Sie sind auf Seite 1von 10

MAINTENANCE

TEST SHEETS






STATION

Exercise 10

OBJECT/EQUIPMENT
BUSBAR- & STATION PROTECTION
SYSTEM REB500SYS

MAINTENANCE DATE


MAINTENANCE ENGINEER


COMPANY















Outstandings refer to page(s)


Total number of pages 10
(incl. this page)



TEST REPORT Page: 2
STATION: BADEN 400KV

Busbar protection type REB500Sys


Date: Signature:

Client
Date: Signature:

General datas

Nominal voltage of the protected station ............... kV

Type of installation (double busbar, 1 system...) ...................................................................................
Air insulated (AIS) not applicable
Gas insulated (GIS) not applicable

Software version V.7.xx: Exercise10.MDB

...................................................................................
...................................................................................

Used drawings not applicable
(designation, No. and modification index) ...................................................................................
...................................................................................
...................................................................................
...................................................................................

Check of power supply

Type of battery grounding not applicable
(Negative grounded, floating, not applicable
symmetrically grounded at high impedance, )

Measured voltages: not applicable

First battery: Second battery: not applicable
Plus to minus ............... V Plus to minus ............... V
Plus to ground ............... V Plus to ground ............... V
Ground to minus ............... V Ground to minus ............... V



Check of auxiliary contacts


Isolator fully OPEN Isolator fully "CLOSED"
Auxiliary contact must be closed
Auxiliary contact ideally closed
Auxiliary contact must be open
Closedauxiliary
contact (N/O)
Isolation gap
Openauxiliary
contact (N/C)


Condition of isolator switching sequence fulfilled:
Yes No not applicable


Remarks:
....................................................................................
....................................................................................
....................................................................................
....................................................................................
....................................................................................
....................................................................................
....................................................................................

TEST REPORT Page: 3
STATION: BADEN 400KV

Busbar protection type REB500Sys


Date: Signature:

Client
Date: Signature:
Binary input/output module 500BIO01

Central unit Slot no.

Binary inputs Function/Remarks Checked


OC01
OC02
OC03
OC04
OC05
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
OC06
OC07
OC08
OC09
OC10
OC11
OC12

OC01 External Reset

OC02 Accept bus image alarm

OC03 Block Output Relays

OC04 Block BBP

OC05 Block BFP

OC06 not used

OC07 not used

OC08 not used

OC09 not used

OC10 not used

OC11 not used

OC12 not used


Tripping and signalling contacts

CR01
1
2
3
4
5
7
6
CR05
8
9
10
CR06
11
12
13
CR07
14
15
16
17
18
CR02
CR03
CR08
CR09
CR04


CR01 Differential current alarm

CR02 Isolator alarm

CR03 Switching inhibited

CR04 Blocked (functions and / outputs)

CR05 General alarm (sum of all possible remaining alarms)

CR06 In service

CR07 not used

CR08 BFP trip

CR09 BBP trip



TEST REPORT Page: 4
STATION: BADEN 400KV

Busbar protection type REB500Sys


Date: Signature:

Client
Date: Signature:
Bay unit 500BU03

Feeder OHL 10

Binary inputs Function/Remarks Checked


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
OC01
OC02
OC03
OC04
OC05
OC06
OC07
OC08
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
OC10
OC11
OC12
OC13
OC14
OC15
OC16
A
B
16
17
18
OC09
OC17
OC18
OC19
OC20
16
17
18



OC01 Q1 OPEN

OC02 Q1 CLOSED



OC03 Q2 OPEN

OC04 Q2 CLOSED



OC05 not used

OC06 not used



OC07 not used

OC08 not used



OC09 not used

OC10 START BFP PHASE R

OC11 START BFP PHASE S

OC12 START BFP PHASE T


OC13 not used

OC14 not used

OC15 not used


OC16 not used

OC17 not used

OC18 RESET


OC19 START BFP PHASE RST (1)

OC20 START BFP PHASE RST (2)


TEST REPORT Page: 5
STATION: BADEN 400KV

Busbar protection type REB500Sys


Date: Signature:

Client
Date: Signature:
Bay unit 500BU03

Feeder OHL 10


Tripping and signalling contacts

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
CR01
CR02
CR03
CR04
CR05
CR06
CR07
CR08
CR09
CR10
CR11
CR12
CR13
CR14
CR15
CR16
C
D




CR01 not used




CR02 not used




CR03 not used


CR04 BFP REMOTE TRIP (1)

CR05 BFP REMOTE TRIP (2)


CR06 BBP / BFP TRIP CB PHASE R

CR07 BBP / BFP TRIP CB PHASE S



CR08 not used

CR09 not used

CR10 not used


CR11 BBP / BFP TRIP SIGNAL PHASE R

CR12 BBP / BFP TRIP SIGNAL PHASE S

CR13 BBP / BFP TRIP SIGNAL PHASE T


CR14 not used

CR15 not used

CR16 BBP / BFP TRIP CB PHASE T






TEST REPORT Page: 6
STATION: BADEN 400KV

Busbar protection type REB500Sys


Date: Signature:

