board of Education is hereby requested for the attached list of school capital outlay projects.
The School Board of _________________________________ County, certifies that this list of projects and the order of priority assigned are based on (a) a survey as set forth
in Section 1013.31, F.S., dated _______________________, as amended; (b) the Florida Administrative Code relating to priority of projects, as set forth in Section 2.1(5), State
Requirements for Educational Facilities (SREF); and (c) other pertinent information relating to school capital outlay needs in this school district.
As said funds are made available, the said Board proposes to implement these projects as nearly as practicable in the order given, subject to changes as provided in state law and
Florida Administrative Code.
Projects are placed in the proper category according to the following:
I. Completed - Once a Certificate of Final Inspection (OEF Form 209, certificate) has been issued or a project not requiring a certificate has been completed, the
project is placed in the completed category. The project will be eligible for the expenditure of state capital outlay funds during the fiscal year in which the certificate
was issued or the project completed, and for one additional fiscal year thereafter, after which it should not be listed unless there are outstanding encumbrances.
Completed projects should be identified only by project priority list number and the date of the certificate or completion date, whichever is applicable.
II. Under Construction - Once a contract or purchase order has been executed for a project, the project is placed in the under construction category and remains there
until the certificate is issued.
III. Planned While a project is in the planning stage and State Board of Education approval is being requested for the expenditure of state capital outlay funds, the
project is placed in the planned category. It remains there until a contract or purchase order is executed for the project.
IV. Deleted When a projects source of funding has changed to other than that provided in accordance with provisions of the Amendment, or projects are not under
contract at the beginning of a new five-year educational plant survey, the project is placed in the deleted category.
Adopted by the School Board of _________________________________ County, Florida on ______________________________________, 20____.
(date)
ATTEST: ____________________________________________________
(Superintendent)
(See instructions on reverse.)
OEF 217-PS
Rule 6A-2.0010, FAC
Page 1 of 3
Effective November 2012
REQUEST TO STATE BOARD OF EDUCATION
FOR APPROVAL OF ORDER OF PRIORITY
FOR EXPENDITURE OF STATE CAPITAL OUTLAY FUNDS
INSTRUCTIONS
A. Projects funded from Capital Outlay and Debt Service (CO&DS) funds, State Board of Education (SBE) bonds and other bonds or loans that are repaid from CO&DS funds require PPL
approval.
B. Projects recommended in an educational plant survey are eligible to be placed on this PPL if they meet the following:
1. A priority projects, as identified in Section 2.1(5)(e)1., SREF, are immediately eligible.
2. B priority projects for the same school center as an A priority project may be placed under the same PPL number provided they are clearly identified as to priority rating and as being
funded as provided in Section 2.1(5)(e)2., SREF.
3. Separate B priority projects are eligible to be placed on the PPL only after all A priority projects have been listed or B priority projects that are identified as projects being funded as
provided in Section 2.1(5)(e)2., SREF.
C. The Districtwide Recommendations may be listed on the PPL as follows:
1. Those recommendations to correct deficiencies as identified in SREF, Sections 4.4(1) and 5(1)(a), relating to safety to life, health, and sanitation as identified in the comprehensive Safety
Inspection Report.
2. Those recommendations for necessary modifications for the physically disabled in existing school buildings recommended for continued use in this survey report as provided in Sections
255.21 and 553.501 - 553.513, F.S.
3. Those recommendations for additional or replacement equipment for existing buildings recommended for continued use in this survey report as provided in SREF, Section 2.1(5)(e)1.b.
4. Those recommendations for replacement of roofs at existing school buildings as provided in SREF, Section 2.1(9)(h), and defined in SREF, Section 1.2(55).
5. Those recommendations to provide storage, custodial spaces, and sanitation facilities to serve students, staff, and public as provided for in Sections 423.20 and 423.16, FBC.
6. Those recommendations to provide paved auto parking areas pursuant to Section 423.1062.7, FBC.
7. Those recommendations for purchasing sites for educational and ancillary facilities for future use beyond the projection period of this survey as provided in SREF, Section 1.4.
8. Those recommendations for retrofitting existing schools for technology, which may include: the creation or improvement of cableways and distribution points (closets in telephone
parlance); provision of clean power and convenient access; video, data and voice signal wiring; and the build-in of equipment involved in distributing video, data and voice signals. This
recommendation does not include new construction, remodeling, nor terminal equipment (workstations, terminals, receiving equipment, etc.).
9. Those recommendations to provide for full-service school facilities upon approval of a full-service school grant application, or issuance to district full-service school funds.
Categories of project should be in the order of (1) completed, (2) under construction, (3) planned, and (4) deleted.
Columnar information:
* Column (1) Project number as listed by district.
Column (2) Priority rating as identified in Section 2.1(5)(e), SREF.
Column (3) School center as identified in the educational plant survey report.
Column (4) Educational plant survey date.
Column (5) Capital Outlay Classification as recommended in the educational plant survey report.
Column (6) Grades as recommended in the education plant survey report.
Column (7) Description of project as given in the educational plant survey report.
Column (8) Estimated cost as identified by the district.
*DO NOT REUSE A PROJECT NUMBER WITHIN A FIVE-YEAR PERIOD.
OEF 217-PS
Rule 6A-2.0010, FAC Page 2 of 3 Effective November 2012
REQUEST TO STATE BOARD OF EDUCATION
FOR APPROVAL OF ORDER OF PRIORITY District: _________________________
FOR EXPENDITURE OF STATE CAPITAL OUTLAY FUNDS
ATTACHMENT A: PROJECT PRIORITY LIST Date: ___________________________
District/Agency Page _____ of ______
(1)
Project
Priority List
Number
(2)
Priority
Rating
(3)
School Center or
Description of Location
(4)
Survey or
Supplemental
Survey Date
(5)
Capital
Outlay
Classification
(6)
Grades
(7)
Description
of Project
(8)
Estimated
Cost
OEF 217-PS
Rule 6A-2.0010, FAC Page 3 of 3 Effective November 2012
OEF 220
Rule 6A-2.0010, FAC Page 1 of 2 Effective November 2012
Return completed form as needed to:
Office of Educational Facilities
325 West Gaines Street, Room 1054
Tallahassee, Florida 32399-0400
(850) 245-0494
Fax (850) 245-9236 or (850) 245-9304
FLORIDA DEPARTMENT OF EDUCATION
Office of Educational Facilities
BUILDING PERMIT APPLICATION
OEF USE ONLY
Permit # __________________
INSTRUCTIONS: Submit one copy of the completed form for each project for which you are requesting a
building permit. Complete each item, if applicable. Reproduce this form in sufficient quantity for your use.
