Sie sind auf Seite 1von 2

BIM 360 Glue

Path Acquire BIM 360 Glue


Target
AE firms, general contractors, large subcontractors utilizing 3D workflow processes
CEO, COO, CIO, VDC/BIM Managers
Business
Issues
More complex projects and distributed teams means more time coordinating models and more
impact to the project timeline
Teams are becoming more model-centric in design, pre-con and construction activities this is
creating potential bottlenecks as more parties need access to the model in the office and the field
Project team members are more comfortable with models and clash detection they want to be
able to manage models and clashes on their own without waiting for a central model manager

Anxiety
Questions
How do you currently manage model-based collaboration and clash detection? What challenges do
you face in that process?
Do you lose a lot of time managing the multi-discipline collaboration process across the extended
project team?
Do you experience a lot of rework on your projects?
Is your review cycle weeks instead of hours?
Where do you feel like you lose the most time?

Are you finding What if you were able to
Topic 1: Lost time in multidiscipline collaboration
that your BIM/VDC managers spend more time on
file management than addressing critical issues?
the extended design team doesnt have access to
the latest models?



Topic 2: Rework in the field
because the entire team isnt working on clash
detection?
you dont have time to coordinate all the models
before you build?
Reduce the collaboration cycle
free up your BIM/VDC managers to focus on critical
tasks of sequencing, quantification, and complex
coordination
give the entire extended project team access to the
latest models
go from weeks to days in the collaboration cycle

Reduce the amount of project rework
provide the project team the ability to run their own
clashes with the latest models
give all jobsite participants the ability to bring the
model to the jobsite


Business Value
What is the impact of
Personal Value
What is the impact of
Increasing efficiency across the entire extended team
Reducing coordination review cycles

Shortened model collaboration cycles and clash
turnaround on project schedule
Better access to a central coordinated model file for
all project participants
Viewed as a leading, progressive firm, delivering high
quality projects which meet/exceed project

BIM 360 Glue


Autodesk, Navisworks, and BIM 360 are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries.
All other brand names, product names, or trademarks belong to their respective holders. Autodesk reserves the right to alter product offerings and specifications at any
time without notice, and is not responsible for typographical or graphical errors that may appear in this document.

2013 Autodesk, Inc. All rights reserved.

requirements.
Viewed as having the ability to win projects in a
competitive environment with the most effective use of
technology in the pre-construction and construction
phases.

Das könnte Ihnen auch gefallen