Client
Date: Signature:
Bay unit 500BU03

Feeder TRAFO 2

Binary inputs Function/Remarks Checked


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
OC01
OC02
OC03
OC04
OC05
OC06
OC07
OC08
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
OC10
OC11
OC12
OC13
OC14
OC15
OC16
A
B
16
17
18
OC09
OC17
OC18
OC19
OC20
16
17
18



OC01 Q1 OPEN

OC02 Q1 CLOSED



OC03 Q2 OPEN

OC04 Q2 CLOSED



OC05 not used

OC06 not used



OC07 not used

OC08 not used



OC09 not used

OC10 START BFP PHASE R

OC11 START BFP PHASE S

OC12 START BFP PHASE T


OC13 not used

OC14 not used

OC15 not used


OC16 not used

OC17 not used

OC18 RESET


OC19 START BFP PHASE RST (1)

OC20 START BFP PHASE RST (2)


TEST REPORT Page: 7
STATION: BADEN 400KV

Busbar protection type REB500Sys


Date: Signature:

Client
Date: Signature:
Bay unit 500BU03

Feeder TRAFO 2


Tripping and signalling contacts

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
CR01
CR02
CR03
CR04
CR05
CR06
CR07
CR08
CR09
CR10
CR11
CR12
CR13
CR14
CR15
CR16
C
D




CR01 not used




CR02 not used




CR03 not used


CR04 not used

CR05 not used


CR06 BBP / BFP TRIP CB PHASE R

CR07 BBP / BFP TRIP CB PHASE S



CR08 not used

CR09 not used

CR10 not used


CR11 BBP / BFP TRIP SIGNAL PHASE R

CR12 BBP / BFP TRIP SIGNAL PHASE S

CR13 BBP / BFP TRIP SIGNAL PHASE T


CR14 not used

CR15 not used

CR16 BBP / BFP TRIP CB PHASE T





Secondary injection: check of the input current transformers


TEST REPORT Page: 8
STATION: BADEN 400KV

Busbar protection type REB500Sys


Date: Signature:

Client
Date: Signature:
Bay unit 500BU03

Feeder COUPLER

Binary inputs Function/Remarks Checked


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
OC01
OC02
OC03
OC04
OC05
OC06
OC07
OC08
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
OC10
OC11
OC12
OC13
OC14
OC15
OC16
A
B
16
17
18
OC09
OC17
OC18
OC19
OC20
16
17
18



OC01 QB1 OPEN

OC02 QB1 CLOSED



OC03 QB2 OPEN

OC04 QB2 CLOSED



OC05 not used

OC06 not used



OC07 QA1 OPEN

OC08 QA1 CLOSED



OC09 QA1 CLOSING COMMAND

OC10 QB10 OPEN

OC11 QB10 CLOSED

OC12 QB20 OPEN


OC13 QB20 CLOSED

OC14 QB11 OPEN

OC15 QB11 CLOSED


OC16 QB21 OPEN

OC17 QB21 CLOSED

OC18 RESET


OC19 START BFP PHASE RST (1)

OC20 START BFP PHASE RST (2)


TEST REPORT Page: 9
STATION: BADEN 400KV

Busbar protection type REB500Sys


Date: Signature:

Client
Date: Signature:
Bay unit 500BU03

Feeder COUPLER


Tripping and signalling contacts

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
CR01
CR02
CR03
CR04
CR05
CR06
CR07
CR08
CR09
CR10
CR11
CR12
CR13
CR14
CR15
CR16
C
D




CR01 not used




CR02 not used




CR03 not used


CR04 not used

CR05 not used


CR06 not used

CR07 not used



CR08 not used

CR09 not used

CR10 not used


CR11 BBP / BFP TRIP SIGNAL PHASE R

CR12 BBP / BFP TRIP SIGNAL PHASE S

CR13 BBP / BFP TRIP SIGNAL PHASE T


CR14 not used

CR15 not used

CR16 BBP / BFP TRIP CB PHASE RST





Secondary injection: check of the input current transformers


TEST REPORT Page: 10
STATION: BADEN 400KV

Busbar protection type REB500Sys


Date: Signature:

Client
Date: Signature:


Measurement of pick-up values IKmin

Setting: Ikmin L1, L2, L3 ............... A Ikmin L0 - A


Each current transformer has to be measured
Feeder Current trans-
former ratio [A/A]
Injection
to bus
Nominal value [A] Measured value [A]
[ABB No.] I
L1
,I
L2
,I
L3
I
L0
I
L1
,I
L2
,I
L3
I
L0
I
L1
I
L2
I
L3
I
L0

_ _ _
_ _ _
_ _ _
_ _ _
_ _ _
_ _ _
_ _ _
_ _ _
_ _ _
_ _ _
_ _ _
_ _ _
_ _ _
_ _ _
_ _ _
_ _ _
_ _ _
_ _ _
_ _ _
_ _ _

Remarks:

Das könnte Ihnen auch gefallen