Include two complete sets of corrected project drawings/specifications with all appropriate permit stamps
affixed to the drawings.
Project Number _________________________________________________________________
District/College Name _________________________________________________________________
Facility Name _________________________________________________________________
Facility Code Number _________________________________________________________________
Project Name and Scope _________________________________________________________________
1. Date of Application
_____________________________
2. Building Code in Effect
_____________________________
3. Proposed Occupancy
___________________________
4. Certified District Statement
I certify that all other permits* have been obtained; all contractor's insurance coverages and certificates of insurance are
current and have been verified; and firesafety plan review has been approved pursuant to s. 633.081, F.S., by Certified
Fire Safety Inspector _________________________ of _____________________ fire district.
__________________________ __________________________________________________
Date Superintendent, President, or Designee Signature
* Other permits include, but are not limited to: Department of Environmental Protection, water management district,
Department of Health, Department of Agriculture and Consumer Services, Department of Transportation, utility
connections.
5. General Contractor Information _________________________ __________________ _________________
Name License Number Phone Number
______________________________________________________________________________________________
Mailing Address (Street Number & Name, City, State, Zip Code)
Qualifying Agent _____________________ ______________________ _____________________
Name License Number Phone Number
____________________________________________________________________________________________
Mailing Address (Street Number & Name, City, State, Zip Code)
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a
permit does not presume to give authority to violate or cancel the provisions of any state law regulating construction or
performance of construction.
_______________________ ______________________________________________
Date Qualifying Agents Signature
OEF 220
Rule 6A-2.0010, FAC Page 2 of 2 Effective November 2012
OEF Use ONLY
Architect
Civil/Structural
Mechanical
Electrical
G.C.=s License Verification
Phase III Docs. Reviewed by:
__________________________________
__________________________________
__________________________________
__________________________________
__________________________________
__________________________________
Date
_________________________
_________________________
_________________________
_________________________
_________________________
_________________________
6. Construction
Cost $______________
7. Student Stations
(Additional) __________________
8. Area (Gross
Square Feet) ____________
9. Design Consultants (Fill in all that apply)
Architect ________________________________ ___________________ _______________
Name License Number Phone Number
Civil Engineer ________________________________ ___________________ _______________
Name License Number Phone Number
Structural Engineer ________________________________ ___________________ _______________
Name License Number Phone Number
Mechanical Engineer ________________________________ ___________________ _______________
Name License Number Phone Number
Electrical Engineer ________________________________ ___________________ _______________
Name License Number Phone Number
10. Sub-Contractors (Fill in all that apply)
Roofing ________________________________ ____________________ ______________
Name License Number Phone Number
__________________________________________________________________________
Mailing Address
Plumbing ________________________________ ____________________ _______________
Name License Number Phone Number
___________________________________________________________________________
Mailing Address
Gas ________________________________ ___________________ _______________
Name License Number Phone Number
___________________________________________________________________________
Mailing Address
Mechanical ________________________________ __________________ ________________
Name License Number Phone Number
___________________________________________________________________________
Mailing Address
Electrical ________________________________ __________________ ________________
Name License Number Phone Number
___________________________________________________________________________
Mailing Address
Florida Department of Education
ANNUAL FACILITY MAINTENANCE PERMIT
PERMIT NO. _________________ DATE ISSUED __________________
DISTRICT
NAME ______________________
EXPIRATION
DATE __________________
This maintenance permit is provided to facilitate routine maintenance, emergency repairs, building
refurbishment, and minor renovations of systems or equipment.
This facility maintenance permit is valid for one year from date of issue.
A detailed log of all work performed under this permit shall be maintained by the school district or college.
A copy of the detailed log shall be annually submitted to the Florida Department of Education, Office of
Educational Facilities.
The Department of Education retains the right to make inspections to ensure that the requirements of the
Florida Building Code and statutes are being adhered to. I f a p attern of code violations is found, the
Department of Education may void this permit, and may withhold the issuance of future annual
maintenance permits.
Maintenance projects may not exceed $300,000 per project.
NOTICE: I n addition to the requirements of this permit, there may be addi tional restrictions applicable to
this property that may be f ound in the public records of this county, and t here may be additional permits
required from other governmental entities such as water management districts, state agencies, or federal
agencies.
If this project includes demolition, remodeling and/or renovation, the owner or operator is responsible to
comply with the provisions of s. 469.003, Florida Statutes, and t o notify the Department of Environmental
Protection of any intentions to remove asbestos. Removal of asbestos shall be in accordance with state
and federal law.
This permit is construed to be a l icense to proceed with the work and not as authority to violate, cancel,
alter, or set aside any of the provisions of the technical codes. This permit does not relieve the school
district or college from complying with all of the requirements of the Florida Building code including required
plan review and inspections for each project.
OEF 226
Rule 6A-2.0010, FAC Effective November 2012
OEF 564CC
Rule 6A-2.0010, FAC Effective November 2012
FLORIDA DEPARTMENT OF EDUCATION
OFFICE OF EDUCATIONAL FACILITIES
2011 REPORT OF COST OF CONSTRUCTION FLORIDA COLLEGES
DATE SUBMITTED__________________________________________
CALENDAR YEAR___________________________________________
PREPARED BY__________________________________(Print Name)
PHONE ___________________________________________________
E-Mail____________________________________________________
STEP 1: COLLEGE AND CAMPUS INFORMATION
COLLEGE NAME:_____________________________________________________________________ OEF Project #_________ - ______________
CAMPUS NAME:_______________________________________________________________________ BUILDING #_________________________
TITLE OF PROJECT:_______________________________________________________________________________________________________
STEP 2: CONSTRUCTION PROJECT INFORMATION
MAJOR SPACE CATEGORY OF PROJECT (Choose One):
(01) Classrooms________ (02) Nonvocational Labs________ (03) Library/Study_______ (04) Vocational Labs_______ (05) Offices_________
(06) Auditorium/Exhibition_____ (07) Audiovisual_____ (08) Student Services_____ (09) Physical Education____ (10) Support Services______
PERCENT EACH SPACE CATEGORY REPRESENTS OF TOTAL PROJECT (Must Total 100%)
(01) Classrooms________ (02) Nonvocational Labs________ (03) Library/Study_______ (04) Vocational Labs_______ (05) Offices_________
(06) Auditorium/Exhibition_____ (07) Audiovisual_____ (08) Student Services_____ (09) Physical Education____ (10) Support Services______
PHASE III PLAN APPROVAL DATE________________________________________CONTRACT AWARD DATE______________________________
DATE CERTIFICATE OF OCCUPANCY ISSUED__________________________________________________________________________________
STEP 3: BASELINE DATA AMOUNT
1. Number of Student Stations ... ____________________
2. Net Square Feet .......................... ____________________
3. Gross Square Feet.......... ____________________
4. Cost Data
a. Cost to purchase site............ $___________________
This is the cost to purchase the site. If the site is an existing site, enter the cost of the site when
originally purchased. If the site was donated, enter zero (0).
