Sie sind auf Seite 1von 7

SAES-J -400,

Sec. 3.2
C1 Instrument checked against data sheet.
Schedule Q,
Att. IV, Sec.6.1.
C Calibration Inspection
B1
Typical installation details and state of art technology product from Exergen
is appended as attachments 1 to 4. The selected manufacturer is for
information purpose only and the actual vendor and product has to be
approved by CSD and proponent.
Schedule Q,
Att. IV, Sec.6.1.
Temperature -Infrared temperature monitoring Instruments-
(pyrometers)- ( Bench calibration / Testing, Field Check and
Certification
PROJ ECT TITLE
FAIL N/A
PLANT NO.
A Certification
RE-TEST
DATE
ITEM
No.
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS
SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO TEST REPORT
SATR NUMBER DATE APPROVED QR NUMBER
WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR
SATR-J-6405 1-Oct-05 INST
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
TRAVEL TIME
SAUDI ARAMCO USE ONLY
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
Schedule Q,
Att. IV, Sec.6.1.
A1
Specific tools and equipment shall be identified to make and perform tests
in the field with instructions for their use, calibration, and storage.
Schedule Q,
Att. IV, Sec.6.1.
A2
The CONTRACTOR shall identify, maintain, control, adjust, and calibrate all
tools, gauges, instruments and other measuring and testing devices used
for controlling quality.
A3
Calibration shall be performed at established periods as specified in
the most stringent of SAUDI ARAMCO standards, other applicable
standards, or manufacturer recommendations; if no standards apply,
the calibration cycle shall not exceed six months.
Schedule Q,
Att. IV, Sec.6.1.
A4
CONTRACTOR shall provide backup equipment when the primary
equipment is being calibrated or tested.
Schedule Q,
Att. IV, Sec.6.1.
B. Installation Inspection
A5
CONTRACTOR personnel performing test and calibrations shall be trained
per applicable international or manufacturer requirements.
Schedule Q,
Att. IV, Sec.6.2
A6
Contractor to produce test results / certification that the pyrometers were
standardized against other optical pyrometers that have been calibrated
by the National Bureau of Standards.
Tag number correct
Schedule Q,
Att. IV, Sec.6.1.
Instrument checked for damage
Schedule Q,
Att. IV, Sec.6.1.
C3
C2
C4 Pneumatic / Electric connections correct
Schedule Q,
Att. IV, Sec.6.1.
C5 Ancillary equipment Correct
Schedule Q,
Att. IV, Sec.6.1.
Page 1 of 7
Notes
a. Indicate in 1 report all instruments of a skid tested and passed
b. Rejected items should be listed in another report, unless they were corrected within the calibration period.
c. Instruments repaired shall be indicated "Repaired and Accepted" in the test report.
After successful completion of each calibration, the instrument shall be marked with a colored label bearing date of the calibration and the initials of
the witnessing party The color code shall be as follows:
Blue- Pre Calibration Tested.
Yellow - Installed & Pressure Tested.
Green- cables or tubing tested.
Red- Loop Check completed.
25%
75%
100%
25%
0%
RE-INSP DATE
% span Input
Measured
out put
Actual
output
Error
ITEM
No.
TEST RESULTS ACCEPTANCE CRITERIA PASS FAIL N/A
General Test Routines
Manufacturer's test routines to be followed and calibration's to be confirmed within tolerance limits
Test Procedures
Manufacture's special Test Procedures if any, to be confirmed and verified.
PASS FAIL N/A RE-TEST DATE
ITEM
No.
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE
SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO TEST REPORT
SATR NUMBER DATE APPROVED QR NUMBER
PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR
Temperature -Infrared temperature monitoring Instruments-
(pyrometers)- ( Bench calibration / Testing, Field Check and
Certification
SATR-J-6405 1-Oct-05 INST
D2
D3
E
E1
F1
F
50%
Calibration Record / Test Equipment
Test Equipment serial numbers :
D
D1
75%
H CONCLUSIONS
Insulation Resistance
Ambient:
Test Variables
Manufacture's Test Variables if any to be highlighted
G Tabulate the Pass / Fail Criteria
RESULTS G1
0%
Page 2 of 7
PASS FAIL N/A RE-TEST DATE
ITEM
No.