b. Cost to make public utilities available at site (water, sewer, electric, gas, telephone) .. $___________________
This is the cost to bring water, sewer, power, gas and telephone to the site boundary and includes
on-site water and on-site sewage treatment plants.
c. Cost to correct site drainage and/or construct a retention area................................ $___________________
This refers to the additional cost incurred as a result of mandatory permits and/or inspections
required by federal, state, or local agencies such as the Environmental Protection Agency, Department of
Environmental Protection, water management districts, including local and state concurrency requirements to
accommodate drainage problems at the site.
d. Cost to make public roads accessible......................................................................... $___________________
This is the cost to make the site accessible to the public, which may require sidewalks, additional
turn lanes, traffic lights, or other requirements.
Complete the following information and return form to:
Kathy Dickey Email: kathy.dickey@fldoe.org
Office of Educational Facilities
Florida Department of Education
325 West Gaines Street, Room 1054
Tallahassee, Florida 32399-0400
(850) 245-9246; FAX: (850) 245-9243
OEF 564CC
Rule 6A-2.0010, FAC Effective November 2012
4. Cost Data (continued)
e. Cost to make site free of environmental problems......................................................... $___________________
This refers to fees or additional costs incurred as a result of mandatory permits and/or inspections
required by federal, state, or local agencies such as the Environmental Protection Agency, Department of
Environmental Protection, water management districts, including local and state concurrency requirements.
f. Cost to make as hurricane shelter and/or hurricane hardened................................... $___________________
This refers to the additional cost incurred as a result of mandatory hurricane shelter and/or
hurricane hardening requirements due to location and designation by the Division of Emergency
Management. Note: This amount should be deducted from Building Cost (Item J).
g. Legal and administrative cost.................................. $___________________
This refers to all legal and administrative fees paid to private attorneys, governmental agencies,
and other professionals who are not architects or engineers, for services rendered (e.g., recording
fees, doc stamps, clerk-of-the-works).
h. Architect / Engineering fees.................................. $___________________
This refers to the cost for professional architectural and engineering services performed in
connection with planning, design, and construction of the facility. Incorporate all base service and
additional authorization services.
i. Site improvement cost (incidental to construction) ................................... $___________________
This refers to the work that must be performed on a site from five feet away from building to site boundary.
This includes the amount spent for finish grading, draining, seeding, planting, and preparing the
site for use after the building has been constructed. Site improvement also refers to the cost of
electrical transformers, sewer lift stations, and water, gas, and electric lines from five feet away
from the building to the source of the utility at the site boundary.
j. Building contract cost.................................... $___________________
This refers to the total cost of building construction within five feet of building including all materials
and supplies purchased by the board of trustees. All change order charges known at the time
should also be added or deducted from the contract cost. Include built-in cabinets, mill work, and
other furniture or equipment permanently fixed or attached to the building as part of building
construction. Do not include cost for movable school furniture and equipment.
k. Furniture and equipment................................ $___________________
This refers to all furniture and equipment required to make the facility operational on the first day of class. This
includes, but is not limited to, student and teacher desks, computer equipment, laboratory equipment, library
furniture, audio-visual equipment, library books required initially, and other equipment that a college would
normally capitalize such as copy machines, etc. Equipment costs excluded from this definition are items such as
interscholastic activity equipment, such as athletic or band uniforms. Additionally, textbooks, consumable supplies,
and non-capitalized laboratory supplies are excluded from this definition.
5. Building Cost (sum of lines 4g - 4k) .................................... $___________________
6. Cost per Student Station (divide line 5 by Line 1) .................................. $___________________
7. Educational Plant Total Cost (sum of lines 4a - 4k) (All plant-related costs)................... $___________________
STEP 4: SOURCE OF FUNDS AMOUNT EXPENDED
PECO - 3-year priority list [s. 1013.64(4)(a), F.S.] $_______________________________________
Cooperative Use Facilities [s. 1013.52, F.S.] $_______________________________________
SBE Bond (COBI) [Article XII, Subsection 9(d), of the State Constitution, as amended] $_______________________________________
CO & DS [Article XII, Subsection 9(d), of the State Constitution, as amended] $_______________________________________
Other State Funds (Specify)____________________________________ $_______________________________________
Other Local Funds (Specify)____________________________________ $_______________________________________
Federal Funds (Specify)_______________________________________ $_______________________________________
Lease & Lease Purchase (COPs) [s.1013.15(4)(a), F.S.] $_______________________________________
****TOTAL(must equal Total Project Cost above) $_______________________________________
I certify that all of the data and statements included in this report are, to the best of my knowledge and belief, true, complete, and correct.
College Official (signature) Telephone Number
PROTOTYPE
6-8 9-12 Total -
a.
b.
c.
OEF 564PS Page 1 of 3
Rule 6A-2.0010, FAC Effective November 2012
This refers to the work that must be performed on a site from five feet away from building to site boundary.
This includes the amount spent for finish grading, draining, seeding, planting, and preparing the
site for use after the building has been constructed. Site improvement also refers to the cost of
electrical transformers, sewer lift stations, and water, gas, and electric lines from five feet away
from the school facility to the source of the utility at the site boundary.
fees, doc stamps, clerk-of-the-works).
5 . # of classrooms assigned capacity.K-5.
STEP 3: BASELINE DATA AMOUNT
This refers to all legal and administrative fees paid to private attorneys, governmental agencies,
6. Cost Data
2. Number of Teacher Stations..
Legal and administrative cost
3. Net Square Feet...
4. Gross Square Feet.
OFFICE OF EDUCATIONAL FACILITIES
FLORIDA DEPARTMENT OF EDUCATION
2011 REPORT OF COST OF CONSTRUCTION - PUBLIC SCHOOLS
E-MAIL:
Complete the following information and e-mail formto:
SCHOOL NAME:
STEP 1: SCHOOL INFORMATION
325 West Gaines Street, Room 1054
FACILITY(FISH)#:
DISTRICT NUMBER:
DATE SUBMITTED:
Kathy.Dickey@FLDOE.org CALENDAR YEAR:
Florida Department of Education PREPARED BY:
PHONE:
Tallahassee, Florida 32399-0400
(850) 245-9246; FAX: (850) 245-9243
DISTRICT NAME:
REUSE OF PLANS DESIGN BUILD. HURRICANE SHELTER
TYPE OF PROJECT (Choose One) New or replacement school Addition to existing school.
DATE CERTIFICATE OF OCCUPANCY ISSUED
STEP 2: CONSTRUCTION PROJECT INFORMATION (Newor Replacement Schools and Additions Only)
TYPE OF ADDITION (gym, classrooms, media, etc)
services.
This refers to the cost for professional architectural and engineering services performed in connection with
PHASE III PLAN APPROVAL DATE CONTRACT AWARD DATE..
1. Number of Student Stations.
and other professionals who are not architects or engineers, for services rendered (i.e., recording
Site improvement cost (incidental to construction) .................................
Architect / Engineering fees................................
planning, design, and construction of the facility. Incorporate all base service and additional authorization
OFFICE OF EDUCATIONAL FACILITIES
FLORIDA DEPARTMENT OF EDUCATION
2011 REPORT OF COST OF CONSTRUCTION - PUBLIC SCHOOLS
d.
e.
f.
g.
h.
i.
j.
k.
OEF 564PS Page 2 of 3
Rule 6A-2.0010, FAC Effective November 2012
turn lanes, traffic lights, or other requirements.
of Environmental Protection, and water management districts, including local and state concurrency requirements.
Environmental Protection, and water management districts, including local and state concurrency requirements to
This is the cost to make the site accessible to the public, which may require sidewalks, additional
other furniture or equipment permanently fixed or attached to the building as part of building
required by federal, state, or local agencies such as the Environmental Protection Agency, Department
-
vocational lab equipment, library furniture, audio-visual equipment, library books required to initially stock the
This is the cost to purchase the site. If the site is an existing site, enter the cost of the site when
Cost to purchase site....................................
and supplies purchased by the district school board. All change order charges known at the time
Emergancy Management. Note: This amount should be deducted from Building Cost (Item d).
This refers to the additional cost incurred as a result of mandatory hurricane shelter and/or
hurricane hardening requirements due to location and designation by the Division of
These costs refer to all furniture and equipment required to make the facility operational on the first day of
school. This includes, but is not limited to, student and teacher desks, computer equipment, science and
Building contract cost..................................
This refers to the total cost of building construction within five feet of building, including all materials
construction. Do not include costs for movable school furniture and equipment.
should also be added or deducted from the contract cost. Include built-in cabinets, mill work, and
Furniture and equipment..............................
Cost to make as hurricane shelter and/or hurricane hardened.................................
etc. Equipment costs excluded from this definition are items such as interscholastic activity equipment (i.e.,
vocational lab supplies are excluded from this definition.
football or band uniforms). Additionally, textbooks, consumable supplies, and noncapitalized science and
media center, and other school equipment that a district would normally capitalize, such as copy machines,
Cost to make public utilities available at site
Cost to correct site drainage and/or construct a retention area............................
originally purchased. If the site was donated, enter zero ("0").
This is the cost to bring water, sewer, power, gas and telephone services to the site boundary and includes
on-site water and on-site sewage treatment plants.
Cost to make public roads accessible........................................................................
This refers to fees or additional costs incurred as a result of mandatory permits and/or inspections
This refers to the additional cost incurred as a result of mandatory permits and/or inspections
required by federal, state, or local agencies such as the Environmental Protection Agency, Department of
Cost to make site free of environmental problems.......................................................
8. Cost per Student Station (divide line 7 by line 1)....................................................................................................................
9 . Cost per Teacher Station (divide line 7 by line 2)....................................................................................................................
-
-
-
accommodate drainage problems at the site.
10. Educational Plant Total Cost (sum of lines 6a-6k) (All plant-related costs)............................................................................
7. Educational Facility Cost (sum of lines 6a-6e).......................................................................................................................
OFFICE OF EDUCATIONAL FACILITIES
FLORIDA DEPARTMENT OF EDUCATION
2011 REPORT OF COST OF CONSTRUCTION - PUBLIC SCHOOLS
Code#
1.___________
2.___________
3.___________
4.___________
5.___________
6.___________
7.___________
8.___________
9.___________
10.__________
11.__________
12.__________
13.__________
14.__________
15.__________
16.__________
17.__________
18.__________
19.__________
20.__________
OEF 564PS Page 3 of 3
Rule 6A-2.0010, FAC Effective November 2012
Loan s.1011.14, F.S
Loan s.1011.15, F.S.
District School Tax Revenue (discretionary millage) [s.1011.71(2), F.S.]
Local Bond Proceeds
Lease Purchase (COPs) [s.1013.15(4)(a), F.S.]
SBE Bond (COBI)
School District Official (Type your name)
I certify that all of the data and statements included in this report are, to the best of my knowledge and belief, true, complete, and correct.
- ****TOTAL(must equal Educational Plant Total Cost)
Federal Funds (Specify)
Cooperative Use Facilities [s.1013.52, F.S]
Cooperative Career and Tech. Ed. Facilities [s.1013.75, F.S.]
Classrooms For Kids [s.1013.735, F.S]
District Effort Recognition [s.1013.736, F.S.]
CO & DS (MVLR Flow-Through)
PECO/Sum of the Digits (Maintenance) [s.1013.64(1), F.S.]