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE
SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO TEST REPORT
SATR NUMBER DATE APPROVED QR NUMBER
PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR
Temperature -Infrared temperature monitoring Instruments-
(pyrometers)- ( Bench calibration / Testing, Field Check and
Certification
SATR-J-6405 1-Oct-05 INST
Work / Rework May Proceed
Name, Initials and Date:
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
Work Verified
Saudi Aramco
with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the
f
PMT Representative
T&I Witnessed
Test Performed Successfully and Results are Acceptable:
Name, Initials and Date:
5. Remarks: -1. Table G to be modified based on usage.
2. Exergen models are used as example. The product has to be approved by CSD and proponent.
Contractor / Third-Party
QC Record Reviewed
1. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), J uly 1993
NOTES:
3. SAES-J -400, Temperature, 31 May, 2004
4. ISA-MC96.1-1982 Temperature Measurement Thermo couples
2. Schedule Q -- Quality Requirements (Pro Forma Contract), November 2003
ATTACHMENTS:
Attachment-1: Infrared Temperature Systems
Attachment-3: IRt/c Installation
6. SAMA RC 21-4-1966 Scientific Apparatus Makers Association, Temperature- Resistance Values for Resistance Thermometer elements for
Platinum, Nickel and Copper.
REFERENCE DOCUMENTS:
REMARKS:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products
5. ASME PTC 19.3 -1974, Part 3, Temperature Measurement- Instruments and Apparatus, Supplement to ASME Performance test codes
Attachment-2: Why Infrared Thermometry
Attachment-4: Exergen Product Specification
or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified
Work Verified T&I Witnessed QC Record Reviewed
QC Inspector PID Representative
indicates compliance with appropriate standards or performance in a specified manner.
Technician Performing Test*
Name, Title, Department,
Company, Initials and
Date:
Work Verified
Name, Sign and Date:
Quality Record Approved:
Name, Organization,
Initials and Date:
T&I Witnessed
QC Supervisor Proponent and Others
Name, Initials and Date:
Witnessed Test
Y =YES N =NO F =FAILED *Person Responsible for Implementation of Test and Analysis of Results
QC Record Reviewed
Page 3 of 7
Temperature -Infrared temperature monitoring Instruments-
(pyrometers)- ( Bench calibration / Testing, Field Check and
Certification
INST
SAUDI ARAMCO ID/PID - 4/14/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO TEST REPORT
SATR NUMBER DATE APPROVED QR NUMBER
SATR-J-6405 1-Oct-05
Attachment-1: Infrared Temperature Systems
Page 4 of 7
SATR-J-6405 1-Oct-05
Attachment-2: Why Infrared Termometry
Temperature -Infrared temperature monitoring Instruments-
(pyrometers)- ( Bench calibration / Testing, Field Check and
Certification
INST
SAUDI ARAMCO ID/PID - 4/14/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO TEST REPORT
SATR NUMBER DATE APPROVED QR NUMBER
Page 5 of 7
SAUDI ARAMCO ID/PID - 4/14/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO TEST REPORT
SATR NUMBER DATE APPROVED QR NUMBER
SATR-J-6405 1-Oct-05
Attachment-3: IRt/c Installation
Temperature -Infrared temperature monitoring Instruments-
(pyrometers)- ( Bench calibration / Testing, Field Check and
Certification
INST
Page 6 of 7
Temperature -Infrared temperature monitoring Instruments-
(pyrometers)- ( Bench calibration / Testing, Field Check and
Certification
INST
SAUDI ARAMCO ID/PID - 4/14/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO TEST REPORT
SATR NUMBER DATE APPROVED QR NUMBER
SATR-J-6405 1-Oct-05
Attachment-4: Exergen Product Specification