Specific Line Item Appropriation
Classrooms First (Lottery) [s.1013.68, F.S]
STEP 4: SOURCE OF FUNDS AMOUNT
Effort Index Grant (Lottery) [s.1013.73, F.S]
PECO/Special Facility Construction [s.1013.64( 2), F.S.]
PECO/New Construction Allocation [s.1013.64(3), F.S]
Telephone Number (with area code)
Other State Funds (Specify)
Other Local Funds (Specify)
OEF LCCA-1
Rule 6A-2.0010, FAC Effective November 2012
Return completed form as needed to:
Office of Educational Facilities
Florida Department of Education
325 West Gaines Street, Room 1054
Tallahassee, Florida 32399-0400
(850) 245-0494
Fax (850) 245-9236 or (850) 245-9304
FLORIDA DEPARTMENT OF EDUCATION
Office of Educational Facilities
LIFE CYCLE COST ANALYSIS
OEF USE ONLY
INSTRUCTIONS: Submit one copy of the c ompleted form, signed and sealed, for each project with
an air-conditioning load of 360,000 BTU per hour or greater. Reproduce this form in sufficient quantity
for your use.
RE: _______________________________________________________ ( School District Florida College)
_______________________________________________________ ( School Name Campus)
_______________________________________________________ Description of Project
DATA SHEET 1
SYSTEM DESCRIPTION
SCHEME A
SCHEME B
SCHEME C
SCHEME D
UNIT ENERGY COSTS
FUEL TYPE UNITS BTU/UNIT UNIT COST
ELECTRIC KWHR 3413
ELECTRIC KW DEMAND
ANNUAL COSTS
SCHEME MAINTENANCE SUPPLIES MAINTENANCE LABOR OPERATING LABOR TOTAL ENERGY
A
B
C
D
HVAC SYSTEM INSTALLED COSTS ENGINEER, Name
SCHEME A Firm Name
SCHEME B Address
SCHEME C City/State/Zip
SCHEME D
Phone
A/C System
Tonnage
E-Mail
Signed/Dated _________________________________________
(Sealed)
OEF LCCA-2
Rule 6A-2.0010, FAC Effective November 2012
LIFE CYCLE COST ANALYSIS
DATA SHEET 2
DISTRICT __________________________________ SCHOOL ____________ __________________________________
PROJECT _____________________________________________________________________________________________
SINGLE EXPENDITURE DATA
PWF Multiplier from VII. SINGLE EXPENDITURE CHART
PRESENT WORTH = (ITEM COST in todays dollars) x PWF
SCHEME ITEM NAME YEAR ITEM COST PWF PRESENT WORTH
TOTAL MAJOR REPAIR COSTS
(Sum of Present Worths on this page.)
SCHEME A
ENGINEER
SCHEME B Signed & Sealed
SCHEME C
SCHEME D
Date
OEF LCCA-3
Rule 6A-2.0010, FAC Effective November 2012
LIFE CYCLE COST ANALYSIS
DATA SHEET 3
DISTRICT __________________________________ SCHOOL _______________________________________________
PROJECT _____________________________________________________________________________________________
PRESENT WORTH IN TODAYS DOLLARS
INITIAL COST = HVAC System Installed Cost
SUPPLIES = Annual Maintenance Supplies x 11.65
LABOR = Annual Total Labor x 11.65
MAJOR REPAIR = Total Major Repair Costs
ENERGY COST = Annual Energy Cost x 12.78
FINANCIAL SUMMARY (total cost over 25-year life of project)
SCHEME A SCHEME B SCHEME C SCHEME D
INITIAL COST
SUPPLIES
LABOR
MAJOR REPAIRS
ENERGY COST
TOTAL COST
ENERGY SUMMARY (Annual energy use in MBTU per square foot per year)
SCHEME A SCHEME B SCHEME C SCHEME D
LIGHTS
PRIMARY HEATING
PRIMARY COOLING
TERMINAL SYSTEM
OTHER USES *
TOTAL
*List other uses
ENGINEER
Signed & Sealed
Date
OEF SCOA-1CC
Rule 6A-2.0010, FAC Effective November 2012
SAMPLE RESOLUTION REQUESTING ISSUANCE OF CAPITAL OUTLAY BONDS
(COBI) FOR FLORIDA COLLEGES
A RESOLUTION OF THE BOARD OF TRUSTEES OF ________________________
COLLEGE DISTRICT, FLORIDA, REQUESTING THE ISSUANCE BY THE
STATE BOARD OF EDUCATION OF FLORIDA OF $_____________________
CAPITAL OUTLAY BONDS FOR AND ON BEHALF OF SUCH BOARD FOR
THE PURPOSE HEREINAFTER STATED.
WHEREAS, pursuant to Article XII, Section 9, Subsection (d) of the Constitution of the
State of Florida of 1968, approved at the general election of November 1968, as amended at the
general elections of November 1972 and November 1992 (herein collectively referred to as
School Capital Outlay Amendment), the State Board of Education of Florida is authorized to
issue bonds payable solely as to both principal and interest from the funds provided for in said
School Capital Outlay Amendment for the purpose of financing capital outlay projects for school
purposes in the manner provided therein upon the application of the School Board of any School
District and of the Board of Trustees of any Florida College District in the State of Florida; and
WHEREAS, this Board of Trustees of ________________________________ College
District, Florida, deems it necessary and essential that $_________________ of such bonds be
issued by said State Board of Education in order to finance capital outlay projects for the
___________________________ College District, Florida (hereinafter called District), as
hereinafter set forth; now, therefore,
BE IT RESOLVED BY THE BOARD OF TRUSTEES OF______________________________
COLLEGE DISTRICT, FLORIDA (hereinafter called Board):
SECTION 1. It is hereby found, declared, and determined by this Board as follows, that:
(a) A survey has heretofore been made and is now in effect, under regulations prescribed
by the State Board of Education, of the capital outlay school needs of said District and said
survey has been approved as required by said State Board of Education, and is now on file in the
office of the Secretary of this Board and in the office of the State Board of Education in
OEF SCOA-1CC
Rule 6A-2.0010, FAC Effective November 2012
Tallahassee, Florida. Said survey is by reference made a part of this resolution as fully and to the
same extent as if incorporated verbatim herein.
(b) It is essential and necessary in order to maintain the Florida colleges in said District for
the State Board of Education to issue $_______________ Capital Outlay Bonds for and on
behalf of the Board in order to finance the cost of acquiring, building, constructing, altering,
remodeling, improving, enlarging, furnishing, equipping, maintaining, renovating, or repairing of
the following capital outlay projects for school purposes in said District, described and listed as
follows in order of priority of need as approved by the State Board of Education:
______________________________________________________________________________
PPL Project Name of School Center, or Description of Project and
Number Description of Location List of Facilities Included
______________________________________________________________________________
-2-
______________________________________________________________________________
OEF SCOA-1CC
Rule 6A-2.0010, FAC Effective November 2012
PPL Project Name of School Center, or Description of Project and
Number Description of Location List of Facilities Included
______________________________________________________________________________
-2a-
OEF SCOA-1CC
Rule 6A-2.0010, FAC Effective November 2012
(c) The capital outlay projects described above shall have priority for financing in the order
stated above, the same being the order of priority of needs of said capital outlay projects as
shown in said survey heretofore referred to, and there being no other capital outlay projects for
said District, as shown on said survey, having a higher order of priority of needs.
(d) It is anticipated that all of the proceeds of the Capital Outlay Bonds issued on behalf of
the District by the State Board of Education pursuant to Section 2 hereof will be spent by the
District within three years from the issuance date of such bonds to pay the costs of the capital
outlay projects described above or such other projects as herein authorized.
SECTION 2. This Board does hereby request the State Board of Education to issue Capital
Outlay Bonds for and on behalf of the Board pursuant to the School Capital Outlay Amendment,
for the purpose of financing the cost of the capital outlay projects described in Section 1(b)
hereof. The Capital Outlay Bonds shall have such date or dates of issue and date or dates of
maturity; shall have such provisions for redemption prior to maturity, with or without premium;
such place or places of payments; and such other details as the State Board of Education shall in
its discretion determine, and the Capital Outlay Bonds shall be sold by the State Board of
Education in the manner provided by said School Capital Outlay Amendment and the proceeds
thereof shall be applied to the financing of the capital outlay projects described in Section 1(b)
hereof in the manner required by and as provided in the rules and regulations of the State Board
of Education now existing or hereafter adopted.
SECTION 3. This Board does hereby agree and consent that it will fully comply with and
abide by all rules, regulations, and orders of said State Board of Education now in existence or
hereafter at any time made relative to the financing of the capital outlay projects; the application
of the proceeds of the Capital Outlay Bonds; and the acquiring, building, constructing, altering,
remodeling, improving, enlarging, furnishing, equipping, maintaining, renovating, or repairing of
said capital outlay projects; and all other matters relating thereto.
OEF SCOA-1CC
Rule 6A-2.0010, FAC Effective November 2012
SECTION 4. In the event any balance of the proceeds of the Capital Outlay Bonds shall
remain after the completion of the capital outlay projects described in Section 1(b), and after the
payment, or reservation of sufficient funds for the payment, of all costs thereof, then such
unexpended balance of such proceeds shall, in the discretion of the State Board of Education, be
deposited in the Reserve Account in the Sinking Fund for the payment of principal and interest
on said Capital Outlay Bonds, or for the cost of other capital outlay projects described in said
survey and for no other purpose.
SECTION 5. In the event that the priority of needs of capital outlay projects of the District
as shown on said survey shall be hereafter changed upon the request of this Board and with
approval as required by the State Board of Education, then the proceeds of such Capital Outlay
Bonds may be used for the capital outlay projects having the highest priority of needs instead of
the capital outlay projects described in Section 1(b) hereof, in the manner provided in the School
Capital Outlay Amendment and under such rules and regulations now existing or hereafter made
by the State Board of Education.
SECTION 6. In the event the interest rates prevailing in the market place at the time the
Capital Outlay Bonds are authorized for sale by the State Board of Education would not permit
compliance with the parity test set forth in this application bond resolution and the coverage
requirements set forth in Article XII, Section 9, Subsection (d) of the Constitution of the State of
Florida, the Board hereby requests and authorizes the State Board of Education to issue a lesser
principal amount of Capital Outlay Bonds on behalf of the Board, which would comply with
such test and requirement at the prevailing interest rates anticipated by the Board of Education at
the time the Bonds are authorized for sale by the State Board of Education, notwithstanding the
authority to issue Bonds in the principal amount set forth hereinabove.
SECTION 7. The Secretary of this Board is hereby directed to forthwith file a certified
copy of this Resolution with said State Board of Education and the proper officials of his Board
are hereby authorized and directed to furnish any and all data, information, records, or other
OEF SCOA-1-CC
Rule 6A-2.0010, FAC Effective November 2012
documents or papers as shall be required or requested by the State Board of Education in
connection with this Resolution and the financing of the capital outlay projects described in this
Resolution.
SECTION 8. This Resolution shall become effective immediately upon its adoption.
STATE OF FLORIDA
COUNTY OF _____________________
I, the undersigned Secretary of the Board of Trustees of __________________________
College, do hereby certify that the foregoing constitutes a true and correct copy of a resolution
duly adopted and entered in the minutes of said Board at meeting held on the ______ day of
_____________________, 20____.
IN WITNESS WHEREOF, I have hereunto set my signature and official seal this ______
day of _____________________, 20____.
Signed
_________________________________________
Secretary of the Board of Trustees of
(SEAL) ___________________________________ College
OEF SCOA-1PS
Rule 6A-2.0010, FAC Effective November 2012
SAMPLE RESOLUTION REQUESTING ISSUANCE OF CAPITAL OUTLAY BONDS
(COBI) FOR PUBLIC SCHOOLS
A RESOLUTION OF THE SCHOOL BOARD OF ___________________________
COUNTY, FLORIDA, REQUESTING THE ISSUANCE BY THE STATE BOARD
OF EDUCATION OF FLORIDA OF $_____________________ CAPITAL OUTLAY
BONDS FOR AND ON BEHALF OF SUCH BOARD FOR THE PURPOSE
HEREINAFTER STATED.
WHEREAS, pursuant to Article XII, Section 9, Subsection (d) of the Constitution of the
State of Florida of 1968, approved at the general election of November 1968, as amended at the
general elections of November 1972 and November 1992 (herein collectively referred to as
School Capital Outlay Amendment), the State Board of Education of Florida is authorized to
issue bonds payable solely as to both principal and interest from the funds provided for in said
School Capital Outlay Amendment for the purpose of financing capital outlay projects for school
purposes in the manner provided therein upon the application of the School Board of any School
District and of the Board of Trustees of any Florida College District in the State of Florida; and
WHEREAS, this School Board of ________________________________ County, Florida,
deems it necessary and essential that $_________________ of such bonds be issued by said State
Board of Education in order to finance capital outlay projects for the School District of
___________________________ County, Florida (hereinafter called District), as hereinafter
set forth; now, therefore,
BE IT RESOLVED BY THE SCHOOL BOARD OF ______________________________
COUNTY, FLORIDA (hereinafter called Board):
SECTION 1. It is hereby found, declared, and determined by this Board as follows, that:
(a) A survey has heretofore been made and is now in effect, under regulations prescribed
by the State Board of Education, of the capital outlay school needs of said District and said
survey has been approved as required by said State Board of Education, and is now on file in the
office of the Secretary of this Board and in the office of the State Board of Education in
OEF SCOA-1PS
Rule 6A-2.0010, FAC Effective November 2012
Tallahassee, Florida. This survey is by reference made a part of this resolution as fully and to the
same extent as if incorporated verbatim herein.
(b) It is essential and necessary in order to maintain the public schools in said District for
the State Board of Education to issue $_______________ Capital Outlay Bonds for and on
behalf of the Board in order to finance the cost of acquiring, building, constructing, altering,
remodeling, improving, enlarging, furnishing, equipping, maintaining, renovating, or repairing of
the following capital outlay projects for school purposes in said District, described and listed as
follows in order of priority of need as approved by the State Board of Education:
______________________________________________________________________________
PPL Project Name of School Center, or Description of Project and
Number Description of Location List of Facilities Included
______________________________________________________________________________
-2-
OEF SCOA-1PS
Rule 6A-2.0010, FAC Effective November 2012
______________________________________________________________________________
PPL Project Name of School Center, or Description of Project and
Number Description of Location List of Facilities Included
______________________________________________________________________________
-2a-
OEF SCOA-1PS
Rule 6A-2.0010, FAC Effective November 2012
(c) The capital outlay projects described above shall have priority for financing in the order
stated above, the same being the order of priority of needs of said capital outlay projects as
shown in said survey heretofore referred to, and there being no other capital outlay projects for
said District, as shown on said survey, having a higher order of priority of needs.
(d) It is anticipated that all of the proceeds of the Capital Outlay Bonds issued on behalf of
the District by the State Board of Education pursuant to Section 2 hereof will be spent by the
District within three years from the issuance date of such bonds to pay the costs of the capital
outlay projects described above or such other projects as herein authorized.
SECTION 2. This Board does hereby request the State Board of Education to issue Capital
Outlay Bonds for and on behalf of the Board pursuant to the School Capital Outlay Amendment,
for the purpose of financing the cost of the capital outlay projects described in Section 1(b)
hereof. The Capital Outlay Bonds shall have such date or dates of issue and date or dates of
maturity; shall have such provisions for redemption prior to maturity, with or without premium;
such place or places of payments; and such other details as the State Board of Education shall in
its discretion determine, and the Capital Outlay Bonds shall be sold by the State Board of
Education in the manner provided by said School Capital Outlay Amendment and the proceeds
thereof shall be applied to the financing of the capital outlay projects described in Section 1(b)
hereof in the manner required by and as provided in the rules and regulations of the State Board
of Education now existing or hereafter adopted.
SECTION 3. This Board does hereby agree and consent that it will fully comply with and
abide by all rules, regulations, and orders of said State Board of Education now in existence or
hereafter at any time made relative to the financing of the capital outlay projects; the application
of the proceeds of the Capital Outlay Bonds; and the acquiring, building, constructing, altering,
remodeling, improving, enlarging, furnishing, equipping, maintaining, renovating, or repairing of
said capital outlay projects; and all other matters relating thereto.
SECTION 4. In the event any balance of the proceeds of the Capital Outlay Bonds shall
remain after the completion of the capital outlay projects described in Section 1(b), and after the
OEF SCOA-1PS
Rule 6A-2.0010, FAC Effective November 2012
payment, or reservation of sufficient funds for the payment, of all costs thereof, then such
unexpended balance of such proceeds shall, in the discretion of the State Board of Education, be
deposited in the Reserve Account in the Sinking Fund for the payment of principal and interest
on said Capital Outlay Bonds, or for the cost of other capital outlay projects described in said
survey and for no other purpose.
SECTION 5. In the event that the priority of needs of capital outlay projects of the District
as shown on said survey shall be hereafter changed upon the request of this Board and with
approval as required by the State Board of Education, then the proceeds of such Capital Outlay
Bonds may be used for the capital outlay projects having the highest priority of needs instead of
the capital outlay projects described in Section 1(b) hereof, in the manner provided in the School
Capital Outlay Amendment and under such rules and regulations now existing or hereafter made
by the State Board of Education.
SECTION 6. In the event the interest rates prevailing in the market place at the time the
Capital Outlay Bonds are authorized for sale by the State Board of Education would not permit
compliance with the parity test set forth in this application bond resolution and the coverage
requirements set forth in Article XII, Section 9, Subsection (d) of the Constitution of the State of
Florida, the Board hereby requests and authorizes the State Board of Education to issue a lesser
principal amount of Capital Outlay Bonds on behalf of the Board, which would comply with
such test and requirement at the prevailing interest rates anticipated by the Board of Education at
the time the Bonds are authorized for sale by the State Board of Education, notwithstanding the
authority to issue Bonds in the principal amount set forth hereinabove.
SECTION 7. The Secretary of this Board is hereby directed to forthwith file a certified
copy of this Resolution with said State Board of Education and the proper officials of his Board
are hereby authorized and directed to furnish any and all data, information, records, or other
documents or papers as shall be required or requested by the State Board of Education in
connection with this Resolution and the financing of the capital outlay projects described in this
Resolution.
OEF SCOA-1PS
Rule 6A-2.0010, FAC Effective November 2012
SECTION 8. This Resolution shall become effective immediately upon its adoption.
STATE OF FLORIDA
COUNTY OF _____________________
I, the undersigned Secretary of the School Board of _____________________________
County, Florida, do hereby certify that the foregoing constitutes a true and correct copy of a
resolution duly adopted and entered in the minutes of said Board at meeting held on the ______
day of _____________________, 20____.
IN WITNESS WHEREOF, I have hereunto set my signature and official seal this ______
day of _____________________, 20____.
Signed
_________________________________________
Secretary of the School Board of
(SEAL) ___________________________________ County
CHARTER SCHOOL CAPITAL OUTLAY PLAN [Form of]
circle one YES NO
SECTION1: The charter school's sponsor can verify that (both criteria apply):
(a) There exists an agreement with the charter school that includes provisions for the reversion of
any unencumbered funds and all equipment and property purchased with public education funds
to the ownership of the district school board in the event that the school terminates operations; and
(b) The charter school facilities were not created by the conversion of a public school,
does not operate in facilities provided by the charter school's sponsor for a nominal fee or at no
charge, and is not directly or indirectly operated by the school district.
SECTION2: A charter school is eligible for capital outlay funds if it meets one of the following four criteria. Please check those that apply
(1) Has been in operation for three or more years.
(2) Is part of an expanded feeder pattern (sends or receives a majority of students from a currently eligible school)
Identify the charter school as (both may be applicable):
a SENDER school which sends over 50 percent of its population to:
School Name: MSID:
a RECEIVING school which receives over 50 percent of its population from:
School Name: MSID:
(3) Has been accredited by the Commission on Schools of the Southern Association of Colleges and
Schools (SACS). Proof of accreditation must be attached.
(4) Is governed by a governing board, which has been established in Florida for three or more years and operates
both charter and conversion schools in Florida.
Please provide the name and MSID of the conversion charter school AND traditional charter school:
Conversion Charter Name: MSID:
Traditional Charter Name: MSID:
SECTION3: A charter school must meet all of the following criteria to qualify for capital outlay funds:
(1) Has financial stability for future operation as a charter school.
(2) Has satisfactory student achievement based on state accountability standards applicable to the school.
(3) Has received final approval from its sponsor pursuant to s. 1002.33, F.S. for operation this fiscal year.
(4) Serves students in facilities not provided by the charter school's sponsor:
(a) This IS NOT a conversion charter school utilizing district-owned facilities;
(b) Nor operating in a district-owned facility which is rented, leased, or otherwise made available to
the charter school by the school district.
Please indicate eligibility pursuant to Section 1013.62, Florida Statutes, by checking the boxes below.
As the charter school representative, I certify that I have read the memorandum published by the Office of Educational Facilities regarding the submission of my
Capital Outlay Plan. Signature: _______________________________________
Did the charter school receive funding for the previous school year?
DISBURSEMENT OF FUNDS TO THE DISTRICT WILL DISCONTINUE UNLESS RECEIVED BY ______________.
CHARTER SCHOOL INFORMATION SPONSOR INFORMATION
Prior to the allocation of funds to a charter school, the charter school must complete this form. The charter school governing board and sponsoring district must
verify and approve the information provided.
Charter School Name District Name
Sponsor Liaison Name / Phone / Email
School Number (MSID)
School Liaison Name / Phone / Email
Charter School Capital Outlay Plan
Rule 6A-2.0010, FAC
Effective November 2012
Page 1 of 2
CHARTER SCHOOL CAPITAL OUTLAY PLAN [Form of]
Please check the box(es) that apply.
(1) Purchase of real property.
(2) Construction of school facilities.
(3) Purchase, lease-purchase, or lease of permanent or relocatable school facilities (i.e., mortgage or rent).
(4) Purchase of vehicles to transport students to and from the charter school.
(5) Renovation, repair, and maintenance of school facilities that the charter school owns
or is purchasing through a lease-purchase or long-term lease of 5 years or longer.
(6) The purchase, lease-purchase, or lease of new and replacement capital equipment, and enterprise resource
software applications (must be classified as capital assets pursuant to the Governmental Accounting
Standards Board [GASB], have a useful life of at least five years, and be used to support school-wide
administration or state-mandated reporting requirements).
(7) Payment of the cost of premiums for property and casualty insurance which are deemed necessary
to insure the school facilities.
(8) Purchase, lease-purchase, or lease of driver's education vehicles; motor vehicles used for the maintenance or
operation of educational plants and equipment; security vehicles; or vehicles used in storing or
distributing materials and equipment.
Certification:
As the Charter School Governing Body Representative, I certify that all information provided is accurate and current, and that
capital outlay funds will only be used for the statutory allowances provided in Section 4.
As the District Finance Officer, I certify that I have documentation on file that substantiates the charter school
Capital Outlay eligibility requirements as written in statute and listed above in sections 1, 2, and 3.
District Finance Officer Signature
Verification:
The Office of Independent Education and Parental Choice has reviewed the information provided in Section 2 and hereby
certifies that the referenced charter school meets the eligibility criteria to receive capital outlay funding.
Name Date
SECTION4: A charter school may use charter school capital outlay funds for any of the following eight expenditures.
Submit on-line through the Charter School Database Portal: https://www.floridaschoolchoice.org/
Charter School Governing Body Signature
Charter School Capital Outlay Plan
Rule 6A-2.0010, FAC
Effective November 2012
Page 2 of 2
Appendix State Requirements for Educational Facilities Appendix
November 2012 Page 165
Information for Ordering Codes
Florida Building Code, Chapter 423
Florida Fire Prevention Code
The FLORIDA BUILDING CODE may be obtained from one of the following:
Florida Department of Business & Professional Regulation, (850) 487-1824
Building Codes and Standards
http://www.myfloridalicense.com/dbpr/bcs/buildingcode.html
Building Officials of Florida (BOAF) (407) 265-9009
http://boaf.net
Broward Board of Rules and Appeals (954) 765-4500
Miami-Dade Building Code Compliance Office (305) 375-2901
International Code Council, Inc. (205) 591-1853
http://www.iccsafe.org/Store/Pages/FloridaDCA.aspx
The FLORIDA FIRE PREVENTION CODE may be obtained from:
BNi Publications (888) 264-2655
1612 S. Clementine Street
Anaheim, CA 92802
http://www.bnibooks.com/
Appendix State Requirements for Educational Facilities Appendix
Page 166 November 2012
(850) 245-0494
State Requirements for Educational Facilities
Florida Department of Education
Office of Educational Facilities
325 West Gaines Street
Tallahassee, Florida 32399-0400
http://www.fldoe.org/edfacil/